CN103266768B - Spherical vault lid construction mold method - Google Patents

Spherical vault lid construction mold method Download PDF

Info

Publication number
CN103266768B
CN103266768B CN201310205861.9A CN201310205861A CN103266768B CN 103266768 B CN103266768 B CN 103266768B CN 201310205861 A CN201310205861 A CN 201310205861A CN 103266768 B CN103266768 B CN 103266768B
Authority
CN
China
Prior art keywords
prefabricated section
reinforcing bar
lap
bar hook
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310205861.9A
Other languages
Chinese (zh)
Other versions
CN103266768A (en
Inventor
杨生治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310205861.9A priority Critical patent/CN103266768B/en
Publication of CN103266768A publication Critical patent/CN103266768A/en
Application granted granted Critical
Publication of CN103266768B publication Critical patent/CN103266768B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A kind of spherical vault lid construction mold method, by the prefabricated section concave surface of first lap down, and the end opening of prefabricated section is fitted on plain-water slurry; Reinforcing bar is hooked in the suitable for reading of prefabricated section, the lower foot lever of reinforcing bar hook clamps at reserved steel bar hook hole intraocular simultaneously; Sequentially install the prefabricated section of first lap; The prefabricated section of the second circle is then installed: beat plain-water slurry at the prefabricated section position of upper of first lap, by the second same concave surface of prefabricated section enclosed down, and the end opening of prefabricated section is fitted on the prefabricated section of first lap plain-water slurry suitable for reading, the prefabricated section simultaneously reinforcing bar being hooked in the second circle is suitable for reading, and the lower foot lever of reinforcing bar hook clamps in the reinforcing bar hook draw-in groove that first lap prefabricated section end opening is arranged; Sequentially install the prefabricated section of the second circle; Then identical method other arch ring prefabricated section assembled is adopted.Have without any need for support, and mould is overall with Cast-in-place concrete layer shape all-in-one-piece, does not need the features such as form removal.

Description

Spherical vault lid construction mold method
Technical field
The present invention relates to spherical vault lid construction mold method.
Background technology
At present; general cast-in-place or that prefabricated component the is assembled method of concrete cast-in-situ concrete that adopts of round building vault construction is carried out; above-mentioned construction method all must build bow member below vault; die-filling; template adopts wooden model or punching block mostly; need mould to remove after construction completes, this mold method not only complex process, cost is high, long in time limit, and to larger sky across round building cannot realize vault.Therefore, be necessary to make improvements.
Summary of the invention
Technical problem to be solved by this invention is, provides a kind of spherical vault lid construction mold method, has without any need for support, and mould is overall with Cast-in-place concrete layer shape all-in-one-piece, does not need the features such as form removal.
The present invention is achieved in that a kind of spherical vault lid construction mold method, adopts following steps:
1) according to spherical vault lid diameter and ratio of rise to span, ball collar radius, sagitta, arch arc length, prefabricated height, number of arch ring, prefabricated section thickness and width is calculated;
2) according to the data in step 1), make prefabricated section, and the end opening end of prefabricated section is provided with reinforcing bar hook draw-in groove;
3) prefabricated section of different arch ring is numbered in order;
4) reinforcing bar hook is made;
5) at circle bay wall top cast-in-place collar tie beam, and carry out and step on pin inclined-plane, reserved steel bar hook eyelet simultaneously;
6) beat plain-water slurry stepping on pin incline position, by the prefabricated section concave surface of first lap down, and the end opening of prefabricated section is fitted on plain-water slurry; Reinforcing bar is hooked in the suitable for reading of prefabricated section, the lower foot lever of reinforcing bar hook clamps at reserved steel bar hook hole intraocular simultaneously; Sequentially install the prefabricated section of first lap;
7) prefabricated section of the second circle is then installed: beat plain-water slurry at the prefabricated section position of upper of first lap, by the second same concave surface of prefabricated section enclosed down, and the end opening of prefabricated section is fitted on the prefabricated section of first lap plain-water slurry suitable for reading, the prefabricated section simultaneously reinforcing bar being hooked in the second circle is suitable for reading, and the lower foot lever of reinforcing bar hook clamps in the reinforcing bar hook draw-in groove that first lap prefabricated section end opening is arranged; Sequentially install the prefabricated section of the second circle;
8) according to step 7), the prefabricated section of other arch rings is installed.
Its width of prefabricated section installed when arch ring closes up can adopt the equipment corrections such as cutting machine.
Often install an arch ring, calibration arch radius, makes its error be no more than 5mm.
Compared with prior art, the mold method of spherical vault lid of the present invention, without any need for support, and mould is overall with Cast-in-place concrete layer shape all-in-one-piece, does not need form removal.The invention has the beneficial effects as follows:
1, Prefabricated block Mold Making is simple, expense is low, durable in use;
2, prefabricated section can concentrate factorial praluction, also can field fabrication;
3, engineering construction is convenient and simple, safe and reliable;
4, save engineering cost, shorten the construction period.
Accompanying drawing explanation
Fig. 1 is the assembled plan view of vault head of the present invention.
Fig. 2 is A place partial enlarged drawing in Fig. 1.
Fig. 3 is the structural representation of reinforcing bar hook.
Fig. 4 is the assembled sectional drawing of vault head of the present invention.
Fig. 5 is B place partial enlarged drawing in Fig. 4.
Fig. 6 is the structural representation of prefabricated section of the present invention.
Detailed description of the invention
Under by reference to the accompanying drawings and embodiment, the present invention is further elaborated.
As shown in Figures 1 to 6, beat plain-water slurry stepping on position, pin inclined-plane 4, by prefabricated section 1 concave surface of first lap down, and the end opening of prefabricated section 1 is fitted on plain-water slurry; Reinforcing bar hook 3 is hooked in the suitable for reading of prefabricated section 1, reinforcing bar is linked up with 3 times foot levers and is clamped at reserved steel bar hook hole intraocular simultaneously; Sequentially install the prefabricated section 1 of first lap; The prefabricated section 1 of the second circle is then installed: beat plain-water slurry at prefabricated section 1 position of upper of first lap, by the same concave surface of the second prefabricated section 1 enclosed down, and the end opening of prefabricated section 1 is fitted on the prefabricated section 1 of first lap plain-water slurry suitable for reading, the prefabricated section simultaneously reinforcing bar hook 3 being hooked in the second circle is suitable for reading, and 3 times foot levers clamping in the reinforcing bar hook draw-in groove 2 that first lap prefabricated section end opening is arranged linked up with by reinforcing bar; Sequentially install the prefabricated section 1 of the second circle; Then identical method other arch ring prefabricated section 1 assembled is adopted; Its width of prefabricated section 1 installed when arch ring closes up can adopt the equipment corrections such as cutting machine; Often install an arch ring, calibration arch radius, makes its error be no more than 5mm.

Claims (3)

1. a spherical vault lid construction mold method, is characterized in that adopting following steps:
1) according to spherical vault lid diameter and ratio of rise to span, ball collar radius, sagitta, arch arc length, prefabricated height, number of arch ring, prefabricated section thickness and width is calculated;
2) according to step 1) in data, make prefabricated section, and the end opening end of prefabricated section is provided with reinforcing bar hook draw-in groove;
3) prefabricated section of different arch ring is numbered in order;
4) reinforcing bar hook is made;
5) at circle bay wall top cast-in-place collar tie beam, and carry out and step on pin inclined-plane, reserved steel bar hook eyelet simultaneously;
6) beat plain-water slurry stepping on pin incline position, by the prefabricated section concave surface of first lap down, and the end opening of prefabricated section is fitted on plain-water slurry; Reinforcing bar is hooked in the suitable for reading of prefabricated section, the lower foot lever of reinforcing bar hook clamps at reserved steel bar hook hole intraocular simultaneously; Sequentially install the prefabricated section of first lap;
7) prefabricated section of the second circle is then installed: beat plain-water slurry at the prefabricated section position of upper of first lap, by the second same concave surface of prefabricated section enclosed down, and the end opening of prefabricated section is fitted on the prefabricated section of first lap plain-water slurry suitable for reading, the prefabricated section simultaneously reinforcing bar being hooked in the second circle is suitable for reading, and the lower foot lever of reinforcing bar hook clamps in the reinforcing bar hook draw-in groove that first lap prefabricated section end opening is arranged; Sequentially install the prefabricated section of the second circle;
8) according to step 7), the prefabricated section of other arch rings is installed.
2. spherical vault lid construction mold method according to claim 1, its width of prefabricated section installed when it is characterized in that arch ring closes up can adopt the equipment corrections such as cutting machine.
3. spherical vault lid construction mold method according to claim 1, is characterized in that often installing an arch ring, and calibration arch radius, makes its error be no more than 5mm.
CN201310205861.9A 2013-05-29 2013-05-29 Spherical vault lid construction mold method Expired - Fee Related CN103266768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310205861.9A CN103266768B (en) 2013-05-29 2013-05-29 Spherical vault lid construction mold method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310205861.9A CN103266768B (en) 2013-05-29 2013-05-29 Spherical vault lid construction mold method

Publications (2)

Publication Number Publication Date
CN103266768A CN103266768A (en) 2013-08-28
CN103266768B true CN103266768B (en) 2015-09-16

Family

ID=49010422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310205861.9A Expired - Fee Related CN103266768B (en) 2013-05-29 2013-05-29 Spherical vault lid construction mold method

Country Status (1)

Country Link
CN (1) CN103266768B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593020A (en) * 2017-01-25 2017-04-26 陈益民 Cement concrete spherical outdoor single-person safe house and single-person rescue capsule

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2228379A5 (en) * 1973-05-04 1974-11-29 Jauffret Gilbert Concrete cylindrical-based spherical building - is formed with pneumatic mould, circular base-sections arc-shaped gangway
GB2144479A (en) * 1983-07-18 1985-03-06 Cmgm Pty Ltd The casting of concrete shells
CN101225718A (en) * 2008-01-30 2008-07-23 重庆三峰卡万塔环境产业有限公司 Construction method of steel reinforced concrete chimney
CN101261082A (en) * 2007-09-11 2008-09-10 李朝侠 Zinc metallurgy ore smelting electric arc furnace spherical top integral pouring and maintenance method
CN101838957A (en) * 2010-05-07 2010-09-22 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
CN101929245A (en) * 2010-08-19 2010-12-29 江苏华江建筑工程有限公司 Thin webbed girder vertical construction method
CN102535844A (en) * 2012-02-10 2012-07-04 中国建筑第八工程局有限公司 Construction method for spherical curved surface stainless steel curtain wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2228379A5 (en) * 1973-05-04 1974-11-29 Jauffret Gilbert Concrete cylindrical-based spherical building - is formed with pneumatic mould, circular base-sections arc-shaped gangway
GB2144479A (en) * 1983-07-18 1985-03-06 Cmgm Pty Ltd The casting of concrete shells
CN101261082A (en) * 2007-09-11 2008-09-10 李朝侠 Zinc metallurgy ore smelting electric arc furnace spherical top integral pouring and maintenance method
CN101225718A (en) * 2008-01-30 2008-07-23 重庆三峰卡万塔环境产业有限公司 Construction method of steel reinforced concrete chimney
CN101838957A (en) * 2010-05-07 2010-09-22 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
CN101929245A (en) * 2010-08-19 2010-12-29 江苏华江建筑工程有限公司 Thin webbed girder vertical construction method
CN102535844A (en) * 2012-02-10 2012-07-04 中国建筑第八工程局有限公司 Construction method for spherical curved surface stainless steel curtain wall

Also Published As

Publication number Publication date
CN103266768A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
DK2803617T3 (en) Method of erecting a tower of a wind power plant
CN204225145U (en) A kind of simple and easy orientation tool for basic embedding anchor bolts
CN201443203U (en) Mold of preformed hole of cast-in-place reinforced concrete slab
CN104153493A (en) Concrete shear wall structure based on 3D printing and construction method of concrete shear wall structure
CN202125074U (en) Double cone floorslab reserved-hole die
CN104018514A (en) Inverted installation method of embedded foundation bolts of large tower-type equipment foundation
CN205223839U (en) Bridge prefabrication stand and prefabricated bent cap slot -in type connection structure
CN103276895B (en) Die supporting method of reversed-cone-shaped column cap die
CN110106780A (en) A kind of connection structure, the construction method of Precast Pier Columns and pile foundation
CN109853610A (en) Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN110847599A (en) Special-shaped column formwork filling reinforcement device and construction method thereof
CN103266768B (en) Spherical vault lid construction mold method
CN204081279U (en) Floor absolute altitude disjunctor split heads
CN209703708U (en) It is a kind of for the pre-buried positioning device for hanging nail of prefabricated components
CN105625187A (en) Method for constructing concrete for large-section inclined column
CN106284428A (en) A kind of concrete column method for supporting of building structure post-cast strip
CN203238953U (en) Embedded sleeve positioning device
CN103266769B (en) A kind of construction method of spherical vault lid
CN104727339B (en) Power equipment basis two-step construction method
CN110046363B (en) Construction method for accurately embedding pipeline group in concrete structure
CN105040973A (en) External decorative layer template of conical column of comprehensive gymnasium and construction method thereof
CN204825665U (en) Utilize device of laser positioning preparation steel reinforcement cage
CN103352568A (en) Method for building constructional column on foundation pad
CN203594024U (en) Cast-in-situ bored pile reinforcement cage elevation control rod
CN103669389A (en) Corrugated pipe fixing method for positioning foundation bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

Termination date: 20180529

CF01 Termination of patent right due to non-payment of annual fee