CN102064495B - Lead wire brace rod for double-circuit lines on same pole - Google Patents

Lead wire brace rod for double-circuit lines on same pole Download PDF

Info

Publication number
CN102064495B
CN102064495B CN 201010558708 CN201010558708A CN102064495B CN 102064495 B CN102064495 B CN 102064495B CN 201010558708 CN201010558708 CN 201010558708 CN 201010558708 A CN201010558708 A CN 201010558708A CN 102064495 B CN102064495 B CN 102064495B
Authority
CN
China
Prior art keywords
double
insulating
lifting
same pole
stay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010558708
Other languages
Chinese (zh)
Other versions
CN102064495A (en
Inventor
曾国忠
吴健仁
洪雄伟
魏嘉建
郑阿建
张嘉荣
陈坪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN 201010558708 priority Critical patent/CN102064495B/en
Publication of CN102064495A publication Critical patent/CN102064495A/en
Application granted granted Critical
Publication of CN102064495B publication Critical patent/CN102064495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种同杆双回线路导线撑杆,包括上撑杆、下撑杆;用于连接撑杆的绝缘吊带以及用于提拉的绝缘吊带;在上、下撑杆上分别设置有两个或两个以上的导线固定夹子,在每个固定夹子处都设置有一个吊点;在连接撑杆的绝缘吊带两端部设置可将绝缘吊带扣于上、下撑杆吊点处的搭扣;在提拉绝缘吊带的端部设置有吊钩。其优点在于:具有结构合理、拆装灵活、携带方便。尤其是铝合金套式丝杆的应用,很好的实现了下层多条导线平稳水平移动的要求。对导线的固定采用撞击式夹头,并根据所要固定导线的排列形式和数量以及环境情况,分别采用了水平和竖直布设两种方式,极大地方便了操作人员的现场装拆使用。

Figure 201010558708

The invention discloses a double-circuit line wire support bar on the same pole, which comprises an upper support bar and a lower support bar; insulating slings used for connecting the support bars and insulating slings used for lifting; There are two or more wire fixing clips, and a lifting point is set at each fixing clip; the insulating straps are installed at both ends of the insulating straps connecting the struts so that the insulating straps can be fastened to the lifting points of the upper and lower struts The hasp; the end of the lifting insulation sling is provided with a hook. The utility model has the advantages of reasonable structure, flexible assembly and disassembly, and convenient portability. In particular, the application of the aluminum alloy sheathed screw rod fulfills the requirement of smooth and horizontal movement of multiple wires in the lower layer. The wires are fixed using impact chucks, and according to the arrangement and quantity of the wires to be fixed and the environmental conditions, two methods of horizontal and vertical layout are adopted, which greatly facilitates the on-site assembly and disassembly of operators.

Figure 201010558708

Description

一种同杆双回线路导线撑杆A double-circuit line wire support rod on the same rod

技术领域 technical field

本发明涉及一种带电作业工器具,特别是一种同杆双回线路导线撑杆。The invention relates to a tool for live work, in particular to a support rod for a double-circuit line conductor on the same rod.

背景技术 Background technique

随着国民经济的快速发展,城乡用电量需求迅速增长,频繁地出现在10kV供电馈线的档中带电补立电杆后,T接新增设备的作业案例。通常单回线路带电立杆采用的作业方式是:在对新立电杆杆坑上方一定范围的带电导线进行绝缘遮蔽后,利用绝缘杆等工具撑开下层的两边相导线并提升上层的中相导线后,进行新电杆的起立。目的是要确保新电杆在起立过程中杆身或横担等构件不碰触带电体,从而提高作业的安全性。但是由于同杆架设双回线路的导线布设形式与单回路不同,因此造成现有的撑杆工具无法对同杆架设双回线路下层的4条导线同时进行固定、撑开或提拉的作业需求。不仅影响了作业的效率,更涉及到同杆双回路线路场合带电补立杆作业的安全、合理性。因此,迫切需要研制同杆双回线路导线撑杆以满足和保障现场实际安全作业的要求。With the rapid development of the national economy, the demand for electricity consumption in urban and rural areas has increased rapidly, and there are frequent cases of T-connection of new equipment after the 10kV power supply feeder is charged and the pole is erected. Usually, the working method of live poles for single-circuit lines is: after insulating and shielding the live wires in a certain range above the pole pit of Xinli electric poles, use tools such as insulating rods to spread the phase wires on both sides of the lower layer and lift the middle phase wires of the upper layer. After conducting the wire, carry out the erection of the new electric pole. The purpose is to ensure that components such as the shaft or the cross arm of the new pole do not touch the charged body during the erection process, thereby improving the safety of the operation. However, due to the fact that the layout of the wires of the double-circuit line on the same pole is different from that of the single-circuit line, the existing pole support tools cannot simultaneously fix, spread or pull the four wires on the lower layer of the double-circuit line erected on the same pole. . It not only affects the efficiency of the operation, but also involves the safety and rationality of the live pole replacement operation in the case of dual-circuit lines on the same pole. Therefore, there is an urgent need to develop the same-rod double-circuit line conductor brace to meet and ensure the actual safety requirements of the site.

发明内容 Contents of the invention

本发明的目的在于克服现有技术的不足之处,而提供一种可适用于同杆架设双回线路导线的导线撑杆。The purpose of the present invention is to overcome the disadvantages of the prior art, and provide a wire support rod suitable for erecting double-circuit line wires on the same rod.

一种同杆双回线路导线撑杆,其结构要点在于:包括上撑杆、下撑杆;用于连接撑杆的绝缘吊带以及用于提拉的绝缘吊带;在上、下撑杆上分别设置有两个或两个以上的导线固定夹子,在每个固定夹子处都设置有一个吊点;在连接撑杆的绝缘吊带两端部设置可将绝缘吊带扣于上、下撑杆吊点处的搭扣;在提拉绝缘吊带的端部设置有吊钩。A double-circuit wire stay on the same pole, the key points of its structure are: including an upper stay and a lower stay; insulating straps for connecting the stays and insulating straps for lifting; There are two or more wire fixing clips, and there is a lifting point at each fixing clip; the insulating straps are installed at both ends of the insulating straps connecting the braces to buckle the straps on the upper and lower braces. The buckle at the place; a hook is provided at the end of the lifting insulation sling.

在使用时,先将将撑杆安装于相应的导线上,然后将连接撑杆的绝缘吊带通过其端部的搭扣固定于上、下撑杆的吊点上。将提拉绝缘吊带通过吊钩钩挂于连接撑杆的绝缘吊带上,而后再利用高空绝缘斗臂车(简称带电车)小吊臂的液压绞盘带动上层导线撑杆、小吊臂带动下层导线撑杆,从而实现上、下层导线的同时或分别提升和调整。When in use, the struts are first installed on the corresponding wires, and then the insulating suspenders connecting the struts are fixed on the hanging points of the upper and lower struts through the hasps at the ends. Hang the lifting insulating sling on the insulating sling connecting the strut through the hook, and then use the hydraulic winch of the small boom of the high-altitude insulating bucket truck (abbreviated as the trolley) to drive the upper conductor strut and the small boom to drive the lower conductor. Support rods, so as to realize the simultaneous or separate lifting and adjustment of the upper and lower layers of wires.

所述的上、下撑杆均为长度可调节的撑杆。将上、下撑杆设置成长度可调节的撑杆,这样就使得该撑杆可应用于多种不同间距的导线。同时还使得该撑杆具有便于携带的优点。The upper and lower struts are all length-adjustable struts. The upper and lower struts are set as length-adjustable struts, so that the struts can be applied to multiple wires with different spacings. At the same time, the strut has the advantage of being easy to carry.

所述的长度可调节的撑杆其实现的方式有很多,以下是申请人提供的两种形式:There are many ways to implement the length-adjustable strut, the following are the two forms provided by the applicant:

一种是:上、下撑杆为由两段或两段以上构成,各段之间采用带有螺栓固定的抽拉式结构。One is: the upper and lower struts are composed of two or more sections, and a pull-out structure with bolts is used between each section.

另一种是:上、下撑杆为由两段或两段以上构成,各段之间采用套式丝杆相连。The other is: the upper and lower struts are composed of two or more sections, and the sections are connected by sleeved screw rods.

采用以上的两种长度可调节的撑杆具有组装便捷、应用灵活,便于携带、装配灵活的优点。The use of the above two length-adjustable struts has the advantages of convenient assembly, flexible application, easy portability, and flexible assembly.

所述的上、下撑杆上的导线固定夹子为撞击式夹头。The wire fixing clips on the upper and lower struts are percussion chucks.

当然上、下撑杆上的导线固定夹子还可以是普通卡钩、旋紧式夹头等。Of course, the wire fixing clips on the upper and lower struts can also be common grabs, screw-on collets and the like.

所述的上撑杆上的撞击式夹头为水平分布式。The percussion chucks on the upper strut are distributed horizontally.

所述的下撑杆上的撞击式夹头为直立式。The percussion chuck on the lower brace is upright.

采用直立式或水平分布式的撞击式夹头,可合理承担水平载荷与垂直载荷的要求。The vertical or horizontal distributed impact chuck can reasonably bear the requirements of horizontal load and vertical load.

在提拉绝缘吊带的端部设置的吊钩为重力闭锁挂钩。The hook provided at the end of the lifting insulation sling is a gravity locking hook.

将提拉绝缘吊带的端部采用重力闭锁挂钩,可以方便地在安全、合理位置完成对下层导线撑杆提拉吊带的入扣组装,进而满足线路带电补立电杆提升导线的需要。The end of the lifting insulating sling is adopted with a gravity locking hook, which can conveniently complete the buckle assembly of the lifting sling of the lower conductor strut in a safe and reasonable position, thereby meeting the needs of the live line to erect the pole and lift the conductor.

连接撑杆的绝缘吊带为可调节长度的扁平吊带。The insulating slings connecting the struts are flat slings of adjustable length.

双回路导线架设的上、下层横担,不同材质的杆型设计和人工安装等因素会造成间距不同,在提拉导线前需要对连接与撑杆的吊带长度进行适当调整。因而选择采用可调节长度的扁平吊带。The upper and lower cross-arms erected by the double-circuit conductors, the pole design of different materials and manual installation will cause different spacing. Before pulling the conductors, the length of the slings connecting and supporting the poles needs to be adjusted appropriately. Hence the choice of a flat harness with adjustable length.

用于提拉的绝缘吊带为圆形吊带。Insulated slings for lifting are round slings.

所述的吊点为吊环。Described suspension point is suspension ring.

综上所述的,本发明相比现有技术如下优点:In summary, compared with the prior art, the present invention has the following advantages:

本发明的同杆双回线路导线撑杆,具有结构合理、拆装灵活、携带方便。尤其是铝合金套式丝杆的应用,很好的实现了下层多条导线平稳水平移动的要求。对导线的固定采用撞击式夹头,并根据所要固定导线的排列形式和数量以及环境情况,分别采用了水平和竖直布设两种方式,极大地方便了操作人员的现场装拆使用。同时,通过长度可调的绝缘吊带,可以很好的适应在作业线路上下层横担安装高度、长度不一场合的调整使用。通过重力闭锁挂钩与吊带的配合使用,可以方便地在安全、合理位置完成对下层导线撑杆提拉吊带的入扣组装,进而满足线路带电补立电杆提升导线的需要。The double-circuit wire support bar of the same pole of the present invention has the advantages of reasonable structure, flexible assembly and disassembly, and convenient portability. In particular, the application of the aluminum alloy sheathed screw rod fulfills the requirement of smooth and horizontal movement of multiple wires in the lower layer. The wires are fixed using impact chucks, and according to the arrangement and quantity of the wires to be fixed and the environmental conditions, two methods of horizontal and vertical layout are adopted, which greatly facilitates the on-site assembly and disassembly of operators. At the same time, through the length-adjustable insulating sling, it can be well adapted to the adjustment and use of the occasions where the installation height and length of the upper and lower cross-arms of the operation line are different. Through the combined use of the gravity locking hook and the sling, it is convenient to complete the buckle-in assembly of the lifting sling of the lower conductor strut at a safe and reasonable position, thereby meeting the needs of the live line for erecting the pole and lifting the conductor.

附图说明 Description of drawings

图1是本发明的同杆双回路导线撑杆上撑杆结构示意图Fig. 1 is a schematic diagram of the structure of the upper strut of the same-rod double-circuit conductor strut of the present invention

图2是本发明的同杆双回路导线撑杆下撑杆结构示意图Fig. 2 is a structural schematic diagram of the lower strut of the same-rod double-circuit conductor strut of the present invention

图3是本发明的同杆双回路导线撑杆组装结构示意图Fig. 3 is a schematic diagram of the assembly structure of the same-rod double-circuit wire strut of the present invention

标号说明1上撑杆2下撑杆3扁平吊带4圆形吊带5撞击式夹头6铝合合套式丝杆7吊点8重力闭锁挂钩9搭扣Explanation of Reference Signs 1 Upper strut 2 Lower strut 3 Flat sling 4 Round sling 5 Impact chuck 6 Aluminum sleeved screw 7 Lifting point 8 Gravity locking hook 9 Hasp

具体实施方式 Detailed ways

下面结合实施例对本发明进行更详细的描述。The present invention will be described in more detail below in conjunction with examples.

实施例1Example 1

一种如图1-3所示的同杆双回线路导线撑杆示意图,包括上撑杆1、下撑杆2、用于撑杆的绝缘吊带及用于提拉的绝缘吊带。所述的上撑杆为由两段式构成,段与段之间采用螺栓固定抽拉式的结构,在上撑杆的两端设置有两个水平分布的撞击式夹头5;所述的下撑杆由两段构成,段与段之间采用铝合金套式丝杆6相连,在下撑杆上分布四个的直立式的撞击式夹头。在上、下撑杆的撞击式夹头处设置有吊环式的吊点7。所述的提拉绝缘吊带为圆形吊带4,在吊带的端部设置有重力闭锁挂钩8。所述的连接撑杆的绝缘吊带为可调节长度的扁平吊带3,在其端部设置有可与吊点相配合的搭扣9。A schematic diagram of a double-circuit line conductor stay on the same pole as shown in Figures 1-3, including an upper stay 1, a lower stay 2, insulating straps for the braces, and insulating straps for lifting. The upper strut is composed of two sections, and the bolts are used to fix the pull-out structure between the sections. Two horizontally distributed impact chucks 5 are arranged at both ends of the upper strut; The lower strut is composed of two sections, and the segments are connected by an aluminum alloy sleeve type screw rod 6, and four vertical impact chucks are distributed on the lower strut. Ring-type lifting points 7 are arranged at the impact chucks of the upper and lower struts. The lifting insulating sling is a round sling 4, and a gravity locking hook 8 is arranged at the end of the sling. The insulating suspenders connecting the struts are flat suspenders 3 with adjustable length, and buckles 9 that can be matched with suspension points are arranged at the ends thereof.

本实施例未述部分与现有技术相同。The parts not described in this embodiment are the same as the prior art.

Claims (10)

1.一种同杆双回线路导线撑杆,其特征在于:包括上撑杆(1)、下撑杆(2);用于连接撑杆的绝缘吊带以及用于提拉的绝缘吊带;在上、下撑杆上分别设置有两个以上的导线固定夹子,在每个固定夹子处都设置有一个吊点(7);在连接撑杆的绝缘吊带两端部设置有将绝缘吊带扣于上、下撑杆吊点处的搭扣(9);在提拉绝缘吊带的端部设置有吊钩。 1. A double-circuit line conductor stay with the same pole, characterized in that: it comprises an upper stay (1), a lower stay (2); an insulating suspender for connecting the stay and an insulating suspender for lifting; The upper and lower braces are respectively provided with more than two wire fixing clips, and a suspension point (7) is arranged at each fixing clip; The hasp (9) at the lifting point of the upper and lower struts; a suspension hook is arranged at the end of the lifting insulating suspender. 2.根据权利要求1所述的同杆双回线路导线撑杆,其特征在于:所述的上、下撑杆均为长度可调节的撑杆。 2. The conductor stay for double-circuit lines on the same pole according to claim 1, wherein the upper and lower stays are length-adjustable stays. 3.根据权利要求2所述的同杆双回线路导线撑杆,其特征在于:所述的上、下撑杆为由两段以上构成,各段之间采用带有螺栓固定的抽拉式结构。 3. The double-circuit line wire stay on the same pole according to claim 2, characterized in that: the upper and lower stays are composed of more than two sections, and the pull-out type with bolts is adopted between each section. structure. 4.根据权利要求2所述的同杆双回线路导线撑杆,其特征在于:所述的上、下撑杆为由两段以上构成,各段之间采用套式丝杆相连。 4. The same-rod double-circuit line wire stay according to claim 2, characterized in that: the upper and lower stays are composed of more than two sections, and the sections are connected by sleeved screw rods. 5.根据权利要求3或4所述的同杆双回线路导线撑杆,其特征在于:所述的上、下撑杆上的导线固定夹子为撞击式夹头(5)。 5. The wire support rod for double-circuit lines on the same pole according to claim 3 or 4, characterized in that: the wire fixing clips on the upper and lower support rods are percussion chucks (5). 6.根据权利要求5所述的同杆双回线路导线撑杆,其特征在于:所述的上撑杆上的撞击式夹头为水平分布式。 6. The conductor support bar of double-circuit lines on the same pole according to claim 5, characterized in that: the percussion chucks on the upper support bar are distributed horizontally. 7.根据权利要求6所述的同杆双回线路导线撑杆,其特征在于:所述的下撑杆上的撞击式夹头为直立式。 7. The same-rod double-circuit line wire support rod according to claim 6, characterized in that: the percussion chuck on the lower support rod is upright. 8.根据权利要求7所述的同杆双回线路导线撑杆,其特征在于:在提拉绝缘吊带的端部设置的吊钩为重力闭锁挂钩(8)。  8. The conductor stay of double-circuit line on the same pole according to claim 7, characterized in that: the hook provided at the end of the lifting insulating sling is a gravity locking hook (8). the 9.根据权利要求8所述的同杆双回线路导线撑杆,其特征在于:连接撑杆的绝缘吊带为可调节长度的扁平吊带(3)。 9. The conductor support bar of double-circuit line on the same pole according to claim 8, characterized in that: the insulating suspenders connecting the poles are flat suspenders (3) with adjustable length. 10.根据权利要求9所述的同杆双回线路导线撑杆,其特征在于:用于提拉的绝缘吊带为圆形吊带(4) 。 10. The conductor support rod of double-circuit lines on the same pole according to claim 9, characterized in that: the insulating sling used for pulling is a round sling (4).
CN 201010558708 2010-11-25 2010-11-25 Lead wire brace rod for double-circuit lines on same pole Active CN102064495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010558708 CN102064495B (en) 2010-11-25 2010-11-25 Lead wire brace rod for double-circuit lines on same pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010558708 CN102064495B (en) 2010-11-25 2010-11-25 Lead wire brace rod for double-circuit lines on same pole

Publications (2)

Publication Number Publication Date
CN102064495A CN102064495A (en) 2011-05-18
CN102064495B true CN102064495B (en) 2013-01-30

Family

ID=43999664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010558708 Active CN102064495B (en) 2010-11-25 2010-11-25 Lead wire brace rod for double-circuit lines on same pole

Country Status (1)

Country Link
CN (1) CN102064495B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2947879A1 (en) * 2014-05-08 2015-11-12 Quanta Associates, L.P. Rotating conductor holder
CN108487761B (en) * 2018-03-29 2019-09-06 国网山东省电力公司潍坊供电公司 Portable Dual Circuit Replacement Pole Insulation Strut
CN112398046A (en) * 2020-10-28 2021-02-23 国网浙江永康市供电有限公司 A kind of double-circuit line delta-arranged wire spreading tool
CN113270812B (en) * 2021-05-08 2025-03-25 国网江苏省电力有限公司南京供电分公司 Components for constructing an insulating support device and an insulating support device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4466506A (en) * 1982-01-15 1984-08-21 Dolenti Alfred N Wire lift device for high tension electric line
US4973795A (en) * 1989-11-09 1990-11-27 Sharpe Robert F Temporary transmission hot line crossarm and method of replacing transmission hot line crossarms
CN101803134A (en) * 2007-05-16 2010-08-11 广达服务 Boom mountable robotic arm
CN201877725U (en) * 2010-11-25 2011-06-22 福建省电力有限公司莆田电业局 Jackstay for double-circuit line conductor on same pole

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2134617C (en) * 1994-10-28 1998-01-06 Daniel Neil O'connell Boom-mountable robotic arm
KR100815836B1 (en) * 2007-12-28 2008-03-24 대원전기 주식회사 Uninterruptible cutting replacement construction of concrete pole for distribution line using pole clamp and pole crusher

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4466506A (en) * 1982-01-15 1984-08-21 Dolenti Alfred N Wire lift device for high tension electric line
US4973795A (en) * 1989-11-09 1990-11-27 Sharpe Robert F Temporary transmission hot line crossarm and method of replacing transmission hot line crossarms
CN101803134A (en) * 2007-05-16 2010-08-11 广达服务 Boom mountable robotic arm
CN201877725U (en) * 2010-11-25 2011-06-22 福建省电力有限公司莆田电业局 Jackstay for double-circuit line conductor on same pole

Also Published As

Publication number Publication date
CN102064495A (en) 2011-05-18

Similar Documents

Publication Publication Date Title
CN201746251U (en) Pole lifting device
CN102336378A (en) On-pole lifting device
CN102064495B (en) Lead wire brace rod for double-circuit lines on same pole
CN103545753B (en) Multifunctional 550kN titanium alloy closed insulator fixture
CN203352051U (en) Insulation protective umbrella
CN201766313U (en) Insulation cross-arm for dual circuit
CN204552245U (en) A kind of extra-high voltage direct-current tangent tower of wire vertical arrangement
CN203553740U (en) A replacing apparatus for a 800kV extra-high voltage direct current transmission line single insulator
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN104795225B (en) A kind of application method for the auxiliary device for installing transformer
CN205265149U (en) Be applied to split conductor of transmission line operation and carry line ware
CN201877725U (en) Jackstay for double-circuit line conductor on same pole
CN201234081Y (en) 220kV bus support column porcelain bottle inspection rack
CN206233852U (en) A kind of Portable lifting transmission platform
CN208264028U (en) A kind of novel combination type carrier cable homing device
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN202395384U (en) Operation tool for multiloop of 110-220kV electric transmission line
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN206053825U (en) A kind of upper font combines insulation elevator
CN105406402B (en) A kind of folding lightweight goes out single string strain insulator string devices
CN203932817U (en) Seal is drawn in the charged disconnecting of articulated type 66kV tube type bus
CN204983880U (en) Supplementary gallows of wire pole roof -rack installation
CN108847617A (en) The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain
CN202651689U (en) Optical cable line construction spanning frame
CN102957113B (en) Decoration construction temporary power construction system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: FUJIAN ELECTRIC POWER CO., LTD. FUJIAN ELECTRIC PO

Effective date: 20121221

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: FUJIAN ELECTRIC POWER CO., LTD., PUTIAN ELECTRIC BUREAU

Effective date: 20121221

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 351100 PUTIAN, FUJIAN PROVINCE TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121221

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: Fujian Electric Power Co., Ltd.

Applicant after: Putian Electric Power Bureau, Fujian Electric Power Co. Ltd.

Address before: Putian City, Fujian Province, 351100 Lane Road Chengxiang District No. 7

Applicant before: Putian Electric Power Bureau, Fujian Electric Power Co. Ltd.

C14 Grant of patent or utility model
GR01 Patent grant