CN202707071U - Unfolded type tunnel construction lining trolley - Google Patents

Unfolded type tunnel construction lining trolley Download PDF

Info

Publication number
CN202707071U
CN202707071U CN 201220318139 CN201220318139U CN202707071U CN 202707071 U CN202707071 U CN 202707071U CN 201220318139 CN201220318139 CN 201220318139 CN 201220318139 U CN201220318139 U CN 201220318139U CN 202707071 U CN202707071 U CN 202707071U
Authority
CN
China
Prior art keywords
lining trolley
tunnel construction
construction
bogie frame
unfolded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220318139
Other languages
Chinese (zh)
Inventor
童耀
陈寓新
王昇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Original Assignee
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd filed Critical GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority to CN 201220318139 priority Critical patent/CN202707071U/en
Application granted granted Critical
Publication of CN202707071U publication Critical patent/CN202707071U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

An unfolded type tunnel construction lining trolley comprises a lining trolley frame, wherein a U-steel base is welded to the bottom of the lining trolley frame in a fixed mode, and operating platforms are arranged on the lining trolley frame in a four-layer mode. A rebar mesh piece is distributed on each operating platform. Ladder stands, a guardrail, a wind pipeline and a water pipeline are distributed on the outer side of each operating platform. The lining trolley frame is made by adopting of H-shaped steel and is composed of parts such as longitudinal beams, crossbeams, bottom holding beams, inclined supports and support cross bars. The constituent parts are connected in a welding mode. The unfolded type tunnel construction lining trolley has the advantages of being simple in structure, light in weight, low in manufacturing price, convenient to install, move and dismantle, and suitable for the characteristic of a tunnel construction that mechanical equipment moves frequently. The working methods that 'the lining trolley is unfolded when a construction is processed', 'the lining trolley is folded back before being moved' and 'a loading machine is lifted and moved to a place' are adopted, the operating platforms can be folded and unfolded freely, operation that the construction lining trolley is moved to a place is easy, safe, fast and convenient, moving time of the lining trolley is shortened, construction cost is reduced, and construction schedule is accelerated. The unfolded type tunnel construction lining trolley is applicable to excavating, retaining and protecting constructions of tunnel projects such as a road, a railway and a water conservancy project.

Description

A kind of expansion tunnel construction trolley
Technical field
The utility model relates to the tunnel excavation construction equipment, particularly a kind of expansion tunnel construction trolley.
Background technology
In tunnel construction, because the construction chassis moves frequently, be subjected to construction environment and spatial constraints, usually the construction chassis moves comparatively difficulty in place, take the long period, and vehicle body is easily impaired, has certain construction safety risk, particularly in the location of features as poor geologic condition, convenient and practical, safe and reliable construction chassis is the necessary condition that tunnelling works carries out smoothly.
Summary of the invention
The utility model is to move easily impaired problem of difficulty in place, vehicle body in order to solve tunnel construction trolley, and a kind of expansion tunnel construction trolley is provided.
The purpose of this utility model is achieved in that
A kind of expansion tunnel construction trolley, it comprises bogie frame, and the bogie frame bottom welding is fixed with the channel-section steel base, and minute four layers of setting operation platform are laid with reinforced mesh on the bogie frame on the operating platform, and the outside is laid with cat ladder, guardrail and wind, water pipeline.
Above-mentioned bogie frame adopts i iron to make, and is comprised of longeron, crossbeam, backing beam, diagonal brace, supporting bar, and each ingredient connected mode is welding.
Above-mentioned backing beam adopts to tie up about two i iron to weld and is formed by connecting, and is welded in the bottom surface of bogie frame.
Above-mentioned supporting bar divides three layers of setting, by the D100 steel pipe that is welded in crossbeam i iron inboard, and the D80 steel pipe of interior insertion formation, supporting bar is scalable, lay reinforced mesh on it and form operating platform, operating platform outwards launches by regulating supporting bar length.
Above-mentioned base adopts channel-section steel to make, and two ends are arcuate structure, and is upwards crooked.
The utility model has been obtained following technique effect:
The expansion tunnel construction trolley that the utility model provides, simple structure, weight is lighter, and cost is lower, installs, moves and convenient disassembly, is fit to frequently characteristics of tunnel construction machinery equipment moving; By the telescopic adjustment of supporting bar, each layer operation berm width of chassis arranged on left and right sides is realized adjustable, and constructability is guaranteed safety; After by the supporting bar that shrinks arranged on left and right sides the operating platform that launches being shunk, adopt loader to lift in the backing beam of bogie frame bottom, make chassis realize safety, mobile in place fast; Construction is laid along the chassis outside with wind, water pipeline and is fixed to each layer operation platform, wind, water pipeline installation, dismounting and easy to use; The outside of each layer operation platform adopts reinforced mesh to be layed on the supporting bar, and deployable to the country rock face, but up and down scope of operation personnel cross-operation in the time of the Effective Raise construction safety, has also reduced construction cost, has accelerated construction speed.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the front view of the utility model structure.
Fig. 2 is the lateral view of Fig. 1.
The specific embodiment
A kind of tunnel excavation support expansion construction chassis as Figure 1-3, it comprises bogie frame 1, the bogie frame bottom welding is fixed with channel-section steel base 7, minute four layers of setting operation platform 8 on the bogie frame, be laid with reinforced mesh 9 on the operating platform, the outside is laid with cat ladder 10, guardrail 11 and wind, water pipeline 12.
Described bogie frame adopts i iron to make, and partly is comprised of longeron 2, crossbeam 3, backing beam 4, diagonal brace 5, supporting bar 6 etc., and each ingredient connected mode is welding.Described backing beam adopts to tie up about two i iron to weld and is formed by connecting, and is welded in the bottom surface of bogie frame.Described supporting bar divides three layers of setting, by the D100 steel pipe that is welded in crossbeam i iron inboard, and the D80 steel pipe of interior insertion formation, supporting bar is scalable, lay reinforced mesh on it and form operating platform, operating platform outwards launches by regulating supporting bar length.Described base adopts channel-section steel to make, and two ends are arcuate structure, and is upwards crooked.
Implementation step of the present utility model is as follows:
1, adopts three groups of steel structures of i iron welding production ∏ type support, two groups of backing beams, at inboard minute three layers of welding D100 steel pipe of the crossbeam at every group of steel structure ∏ type support two ends, and by longeron, backing beam, diagonal brace and channel-section steel base, it is in aggregates to adopt welding manner that three groups of steel structure ∏ type supports are connected, and forms bogie frame;
2, in the D100 steel pipe, insert the D80 steel pipe, form telescopic supporting bar;
3, lay fixedly reinforced mesh at the supporting bar of bogie frame and both sides, form operating platform;
4, be welded and fixed cat ladder, guardrail and wind, water pipeline in the bogie frame outside;
5, adopt loader to lift on the backing beam of bogie frame bottom, in place by will the construct movement of chassis of loader;
6, transfer the supporting bar of long both sides after, lay fixedly reinforced mesh, each layer operation platform is expanded to the country rock face, connect wind, water pipeline can drop into tunnel excavation and construct;
7, after construction is finished, remove the reinforced mesh on the two-side supporting cross bar, shrink supporting bar, and remove wind, water pipeline can move the construction chassis by loader.

Claims (5)

1. expansion tunnel construction trolley, it is characterized in that: it comprises bogie frame (1), the bogie frame bottom welding is fixed with channel-section steel base (7), minute four layers of setting operation platform (8) on the bogie frame, be laid with reinforced mesh (9) on the operating platform, the outside is laid with cat ladder (10), guardrail (11) and wind, water pipeline (12).
2. expansion tunnel construction trolley according to claim 1, it is characterized in that: described bogie frame (1) adopts i iron to make, be comprised of longeron (2), crossbeam (3), backing beam (4), diagonal brace (5) and supporting bar (6), each ingredient connected mode is welding.
3. expansion tunnel construction trolley according to claim 1 and 2 is characterized in that: tie up weldering about two i iron of described backing beam (4) employing and be formed by connecting, be welded in the bottom surface of bogie frame.
4. expansion tunnel construction trolley according to claim 1 and 2, it is characterized in that: described supporting bar (6) minute three layers of setting, by the D100 steel pipe that is welded in crossbeam (3) i iron inboard, and the D80 steel pipe of interior insertion consists of, supporting bar is scalable, lay reinforced mesh (9) on it and form operating platform, operating platform outwards launches by regulating supporting bar length.
5. expansion tunnel construction trolley according to claim 1 is characterized in that: described base (7) adopts channel-section steel to make, and two ends are arcuate structure, and is upwards crooked.
CN 201220318139 2012-07-03 2012-07-03 Unfolded type tunnel construction lining trolley Expired - Lifetime CN202707071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220318139 CN202707071U (en) 2012-07-03 2012-07-03 Unfolded type tunnel construction lining trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220318139 CN202707071U (en) 2012-07-03 2012-07-03 Unfolded type tunnel construction lining trolley

Publications (1)

Publication Number Publication Date
CN202707071U true CN202707071U (en) 2013-01-30

Family

ID=47587380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220318139 Expired - Lifetime CN202707071U (en) 2012-07-03 2012-07-03 Unfolded type tunnel construction lining trolley

Country Status (1)

Country Link
CN (1) CN202707071U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277112A (en) * 2013-06-22 2013-09-04 中铁十八局集团第二工程有限公司 Tunnel engineering train type rapid lifting and folding working platform
CN104653194A (en) * 2015-02-28 2015-05-27 中铁十九局集团第七工程有限公司 Multi-platform railway tunnel operation trolley
CN106368714A (en) * 2015-07-24 2017-02-01 中国铁建大桥工程局集团有限公司 Tire type automatic lifting assembly rack for tunnel excavation construction
CN106812534A (en) * 2017-03-27 2017-06-09 中国华冶科工集团有限公司 Mine big cross section excavation builder's staging
CN107100648A (en) * 2017-06-23 2017-08-29 中铁第四勘察设计院集团有限公司 Tunnel plain concrete lining construction auxiliary equipment and method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277112A (en) * 2013-06-22 2013-09-04 中铁十八局集团第二工程有限公司 Tunnel engineering train type rapid lifting and folding working platform
CN103277112B (en) * 2013-06-22 2016-06-01 中铁十八局集团第二工程有限公司 Tunnel Engineering train formula fast lifting folding work platform
CN104653194A (en) * 2015-02-28 2015-05-27 中铁十九局集团第七工程有限公司 Multi-platform railway tunnel operation trolley
CN106368714A (en) * 2015-07-24 2017-02-01 中国铁建大桥工程局集团有限公司 Tire type automatic lifting assembly rack for tunnel excavation construction
CN106812534A (en) * 2017-03-27 2017-06-09 中国华冶科工集团有限公司 Mine big cross section excavation builder's staging
CN107100648A (en) * 2017-06-23 2017-08-29 中铁第四勘察设计院集团有限公司 Tunnel plain concrete lining construction auxiliary equipment and method
CN107100648B (en) * 2017-06-23 2024-03-12 中铁第四勘察设计院集团有限公司 Auxiliary facility and method for tunnel plain concrete lining construction

Similar Documents

Publication Publication Date Title
CN202707071U (en) Unfolded type tunnel construction lining trolley
CN203809019U (en) Tunnel wide waterproof plate mounting platform
CN103590337B (en) A kind of bridge girder erection machine system and transfer method thereof
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN103277110A (en) Construction method of overlapped shield tunnel
CN108677742B (en) Movable cantilever bridge girder erection machine for full-prefabricated bridge pier, bearing platform and girder body assembled construction
CN102337905B (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN202441387U (en) Multifunctional tunnel working rack
CN102364012A (en) Method for expanding existing large-span truss
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN104329096A (en) Shield station-crossing starting translation construction process
CN103552800B (en) Large-scale can-like equipment shift method
CN103132463B (en) Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN210714718U (en) Subway station rail top air duct and shield synchronous construction mobile trolley
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN101943004B (en) Hydraulic self-running inclined-hole ordinary-state concrete casting trolley
CN205875162U (en) Unilateral formula rock -anchored beam concrete placement rebar installation platform truck
CN103290851A (en) Prestressed steel support used for controlling internal and external differential displacement of foundation pit enclosure wall and construction method
CN103266567B (en) Steel truss cantilever supporting frame and its implementation
CN202247686U (en) Bridge erecting machine for construction method for ultra-small-radius frame beam
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
CN106837376B (en) Bind module turnover device for subway tunnel section of jurisdiction
CN110439004B (en) Movable inner supporting device for foundation pit support and application method thereof
CN112160773A (en) Tunnel lining reinforcing steel bar trolley and lining reinforcing steel bar binding construction method
CN109630146B (en) Shield assembly method and assembly chamber

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130130

CX01 Expiry of patent term