CN103266768A - Method for erecting form used for spherical arch head cover - Google Patents

Method for erecting form used for spherical arch head cover Download PDF

Info

Publication number
CN103266768A
CN103266768A CN2013102058619A CN201310205861A CN103266768A CN 103266768 A CN103266768 A CN 103266768A CN 2013102058619 A CN2013102058619 A CN 2013102058619A CN 201310205861 A CN201310205861 A CN 201310205861A CN 103266768 A CN103266768 A CN 103266768A
Authority
CN
China
Prior art keywords
prefabricated section
circle
prefabricated
prefabricated blocks
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102058619A
Other languages
Chinese (zh)
Other versions
CN103266768B (en
Inventor
杨生治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310205861.9A priority Critical patent/CN103266768B/en
Publication of CN103266768A publication Critical patent/CN103266768A/en
Application granted granted Critical
Publication of CN103266768B publication Critical patent/CN103266768B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

Provided is a method for erecting a form used for a spherical arch head cover. The concave surfaces of prefabricated blocks of a first circle face downward, and lower openings of the prefabricated blocks are attached to neat cement paste; at the same time, a steel bar hook is hooked on an upper opening of each prefabricated block, and lower foot rods of the steel bar hooks are tightly clamped in reserved steel bar hook holes; the prefabricated blocks of the first circle are sequentially installed; then prefabricated blocks of a second circle are installed, neat cement paste is cemented at the upper opening positions of the prefabricated blocks of the first circle, the concave surfaces of the prefabricated blocks of the second circle face downward as well, lower openings of the prefabricated blocks of the second circle are attached to the neat cement paste of the upper openings of the prefabricated blocks of the first circle, meanwhile, steel bar hooks are hooked on upper openings of the prefabricated blocks of the second circle, and lower foot rods of the steel bar hooks are tightly clamped in steel bar hook clamping grooves formed in the lower openings of the prefabricated blocks of the first circle; the prefabricated blocks of the second circle are sequentially installed; prefabricated blocks of other circles are spliced through the same method. The method has the advantages that no support is needed, meanwhile, the form is integrated with a cast-in-situ concrete layer, and the form does not need to be disassembled.

Description

Spherical vault head construction mold method
Technical field
The present invention relates to spherical vault head construction mold method.
Background technology
At present; the general concrete cast-in-situ concrete method cast-in-place or the prefabricated component assembly unit that adopts of round building vault construction is carried out; above-mentioned job practices all must be built bow member below vault; the dress mould; template adopts wooden model or punching block mostly; need after construction is finished mould is removed, this mold method is complex process, cost height, long in time limit not only, and can't realize vault to the round building that big sky is striden.Therefore, be necessary to make improvements.
Summary of the invention
Technical problem to be solved by this invention is, provides a kind of spherical vault head construction to use mold method, have without any need for support, and mould is to form unitary whole with the Cast-in-place concrete layer, does not need characteristics such as form removal.
The present invention is achieved in that a kind of spherical vault head construction mold method, adopts following steps:
1) according to spherical vault head diameter and ratio of rise to span, calculates ball collar radius, sagitta, arch arc length, prefabricated height, the arch ring number of plies, prefabricated section thickness and width;
2) according to the data in the step 1), make prefabricated section, and the end opening end of prefabricated section is provided with reinforcing bar hook draw-in groove;
3) prefabricated section of different arch rings is numbered in order;
4) make the reinforcing bar hook;
5) at the cast-in-place collar tie beam in circle bay wall top, and carry out and step on the pin inclined-plane, simultaneously reserved steel bar hook eyelet;
6) beat plain-water slurry stepping on the pin incline position, with the prefabricated section concave surface of first lap down, and the end opening of prefabricated section is fitted on the plain-water slurry; Simultaneously reinforcing bar is hooked in the suitable for reading of prefabricated section, reinforcing bar hook foot lever down tightens at reserved steel bar hook hole intraocular; Order installs the prefabricated section of first lap successively;
7) second prefabricated section that encloses then is installed: the prefabricated section position of upper at first lap is beaten plain-water slurry, with the second same concave surface of prefabricated section that encloses down, and the end opening of prefabricated section is fitted on the prefabricated section of the first lap plain-water slurry suitable for reading, the prefabricated section that simultaneously reinforcing bar is hooked in second circle is suitable for reading, and reinforcing bar hook foot lever down tightens in the reinforcing bar hook draw-in groove of first lap prefabricated section end opening setting; Order installs the prefabricated section of second circle successively;
8) according to step 7), the prefabricated section of other arch rings is installed.
Its width of prefabricated section of installing when arch ring closes up can adopt equipment corrections such as cutting machine.
Whenever install an arch ring, calibration arch radius makes its error be no more than 5mm.
Compared with prior art, the mold method of spherical vault head of the present invention, without any need for support, and mould is to form unitary whole with the Cast-in-place concrete layer, does not need form removal.The invention has the beneficial effects as follows:
1, the Prefabricated block Mold Making is simple, expense is low, and is durable in use;
2, prefabricated section can be concentrated batch production production, but also field fabrication;
3, engineering construction is convenient and simple, and is safe and reliable;
4, save engineering cost, shorten the construction period.
Description of drawings
Fig. 1 is the plan view of vault head assembly unit of the present invention.
Fig. 2 is A place partial enlarged drawing among Fig. 1.
Fig. 3 is the structural representation of reinforcing bar hook.
Fig. 4 is the sectional drawing of vault head assembly unit of the present invention.
Fig. 5 is B place partial enlarged drawing among Fig. 4.
Fig. 6 is the structural representation of prefabricated section of the present invention.
The specific embodiment
Reach embodiment by reference to the accompanying drawings down, the present invention is further elaborated.
Shown in Fig. 1 to 6, beat plain-water slurry stepping on 4 positions, pin inclined-plane, with prefabricated section 1 concave surface of first lap down, and the end opening of prefabricated section 1 is fitted on the plain-water slurry; Simultaneously reinforcing bar hook 3 is hooked in the suitable for reading of prefabricated section 1,3 times foot levers of reinforcing bar hook tighten at reserved steel bar hook hole intraocular; Order installs the prefabricated section 1 of first lap successively; The prefabricated section 1 of second circle then is installed: prefabricated section 1 position of upper at first lap is beaten plain-water slurry, with the second prefabricated section 1 same concave surface that encloses down, and the end opening of prefabricated section 1 is fitted on the prefabricated section 1 of the first lap plain-water slurry suitable for reading, the prefabricated section that simultaneously reinforcing bar hook 3 is hooked in second circle is suitable for reading, and 3 times foot levers of reinforcing bar hook are chucking in the reinforcing bar hook draw-in groove 2 that first lap prefabricated section end opening arranges; Order installs the prefabricated section 1 of second circle successively; Then adopt other arch ring prefabricated section 1 of identical method assembly unit; Prefabricated section 1 its width of installing when arch ring closes up can adopt equipment corrections such as cutting machine; Whenever install an arch ring, calibration arch radius makes its error be no more than 5mm.

Claims (3)

1. mold method is used in a spherical vault head construction, it is characterized in that adopting following steps:
1) according to spherical vault head diameter and ratio of rise to span, calculates ball collar radius, sagitta, arch arc length, prefabricated height, the arch ring number of plies, prefabricated section thickness and width;
2) according to the data in the step 1), make prefabricated section, and the end opening end of prefabricated section is provided with reinforcing bar hook draw-in groove;
3) prefabricated section of different arch rings is numbered in order;
4) make the reinforcing bar hook;
5) at the cast-in-place collar tie beam in circle bay wall top, and carry out and step on the pin inclined-plane, simultaneously reserved steel bar hook eyelet;
6) beat plain-water slurry stepping on the pin incline position, with the prefabricated section concave surface of first lap down, and the end opening of prefabricated section is fitted on the plain-water slurry; Simultaneously reinforcing bar is hooked in the suitable for reading of prefabricated section, reinforcing bar hook foot lever down tightens at reserved steel bar hook hole intraocular; Order installs the prefabricated section of first lap successively;
7) second prefabricated section that encloses then is installed: the prefabricated section position of upper at first lap is beaten plain-water slurry, with the second same concave surface of prefabricated section that encloses down, and the end opening of prefabricated section is fitted on the prefabricated section of the first lap plain-water slurry suitable for reading, the prefabricated section that simultaneously reinforcing bar is hooked in second circle is suitable for reading, and reinforcing bar hook foot lever down tightens in the reinforcing bar hook draw-in groove of first lap prefabricated section end opening setting; Order installs the prefabricated section of second circle successively;
8) according to step 7), the prefabricated section of other arch rings is installed.
2. the job practices of spherical vault head according to claim 1 is characterized in that its width of prefabricated section of installing when arch ring closes up can adopt equipment corrections such as cutting machine.
3. the job practices of spherical vault head according to claim 1 is characterized in that whenever installing an arch ring, and calibration arch radius makes its error be no more than 5mm.
CN201310205861.9A 2013-05-29 2013-05-29 Spherical vault lid construction mold method Expired - Fee Related CN103266768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310205861.9A CN103266768B (en) 2013-05-29 2013-05-29 Spherical vault lid construction mold method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310205861.9A CN103266768B (en) 2013-05-29 2013-05-29 Spherical vault lid construction mold method

Publications (2)

Publication Number Publication Date
CN103266768A true CN103266768A (en) 2013-08-28
CN103266768B CN103266768B (en) 2015-09-16

Family

ID=49010422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310205861.9A Expired - Fee Related CN103266768B (en) 2013-05-29 2013-05-29 Spherical vault lid construction mold method

Country Status (1)

Country Link
CN (1) CN103266768B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593020A (en) * 2017-01-25 2017-04-26 陈益民 Cement concrete spherical outdoor single-person safe house and single-person rescue capsule

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2228379A5 (en) * 1973-05-04 1974-11-29 Jauffret Gilbert Concrete cylindrical-based spherical building - is formed with pneumatic mould, circular base-sections arc-shaped gangway
GB2144479A (en) * 1983-07-18 1985-03-06 Cmgm Pty Ltd The casting of concrete shells
CN101225718A (en) * 2008-01-30 2008-07-23 重庆三峰卡万塔环境产业有限公司 Construction method of steel reinforced concrete chimney
CN101261082A (en) * 2007-09-11 2008-09-10 李朝侠 Zinc metallurgy ore smelting electric arc furnace spherical top integral pouring and maintenance method
CN101838957A (en) * 2010-05-07 2010-09-22 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
CN101929245A (en) * 2010-08-19 2010-12-29 江苏华江建筑工程有限公司 Thin webbed girder vertical construction method
CN102535844A (en) * 2012-02-10 2012-07-04 中国建筑第八工程局有限公司 Construction method for spherical curved surface stainless steel curtain wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2228379A5 (en) * 1973-05-04 1974-11-29 Jauffret Gilbert Concrete cylindrical-based spherical building - is formed with pneumatic mould, circular base-sections arc-shaped gangway
GB2144479A (en) * 1983-07-18 1985-03-06 Cmgm Pty Ltd The casting of concrete shells
CN101261082A (en) * 2007-09-11 2008-09-10 李朝侠 Zinc metallurgy ore smelting electric arc furnace spherical top integral pouring and maintenance method
CN101225718A (en) * 2008-01-30 2008-07-23 重庆三峰卡万塔环境产业有限公司 Construction method of steel reinforced concrete chimney
CN101838957A (en) * 2010-05-07 2010-09-22 柏松平 Integral type T-shaped outer cantilever roads and construction method thereof
CN101929245A (en) * 2010-08-19 2010-12-29 江苏华江建筑工程有限公司 Thin webbed girder vertical construction method
CN102535844A (en) * 2012-02-10 2012-07-04 中国建筑第八工程局有限公司 Construction method for spherical curved surface stainless steel curtain wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593020A (en) * 2017-01-25 2017-04-26 陈益民 Cement concrete spherical outdoor single-person safe house and single-person rescue capsule

Also Published As

Publication number Publication date
CN103266768B (en) 2015-09-16

Similar Documents

Publication Publication Date Title
CN108457421A (en) A kind of assembled steel reinforced Concrete U Vierendeel girder and its construction method
CN105431595B (en) Concrete pedestal and the positioner for positioning of the manufacture for the method for the concrete pedestal of wind power tower and for sleeve pipe in concrete pedestal
CN106150087B (en) A kind of combined frame column template and its construction method
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN110847599A (en) Special-shaped column formwork filling reinforcement device and construction method thereof
CN108755972B (en) Foot pad for prefabricated part and using method thereof
CN109853610A (en) Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN108265888B (en) Connecting structure of assembled concrete vertical member and construction method
CN106113230A (en) For the prefabricated non-type of bench, template system and construction method thereof can be had enough to meet the need
CN109750892B (en) Prefabricated assembly type hybrid fan tower formwork supporting method and device
BR102015027603B1 (en) METHOD FOR INSTALLING A HOLLOW CONCRETE TOWER MADE OF MORE THAN ONE SEGMENT
CN205223839U (en) Bridge prefabrication stand and prefabricated bent cap slot -in type connection structure
CN103266768A (en) Method for erecting form used for spherical arch head cover
CN104727339B (en) Power equipment basis two-step construction method
CN103266769B (en) A kind of construction method of spherical vault lid
CN105019605A (en) Floor slab reinforcement protective layer double-control precast concrete cushion block and installation method thereof
CN211817000U (en) Constructional column steel bar positioning mechanism
CN209703708U (en) It is a kind of for the pre-buried positioning device for hanging nail of prefabricated components
CN204826427U (en) Two accuse precast concrete cushions of floor cover to reinforcement
CN204960309U (en) Fixed adjustable cast -in -place stair template is propped up to establish and is used cushion braced system
CN104947853B (en) A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN113073789B (en) Construction method of crotch column inclined column of swimming pool
CN206554428U (en) A kind of precast stair connecting node
CN103352568A (en) Method for building constructional column on foundation pad

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

Termination date: 20180529