CN105040973A - Outer decorating layer formwork for conical columns of comprehensive gym and construction method of outer decorating layer formwork - Google Patents

Outer decorating layer formwork for conical columns of comprehensive gym and construction method of outer decorating layer formwork Download PDF

Info

Publication number
CN105040973A
CN105040973A CN201510470894.5A CN201510470894A CN105040973A CN 105040973 A CN105040973 A CN 105040973A CN 201510470894 A CN201510470894 A CN 201510470894A CN 105040973 A CN105040973 A CN 105040973A
Authority
CN
China
Prior art keywords
template
formwork
decorative layer
construction method
perforating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510470894.5A
Other languages
Chinese (zh)
Other versions
CN105040973B (en
Inventor
高飞
李树成
王全逵
姜斌
刘坤
胡杭
高李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201510470894.5A priority Critical patent/CN105040973B/en
Publication of CN105040973A publication Critical patent/CN105040973A/en
Application granted granted Critical
Publication of CN105040973B publication Critical patent/CN105040973B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a device for casting cast-in-place concrete, in particular to an outer decorating layer formwork for conical columns of a comprehensive gym and a construction method of the outer decorating layer formwork. The outer decorating layer formwork is positioned on the outer side of an outer decorating layer and comprises a face board, back ribs and oppositely-pulling screws, the face board is a bilayer thick wood formwork, a three-ply board is lined on one face, facing the decorating layer, of the face board, and one ends of the oppositely-pulling screws are anchored on conical concrete columns to fix the face board and the back ribs. The construction method includes the following steps: rechecking structural size of cast conical columns; determining a formwork machining detailed drawing; making and assembling the formwork; trepanning for bolts of the formwork; putting the formwork in place for the first time; trepanning structural columns along reserved bolt holes of the formwork; retreating the formwork; implanting sectional screws; putting the formwork for the second time; demounting the formwork. A wood formwork face board and a section steel keel are matched mutually, so that the outer decorating layer formwork is easy to assemble and suitable for structural components variable in shape, and forming effect of the components meets designing requirements under the condition of reasonable and effective reinforcing and supporting.

Description

Comprehensive gymnasium tapered pole outer decorative layer template and construction method thereof
Technical field
The present invention relates to the device that a kind of cast-in-situ concrete is built, be specially comprehensive gymnasium tapered pole outer decorative layer template and construction method thereof.
Background technology
In the face of the special-shaped component of large space, often select to design and produce typified form by professional template producer, as set shaped steel formwork, specialized factory's design advantage is that template system is more accurate, Stability Analysis of Structures, construct also more convenient, but construction costs is higher, typified form also has its limitation simultaneously, run into irregular structure component, on a production line also just cannot mechanization production, just there is very large difficulty in specialty template processing and fabricating, cannot deal with problems, the fabrication cycle of typified form is longer in addition, generally can take certain duration, typified form can not again repeatability, also data can be caused to waste.Therefore, how to find applicable tapered pole outer decorative layer template and construction method thereof, become in building engineering construction the technical problem being badly in need of solving.
Summary of the invention
The present invention is directed to problem above, devise a kind of template for the construction of tapered pole outer decorative layer and corresponding construction method thereof.
Concrete solution is: comprehensive gymnasium tapered pole outer decorative layer template, outer decorative layer template is positioned at outside outer decorative layer, described outer decorative layer template comprises cylinder template and cone template, and the circular end face of cylinder template is the bottom surface of cone template; Outer decorative layer template comprises: double-layer back plate, main joist channel-section steel back cord, secondary joist channel-section steel, a few word beam back cord, square steel pipe and Screw arbor with nut at both-ends, double-layer back plate is lined with three-ply board towards the one side of decorative layer, one end of Screw arbor with nut at both-ends is anchored on taper concrete column, main joist channel-section steel back cord, secondary joist channel-section steel, a few word beam back cord, square steel pipe and double-layer back plate is fixed on taper concrete column respectively.
Further, the double-layer back plate of described outer decorative layer template is the thick wooden form of double-deck 15mm, and double-layer back plate is lined with the thick three-ply board of 3mm towards decorative layer one side, forms the lines with wood grain effect; The wooden form of double-layer back plate is thin-walled Ascast finish concrete template with wood grain, vertical 40 × 60 × more than the 2 word beam back cords of double-layer back plate backing, and horizontal direction arranges 8# channel-section steel 500 as horizontal secondary joist, and back cord adopts two 14# channel-section steel as main joist; Screw arbor with nut at both-ends is three-stage screw.
The invention also discloses the construction method of comprehensive gymnasium tapered pole outer decorative layer template, comprise the steps:
1) check the physical dimension of having built tapered pole: must be simulated by entity, and field measurement actual quantities errorless after, in-depth and the processing of template can be carried out;
2) in conjunction with drawing and check size determination template shop detail drawing: according to the field data measured, in conjunction with drawing, carry out datumization setting-out, determine final template shop detail drawing;
3) template construct and assembled: template construct should be constructed in strict accordance with the material required by scheme, to ensure enough intensity.
4) template bolt perforating: bolt hole spacing due to tapered pole complex-shaped, accurately cannot draw expanded view, so must the arrangement of field lofting bolt hole, setting-out layout viewing, after each side confirms, can carry out punching work.Punching diameter control is at 25mm, so that the angle of adjustment segmented screw carries out reinforcement by connection.
5) template first time is in place: on-the-spot put sample well according to reinforcement location, template highest and lowest portion line is aimed to carry out template temporary fixed, and on pillar, arrange temporary support bar, ensures that template does not move.And protect temporary fixed point, in place to ensure second time;
6) along template prepared screw-bolt hole to structural column perforating: along template bolt hole to pillar perforating, perforating degree of depth 300mm, arranges mark during perforating on drill bit, ensures that the perforating degree of depth is accurate;
7) template is given up the throne: utilize the movable pulley of template itself and crane to withdraw from template, must utilize the suspension hook position in template, and command lifting by special messenger, forbid template to collide outrigger and building when noting handling;
8) implant segmented screw rod: can bar planting after noting bolt hole to clean out before implanting segmented screw rod, bar planting should meet the requirement of concrete structure post-anchoring technology;
9) template second time in place: template second time in place, ensure that primary template contral point does not change, guarantee twice in place identical.
10) form removable: two days strippings after concreting completes, removes from top to bottom, and crane hangs up properly suspension hook → carry out temporary support → dismounting primary and secondary skeletal frame → dismounting temporary support → lifting demoulding.
Further, in described step 3), form surfacing assembled complete after, subsides three-ply board before, quadrat sampling must be measured on template entity, setting-out result must be obtained, management, school side, design and construction over contract side can carry out the splicing of three-ply board after confirming, after three-ply board has spliced, jointly confirmed by management, school side, design and overall budget, after getting the nod, can subsequent construction be carried out in the scene of dropping into.
Further, in described step 4), template perforating adopts target drill from the outside perforating in three-ply board side, avoids three-ply board damaged.
Further, in described step 9), all templates should be checked in advance before concreting, to all have the position foamed glue in space close avoid running pulp.
Further, in described step 10), during form removal, operating personnel should stand in safe place, to avoid security incident; Should trying not during form removal, it is too urgent to overexert, and forbids firmly to pound with sledgehammer and crowbar firmly to strike, in order to avoid concrete surface or template are damaged.
Further, in described step 10), the template pulled down and accessory thereof, forbid disorderly to throw to throw out without care, special messenger should be had to scoop out transmission, stack by appointed place, and cleaning in time, maintenance and brush interleaving agent, use in order to turnover.
Further, in described step 10), in form removal process, during as found that concrete has quality problems affect structural safety, should stop removing, after treatment, just can continue dismounting.
Beneficial effect: wooden form panel and shaped steel keel cooperatively interact, be easy to assembled, be applicable to the structural element that moulding is changeable, in reinforcing with under supporting reasonable effective condition, stiffness by itself can meet fixing needs, the molding effect of component meets design requirement, and plate body system is relatively low relative to typified form cost.
Accompanying drawing explanation
Fig. 1 is tapered pole outer decorative layer template laterally first time formwork figure;
Fig. 2 is tapered pole outer decorative layer template laterally second time formwork figure;
Fig. 3 is tapered pole outer decorative layer template formwork figure of vertical first time;
Fig. 4 is tapered pole outer decorative layer template vertical second time formwork figure;
Fig. 5 is tapered pole outer decorative layer template formwork part plan enlarged drawing;
In figure, 11-double-layer back plate; 12-channel-section steel back cord; 13-Screw arbor with nut at both-ends; 131-high-strength bolt silk end; The high-strength conical head of 132-; The high-strength pre-embedded bolt of 133-; 14-secondary joist channel-section steel; 2-outer decorative layer; 3-taper concrete column; 4-back cord; 5 square steel pipes; More than 6 word beam back cords.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described.
As Figure 1-Figure 2,: comprehensive gymnasium tapered pole outer decorative layer template, outer decorative layer template is positioned at outside outer decorative layer 2, and described outer decorative layer template comprises cylinder template and cone template, and the circular end face of cylinder template is the bottom surface of cone template; Outer decorative layer template comprises: double-layer back plate 11, main joist channel-section steel back cord 12, secondary joist channel-section steel 14, a few word beam back cord 6, square steel pipe 5 and Screw arbor with nut at both-ends 13, double-layer back plate 11 is lined with three-ply board towards the one side of decorative layer, one end of Screw arbor with nut at both-ends 13 is anchored on taper concrete column 3, main joist channel-section steel back cord 12, secondary joist channel-section steel 14, a few word beam back cord 6, square steel pipe 5 and double-layer back plate 11 is fixed on taper concrete column 3 respectively.
Further, the double-layer back plate 11 of described outer decorative layer template is the thick wooden form of double-deck 15mm, and double-layer back plate 11 is lined with the thick three-ply board of 3mm towards decorative layer one side, forms the lines with wood grain effect; The wooden form of double-layer back plate 11 is thin-walled Ascast finish concrete template with wood grain, vertical 40 × 60 × more than the 2 word beam back cords 6 of double-layer back plate 11 backing, horizontal direction arranges 8# channel-section steel and arranges as horizontal secondary joist according to interval 500mm, and back cord 12 adopts two 14# channel-section steel as main joist; Screw arbor with nut at both-ends 13 is three-stage screw.
The construction method of tapered pole outer decorative layer template, comprises the steps:
1) check the physical dimension of having built tapered pole: must be simulated by BIM entity, and field measurement actual quantities errorless after, in-depth and the processing of template can be carried out;
2) in conjunction with drawing and check size determination template shop detail drawing: according to the field data measured, in conjunction with drawing, utilize BIM technology and cad to carry out datumization setting-out, determine final template shop detail drawing;
3) template construct and assembled: template construct should be constructed in strict accordance with the material required by scheme, to ensure enough intensity.Form surfacing assembled complete after, before subsides three-ply board, quadrat sampling must be measured on template entity, setting-out result must be obtained, management, school side, design and construction over contract side can carry out the splicing of three-ply board after confirming, after three-ply board has spliced, jointly confirmed by management, school side, design and overall budget, after getting the nod, can subsequent construction be carried out in the scene of dropping into.
4) template bolt perforating: bolt hole spacing due to tapered pole complex-shaped, accurately cannot draw expanded view, so must the arrangement of field lofting bolt hole, setting-out layout viewing, after each side confirms, can carry out punching work.Punching diameter control is at 25mm, so that the angle of adjustment segmented screw carries out reinforcement by connection.Template perforating adopts target drill from the outside perforating in three-ply board side, avoids three-ply board damaged.
5) template first time is in place: on-the-spot put sample well according to reinforcement location, template highest and lowest portion line is aimed to carry out template temporary fixed, and on pillar, arrange temporary support bar, ensures that template does not move.And protect temporary fixed point, in place to ensure second time;
6) along template prepared screw-bolt hole to structural column perforating: along template bolt hole to pillar perforating, perforating degree of depth 300mm, arranges mark during perforating on drill bit, ensures that the perforating degree of depth is accurate;
7) template is given up the throne: utilize the movable pulley of template itself and crane to withdraw from template, must utilize the suspension hook position in template, and command lifting by special messenger, forbid template to collide outrigger and building when noting handling;
8) implant segmented screw rod: can bar planting after noting bolt hole to clean out before implanting segmented screw rod, bar planting is required to meet the requirement of specification concrete structure post-anchoring technology code JGJ145-2013;
9) template second time in place: template second time in place, ensure that primary template contral point does not change, guarantee twice in place identical.All templates should be checked in advance before concreting, to all have the position foamed glue in space close avoid running pulp.
10) form removable: two days strippings after concreting completes, removes from top to bottom, and crane hangs up properly suspension hook → carry out temporary support → dismounting primary and secondary skeletal frame → dismounting temporary support → lifting demoulding.During form removal, operating personnel should stand in safe place, to avoid security incident; Should trying not during form removal, it is too urgent to overexert, and forbids firmly to pound with sledgehammer and crowbar firmly to strike, in order to avoid concrete surface or template are damaged.The template pulled down and accessory thereof, forbid disorderly to throw to throw out without care, special messenger should be had to scoop out transmission, stack by appointed place, and cleaning in time, maintenance and brush interleaving agent, use in order to turnover.In form removal process, during as found that concrete has quality problems affect structural safety, should stop removing, after treatment, just can continue dismounting.

Claims (9)

1. comprehensive gymnasium tapered pole outer decorative layer template, it is characterized in that, described outer decorative layer template is positioned at outer decorative layer (2) outside, and described outer decorative layer template comprises cylinder template and cone template, and the circular end face of cylinder template is the bottom surface of cone template; Outer decorative layer template comprises: double-layer back plate (11), main joist channel-section steel back cord (12), secondary joist channel-section steel (14), a few word beam back cord (6), square steel pipe (5) and Screw arbor with nut at both-ends (13), double-layer back plate (11) is lined with three-ply board towards the one side of decorative layer, one end of Screw arbor with nut at both-ends (13) is anchored on taper concrete column (3), main joist channel-section steel back cord (12), secondary joist channel-section steel (14), a few word beam back cord (6), square steel pipe (5) and double-layer back plate (11) is fixed on taper concrete column (3) respectively.
2. tapered pole outer decorative layer template according to claim 1, it is characterized in that, the double-layer back plate (11) of described outer decorative layer template is the thick wooden form of double-deck 15mm, and double-layer back plate (11) is lined with the thick three-ply board of 3mm towards decorative layer one side, forms the lines with wood grain effect;
The wooden form of double-layer back plate (11) is thin-walled Ascast finish concrete template with wood grain, vertical 40 × 60 × more than the 2 word beam back cords (6) of double-layer back plate (11) backing, horizontal direction arranges 8# channel-section steel 500 as horizontal secondary joist, and channel-section steel back cord (12) adopts two 14# channel-section steel as main joist; Screw arbor with nut at both-ends (13) is three-stage screw.
3. the construction method of comprehensive gymnasium tapered pole outer decorative layer template, is characterized in that, comprise the steps:
1) check the physical dimension of having built tapered pole: must be simulated by entity, and field measurement actual quantities errorless after, in-depth and the processing of template can be carried out;
2) in conjunction with drawing and check size determination template shop detail drawing: according to the field data measured, in conjunction with drawing, carry out datumization setting-out, determine final template shop detail drawing;
3) template construct and assembled: template construct should be constructed in strict accordance with the material required by scheme, to ensure enough intensity;
4) template bolt perforating: bolt hole spacing due to tapered pole complex-shaped, accurately cannot draw expanded view, so must the arrangement of field lofting bolt hole, setting-out layout viewing, after each side confirms, can carry out punching work;
Punching diameter control is at 25mm, so that the angle of adjustment segmented screw carries out reinforcement by connection;
5) template first time is in place: on-the-spot put sample well according to reinforcement location, template highest and lowest portion line is aimed to carry out template temporary fixed, and on pillar, arrange temporary support bar, ensures that template does not move;
And protect temporary fixed point, in place to ensure second time;
6) along template prepared screw-bolt hole to structural column perforating: along template bolt hole to pillar perforating, perforating degree of depth 300mm, arranges mark during perforating on drill bit, ensures that the perforating degree of depth is accurate;
7) template is given up the throne: utilize the movable pulley of template itself and crane to withdraw from template, must utilize the suspension hook position in template, and command lifting by special messenger, forbid template to collide outrigger and building when noting handling;
8) implant segmented screw rod: can bar planting after noting bolt hole to clean out before implanting segmented screw rod, bar planting should meet the requirement of concrete structure post-anchoring technology;
9) template second time in place: template second time in place, ensure that primary template contral point does not change, guarantee twice in place identical;
10) form removable: two days strippings after concreting completes, removes from top to bottom, and crane hangs up properly suspension hook → carry out temporary support → dismounting primary and secondary skeletal frame → dismounting temporary support → lifting demoulding.
4. construction method according to claim 3, it is characterized in that, in described step 3), form surfacing assembled complete after, before subsides three-ply board, must measure quadrat sampling on template entity, setting-out result must be obtained, and management, school side, design and construction over contract side can carry out the splicing of three-ply board after confirming, after three-ply board has spliced, jointly confirmed by management, school side, design and overall budget, after getting the nod, can subsequent construction be carried out in the scene of dropping into.
5. construction method according to claim 3, is characterized in that, in described step 4), template perforating adopts target drill from the outside perforating in three-ply board side, avoids three-ply board damaged.
6. construction method according to claim 3, is characterized in that, in described step 9), should check all templates in advance before concreting, to all have the position foamed glue in space close avoid running pulp.
7. construction method according to claim 3, is characterized in that, in described step 10), during form removal, operating personnel should stand in safe place, to avoid security incident; Should trying not during form removal, it is too urgent to overexert, and forbids firmly to pound with sledgehammer and crowbar firmly to strike, in order to avoid concrete surface or template are damaged.
8. construction method according to claim 3, is characterized in that, in described step 10), the template pulled down and accessory thereof, forbid disorderly to throw to throw out without care, special messenger should be had to scoop out transmission, stack by appointed place, and cleaning in time, maintenance and brush interleaving agent, use in order to turnover.
9. construction method according to claim 3, is characterized in that, in described step 10), in form removal process, during as found that concrete has quality problems affect structural safety, should stop removing, after treatment, just can continue dismounting.
CN201510470894.5A 2015-08-05 2015-08-05 Construction method of outer decorating layer formwork for conical columns of comprehensive gym Expired - Fee Related CN105040973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510470894.5A CN105040973B (en) 2015-08-05 2015-08-05 Construction method of outer decorating layer formwork for conical columns of comprehensive gym

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510470894.5A CN105040973B (en) 2015-08-05 2015-08-05 Construction method of outer decorating layer formwork for conical columns of comprehensive gym

Publications (2)

Publication Number Publication Date
CN105040973A true CN105040973A (en) 2015-11-11
CN105040973B CN105040973B (en) 2017-04-26

Family

ID=54447914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510470894.5A Expired - Fee Related CN105040973B (en) 2015-08-05 2015-08-05 Construction method of outer decorating layer formwork for conical columns of comprehensive gym

Country Status (1)

Country Link
CN (1) CN105040973B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370037A (en) * 2015-11-24 2016-03-02 上海市安装工程集团有限公司 Large steel die and manufacturing and use method thereof
CN105464401A (en) * 2016-01-06 2016-04-06 中国建筑第八工程局有限公司 One-side support formwork structure for enlarging section and strengthening construction and construction method
CN109184196A (en) * 2018-10-09 2019-01-11 中国五冶集团有限公司 A kind of formwork erecting structure that oblique arch face structural concrete pours and method
CN113482326A (en) * 2021-06-01 2021-10-08 上海宝冶集团有限公司 Method for erecting arc formwork of bare concrete diaphragm wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2119460U (en) * 1991-09-28 1992-10-21 福建省第二建筑工程公司 Assembled permanent reinforced concrete form
CN2537780Y (en) * 2002-04-04 2003-02-26 权县民 Adjustable building garden formwork
CN102787716A (en) * 2012-08-22 2012-11-21 中建一局华江建设有限公司 Template system and construction method for European style hollowed slab pinnacle model structure
CN103276895A (en) * 2013-06-06 2013-09-04 金陵科技学院 Reversed-cone-shaped column cap die and die supporting method thereof
CN203213591U (en) * 2012-12-27 2013-09-25 上海建工七建集团有限公司 Beam-free turbinate column cap structure template system
CN205012621U (en) * 2015-08-05 2016-02-03 中国建筑第二工程局有限公司 Template is pour to outside decorative layer of conical column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2119460U (en) * 1991-09-28 1992-10-21 福建省第二建筑工程公司 Assembled permanent reinforced concrete form
CN2537780Y (en) * 2002-04-04 2003-02-26 权县民 Adjustable building garden formwork
CN102787716A (en) * 2012-08-22 2012-11-21 中建一局华江建设有限公司 Template system and construction method for European style hollowed slab pinnacle model structure
CN203213591U (en) * 2012-12-27 2013-09-25 上海建工七建集团有限公司 Beam-free turbinate column cap structure template system
CN103276895A (en) * 2013-06-06 2013-09-04 金陵科技学院 Reversed-cone-shaped column cap die and die supporting method thereof
CN205012621U (en) * 2015-08-05 2016-02-03 中国建筑第二工程局有限公司 Template is pour to outside decorative layer of conical column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张菊萍: "榆中县城区供水扩建工程清水池混凝土锥体模板施工技术", 《甘肃科技》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370037A (en) * 2015-11-24 2016-03-02 上海市安装工程集团有限公司 Large steel die and manufacturing and use method thereof
CN105464401A (en) * 2016-01-06 2016-04-06 中国建筑第八工程局有限公司 One-side support formwork structure for enlarging section and strengthening construction and construction method
CN109184196A (en) * 2018-10-09 2019-01-11 中国五冶集团有限公司 A kind of formwork erecting structure that oblique arch face structural concrete pours and method
CN109184196B (en) * 2018-10-09 2023-10-13 中国五冶集团有限公司 Formwork structure and method for concrete pouring of oblique arch surface structure
CN113482326A (en) * 2021-06-01 2021-10-08 上海宝冶集团有限公司 Method for erecting arc formwork of bare concrete diaphragm wall

Also Published As

Publication number Publication date
CN105040973B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN105040973A (en) Outer decorating layer formwork for conical columns of comprehensive gym and construction method of outer decorating layer formwork
CN204781624U (en) Floor elevation and roughness controlling means
CN104895318A (en) Aluminum alloy template system and construction method of same
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN104963431A (en) Corner structural column construction method
CN203891058U (en) Built-in foundation bolt positioning tool for fixed type tower crane foundation
CN209585294U (en) A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction
CN103174288A (en) Reinforcing method for U-bar hoop formworks of large-section frame column
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN103216131A (en) Reserved hole pore-forming construction method for concrete structure
CN205012621U (en) Template is pour to outside decorative layer of conical column
CN202090614U (en) Double-layer positioning mold made of waste wooden rubber plates for embedding anchor bolt
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN113021603A (en) Construction method for prefabricated assembled diamond type bent cap
CN109372003B (en) Deep cup rim template of bearing platform foundation and construction method for removing cup rim template
CN102635234A (en) Construction method for controlling thickness of upper-layer steel bar protection layer and board thickness of floorboard
CN205669210U (en) Steel building concrete cup-shaped foundation inner bore die carrier
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN211949655U (en) Reusable lifting plate thickness control device
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
CN203856199U (en) Prefabricated square steel stepping die
CN203066493U (en) Positioning die for precise construction of main reinforcement of pillar
CN204040457U (en) Wooden frame plastic formwork system
CN206723622U (en) One kind is reusable to hang die worker's tool
CN205822778U (en) A kind of huge post of stiffness is without screw aluminum alloy formwork system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20170805

CF01 Termination of patent right due to non-payment of annual fee