CN108999458A - The double cross-arm assembly integral installation device and method of electric power - Google Patents

The double cross-arm assembly integral installation device and method of electric power Download PDF

Info

Publication number
CN108999458A
CN108999458A CN201810940565.6A CN201810940565A CN108999458A CN 108999458 A CN108999458 A CN 108999458A CN 201810940565 A CN201810940565 A CN 201810940565A CN 108999458 A CN108999458 A CN 108999458A
Authority
CN
China
Prior art keywords
arm assembly
double cross
hoop
cross
electric double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810940565.6A
Other languages
Chinese (zh)
Other versions
CN108999458B (en
Inventor
周杰
孟大勇
聂志文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810940565.6A priority Critical patent/CN108999458B/en
Publication of CN108999458A publication Critical patent/CN108999458A/en
Application granted granted Critical
Publication of CN108999458B publication Critical patent/CN108999458B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明提供了一种电力双横担总成整体安装设备,属于横担安装设备技术领域,包括纵向支杆;横向支杆,垂直设置在所述纵向支杆的上部,其上设置有用于挂设牵引绳的吊挂件;抱箍,转动设置在所述纵向支杆的下部,用于与电线杆固定连接;以及托架,设置在所述横向支杆与所述抱箍之间,与所述纵向支杆转动且沿所述纵向支杆长度方向升降连接,用于支撑双横担总成并携带所述双横担总成上下移动或转动。还提供了一种电力双横担总成整体安装方法。本发明提供的电力双横担总成整体安装设备,旨在解决现有横担安装技术停电时间长;杆上作业人员施工强度大的技术问题。

The invention provides an overall installation device for electric double cross-arm assembly, which belongs to the technical field of cross-arm installation equipment, and includes a longitudinal support rod; There is a hanging piece for a traction rope; a hoop, which is rotatably arranged at the lower part of the longitudinal strut, for fixed connection with the utility pole; and a bracket, which is set between the horizontal strut and the hoop, and the The longitudinal struts rotate and are connected up and down along the length direction of the longitudinal struts, and are used to support the double cross-arm assembly and carry the double cross-arm assembly to move up and down or rotate. Also provided is an overall installation method of the electric double cross-arm assembly. The overall installation equipment for electric double cross-arm assembly provided by the invention aims to solve the technical problems of long power outage time and high construction intensity of workers on poles in the existing cross-arm installation technology.

Description

电力双横担总成整体安装设备及方法Overall installation equipment and method of electric double cross-arm assembly

技术领域technical field

本发明属于横担安装设备技术领域,更具体地说,是涉及一种电力双横担总成整体安装设备及方法。The invention belongs to the technical field of cross-arm installation equipment, and more specifically relates to an overall installation equipment and method for an electric double cross-arm assembly.

背景技术Background technique

对于电力双横担总成的安装,传统的方法为,工作人员登杆,通过绝缘绳由杆上人员依次上拽并紧固横担的各个部件,安装顺序依次为,两侧横担、五联板及紧固螺栓、U型挂环、多个悬垂、耐张线夹等。现有技术的缺陷及不足在于:一是停电时间长;二是杆上作业人员施工强度大;三是存在频繁停电投诉风险较大;四是导线的反复拆卸安装,造成金属表面的部分磨损,从而降低导线抗拉力强度,缩短使用周期。For the installation of the electric double cross-arm assembly, the traditional method is that the staff climb on the pole, and the personnel on the pole pull up and fasten the various parts of the cross-arm in turn through the insulating rope. Connecting plates and fastening bolts, U-shaped hanging rings, multiple overhangs, strain clamps, etc. The defects and deficiencies of the existing technology are: first, the power outage time is long; second, the construction intensity of the workers on the pole is high; third, there is a high risk of frequent power failure complaints; fourth, the repeated disassembly and installation of the wires causes partial wear on the metal surface, Thereby reducing the tensile strength of the wire and shortening the service life.

综上所述,对电力双横担总成实现整体安装的流程再造,已迫在眉睫。To sum up, it is imminent to realize the process reengineering of the overall installation of the electric double cross-arm assembly.

发明内容Contents of the invention

本发明的目的在于提供一种电力双横担总成整体安装设备及方法,旨在解决现有横担安装技术停电时间长;杆上作业人员施工强度大的技术问题。The purpose of the present invention is to provide an overall installation device and method for electric double cross-arm assembly, aiming to solve the technical problems of long power outage time and high construction intensity of workers on poles in the existing cross-arm installation technology.

为实现上述目的,本发明采用的技术方案是:提供一种电力双横担总成整体安装设备,包括:In order to achieve the above purpose, the technical solution adopted by the present invention is to provide an overall installation equipment for electric double cross-arm assembly, including:

纵向支杆;longitudinal struts;

横向支杆,垂直设置在所述纵向支杆的上部,其上设置有用于挂设牵引绳的吊挂件;The horizontal strut is vertically arranged on the upper part of the longitudinal strut, on which a hanging piece for hanging a traction rope is arranged;

抱箍,转动设置在所述纵向支杆的下部,用于与电线杆固定连接;以及a hoop, which is rotatably arranged at the lower part of the longitudinal strut, and is used for fixed connection with the utility pole; and

托架,设置在所述横向支杆与所述抱箍之间,与所述纵向支杆转动且沿所述纵向支杆长度方向升降连接,用于支撑双横担总成并携带所述双横担总成上下移动或转动。The bracket is arranged between the horizontal strut and the hoop, is connected with the vertical strut to rotate and rise and fall along the length direction of the longitudinal strut, and is used to support the double cross-arm assembly and carry the double cross-arm assembly. The cross arm assembly moves or turns up and down.

进一步地,所述托架包括安装架和可拆卸设置在所述安装架上的托板,所述安装架转动且沿所述纵向支杆长度方向升降设置在所述纵向支杆上,所述托板用于支撑所述双横担总成。Further, the bracket includes a mounting frame and a supporting plate detachably arranged on the mounting frame, the mounting frame rotates and is arranged on the longitudinal rod along the length direction of the longitudinal rod, and the The pallet is used to support the double cross-arm assembly.

进一步地,所述托板为两个且对称设置在所述安装架的两侧,两个所述托板之间设有空隙,且所述空隙宽度大于所述电线杆直径。Further, there are two supporting plates and they are arranged symmetrically on both sides of the installation frame, a gap is provided between the two supporting plates, and the width of the gap is larger than the diameter of the utility pole.

进一步地,所述托板与所述安装架插接。Further, the pallet is inserted into the installation frame.

进一步地,所述安装架包括升降部和转动设置在所述升降部上的转动部,所述升降部沿所述纵向支杆长度方向上下移动设置在所述纵向支杆上,所述转动部两侧对称设置有向外延伸的支撑臂,所述托板与所述支撑臂的自由端插接。Further, the installation frame includes a lifting part and a rotating part rotatably arranged on the lifting part, the lifting part moves up and down along the length direction of the longitudinal rod and is arranged on the longitudinal rod, and the rotating part Both sides are symmetrically provided with outwardly extending support arms, and the support plate is inserted into the free ends of the support arms.

进一步地,所述纵向支杆为丝杆,底部固设有手摇动轮,所述升降部套设在所述纵向支杆外,且两者螺纹连接,所述转动部套设在所述升降部外,且两者通过轴承连接。Further, the longitudinal support rod is a threaded rod, the bottom is fixed with a hand wheel, the lifting part is sleeved outside the longitudinal support rod, and the two are screwed together, and the rotating part is sleeved on the lifting part. outside, and the two are connected by bearings.

进一步地,所述吊挂件包括第一吊挂件和第二吊挂件,所述第一吊挂件设置在所述横向支杆自由端底部,所述第二吊挂件设置在所述横向支杆和所述纵向支杆连接端顶部。Further, the hanger includes a first hanger and a second hanger, the first hanger is set at the bottom of the free end of the transverse strut, and the second hanger is set at the bottom of the transverse strut and the above the top of the connecting end of the longitudinal strut.

进一步地,所述第一吊挂件和所述第二吊挂件分别为定滑轮。Further, the first hanging member and the second hanging member are respectively fixed pulleys.

进一步地,所述抱箍包括通过螺栓可拆卸连接的左抱箍和右抱箍,所述左抱箍包括相互平行设置的第一上抱箍片和第一下抱箍片,所述第一上抱箍片和所述第一下抱箍片通过第一连接件连接;Further, the hoop includes a left hoop and a right hoop detachably connected by bolts, the left hoop includes a first upper hoop piece and a first lower hoop piece arranged parallel to each other, the first The upper hoop piece is connected to the first lower hoop piece through a first connecting piece;

所述右抱箍包括相互平行设置的第二上抱箍片和第二下抱箍片,所述第二上抱箍片和所述第二下抱箍片通过第二连接件连接,所述第二连接件与所述纵向支杆转动连接。The right hoop includes a second upper hoop piece and a second lower hoop piece arranged parallel to each other, the second upper hoop piece and the second lower hoop piece are connected by a second connecting piece, the The second connecting piece is rotatably connected with the longitudinal strut.

电力双横担总成整体安装方法,包括以下步骤:The overall installation method of the electric double cross-arm assembly includes the following steps:

步骤一,在地面上将所述双横担总成组装好;Step 1, assembling the double cross-arm assembly on the ground;

步骤二,将所述电力双横担总成整体安装设备安装至所述电线杆顶部;Step 2, installing the overall installation equipment of the electric double cross-arm assembly on the top of the utility pole;

步骤三,将组装好的所述双横担总成牵引至所述电线杆顶部并放置在所述托架上;Step 3, pulling the assembled double cross-arm assembly to the top of the utility pole and placing it on the bracket;

步骤四,控制所述托架上升,直至其底端高于所述电线杆顶端;Step 4, controlling the bracket to rise until its bottom is higher than the top of the utility pole;

步骤五,旋转所述托架,使得两个所述横担之间的安装孔位于所述电线杆的正上方,之后控制所述托架下降,直至所述双横担总成下降至预设的横担安装位置,安装所述双横担总成;Step 5, rotate the bracket so that the installation hole between the two cross-arms is located directly above the utility pole, and then control the lowering of the bracket until the double-cross-arm assembly is lowered to a preset value. The installation position of the cross-arm, install the double cross-arm assembly;

步骤六,所述双横担总成安装完毕后,拆除所述电力双横担总成整体安装设备并将其送至地面。Step 6, after the installation of the double cross-arm assembly is completed, the overall installation equipment of the electric double-cross-arm assembly is removed and sent to the ground.

本发明提供的电力双横担总成整体安装设备及方法的有益效果在于:与现有技术相比,本发明电力双横担总成整体安装设备及方法设置了一个可以将双横担总成进行整体安装的设备,改变了双横担的安装方式,使得双横担总成安装时无需将各零部件分别通过牵引绳牵引至电线杆顶部后再组装,可以先在地面上将双横担总成组装好后再通过电力双横担总成整体安装设备送至电线杆上进行整体安装,这一设置具有方便、快捷、高效、可靠的特点。The beneficial effect of the overall installation equipment and method of the electric double cross-arm assembly provided by the present invention is that compared with the prior art, the overall installation equipment and method of the electric double cross-arm assembly of the present invention provide a The equipment for overall installation has changed the installation method of the double cross-arm, so that when the double-cross-arm assembly is installed, it is not necessary to pull the parts to the top of the utility pole through the traction rope before assembling, and the double cross-arm can be placed on the ground first. After the assembly is assembled, it is sent to the utility pole for overall installation through the overall installation equipment of the electric double cross-arm assembly. This setting is convenient, fast, efficient and reliable.

本发明所提供的电力双横担总成整体安装设备在电力生产中的应用,可有效的提高工作效率,降低高空作业风险,缩短作业时长,实现电力横担安装的流程再造。采用传统的双横担安装方式,完成导线架设通常要三个小时以上。采用本发明所提供的安装设备,在一基终端杆上的安装时长可缩短一半以上。对于故障线路的消缺工作,缩短停电时长等于为供电企业增加了销售效益,降低了投诉风险。本发明实施例提供的电力双横担总成整体安装设备,可作为一种标配生产辅助设备,在配电网范围内普遍推广使用。The application of the overall installation equipment for the electric double cross-arm assembly provided by the present invention in electric power production can effectively improve work efficiency, reduce the risk of high-altitude operations, shorten the working time, and realize the process reengineering of electric power cross-arm installation. Using the traditional double cross-arm installation method, it usually takes more than three hours to complete the wire erection. By adopting the installation equipment provided by the invention, the installation time on a basic terminal pole can be shortened by more than half. For the work of eliminating faulty lines, shortening the duration of power outages is equivalent to increasing sales benefits for power supply companies and reducing the risk of complaints. The overall installation equipment for the electric double cross-arm assembly provided by the embodiment of the present invention can be used as a standard production auxiliary equipment and widely used in the distribution network.

总而言之,通过本发明所提供的电力双横担总成整体安装设备在电力生产中的应用,一是大幅的缩短了停电时间;二是登高作业人员工作强度得到显著降低;三是施工人员数量明显减少;四是增加了售电量,提升了客户满意度,为供电企业实现了降本增效,实现了电力双横担总成实现整体安装的流程再造。All in all, through the application of the overall installation equipment of the electric double cross-arm assembly provided by the present invention in electric power production, firstly, the power outage time is greatly shortened; secondly, the work intensity of climbing workers is significantly reduced; thirdly, the number of construction personnel The fourth is to increase electricity sales, improve customer satisfaction, reduce costs and increase efficiency for power supply companies, and realize the process reengineering of the overall installation of the power double cross-arm assembly.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the descriptions of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only of the present invention. For some embodiments, those of ordinary skill in the art can also obtain other drawings based on these drawings without any creative effort.

图1为本发明实施例提供的电力双横担总成整体安装设备的结构示意图一;Fig. 1 is a structural schematic diagram 1 of the overall installation equipment of the electric double cross-arm assembly provided by the embodiment of the present invention;

图2为图1所示的电力双横担总成整体安装设备的俯视结构示意图;Fig. 2 is a top view structural diagram of the overall installation equipment of the electric double cross-arm assembly shown in Fig. 1;

图3为本发明实施例提供的电力双横担总成整体安装设备的结构示意图二;Fig. 3 is a structural schematic diagram II of the overall installation equipment of the electric double cross-arm assembly provided by the embodiment of the present invention;

图4为图3所示的电力双横担总成整体安装设备的俯视结构示意图。Fig. 4 is a schematic top view structural view of the overall installation equipment of the electric double cross-arm assembly shown in Fig. 3 .

图中:1、纵向支杆;2、横向支杆;3、牵引绳;4、吊挂件;41、第一吊挂件;42、第二吊挂件;5、抱箍;51、左抱箍;511、上抱箍片;512、下抱箍片;513、连接件;52、右抱箍;521、上抱箍片;522、下抱箍片;523、连接件;6、电线杆;7、托架;71、安装架;711、升降部;712、转动部;713、支撑臂;72、托板;8、双横担总成;9、手摇动轮。In the figure: 1. Longitudinal pole; 2. Horizontal pole; 3. Traction rope; 4. Suspension piece; 41. First suspension piece; 42. Second suspension piece; 5. Hoop; 51. Left hoop; 511, upper hoop piece; 512, lower hoop piece; 513, connector; 52, right hoop; 521, upper hoop piece; 522, lower hoop piece; 523, connector; 6, utility pole; 7 , bracket; 71, mounting frame; 711, lifting part; 712, rotating part; 713, support arm; 72, pallet; 8, double cross-arm assembly; 9, hand wheel.

具体实施方式Detailed ways

为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

请一并参阅图1至图4,现对本发明实施例提供的电力双横担总成整体安装设备进行说明。所述电力双横担总成整体安装设备,包括纵向支杆1;横向支杆2,垂直设置在纵向支杆1的上部,其上设置有用于挂设牵引绳3的吊挂件4;抱箍5,转动设置在纵向支杆1的下部,用于与电线杆6固定连接;以及托架7,设置在横向支杆2与抱箍5之间,与纵向支杆1转动且沿纵向支杆1长度方向升降连接,用于支撑双横担总成8并携带双横担总成8上下移动或转动。Please refer to FIG. 1 to FIG. 4 together, and now describe the overall installation equipment for the electric double cross-arm assembly provided by the embodiment of the present invention. The overall installation equipment of the electric double cross-arm assembly includes a longitudinal support rod 1; a horizontal support rod 2, which is vertically arranged on the upper part of the longitudinal support rod 1, on which a hanging piece 4 for hanging a traction rope 3 is arranged; a hoop 5. The rotation is arranged at the lower part of the longitudinal strut 1 for fixed connection with the utility pole 6; and the bracket 7 is set between the transverse strut 2 and the hoop 5, and rotates with the longitudinal strut 1 and along the vertical strut 1. Lifting connection in the length direction, used to support the double cross-arm assembly 8 and carry the double cross-arm assembly 8 to move up and down or rotate.

安装横担时,首先在地面完成双横担总成8的组件组装,包括两侧横担、五联板、紧固螺栓、U型挂环、多个悬垂、耐张线夹等,与横担相关联的所有组件;并在地面将牵引绳3安装到吊挂件4上;然后,作业人员登高到电线杆6顶部,安装本发明所提供的电力双横担总成整体安装设备,完成安装位置的调整(使得抱箍5安装在双横担总成安装位置下方,横向支杆2延伸至电线杆6上方),紧固抱箍5,实现本设备与电线杆6的固定;之后地面作业人员,通过牵引绳3,将双横担总成8牵引至本设备的托架7上,再控制托架7带动其上双横担总成8上升至电线杆6顶端上方,顺时针或逆时针转动托架7,使其上双横担总成8中两个横担之间的安装孔转动至电线杆6的正上方,之后控制托架7下降,使得双横担总成2套设在电线杆6上并下降至预设的双横担总成8安装位置;最后,紧固双横担总成2上的紧固螺丝、五联板等,待其安装好后,将抱箍5由电线杆6上取下,拆除本设备,之后通过牵引绳将电力双横担总成整体安装设备送至地面上,完成该项工作。When installing the cross arm, first complete the assembly of the components of the double cross arm assembly 8 on the ground, including cross arms on both sides, five joint plates, fastening bolts, U-shaped hanging rings, multiple suspensions, tension clamps, etc. Carry all associated components; and install the traction rope 3 on the hanger 4 on the ground; then, the operator climbs to the top of the utility pole 6, installs the overall installation equipment for the electric double cross-arm assembly provided by the present invention, and completes the installation Position adjustment (so that the hoop 5 is installed below the installation position of the double cross-arm assembly, and the horizontal support rod 2 extends above the utility pole 6), tighten the hoop 5, and realize the fixation of the equipment and the utility pole 6; after that, the ground work Personnel, through the traction rope 3, pull the double cross-arm assembly 8 to the bracket 7 of the equipment, and then control the bracket 7 to drive the upper double cross-arm assembly 8 to rise above the top of the utility pole 6, clockwise or counterclockwise Turn the bracket 7 clockwise to make the installation hole between the two cross arms in the upper double cross arm assembly 8 rotate to the top of the utility pole 6, and then control the bracket 7 to descend, so that the double cross arm assembly 2 sets On the utility pole 6 and descend to the preset installation position of the double cross-arm assembly 8; finally, fasten the fastening screws and five-joint plates on the double-cross-arm assembly 2, and after it is installed, put the hoop 5 is taken off from utility pole 6, dismantles this equipment, afterward by traction rope, the overall installation equipment of electric double cross-arm assembly is sent on the ground, finishes this work.

本发明提供的电力双横担总成整体安装设备,与现有技术相比,设置了一个可以将双横担总成进行整体安装的设备,改变了双横担的安装方式,使得双横担总成8安装时无需将各零部件分别通过牵引绳牵引至电线杆6顶部后再组装,可以先在地面上将双横担总成8组装好后再通过电力双横担总成整体安装设备送至电线杆6上进行整体安装,这一设置具有方便、快捷、高效、可靠的特点。Compared with the prior art, the overall installation equipment for the electric double cross-arm assembly provided by the present invention is provided with a device capable of integrally installing the double cross-arm assembly, which changes the installation method of the double cross-arm so that the double cross-arm When the assembly 8 is installed, it is not necessary to pull each component to the top of the utility pole 6 through the traction rope and then assemble it. The double cross-arm assembly 8 can be assembled on the ground first, and then the equipment can be installed as a whole through the electric double cross-arm assembly. Sent to the utility pole 6 for overall installation, this setting has the characteristics of convenience, quickness, high efficiency and reliability.

本发明所提供的电力双横担总成整体安装设备在电力生产中的应用,可有效的提高工作效率,降低高空作业风险,缩短作业时长,实现电力横担安装的流程再造。采用传统的双横担安装方式,完成导线架设通常要三个小时以上。采用本发明所提供的安装设备,在一基终端杆上的安装时长可缩短一半以上。对于故障线路的消缺工作,缩短停电时长等于为供电企业增加了销售效益,降低了投诉风险。本发明实施例提供的电力双横担总成整体安装设备,可作为一种标配生产辅助设备,在配电网范围内普遍推广使用。The application of the overall installation equipment for the electric double cross-arm assembly provided by the present invention in electric power production can effectively improve work efficiency, reduce the risk of high-altitude operations, shorten the working time, and realize the process reengineering of electric power cross-arm installation. Using the traditional double cross-arm installation method, it usually takes more than three hours to complete the wire erection. By adopting the installation equipment provided by the invention, the installation time on a basic terminal pole can be shortened by more than half. For the work of eliminating faulty lines, shortening the duration of power outages is equivalent to increasing sales benefits for power supply companies and reducing the risk of complaints. The overall installation equipment for the electric double cross-arm assembly provided by the embodiment of the present invention can be used as a standard production auxiliary equipment and widely used in the distribution network.

总而言之,通过本发明所提供的电力双横担总成整体安装设备在电力生产中的应用,一是大幅的缩短了停电时间;二是登高作业人员工作强度得到显著降低;三是施工人员数量明显减少;四是增加了售电量,提升了客户满意度,为供电企业实现了降本增效,实现了电力双横担总成实现整体安装的流程再造。All in all, through the application of the overall installation equipment of the electric double cross-arm assembly provided by the present invention in electric power production, firstly, the power outage time is greatly shortened; secondly, the work intensity of climbing workers is significantly reduced; thirdly, the number of construction personnel The fourth is to increase electricity sales, improve customer satisfaction, reduce costs and increase efficiency for power supply companies, and realize the process reengineering of the overall installation of the power double cross-arm assembly.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图1至图4,托架7包括安装架71和可拆卸设置在安装架71上的托板72,安装架71转动且沿纵向支杆1长度方向升降设置在纵向支杆1上,托板72用于支撑双横担总成8。As a specific implementation of the overall installation equipment of the electric double cross-arm assembly provided by the present invention, please refer to Figures 1 to 4, the bracket 7 includes a mounting frame 71 and a supporting plate 72 detachably arranged on the mounting frame 71, The installation frame 71 is rotated and installed on the longitudinal strut 1 up and down along the length direction of the longitudinal strut 1 , and the supporting plate 72 is used to support the double cross-arm assembly 8 .

使用时,可先将托板72取下,待双横担总成8被牵引至安装架71上方后,再将托板72安装至安装架71上,之后再下放牵引绳3,将双横担总成8平稳的放置再托板72上。这一设置避免了托板72的加设对双横担总成8向上牵引的不良影响,使得使用时双横担总成8可水平向下移动,这一设置避免了双横担总成8向上牵引时其上各部件相互碰撞发生脱落或错位的现象发生,保证了双横担总成8安装的顺畅性,符合其安装需要。同时托板72与安装架71可拆卸连接,便于设备的移动、搬运和维修。When in use, the supporting plate 72 can be removed first, and after the double cross-arm assembly 8 is pulled to the top of the mounting frame 71, the supporting plate 72 is installed on the mounting frame 71, and then the traction rope 3 is lowered, and the double horizontal arm assembly Bear assembly 8 and place on the supporting plate 72 steadily again. This setting avoids the adverse effect of the addition of the supporting plate 72 on the upward traction of the double cross-arm assembly 8, so that the double cross-arm assembly 8 can move horizontally downward during use. This setting avoids the double cross-arm assembly 8 When pulling upwards, the parts on it collide with each other and come off or dislocate, which ensures the smoothness of the installation of the double cross-arm assembly 8 and meets its installation needs. At the same time, the supporting plate 72 is detachably connected with the mounting frame 71, which is convenient for moving, carrying and maintaining the equipment.

本实施例中托板72可以采用多种形式,如中部设有孔洞的平板或网格板,只要不会妨碍双横担总成8由上向下套设在电线杆6上即可。In this embodiment, the supporting plate 72 can adopt various forms, such as a flat plate or a grid plate with a hole in the middle, as long as the double cross-arm assembly 8 is sleeved on the utility pole 6 from top to bottom and gets final product.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图2及图4,托板72为两个且对称设置在安装架71的两侧,两个托板72之间设有空隙,且空隙宽度大于电线杆6直径。As a specific implementation of the overall installation equipment for the electric double cross-arm assembly provided by the present invention, please refer to Figure 2 and Figure 4, there are two supporting plates 72 and they are arranged symmetrically on both sides of the mounting frame 71, and the two supporting plates There is a gap between 72, and the gap width is greater than the diameter of the utility pole 6.

托板72采用两个,降低了托板72及设备整体所需重量,便于其搬运和安装,同时两个托板72之间的间距足够大,可适用于不同规格电线杆6和双横担总成8的安装需要。Two pallets 72 are used, which reduces the weight required for the pallet 72 and the overall equipment, and facilitates its handling and installation. At the same time, the distance between the two pallets 72 is large enough to be applicable to utility poles 6 and double cross-arms of different specifications. Assembly 8 is required for installation.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,托板72与安装架71插接,实现了两者的快速连接或分离,便于操作人员在高空操作,符合其使用要求。As a specific embodiment of the overall installation equipment of the electric double cross-arm assembly provided by the present invention, the supporting plate 72 is plugged into the mounting frame 71 to realize the quick connection or separation of the two, which is convenient for the operator to operate at high altitude, and conforms to its Requirements.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图1至图4,安装架71包括升降部711和转动设置在升降部711上的转动部712,升降部711沿纵向支杆1长度方向上下移动设置在纵向支杆1上,转动部712两侧对称设置有向外延伸的支撑臂713,托板72与支撑臂713的自由端插接。As a specific implementation of the overall installation equipment for the electric double cross-arm assembly provided by the present invention, please refer to Figures 1 to 4, the installation frame 71 includes a lifting part 711 and a rotating part 712 that is rotatably arranged on the lifting part 711, and the lifting The part 711 moves up and down along the length direction of the longitudinal strut 1 and is arranged on the longitudinal strut 1 . The two sides of the rotating part 712 are symmetrically provided with support arms 713 extending outward.

本实施例所提出的安装架71采用升降部711、转动部712和支撑臂713相结合的方式,便于设备的维修和安装,托板72设置在支撑臂713自由端,保证了两个托板72之间空隙的最大化,降低了使用过程中托板72对双横担总成8吊装的风险。The installation frame 71 proposed in this embodiment adopts the combination of the lifting part 711, the rotating part 712 and the support arm 713, which is convenient for the maintenance and installation of the equipment. The maximization of the space between 72 reduces the risk of hoisting of the pallet 72 to the double cross-arm assembly 8 during use.

本实施例中支撑臂713可以采用伸缩式结构,使用时根据双横担总成8长度调节支撑臂713的长度,进而实现两个托板72之间宽度的调整,确保其上双横担总成8受力均衡,降低了双横担总成8在随托架7上升、下降、旋转时发生掉落的风险。这一设置有效提高了设备组装的灵活性,保证了设备使用的安全性,增加了其适用范围的广度。伸缩结构可以采用市场上现有的插接、螺纹连接等,只要能实现支撑臂713长度的调节即可。In this embodiment, the support arm 713 can adopt a telescopic structure. When in use, the length of the support arm 713 is adjusted according to the length of the double cross-arm assembly 8, thereby realizing the adjustment of the width between the two supporting plates 72, ensuring that the upper double cross-arm assembly 8 is balanced in force, which reduces the risk of the double cross-arm assembly 8 falling when it rises, falls, and rotates with the bracket 7 . This setting effectively improves the flexibility of equipment assembly, ensures the safety of equipment use, and increases the breadth of its application range. The telescoping structure can adopt the existing plug-in connection and screw connection in the market, as long as the length adjustment of the support arm 713 can be realized.

进一步地,本实施例中托板72顶面上还可以加设防滑垫或磁力块,增加操作过程中其与双横担总成8相对位置关系的稳定性,降低使用过程中双横担总成8与托板72或托架7发生相对滑动的风险,保证其使用的安全性。Further, in this embodiment, an anti-slip pad or a magnetic block can also be added on the top surface of the supporting plate 72 to increase the stability of the relative positional relationship between it and the double cross-arm assembly 8 during operation, and reduce the overall stability of the double cross-arm assembly 8 during use. 8 and the risk of sliding relative to the pallet 72 or bracket 7 to ensure the safety of its use.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图1及图3,纵向支杆1为丝杆,底部固设有手摇动轮9,升降部711套设在纵向支杆1外,且两者螺纹连接,转动部712套设在升降部711外,且两者通过轴承连接。As a specific implementation of the overall installation equipment of the electric double cross-arm assembly provided by the present invention, please refer to Figure 1 and Figure 3, the longitudinal support rod 1 is a screw rod, the bottom is fixed with a hand wheel 9, and there are 711 sets of lifting parts It is arranged outside the longitudinal support rod 1, and the two are screwed together. The rotating part 712 is sleeved outside the lifting part 711, and the two are connected by bearings.

使用时,转动手摇动轮9纵向支杆1随之转动,手扶托架7防止其转动,这时托架7会随着纵向支杆1的转动向上移动或向下移动,实现托架7及其上双横担总成8的上升或下降。纵向支杆1采用丝杆,与手摇动轮9相配合,实现托架7的上升和下降,结构简单,操作方便,无需借助其他动力装置,有效降低了设备的重量和制造成本,有利于其搬运和推广。During use, turn the hand crank wheel 9 and the longitudinal pole 1 rotates thereupon, and the hand-held bracket 7 prevents it from rotating. And the rise or fall of the upper double cross-arm assembly 8. Longitudinal strut 1 adopts screw rod, cooperates with hand wheel 9, realizes the rise and fall of bracket 7, simple structure, easy operation, no need to rely on other power devices, effectively reduces the weight of equipment and manufacturing cost, is beneficial to its Handling and promotion.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图1及图3,吊挂件4包括第一吊挂件41和第二吊挂件42,第一吊挂件41设置在横向支杆2自由端底部,第二吊挂件42设置在横向支杆2和纵向支杆1连接端顶部。As a specific embodiment of the overall installation equipment for the electric double cross-arm assembly provided by the present invention, please refer to Fig. 1 and Fig. 3, the hanger 4 includes a first hanger 41 and a second hanger 42, the first hanger 41 It is arranged at the bottom of the free end of the transverse strut 2 , and the second hanger 42 is set at the top of the connecting end of the transverse strut 2 and the longitudinal strut 1 .

当需要向上牵引双横担总成8时,将牵引绳3挂设在第一吊挂件41上,当需要向上或向下运送电力双横担总成整体安装设备时,则将牵引绳3挂设在第二吊挂件42上。其中,第一吊挂件41设置在横向支杆2自由端底部,使得双横担总成8离纵向支杆1距离最远,降低了双横担总成8向上运输时与纵向支杆1发生碰撞的几率,进而确保了双横担总成8向上牵引的稳定性和电力双横担总成整体安装设备与电线杆6连接的稳定性。第二吊挂件42设置在横向支杆2和纵向支杆1连接端顶部,确保了通过牵引绳3向上或向下运送电力双横担总成整体安装设备时,设备可以采用竖直状态,进而避免了设备运送过程中与电线杆6发生碰撞,保证了设备运送的稳定性。When it is necessary to pull the double cross-arm assembly 8 upwards, hang the traction rope 3 on the first hanging part 41, and when it is necessary to transport the electric double cross-arm assembly up or down to install the equipment as a whole, hang the traction rope 3 It is provided on the second hanger 42 . Among them, the first hanger 41 is arranged at the bottom of the free end of the transverse strut 2, so that the distance between the double cross-arm assembly 8 and the longitudinal strut 1 is the farthest, which reduces the occurrence of the double cross-arm assembly 8 and the longitudinal strut 1 when it is transported upwards. The probability of collision ensures the stability of the upward traction of the double cross-arm assembly 8 and the stability of the connection between the overall installation equipment of the electric double cross-arm assembly and the utility pole 6. The second hanger 42 is arranged on the top of the connecting end of the transverse strut 2 and the longitudinal strut 1, which ensures that the equipment can adopt a vertical state when the overall installation of the equipment is carried up or down by the traction rope 3. The collision with the utility pole 6 during the transportation of the equipment is avoided, and the stability of the transportation of the equipment is ensured.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图1及图3,第一吊挂件41和第二吊挂件42分别为定滑轮。As a specific embodiment of the overall installation equipment of the electric double cross-arm assembly provided by the present invention, please refer to FIG. 1 and FIG. 3 , the first hanging member 41 and the second hanging member 42 are fixed pulleys respectively.

第一吊挂件41和第二吊挂件42分别采用定滑轮,确保了第一吊挂件41和第二吊挂件42与牵引绳3之间较低的摩擦力,降低了使用牵引绳3运送东西时的劳动强度和牵引绳3使用时发生磨损的风险,保证了设备安装和使用的便捷性和安全性。The first hanging part 41 and the second hanging part 42 adopt fixed pulleys respectively, which ensures the lower frictional force between the first hanging part 41 and the second hanging part 42 and the traction rope 3, and reduces the friction when using the traction rope 3 to transport things. The labor intensity and the risk of wear of the traction rope 3 during use ensure the convenience and safety of equipment installation and use.

作为本发明提供的电力双横担总成整体安装设备的一种具体实施方式,请参阅图1至图4,抱箍5包括通过螺栓可拆卸连接的左抱箍51和右抱箍52,左抱箍51包括相互平行设置的第一上抱箍片511和第一下抱箍片512,第一上抱箍片511和第一下抱箍片512通过第一连接件513连接;右抱箍52包括相互平行设置的第二上抱箍片521和第二下抱箍片522,第二上抱箍片521和第二下抱箍片522通过第二连接件523连接,第二连接件523与纵向支杆1转动连接。As a specific implementation of the overall installation equipment of the electric double cross-arm assembly provided by the present invention, please refer to Figures 1 to 4, the hoop 5 includes a left hoop 51 and a right hoop 52 detachably connected by bolts, The hoop 51 includes a first upper hoop piece 511 and a first lower hoop piece 512 arranged parallel to each other, and the first upper hoop piece 511 and the first lower hoop piece 512 are connected by a first connecting piece 513; the right hoop 52 includes a second upper hoop piece 521 and a second lower hoop piece 522 arranged parallel to each other, the second upper hoop piece 521 and the second lower hoop piece 522 are connected by a second connecting piece 523, and the second connecting piece 523 It is rotatably connected with the longitudinal strut 1.

左抱箍51和右抱箍52分别采用上抱箍片、下抱箍片和连接片相结合的形式,确保了抱箍5与电线杆6之间的摩擦力足够大,降低了使用过程中电力双横担总成整体安装设备与电线杆6发生相对滑动的风险,保证了双横担总成8安装的安全性。The left hoop 51 and the right hoop 52 respectively adopt the form of an upper hoop piece, a lower hoop piece and a connecting piece, which ensures that the friction between the hoop 5 and the utility pole 6 is large enough, and reduces the friction during use. The risk of relative sliding between the overall installation equipment of the power double cross-arm assembly and the utility pole 6 ensures the safety of the installation of the double cross-arm assembly 8 .

本发明还提供一种电力双横担总成整体安装方法。所述电力双横担总成整体安装方法,包括以下步骤:The invention also provides an overall installation method of the electric double cross-arm assembly. The overall installation method of the electric double cross-arm assembly includes the following steps:

步骤一,在地面上将双横担总成8组装好;Step 1, assemble the double cross-arm assembly 8 on the ground;

步骤二,将电力双横担总成整体安装设备安装至电线杆6顶部;Step 2, installing the overall installation equipment of the electric double cross-arm assembly on the top of the utility pole 6;

步骤三,将组装好的双横担总成8牵引至电线杆6顶部并放置在托架7上;Step 3, pulling the assembled double cross-arm assembly 8 to the top of the utility pole 6 and placing it on the bracket 7;

步骤四,控制托架7上升,直至其底端高于电线杆6顶端;Step 4, the control bracket 7 rises until its bottom is higher than the top of the utility pole 6;

步骤五,旋转托架7,使得两个横担之间的安装孔位于电线杆6的正上方,之后控制托架7下降,直至双横担总成8下降至预设的横担安装位置,安装双横担总成8;Step 5, rotate the bracket 7 so that the installation hole between the two cross-arms is located directly above the utility pole 6, and then control the bracket 7 to descend until the double-cross-arm assembly 8 descends to the preset cross-arm installation position, Install the double cross-arm assembly 8;

步骤六,双横担总成8安装完毕后,拆除电力双横担总成整体安装设备并将其送至地面。Step 6, after the installation of the double cross-arm assembly 8 is completed, remove the overall installation equipment of the electric double cross-arm assembly and send it to the ground.

其中,安装电力双横担总成整体安装设备时,可将抱箍5安装在双横担总成安装位置下方,横向支杆2延伸至电线杆6上方,便于之后双横担总成8的安装;步骤三中双横担总成8可以通过地面上的操作人员拉动设置在吊挂件4上的牵引绳3来进行牵引。Among them, when installing the overall installation equipment of the electric double cross-arm assembly, the hoop 5 can be installed below the installation position of the double cross-arm assembly, and the transverse support rod 2 extends to the top of the utility pole 6, which is convenient for the installation of the double cross-arm assembly 8 later. Installation; in step 3, the double cross-arm assembly 8 can be pulled by the operator on the ground by pulling the traction rope 3 arranged on the suspension part 4 .

本发明提供的电力双横担总成整体安装方法,采用了一种全新的安装双横担总成的方法,使得双横担总成8安装时无需将各零部件分别通过牵引绳3牵引至电线杆6顶部后再组装,可以先在地面上将双横担总成8组装好后再通过电力双横担总成整体安装设备送至电线杆6上进行整体安装,这一设置具有方便、快捷、高效、可靠的特点。The overall installation method of the electric double cross-arm assembly provided by the present invention adopts a brand-new method for installing the double cross-arm assembly, so that when the double cross-arm assembly 8 is installed, it is not necessary to pull each component to the Assembled after the top of utility pole 6, first double cross-arm assembly 8 can be assembled on the ground and then sent to utility pole 6 by the integral installation equipment of electric double cross-arm assembly for integral installation, this setting has convenience, Fast, efficient and reliable features.

本发明所提供的电力双横担总成整体安装设备在电力生产中的应用,可有效的提高工作效率,降低高空作业风险,缩短作业时长,实现电力横担安装的流程再造。采用传统的双横担安装方式,完成导线架设通常要三个小时以上。采用本发明所提供的安装设备,在一基终端杆上的安装时长可缩短一半以上。对于故障线路的消缺工作,缩短停电时长等于为供电企业增加了销售效益,降低了投诉风险。本发明实施例提供的电力双横担总成整体安装设备,可作为一种标配生产辅助设备,在配电网范围内普遍推广使用。The application of the overall installation equipment for the electric double cross-arm assembly provided by the present invention in electric power production can effectively improve work efficiency, reduce the risk of high-altitude operations, shorten the working time, and realize the process reengineering of electric power cross-arm installation. Using the traditional double cross-arm installation method, it usually takes more than three hours to complete the wire erection. By adopting the installation equipment provided by the invention, the installation time on a basic terminal pole can be shortened by more than half. For the work of eliminating faulty lines, shortening the duration of power outages is equivalent to increasing sales benefits for power supply companies and reducing the risk of complaints. The overall installation equipment for the electric double cross-arm assembly provided by the embodiment of the present invention can be used as a standard production auxiliary equipment and widely used in the distribution network.

总而言之,通过本发明所提供的电力双横担总成整体安装设备在电力生产中的应用,一是大幅的缩短了停电时间;二是登高作业人员工作强度得到显著降低;三是施工人员数量明显减少;四是增加了售电量,提升了客户满意度,为供电企业实现了降本增效,实现了电力双横担总成实现整体安装的流程再造。All in all, through the application of the overall installation equipment of the electric double cross-arm assembly provided by the present invention in electric power production, firstly, the power outage time is greatly shortened; secondly, the work intensity of climbing workers is significantly reduced; thirdly, the number of construction personnel The fourth is to increase electricity sales, improve customer satisfaction, reduce costs and increase efficiency for power supply companies, and realize the process reengineering of the overall installation of the power double cross-arm assembly.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.

Claims (10)

1.电力双横担总成整体安装设备,其特征在于,包括:1. The overall installation equipment of the electric double cross-arm assembly is characterized in that it includes: 纵向支杆(1);longitudinal strut (1); 横向支杆(2),垂直设置在所述纵向支杆(1)的上部,其上设置有用于挂设牵引绳(3)的吊挂件(4);The horizontal strut (2) is vertically arranged on the upper part of the longitudinal strut (1), on which a hanging piece (4) for hanging the traction rope (3) is arranged; 抱箍(5),转动设置在所述纵向支杆(1)的下部,用于与电线杆(6)固定连接;以及The hoop (5), which is rotatably arranged at the lower part of the longitudinal strut (1), is used for fixed connection with the utility pole (6); and 托架(7),设置在所述横向支杆(2)与所述抱箍(5)之间,与所述纵向支杆(1)转动且沿所述纵向支杆(1)长度方向升降连接,用于支撑双横担总成(8)并携带所述双横担总成(8)上下移动或转动。Bracket (7), arranged between the transverse strut (2) and the hoop (5), rotates with the longitudinal strut (1) and lifts along the length direction of the longitudinal strut (1) connected, used to support the double cross-arm assembly (8) and carry the double cross-arm assembly (8) to move up and down or rotate. 2.如权利要求1所述的电力双横担总成整体安装设备,其特征在于:所述托架(7)包括安装架(71)和可拆卸设置在所述安装架(71)上的托板(72),所述安装架(71)转动且沿所述纵向支杆(1)长度方向升降设置在所述纵向支杆(1)上,所述托板(72)用于支撑所述双横担总成(8)。2. The overall installation equipment of electric double cross-arm assembly according to claim 1, characterized in that: the bracket (7) includes a mounting frame (71) and a detachable mounting frame (71) A supporting plate (72), the mounting frame (71) rotates and is arranged on the longitudinal supporting rod (1) up and down along the length direction of the longitudinal supporting rod (1), and the supporting plate (72) is used to support the Describe the double cross-arm assembly (8). 3.如权利要求2所述的电力双横担总成整体安装设备,其特征在于:所述托板(72)为两个且对称设置在所述安装架(71)的两侧,两个所述托板(72)之间设有空隙,且所述空隙宽度大于所述电线杆(6)直径。3. The overall installation equipment for electric double cross-arm assembly according to claim 2, characterized in that: there are two supporting plates (72) and they are arranged symmetrically on both sides of the mounting frame (71), two There is a gap between the supporting plates (72), and the width of the gap is larger than the diameter of the utility pole (6). 4.如权利要求3所述的电力双横担总成整体安装设备,其特征在于:所述托板(72)与所述安装架(71)插接。4. The overall installation equipment for electric double cross-arm assembly according to claim 3, characterized in that: the support plate (72) is plugged into the installation frame (71). 5.如权利要求4所述的电力双横担总成整体安装设备,其特征在于:所述安装架(71)包括用于沿所述纵向支杆(1)长度方向上下移动的升降部(711)和转动设置在所述升降部(711)上的转动部(712),所述转动部(712)两侧对称设置有向外延伸的支撑臂(713),所述托板(72)与所述支撑臂(713)的自由端插接。5. The overall installation equipment of electric double cross-arm assembly according to claim 4, characterized in that: the installation frame (71) includes a lifting part ( 711) and the rotating part (712) arranged on the lifting part (711), the rotating part (712) is symmetrically provided with supporting arms (713) extending outwards on both sides, and the supporting plate (72) Insert with the free end of the support arm (713). 6.如权利要求5所述的电力双横担总成整体安装设备,其特征在于:所述纵向支杆(1)为丝杆,底部固设有手摇动轮(9),所述升降部(711)套设在所述纵向支杆(1)外,且两者螺纹连接,所述转动部(712)套设在所述升降部(711)外,且两者通过轴承连接。6. The overall installation equipment of electric double cross-arm assembly as claimed in claim 5, characterized in that: the longitudinal support rod (1) is a screw rod, the bottom is fixed with a hand wheel (9), and the lifting part (711) is sheathed on the outside of the longitudinal pole (1), and both are threadedly connected, and the rotating part (712) is sheathed on the outside of the lifting part (711), and both are connected by a bearing. 7.如权利要求1所述的电力双横担总成整体安装设备,其特征在于:所述吊挂件(4)包括第一吊挂件(41)和第二吊挂件(42),所述第一吊挂件(41)设置在所述横向支杆(2)自由端底部,所述第二吊挂件(42)设置在所述横向支杆(2)和所述纵向支杆(1)连接端顶部。7. The overall installation equipment of electric power double cross-arm assembly according to claim 1, characterized in that: the hanger (4) includes a first hanger (41) and a second hanger (42), and the first hanger (4) A hanger (41) is arranged at the bottom of the free end of the transverse strut (2), and the second hanger (42) is set at the connecting end of the transverse strut (2) and the longitudinal strut (1) top. 8.如权利要求7所述的电力双横担总成整体安装设备,其特征在于:所述第一吊挂件(41)和所述第二吊挂件(42)分别为定滑轮。8. The overall installation equipment for electric double cross-arm assembly according to claim 7, characterized in that: the first hanging member (41) and the second hanging member (42) are fixed pulleys respectively. 9.如权利要求1~8任一项所述的电力双横担总成整体安装设备,其特征在于:所述抱箍(5)包括通过螺栓可拆卸连接的左抱箍(51)和右抱箍(52),所述左抱箍(51)包括相互平行设置的第一上抱箍片(511)和第一下抱箍片(512),所述第一上抱箍片(511)和所述第一下抱箍片(512)通过第一连接件(513)连接;9. The overall installation equipment for electric double cross-arm assembly according to any one of claims 1 to 8, characterized in that: the hoop (5) includes a left hoop (51) and a right hoop which are detachably connected by bolts. A hoop (52), the left hoop (51) includes a first upper hoop piece (511) and a first lower hoop piece (512) arranged parallel to each other, and the first upper hoop piece (511) connected with the first lower hoop piece (512) through a first connecting piece (513); 所述右抱箍(52)包括相互平行设置的第二上抱箍片(521)和第二下抱箍片(522),所述第二上抱箍片(521)和所述第二下抱箍片(522)通过第二连接件(523)连接,所述第二连接件(523)与所述纵向支杆(1)转动连接。The right hoop (52) includes a second upper hoop piece (521) and a second lower hoop piece (522) arranged parallel to each other, and the second upper hoop piece (521) and the second lower hoop piece (521) The hoop piece (522) is connected through a second connecting piece (523), and the second connecting piece (523) is rotatably connected with the longitudinal strut (1). 10.电力双横担总成整体安装方法,其特征在于,包括以下步骤:10. The overall installation method of the electric double cross-arm assembly is characterized in that it comprises the following steps: 步骤一,在地面上将所述双横担总成(8)组装好;Step 1, assembling the double cross-arm assembly (8) on the ground; 步骤二,将权利要求1~9任一项所述电力双横担总成整体安装设备安装至所述电线杆(6)顶部;Step 2, installing the overall installation equipment of the electric double cross-arm assembly described in any one of claims 1 to 9 on the top of the utility pole (6); 步骤三,将组装好的所述双横担总成(8)牵引至所述电线杆(6)顶部并放置在所述托架(7)上;Step 3, pulling the assembled double cross-arm assembly (8) to the top of the utility pole (6) and placing it on the bracket (7); 步骤四,控制所述托架(7)上升,直至其底端高于所述电线杆(6)顶端;Step 4, controlling the bracket (7) to rise until its bottom is higher than the top of the utility pole (6); 步骤五,旋转所述托架(7),使得两个所述横担之间的安装孔位于所述电线杆(6)的正上方,之后控制所述托架(7)下降,直至所述双横担总成(8)下降至预设的横担安装位置,安装所述双横担总成(8);Step 5, rotate the bracket (7) so that the installation hole between the two cross arms is located directly above the utility pole (6), and then control the bracket (7) to descend until the The double cross-arm assembly (8) descends to the preset cross-arm installation position, and the double cross-arm assembly (8) is installed; 步骤六,所述双横担总成(8)安装完毕后,拆除所述电力双横担总成整体安装设备并将其送至地面。Step 6, after the installation of the double cross-arm assembly (8) is completed, remove the overall installation equipment of the electric double-cross-arm assembly and send it to the ground.
CN201810940565.6A 2018-08-17 2018-08-17 Overall installation equipment and method of electric double cross arm assembly Active CN108999458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810940565.6A CN108999458B (en) 2018-08-17 2018-08-17 Overall installation equipment and method of electric double cross arm assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810940565.6A CN108999458B (en) 2018-08-17 2018-08-17 Overall installation equipment and method of electric double cross arm assembly

Publications (2)

Publication Number Publication Date
CN108999458A true CN108999458A (en) 2018-12-14
CN108999458B CN108999458B (en) 2020-04-28

Family

ID=64593587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810940565.6A Active CN108999458B (en) 2018-08-17 2018-08-17 Overall installation equipment and method of electric double cross arm assembly

Country Status (1)

Country Link
CN (1) CN108999458B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236011A (en) * 2021-06-03 2021-08-10 河北久金电力器材制造有限公司 Cross arm convenient to install and method for enabling cross arm to be convenient to install
CN114293836A (en) * 2021-12-30 2022-04-08 扬州鑫龙电器有限公司 Transformer rectifier outlet rod capable of being installed quickly
CN114293833A (en) * 2022-01-13 2022-04-08 郑斯用 High-strength environment-friendly energy-saving telegraph pole for power line

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1547915A (en) * 1923-08-28 1925-07-28 Ernest J Hirn Transformer-hoisting bracket
KR20120115055A (en) * 2011-04-08 2012-10-17 오완곤 Winch supporting device
CN204012466U (en) * 2014-08-22 2014-12-10 重庆工商职业学院 Concertina type bottle-holding rack
CN204848091U (en) * 2015-08-03 2015-12-09 国家电网公司 Steel sheet cross arm hoisting accessory
CN206707394U (en) * 2017-03-20 2017-12-05 国家电网公司 Modified adhesion type is from lifting pole
CN107724767A (en) * 2017-10-25 2018-02-23 国网黑龙江省电力有限公司七台河供电公司 Tool for lifting cross arm

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1547915A (en) * 1923-08-28 1925-07-28 Ernest J Hirn Transformer-hoisting bracket
KR20120115055A (en) * 2011-04-08 2012-10-17 오완곤 Winch supporting device
CN204012466U (en) * 2014-08-22 2014-12-10 重庆工商职业学院 Concertina type bottle-holding rack
CN204848091U (en) * 2015-08-03 2015-12-09 国家电网公司 Steel sheet cross arm hoisting accessory
CN206707394U (en) * 2017-03-20 2017-12-05 国家电网公司 Modified adhesion type is from lifting pole
CN107724767A (en) * 2017-10-25 2018-02-23 国网黑龙江省电力有限公司七台河供电公司 Tool for lifting cross arm

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236011A (en) * 2021-06-03 2021-08-10 河北久金电力器材制造有限公司 Cross arm convenient to install and method for enabling cross arm to be convenient to install
CN114293836A (en) * 2021-12-30 2022-04-08 扬州鑫龙电器有限公司 Transformer rectifier outlet rod capable of being installed quickly
CN114293833A (en) * 2022-01-13 2022-04-08 郑斯用 High-strength environment-friendly energy-saving telegraph pole for power line

Also Published As

Publication number Publication date
CN108999458B (en) 2020-04-28

Similar Documents

Publication Publication Date Title
CN102882153B (en) Phase replacing insulator string method in charged for replacement circuit many times towers
CN108999458A (en) The double cross-arm assembly integral installation device and method of electric power
CN107181203A (en) Helicopter hotline maintenance ground wire basket of work
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN203760908U (en) Cement pole crossarm installation tool
CN106229889B (en) A kind of transmission line of electricity lifting device for aerial wires
CN105375391A (en) Automatic elevation type temporary cross arm
CN208207025U (en) A kind of high-tension electricity equipment test attachment device
CN102602794B (en) Special tools for casing hoisting
CN205811420U (en) A kind of aid of charged for replacement rod insulator
CN210825200U (en) Lifting device for large-scale power equipment installation
CN202594599U (en) Tool special for hoisting casing
CN103318745A (en) Lightweight special-purposed spreader and mounting method thereof
CN205355684U (en) Straight line porcelain insulator dismouting hoist
CN109347038B (en) High-voltage wire jumper windproof partial suspension weight device
CN201817243U (en) Platform and device for replacing conductor rail
CN107558793B (en) A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof
CN205676052U (en) Bench type transformer crane device
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN204858403U (en) A temporary hanging point fixing device for live replacement of V-shaped insulators on transmission lines
CN108445266A (en) A kind of high-tension electricity equipment test attachment device
CN105060154A (en) Suspension installation machine of suspended load type transformer
CN204958263U (en) Suspended load formula transformer suspends installation apparatus in midair
CN205178388U (en) Two cluster insulators of straight line are changed and are connected
CN204558970U (en) 10kV, 35kV switch gear room crane span structure lifting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant