CN103273052A - Method and device for rapidly transferring hanging type casting bogie - Google Patents
Method and device for rapidly transferring hanging type casting bogie Download PDFInfo
- Publication number
- CN103273052A CN103273052A CN2012105579524A CN201210557952A CN103273052A CN 103273052 A CN103273052 A CN 103273052A CN 2012105579524 A CN2012105579524 A CN 2012105579524A CN 201210557952 A CN201210557952 A CN 201210557952A CN 103273052 A CN103273052 A CN 103273052A
- Authority
- CN
- China
- Prior art keywords
- track
- casting
- short rail
- arc
- straight line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a method and device for rapidly transferring a hanging type casting bogie. The method and device for rapidly transferring the hanging type casting bogie is characterized in that a track conversion device is arranged between an annular casting track (2) and an overhaul track (12), the track conversion track is provided with a linkage plate (5), a straight line short track (6) and an arc-shaped short track (7) are arranged on the linkage plate (5), the position of the straight line short track (6) and the position of the arc-shaped short track (7) can be converted through an air cylinder (8) on the track conversion device, and the straight line short track (6) and the arc-shaped short track (7) can be respectively connected with the casting track (2) through the air cylinder, so that the casting bogie can be transferred from the straight line short track (6) to the overhaul track (12), or the casting bogie can be connected with the casting track (2) through the arc-shaped short track (7) to conduct normal casting. According to the method and device for rapidly transferring the hanging type casting bogie, the casting bogie can be rapidly transferred between the casting track and the overhaul track, when the casting bogie is transferred, a linkage mechanism structure is utilized to conduct accurate guiding and locating, and therefore conversion efficiency can be greatly improved.
Description
Technical field
The present invention relates to method and device that a kind of suspension type casting bogie shifts fast, be based on anode assembling industry and the field of Aluminum Electrolysis Production.
Background technology
In Aluminum Electrolysis Production, above between main frequency furnace and anode casting and the pipeline, be provided with circular orbit, be hung with at circular orbit and can loading the suspension type casting bogie that ladle moves along circular orbit.Dolly transports ladle and delivers to the casting position of anode casting and supply line from main frequency furnace, exactly the anode block and the aluminum guide that are placed on anode casting and the pipeline is cast after cucurbit is promoted to certain position rollover with dolly by promoting then.The employed track support of this casting bogie is integral solder at present, adopt two casting bogie circulations to carry out casting operation in orbit, when a casting bogie breaks down or need interim Maintenance and Repair, just casting bogie need be shifted from track and overhaul.Yet because track support is integral solder, when needs shift a casting bogie from track, just must quit work the automated system of whole anode composing room, and the process need of whole transfer expends great amount of manpower and time, thereby having increased production cost, the work survival rate is not high yet.Therefore, the method for existing suspension type casting bogie transfer and device are also undesirable.
Summary of the invention
The objective of the invention is for overcoming the deficiencies in the prior art, a kind of method and device that can fast the suspension type casting bogie be shifted from circular orbit is provided, the casting bogie of needs maintenance can be shifted from circular orbit fast, be transferred to the casting bogie that has overhauled on the circular orbit fast, and it is simple and convenient, the conversion accurate positioning, the productivity ratio height.
For realizing purpose of the present invention, the present invention has adopted such technical scheme: the method that suspension type casting bogie of the present invention shifts fast, mainly be to be implemented in Electrolytic Workshop will need the dolly that overhauls to transfer to a dolly that the maintenance point maybe finishes maintenance from annular casting track to shift and go up annular casting track, the present invention is provided with a track conversion equipment between the casting track of annular and maintenance track, at this position circular orbit one breach is arranged, simultaneously, this track conversion equipment is provided with an interlock plate, and the interlock plate is provided with the short rail of one section straight line and one section short rail of arc; Cylinder on the track conversion equipment can be connected the short rail of straight line and the dislocation of arc weak point rail respectively with the casting track, makes dolly transfer to the maintenance track by the short rail of straight line, perhaps normally casts by the breach of the short rail connection of arc casting track.
Track conversion equipment of the present invention is provided in a side of between the casting track and rectilinear maintenance track of Electrolytic Workshop annular, and this device is provided with an interlock plate, is fixed with the short rail of one section straight line and one section short rail of arc on this interlock plate; Be provided with a breach at the position of this interlock plate top casting track, this interlock plate by a cylinder make the short rail of the short rail of straight line and arc mutually dislocation be connected with the track of casting; When one end of the short rail of straight line was connected with the casting track, the other end connected the maintenance track; When the short rail of arc was connected with the casting track, can close just the cast breach of track of the two ends of arc track made the orbit-shaped of casting circularize integral body.
Further, this device also is provided with for the rack beam that supports described interlock plate, and the interlock plate can slide at rack beam by roller.
Further, this device also is provided with the check lock lever that can make interlock plate fixed position on rack beam.Like this when by cylinder the short rail of straight line or the short rail of arc being transformed into the position that needs, can pin with the check lock lever plate that will link, prevent the movement of the short rail of straight line or the short rail of arc position in running, improve the stability of use.
In addition, be fixed with on the rack beam for support cylinder and stressed cylinder gripper shoe and the lock support plate of check lock lever.After being provided with such gripper shoe, cylinder and check lock lever have had a stress point at rack beam, make things convenient for cylinder and check lock lever can spur the interlock plate and slide at rack beam.
Further, check lock lever is two, and two check lock levers are that axle is arranged in the cylinder bilateral symmetry with the cylinder.Both sides stress balance when check lock lever is locked like this, the plate that prevents from linking rotates because being subjected to force unbalance, causes the position of the short rail of straight line and the short rail of arc deviation to occur.
Owing to adopted technical scheme of the present invention, the present invention can realize that dolly shifts fast between casting track and maintenance track, and adopt the interlock plate structure to carry out accurate guide-localization when shifting, can improve the efficient of conversion greatly, and not influence the operate as normal of other dollies on the casting track.Track transfer process of the present invention adopts the pneumatic handle of manually-operated to realize, give the cylinder air feed by operating pneumatic handle, cylinder relies on roller front and back on rack beam to move by bouncing back and stretching out drive interlock plate, and change the short rail of straight line on the realization interlock plate and the position of arc weak point rail; Apparatus structure of the present invention is compact practical, property easy for installation, and the structure of device is optimized design, the weight of device is low weight, power easy for installation.It is good that the present invention also has practicality, and the advantage of compact conformation has solved the deficiency that integral rail exists in the prior art, guarantees plant working automation continuity, has ensured the production capacity of the anode rod group of anode composing room.
Description of drawings
Fig. 1 is casting of the present invention and examination and repair system general layout;
Fig. 2 is casting system side view of the present invention;
Fig. 3 is track conversion equipment interlock plate structure schematic diagram;
Fig. 4 is track conversion equipment upward view;
Fig. 5 is track conversion equipment vertical view.
Description of reference numerals: 1-inspection trolley, the 2-track of casting, 3-main frequency furnace, 4-track conversion equipment, the 5-plate that links, the short rail of 6-straight line, the short rail of 7-arc, 8-cylinder, 9-check lock lever, the 10-rack beam, the 11-casting bogie, 12-overhauls track, 13-roller, 14-cylinder gripper shoe, 15-lock support plate.
The specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
See Fig. 1 and Fig. 2 earlier, in Aluminum Electrolysis Production, above between main frequency furnace 3 and anode casting and the pipeline, be provided with annular casting track 2, be hung with at casting track 2 and can loading the suspension type casting bogie 11 that ladle moves along casting track 2.Casting bogie 11 transports ladle and delivers to the casting position of anode casting and supply line from main frequency furnace 3, exactly the anode block and the aluminum guide that are placed on anode casting and the pipeline is cast after by the lifting cucurbit on the casting track 2 casting bogie 11 being promoted to certain position rollover then.The present invention (as the circular orbit upper right corner among Fig. 1) on casting track 2 is provided with track conversion equipment 4, make annular casting track 2 that a breach is arranged in this position, be provided with a maintenance track 12 that flushes with the straight line portion of annular casting track 2 in this position, maintenance track 12 is delivered to the maintenance of maintenance point with inspection trolley 1, and other casting bogie 11 can continue casting at casting track 2.
See Fig. 4 and Fig. 5, in order to realize above-mentioned purpose, track conversion equipment 4 of the present invention is such: this device is located between the casting track 2 and rectilinear maintenance track 12 of Electrolytic Workshop annular, this device is provided with an interlock plate 5, as shown in Figure 3, be fixed with the short rail 6 of one section straight line and one section short rail 7 of arc on this interlock plate 5; Be provided with a breach at the position of this interlock plate 5 top casting track 2, this interlock plate 5 by a cylinder 8 make the short rail 7 of the short rail 6 of straight line and arc mutually dislocation be connected with the track 2 of casting; When one end of the short rail 6 of straight line was connected with casting track 2, the other end connected maintenance track 12; When the short rail 7 of arc was connected with casting track 2, can close the just breach of casting track 2 of the two ends of arc track 7 made casting track 2 form annular integral body.
During the invention process, when needs are transferred to maintenance track 12 on from casting track 2 inspection trolley 1, use cylinder 8 retraction pulling interlock plates 5, make the two ends of the short rail 6 of straight line on the interlock plate 5 connect casting track 2 and maintenance track 12 respectively, and use check lock lever 9 to lock.Inspection trolley 1 can be transferred on the short rail 6 of straight line from casting track 2 like this, and then transfers on the maintenance track 12 and overhaul.After inspection trolley 1 shifts following casting track 2, in order not influence the operate as normal of other casting bogies 11, need make casting track 2 recover to become original circular orbit, at this time unclamp check lock lever 9, cylinder 8 is released, the plate 5 that will link promotes, make the short rail 6 of straight line allow out position, and the breach two ends that the short rail 7 of arc is received casting track 2 are closed the breach of casting track 2, casting track 2 becomes complete circular orbit, like this casting bogie 11 can be on the track 2 of casting operate as normal.
Certainly, more than be concrete exemplary applications of the present invention, the present invention also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop within the protection domain of the presently claimed invention.
Claims (7)
1. the method that shifts fast of a suspension type casting bogie, being included in Electrolytic Workshop will need the dolly that overhauls to transfer to the dolly that the maintenance point maybe finishes maintenance and shift the method that goes up annular casting track (2) from the annular track (2) of casting, it is characterized in that: between the casting track (2) of annular and maintenance track (12), be provided with a track conversion equipment, this track conversion equipment is provided with an interlock plate (5), and interlock plate (5) is provided with the short rail (6) of one section straight line and one section short rail (7) of arc; Cylinder on the track conversion equipment (8) can be connected short rail (7) dislocation of the short rail of straight line (6) and arc respectively with casting track (2), make dolly transfer to maintenance track (12) by the short rail of straight line (6), perhaps connect casting track (2) by the short rail of arc (7) and normally cast.
2. track conversion equipment, this device is located between the casting track (2) and rectilinear maintenance track (12) of Electrolytic Workshop annular, it is characterized in that: this device is provided with an interlock plate (5), is fixed with the short rail (6) of one section straight line and one section short rail (7) of arc on this interlock plate (5); Position top casting track (2) at this interlock plate (5) is provided with a breach, this interlock plate (5) by a cylinder (8) make the short rail of straight line (6) and the short rail of arc (7) mutually dislocation be connected with the track (2) of casting; One end of the short rail of straight line (6) and casting track (2) are when being connected, and track (12) is overhauled in other end connection; The short rail of arc (7) and casting track (2) be when being connected, and can close the just breach of casting track (2) of the two ends of arc track (7) makes casting track (2) form annular integral body.
3. track conversion equipment according to claim 2 is characterized in that: this device also is provided with for the rack beam (10) that supports described interlock plate (5), and described interlock plate (5) can pass through roller (13) and slide at rack beam (10).
4. track conversion equipment according to claim 3 is characterized in that: this device also is provided with and can makes described interlock plate (5) go up the check lock lever (9) of fixed position at described rack beam (10).
5. track conversion equipment according to claim 4 is characterized in that: be fixed with on the described rack beam (10) for supporting described cylinder (8) and stressed cylinder gripper shoe (14) and the lock support plate (15) of check lock lever (9).
6. track conversion equipment according to claim 4, it is characterized in that: described check lock lever (9) is two.
7. track conversion equipment according to claim 6 is characterized in that: two check lock levers (9) serve as that axle is arranged in its bilateral symmetry with cylinder (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210557952.4A CN103273052B (en) | 2012-12-20 | 2012-12-20 | A kind of device of suspension type casting bogie fast transfer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210557952.4A CN103273052B (en) | 2012-12-20 | 2012-12-20 | A kind of device of suspension type casting bogie fast transfer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103273052A true CN103273052A (en) | 2013-09-04 |
CN103273052B CN103273052B (en) | 2016-04-13 |
Family
ID=49055730
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210557952.4A Expired - Fee Related CN103273052B (en) | 2012-12-20 | 2012-12-20 | A kind of device of suspension type casting bogie fast transfer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103273052B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103990784A (en) * | 2014-05-28 | 2014-08-20 | 徐州君涛工贸有限公司 | Device for quickly transporting cast ball molten iron |
CN104722733A (en) * | 2015-03-31 | 2015-06-24 | 中国重型机械研究院股份公司 | Offline device and method for overhauling oblique extraction blank collecting trolley |
CN109108992A (en) * | 2018-08-22 | 2019-01-01 | 浙江国自机器人技术有限公司 | A kind of crusing robot inspection track applied in piping lane and piping lane control system |
CN113953505A (en) * | 2021-09-27 | 2022-01-21 | 东风精密铸造有限公司 | Grid-shaped pouring line for multi-steel-ladle rapid steel tapping and bilateral pouring |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0530435A1 (en) * | 1991-09-03 | 1993-03-10 | PROTECH AUTOMATION GmbH | Duplex-conveying line |
CN1135738A (en) * | 1993-11-24 | 1996-11-13 | 电梯公开有限公司 | Rail mounted transport system |
US20100126828A1 (en) * | 2008-11-21 | 2010-05-27 | Marco Willi | Conveyor comprising a curve |
CN202016482U (en) * | 2010-12-22 | 2011-10-26 | 四川省华蓥山煤业股份有限公司李子垭南煤矿 | Side shifting type shunting device |
CN202213974U (en) * | 2011-08-03 | 2012-05-09 | 江苏天奇物流系统工程股份有限公司 | Sliding plate conveying system with accompanying lifting function |
CN202481706U (en) * | 2012-03-07 | 2012-10-10 | 江苏长虹汽车装备集团有限公司 | Double-crank coating conveyor for automobiles |
CN202518766U (en) * | 2012-05-03 | 2012-11-07 | 中国国际海运集装箱(集团)股份有限公司 | Conveying rail and rail conversion device thereof |
CN202864323U (en) * | 2012-09-29 | 2013-04-10 | 山西东杰智能物流装备股份有限公司 | Friction type conveying line guide rail turnout with balance rails |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202984638U (en) * | 2012-12-20 | 2013-06-12 | 贵州航天乌江机电设备有限责任公司 | Track switch |
-
2012
- 2012-12-20 CN CN201210557952.4A patent/CN103273052B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0530435A1 (en) * | 1991-09-03 | 1993-03-10 | PROTECH AUTOMATION GmbH | Duplex-conveying line |
CN1135738A (en) * | 1993-11-24 | 1996-11-13 | 电梯公开有限公司 | Rail mounted transport system |
US20100126828A1 (en) * | 2008-11-21 | 2010-05-27 | Marco Willi | Conveyor comprising a curve |
CN202016482U (en) * | 2010-12-22 | 2011-10-26 | 四川省华蓥山煤业股份有限公司李子垭南煤矿 | Side shifting type shunting device |
CN202213974U (en) * | 2011-08-03 | 2012-05-09 | 江苏天奇物流系统工程股份有限公司 | Sliding plate conveying system with accompanying lifting function |
CN202481706U (en) * | 2012-03-07 | 2012-10-10 | 江苏长虹汽车装备集团有限公司 | Double-crank coating conveyor for automobiles |
CN202518766U (en) * | 2012-05-03 | 2012-11-07 | 中国国际海运集装箱(集团)股份有限公司 | Conveying rail and rail conversion device thereof |
CN202864323U (en) * | 2012-09-29 | 2013-04-10 | 山西东杰智能物流装备股份有限公司 | Friction type conveying line guide rail turnout with balance rails |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103990784A (en) * | 2014-05-28 | 2014-08-20 | 徐州君涛工贸有限公司 | Device for quickly transporting cast ball molten iron |
CN104722733A (en) * | 2015-03-31 | 2015-06-24 | 中国重型机械研究院股份公司 | Offline device and method for overhauling oblique extraction blank collecting trolley |
CN104722733B (en) * | 2015-03-31 | 2017-03-22 | 中国重型机械研究院股份公司 | Offline device and method for overhauling oblique extraction blank collecting trolley |
CN109108992A (en) * | 2018-08-22 | 2019-01-01 | 浙江国自机器人技术有限公司 | A kind of crusing robot inspection track applied in piping lane and piping lane control system |
CN113953505A (en) * | 2021-09-27 | 2022-01-21 | 东风精密铸造有限公司 | Grid-shaped pouring line for multi-steel-ladle rapid steel tapping and bilateral pouring |
CN113953505B (en) * | 2021-09-27 | 2023-12-26 | 东风精密铸造有限公司 | Double-sided casting's of tapping fast field style of calligraphy pouring line of many ladles |
Also Published As
Publication number | Publication date |
---|---|
CN103273052B (en) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103273052A (en) | Method and device for rapidly transferring hanging type casting bogie | |
CN201172574Y (en) | Precast beam reinforced bar hoisting rack | |
CN201809076U (en) | Device for replacing power transformation equipment | |
CN201980880U (en) | Hoisting device | |
CN203903767U (en) | Single-rail walking sling for installing power plant boiler equipment | |
CN202984638U (en) | Track switch | |
CN104003291A (en) | Single-rail walking lifting device for mounting boiler equipment in power plant | |
CN201999638U (en) | Hoisting device for ascending pipe and bridge pipe of coke oven | |
CN103979429A (en) | Cantilever type portal crane | |
CN103128537A (en) | Railway vehicle body assembling flexible process equipment | |
CN204509373U (en) | Sectional type oxygen rifle fixed guide | |
CN206169261U (en) | Double duplex position casting device of single positive pole | |
CN209211183U (en) | A kind of dedicated traction device of smelter mechanical equipment track | |
CN201265028Y (en) | Special-purpose tool for changing fibre roller | |
CN202542677U (en) | Device for mounting tube bundle supporting plates of evaporator | |
CN203361029U (en) | Cantilever type outer formwork installation crane of bridge floor curtain board | |
CN102583146A (en) | Device for mounting tube supporting plate in evaporator | |
CN207479924U (en) | A kind of electromobile frame automatic welding device | |
CN207468039U (en) | Complete non-maintaining simple and easy hoisting system manually | |
CN203501779U (en) | Auxiliary device for trolley replacement | |
CN206278602U (en) | A kind of clipping suspended structure installed for Automatic Conveying line | |
CN202022295U (en) | Segmentation shelving and transferring gantry | |
CN202006361U (en) | Core extraction machine | |
CN202984296U (en) | Group square steel variable pitch transfer device for cooling bed | |
CN201908240U (en) | Turnout transfer device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160413 Termination date: 20161220 |