A kind of power plant boiler equipment is installed with the single track suspender of walking
Technical field
The present invention relates to suspender technical field, be specifically related to a kind of power plant boiler equipment and install with the single track suspender of walking.
Background technology
In heat power plant boiler equipment, be generally all designed with S-shaped tube panel, this S-shaped tube panel lifting rigidity is poor, after lifting, need translation could arrive installation site, some S-shaped tube panels are designed with ultra-thin heat transfer H type fin, generally adopt at present steel rope binding lifting, the binding angle of steel rope can damage the H type fin of S-shaped tube panel, and original lifting mode efficiency is lower, uses steel rope more.
Summary of the invention
The present invention is in order to overcome the deficiency of above technology, provides a kind of power plant boiler equipment that can not damage S-shaped tube panel H type fin to install with the single track suspender of walking.
The present invention overcomes the technical scheme that its technical matters adopts:
This power plant boiler equipment is installed with the single track suspender of walking, comprise track girder, be installed on walking dolly on track girder, be horizontally placed on track girder below and and the crossbeam of track girder spatial vertical, be installed on crossbeam top upper hanger, be installed on crossbeam below some lower hanger, be fixed on the chain and tackle block on each lower hanger and be fixed on chain and tackle block below between two fins and hook the clamping apparatus of each pipeline on S-shaped tube panel, described upper hanger is fixed on walking dolly below by suspension ring.
Above-mentioned clamping apparatus comprises that thickness is less than the shackle plate of two fin pitch, is arranged at lifting hole(eyelet) on shackle plate, by bearing pin I, rotated and be installed on the connecting panel that shackle plate below and thickness are less than the left jig arm of two fin pitch and right jig arm and are fixed on respectively left jig arm and right jig arm below by bearing pin II, in described left jig arm and right jig arm, be relatively set with some gib heads, when left jig arm and right jig arm turn to while being parallel to each other, left jig arm and right jig arm and each gib head form the cavity volume that some cross-sectional planes are greater than S-shaped tube panel pipeline diameter.
In order once to lift by crane two S-shaped tube panels, above-mentioned crossbeam is two, and two crossbeams are parallel to each other, and described two upper and lower two ends of crossbeam are connected and fixed by some connecting panels respectively.
For the convenient lifting position of adjusting, above-mentioned crossbeam below is provided with slide rail, and described lower hanger is slidably fixed in slide rail.
In order not damage power cable, on above-mentioned track girder, be provided with along its length steel wire bracing wire, the power cable of described walking dolly is slided and is threaded onto in steel wire bracing wire by some links.
The invention has the beneficial effects as follows: by clamping apparatus, be placed between every two fins S-shaped tube panel is fixed, thereby can effectively prevent that the situation that fin damages in lifting process from occurring.During lifting, utilize chain and tackle block that S-shaped tube panel is lifted by crane, because crossbeam below is provided with a plurality of chain and tackle blocks, so Heave Here is many, reliable and stable.Walking dolly can drive S-shaped tube panel to move longitudinally to correct position, has improved efficiency.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present invention;
Fig. 2 is left TV structure schematic diagram of the present invention;
Fig. 3 is clamping apparatus portion structure schematic diagram of the present invention;
In figure, 1. right jig arm 18. gib head 19. connecting panel 20. bearing pin II of 6. times hangers of hanger 5. crossbeam, the 7. chain and tackle block 8. clamping apparatus 9. S-shaped tube panel 10. steel wire bracing wire 11. power cable left jig arm 17. of 12. connecting panel 13. shackle plate 14. lifting hole(eyelet) 15. bearing pin I 16. on track girder 2. walking dolly 3. suspension ring 4..
The specific embodiment
Below in conjunction with accompanying drawing 1, accompanying drawing 2, the present invention will be further described for accompanying drawing 3.
This power plant boiler equipment is installed with the single track suspender of walking, comprise track girder 1, be installed on walking dolly 2 on track girder 1, be horizontally placed on track girder 1 below and and the crossbeam 5 of track girder 1 spatial vertical, be installed on crossbeam 5 tops upper hanger 4, be installed on crossbeam 5 belows some lower hanger 6, be fixed on the chain and tackle block 7 on each lower hanger 6 and be fixed on chain and tackle block 7 belows between two fins and hook the clamping apparatus 8 of each pipeline on S-shaped tube panel 9, upper hanger 4 is fixed on walking dolly 2 belows by suspension ring 3.By clamping apparatus 8, be placed between every two fins S-shaped tube panel 9 is fixed, thereby can effectively prevent that the situation that fin damages in lifting process from occurring.During lifting, utilize chain and tackle block 7 by S-shaped tube panel 9 liftings, because crossbeam 5 belows are provided with a plurality of chain and tackle blocks 7, so Heave Here is many, reliable and stable.Walking dolly 2 can drive S-shaped tube panel 9 to move longitudinally to correct position, has improved efficiency.
Above-mentioned clamping apparatus 8 comprises that thickness is less than the shackle plate 13 of two fin pitch, be arranged at the lifting hole(eyelet) 14 on shackle plate 13, by bearing pin I 15, rotate and be installed on the connecting panel 19 that shackle plate 13 belows and thickness are less than the left jig arm 16 of two fin pitch and right jig arm 17 and are fixed on respectively left jig arm 16 and right jig arm 17 belows by bearing pin II 20, in left jig arm 16 and right jig arm 17, be relatively set with some gib heads 18, when left jig arm 16 and right jig arm 17 turn to while being parallel to each other, left jig arm 16 and right jig arm 17 form with each gib head 18 cavity volume that some cross-sectional planes are greater than S-shaped tube panel 9 pipeline diameters.In the time of need to lifting, bearing pin II 20 is extracted, thereby connecting panel 12 is pulled down, now to both sides, rotate respectively left jig arm 16 and right jig arm 17, thereby make it open mouth, and make left jig arm 16 and right jig arm 17 lay respectively at the both sides of S-shaped tube panel 9, afterwards left jig arm 16 and right jig arm 17 are drawn close to the inside, left jig arm 16 and right jig arm 17 are placed between two fins, and make gib head 18 hook each pipeline in S-shaped tube panel 9, by bearing pin II 20, connecting panel 12 is fixed on to left jig arm 16 and right jig arm 17 belows afterwards, realizes locking.Now can utilize by the hook of chain and tackle block 7 lower ends lifting hole(eyelet) 14 by S-shaped tube panel 9 liftings, convenient disassembly is simple.
Crossbeam 5 can be two, and two crossbeams 5 are parallel to each other, and two crossbeams are connected and fixed by some connecting panels 12 respectively at two ends Shang Xia 5.By two crossbeams 5 are set, can once lift by crane two S-shaped tube panels 9, improve efficiency.
Crossbeam 5 belows can be provided with slide rail, and lower hanger 6 is slidably fixed in slide rail.By movement, descend hanger 6 to make its size according to S-shaped tube panel 9 move to correct position, can conveniently adjust lifting position, improved the convenience using.
On track girder 1, be provided with along its length steel wire bracing wire 10, the power cable 11 of walking dolly 2 is slided and is threaded onto in steel wire bracing wire 10 by some links.When walking dolly 2 is walked along track girder 1, its power cable 11 can be followed walking dolly 2 along steel wire bracing wire 10 by link and be moved, and effectively prevents that the situation of power cable 11 fails in tension from occurring, and has improved the reliability using.