CN103277112B - Tunnel Engineering train formula fast lifting folding work platform - Google Patents

Tunnel Engineering train formula fast lifting folding work platform Download PDF

Info

Publication number
CN103277112B
CN103277112B CN201310249387.XA CN201310249387A CN103277112B CN 103277112 B CN103277112 B CN 103277112B CN 201310249387 A CN201310249387 A CN 201310249387A CN 103277112 B CN103277112 B CN 103277112B
Authority
CN
China
Prior art keywords
platform
folding
column
primary truss
lifting gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310249387.XA
Other languages
Chinese (zh)
Other versions
CN103277112A (en
Inventor
于长彬
陈国胜
张文卷
马志刚
桑明玉
孙兆会
韦有波
石迎新
郝俊锁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201310249387.XA priority Critical patent/CN103277112B/en
Publication of CN103277112A publication Critical patent/CN103277112A/en
Application granted granted Critical
Publication of CN103277112B publication Critical patent/CN103277112B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to railway tunnel Disease Treatment construction workplatform, specifically a kind of Tunnel Engineering train formula fast lifting folding work platform. Comprise track flat-bed trailer, platform primary truss, lifting gantry and folding platform, described platform primary truss is fixed on track flat-bed trailer base plate, described lifting gantry column telescoping is sleeved on described platform primary truss column, and described folding platform support is hinged on described platform primary truss column. The present invention uses often to save track flat-bed trailer as cellular installation, big area construction can be launched in train length range, effectively " skylight " time can be made full use of, accelerating construction progress, engineering train is promoted comprehensively and exits simultaneously, can guarantee to disappear in time a little, guarantee existing alignment car safe operation on schedule, can significantly reduce the repetition activity duration, save through engineering cost, ensure construction safety.

Description

Tunnel Engineering train formula fast lifting folding work platform
Technical field
The present invention relates to railway tunnel Disease Treatment construction workplatform, specifically a kind of Tunnel Engineering train formula fast lifting folding work platform.
Background technology
Can there is disease in various degree in service time longer railway tunnel, especially for railway electrifing reforming engineering, need electric power contact system linked network in tunnel, then first the tunnel of disease must be carried out the comprehensive regulation. at present, tunnel regulation is general adopts the simple and easy workplatform of dismounting formula, the general structure of platform is: the framework making a 2m �� 2m, arrange 4 little wheels below framework to contact with rail top face, can at rail top face sliding, scaffolding steel pipe is utilized to set up the square workplatform of 1.8m �� 1.8m above framework, podium level needs to set up according to operation height, usually two job platforms are linked into one group of use, this kind of method generally starts in Window time after track traffic is blocked assembled, move to again after neighbouring operation point is reinforced again and start operation, and need before predetermined track traffic is open, remove from track and remove all facilities. weak point one is that simple rack weight is light, center of gravity height, not too safe, two is that each track traffic blocking time section interior dismounting activity duration is long, and effective engineering time is short, and especially for transporting main line frequently, traffic is precious especially for off-period, three is cost height, and it is that one repeats work that simple and easy workplatform all to be carried out dismounting by every subjob, and traffic can not get sufficient utilization off-period, causes personnel's work holdup.
Summary of the invention
Need the long-time problem interrupting railway operation when the present invention is directed to current tunnel Disease Treatment, and a kind of Tunnel Engineering train formula fast lifting folding work platform in place fast is provided.
The present invention solves the technical scheme of described problem employing:
A kind of Tunnel Engineering train formula fast lifting folding work platform, comprise track flat-bed trailer, platform primary truss, lifting gantry and folding platform, described platform primary truss is fixed on track flat-bed trailer base plate, described lifting gantry column telescoping is sleeved on described platform primary truss column, and described folding platform support is hinged on described platform primary truss column.
Further, described platform primary truss column and described lifting gantry column are sleeve type structure, both are locked by corresponding pin-and-hole bearing pin, having on platform primary truss column erects to chute, upper end is hung with chain block by weldering ear connecting plate, lifting gantry column lower end be welded with for hanging point under described chain block and can described erect in chute slip draw plate.
Further, described folding platform is positioned at described platform primary truss both sides, every side has upper and lower two layers, the inner of folding platform support is hinged by rotating pin and platform primary truss column, the pin-and-hole keying on wireline and lifting gantry column is drawn to fix by leading when the outer end of upper strata folding platform support is opened, by movable latch and the draw ring temporary locking being welded on platform primary truss column time folding; The draw ring drawknot on wireline and platform primary truss column is drawn to fix by leading when the outer end of lower floor's folding platform support is opened, by movable latch and the draw ring temporary locking being welded on platform primary truss column time folding.
Further, described lifting gantry and described folding platform surrounding are respectively arranged with safe guardrail.
Further, on the truss sheet of described platform primary truss and on the athwartship plane of described lifting gantry, cat ladder is housed respectively.
Compared with prior art, often to save, track flat-bed trailer uses as cellular installation in the present invention, during engineering train operation, lifting part can be down to lowest part by job platform, and both sides foldable portion packs up locking simultaneously, it is ensured that do not exceed vehicle gauge of the locomotive; Workplatform foldable portion is opened and is fixed after driveing to tunnel operation point by engineering train, promotes workplatform to correct position according to single position, two-wire tunneling operation face simultaneously; Engineering train can move to job location fast, and in train length range, big area launches construction, blocks before point terminates and returns bus stop in time. Therefore, the present invention can make full use of effectively " skylight " time, accelerating construction progress, engineering train is promoted comprehensively and exits simultaneously, can guarantee to disappear in time a little, it is ensured that existing alignment car safe operation on schedule, can significantly reduce the repetition activity duration, save through engineering cost, ensure construction safety.
Accompanying drawing explanation
Fig. 1 is the Facad structure schematic diagram of the present invention when being in operation state.
Fig. 2 is the side structure schematic diagram of the present invention when being in operation state.
Fig. 3 is the Facad structure schematic diagram of the present invention when being in non-operation state.
In figure: lifting gantry 1, lifting gantry column 2, leads and draws wireline 3, folding platform 4, upper strata folding platform support 5, chain block 6, draw ring 7, platform primary truss column 8, rotating pin 9, active pin shaft 10, lower floor's folding platform support 11, erect to chute 12, track flat-bed trailer base plate 13, cat ladder 14, top end rail 15, safe guardrail 16, ear plate 17, draw plate 18, pin-and-hole 19, ridge directional brace 20.
Embodiment
Below in conjunction with embodiment, the invention will be further described, and object is only to understand content of the present invention better.
Tunnel Engineering train formula fast lifting folding work platform described in the present embodiment, taking track flat-bed trailer base plate 13 as mounting seat, often saving track flat-bed trailer is an independent operation unit, it is possible to arbitrary combination forms multiple operation unit.
FIGS, platform primary truss is made up of forward and backward truss sheet and the ridge directional brace 20 that connects forward and backward truss sheet, platform primary truss is connect as bottom girder and track flat-bed trailer base plate 13 bolt by channel-section steel, platform primary truss column 8 and top end rail 15 adopt steel pipe manufacturing, having on platform primary truss column 8 and erect to chute 12, platform primary truss column 8 upper end is hung with chain block 6 by weldering ear connecting plate 17. Being sleeved in the platform primary truss column 8 of steel pipe manufacturing by the lifting gantry column 2 of steel pipe manufacturing equally, plate 14 is drawn in the welding of lifting gantry column 2 times ends, for the lower hanging point of chain block 6, draws plate 14 can to slide up and down in chute 12 erecting. Position corresponding on platform primary truss column 8 and lifting gantry column 2, it is drilled with pin-and-hole 19 by same intervals distance, when lifting gantry 1 needs to rise, tighten up chain block 6, lifting gantry column 2 upwards moves under the drawing high drawing plate 14, during to the height needed, insert, with bearing pin, the position that pin-and-hole 19 can fix lifting gantry 1.
Platform primary truss both sides arrange upper and lower two layers of folding platform 4 respectively, the inner of upper strata folding platform support 5 and lower floor's folding platform support 11 is hinged by rotating pin 9 and platform primary truss column 8, draw wireline 3 to fix with pin-and-hole 18 keying on lifting gantry column 2 by leading when the outer end of upper strata folding platform support 5 is opened, led with being welded on by movable latch 10 time folding and draw wireline 3 draw ring 7 temporary locking; Wireline 3 is drawn to fix with draw ring 7 drawknot on platform primary truss column 8 by leading when the outer end of lower floor's folding platform support 11 is opened, by movable latch 10 and draw ring 7 temporary locking being welded on platform primary truss column 8 time folding. When folding platform 4 is opened by needs, pull open movable latch 10, manually folding platform 4 is opened, wireline 3 and draw ring 7 drawknot on platform primary truss column 8 are drawn by leading in lower floor's folding platform support 11 outer end, the outer end of upper strata folding platform support 5 by lead draw wireline 3 keying on lifting gantry column 2 pin-and-hole 19.
Lifting gantry 1 and folding platform 4 completely spread formation job platform by plank, platform surrounding establishes the safe guardrail 16 being highly not less than 1.05m, during engineering train operation, lifting gantry 1 is down to lowest part, both sides folding platform 4 packs up locking simultaneously, can guarantee not exceed vehicle gauge of the locomotive.

Claims (3)

1. a Tunnel Engineering train formula fast lifting folding work platform, comprise track flat-bed trailer, platform primary truss, platform primary truss column, lifting gantry, lifting gantry column, folding platform and folding platform support, described platform primary truss is fixed on track flat-bed trailer base plate, described lifting gantry column telescoping is sleeved on described platform primary truss column, and described folding platform support is hinged on described platform primary truss column; It is characterized in that:
Described platform primary truss column and described lifting gantry column are sleeve type structure, both are locked by corresponding pin-and-hole bearing pin, having on platform primary truss column erects to chute, upper end is hung with chain block by weldering ear connecting plate, lifting gantry column lower end be welded with for hanging point under described chain block and can described erect in chute slip draw plate;
Described folding platform is positioned at described platform primary truss both sides, every side has upper and lower two layers, the inner of folding platform support is hinged by rotating pin and platform primary truss column, the pin-and-hole keying on wireline and lifting gantry column is drawn to fix by leading when the outer end of upper strata folding platform support is opened, by movable latch and the draw ring temporary locking being welded on platform primary truss column time folding; The draw ring drawknot on wireline and platform primary truss column is drawn to fix by leading when the outer end of lower floor's folding platform support is opened, by movable latch and the draw ring temporary locking being welded on platform primary truss column time folding.
2. Tunnel Engineering train formula fast lifting folding work platform according to claim 1, it is characterised in that, described lifting gantry and described folding platform surrounding are respectively arranged with safe guardrail.
3. Tunnel Engineering train formula fast lifting folding work platform according to claim 1, it is characterised in that, on the truss sheet of described platform primary truss and on the athwartship plane of described lifting gantry, cat ladder is housed respectively.
CN201310249387.XA 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform Active CN103277112B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310249387.XA CN103277112B (en) 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310249387.XA CN103277112B (en) 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform

Publications (2)

Publication Number Publication Date
CN103277112A CN103277112A (en) 2013-09-04
CN103277112B true CN103277112B (en) 2016-06-01

Family

ID=49059716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310249387.XA Active CN103277112B (en) 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform

Country Status (1)

Country Link
CN (1) CN103277112B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106698144B (en) * 2016-12-27 2019-05-07 廖忠民 The elevator of lifting device maintenance platform and safety electromagnetic brake apparatus is installed

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201991538U (en) * 2011-02-24 2011-09-28 重庆工程职业技术学院 Mining hydraulic liftable worktable
CN202039857U (en) * 2011-03-16 2011-11-16 中铁隧道集团四处有限公司 Lifting type tunnel excavation support operation rack
CN202039858U (en) * 2011-04-11 2011-11-16 中铁隧道集团四处有限公司 Automatically-folded multifunctional tunnel construction scaffolding
CN202707071U (en) * 2012-07-03 2013-01-30 葛洲坝集团基础工程有限公司 Unfolded type tunnel construction lining trolley
CN202851007U (en) * 2012-10-19 2013-04-03 金诚信矿业管理股份有限公司 Movable type work platform used for laneway drilling and supporting
CN203321529U (en) * 2013-06-22 2013-12-04 中铁十八局集团第二工程有限公司 Train type rapid lifting and folding work platform for tunnel engineering

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202071836U (en) * 2011-06-04 2011-12-14 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 Flat vehicle for railroad-bridge tunnel-lifting operation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201991538U (en) * 2011-02-24 2011-09-28 重庆工程职业技术学院 Mining hydraulic liftable worktable
CN202039857U (en) * 2011-03-16 2011-11-16 中铁隧道集团四处有限公司 Lifting type tunnel excavation support operation rack
CN202039858U (en) * 2011-04-11 2011-11-16 中铁隧道集团四处有限公司 Automatically-folded multifunctional tunnel construction scaffolding
CN202707071U (en) * 2012-07-03 2013-01-30 葛洲坝集团基础工程有限公司 Unfolded type tunnel construction lining trolley
CN202851007U (en) * 2012-10-19 2013-04-03 金诚信矿业管理股份有限公司 Movable type work platform used for laneway drilling and supporting
CN203321529U (en) * 2013-06-22 2013-12-04 中铁十八局集团第二工程有限公司 Train type rapid lifting and folding work platform for tunnel engineering

Also Published As

Publication number Publication date
CN103277112A (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN104912004A (en) Hold rail-type track transportation bridge evacuation maintenance platform
CN210561776U (en) Bridge anticollision barrier joins externally platform
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
CN103277112B (en) Tunnel Engineering train formula fast lifting folding work platform
CN103866985A (en) Butt joint method and device for construction elevator and creeping formwork frame body
CN104986171A (en) Through operation platform for railway engineering truck
CN203639826U (en) Steel truss girder bridge inspection vehicle
CN204728225U (en) A kind of rail rail traffic bridge of embracing evacuates inspection platform
CN210216166U (en) T roof beam pours safety protection platform
CN202865707U (en) Equipment for erecting and constructing beam and vertical beam on existing line
CN207646617U (en) A kind of integration bridge machine
CN102146798B (en) Arch ring lining trolley for additionally building open cut tunnel on electrified railway business line and construction method of arch ring lining trolley
ES2624211B1 (en) System to expand a cable-stayed bridge structure, extended cable-stayed bridge structure and its construction process
CN205445620U (en) A can pass formula pedestrian platform for auxiliary shaft well head
CN204920768U (en) Convertible car ladder that goes up of on -vehicle workover rig
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN204825527U (en) Construction structures is moved to whole indulging of this line D roof beam
CN203923917U (en) Job platform at the bottom of a kind of packaged type bridge
CN211421800U (en) Lower operating platform for hanging basket
CN214879986U (en) Construction platform for deep shaft lining and track installation
CN212505658U (en) Air rail train track convenient to maintenance
CN111364366B (en) Hinged protective shed frame for construction of viaduct spanning railway and erection method
CN203594455U (en) Removable adjustment type work platform for tunnel portal chiseling removing
CN211548686U (en) Mobile trolley for subway tunnel
CN217498614U (en) Railway tunnel lifting operation vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Yu Changbin

Inventor after: Chen Guosheng

Inventor after: Zhang Wenjuan

Inventor after: Ma Zhigang

Inventor after: Sang Mingyu

Inventor after: Sun Zhaohui

Inventor after: Wei Youbo

Inventor after: Shi Yingxin

Inventor after: Hao Junsuo

Inventor before: Yu Changbin

Inventor before: Chen Guosheng

Inventor before: Zhang Wenjuan

Inventor before: Ma Zhigang

Inventor before: Sang Mingyu

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160426

Address after: 064000, 14 District, Fengrun District, Hebei, Tangshan City (Guanghua Road, No. 8)

Applicant after: the 2nd Engineering Co., Ltd. of China Railway 18th Bureau Group Co., Ltd.

Applicant after: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

Address before: 064000, 14 District, Fengrun District, Hebei, Tangshan City (Guanghua Road, No. 8)

Applicant before: the 2nd Engineering Co., Ltd. of China Railway 18th Bureau Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant