CN103264952A - 一种采用导杆吊装就位转炉塔楼汽包的施工方法 - Google Patents

一种采用导杆吊装就位转炉塔楼汽包的施工方法 Download PDF

Info

Publication number
CN103264952A
CN103264952A CN201310182456XA CN201310182456A CN103264952A CN 103264952 A CN103264952 A CN 103264952A CN 201310182456X A CN201310182456X A CN 201310182456XA CN 201310182456 A CN201310182456 A CN 201310182456A CN 103264952 A CN103264952 A CN 103264952A
Authority
CN
China
Prior art keywords
guide rod
drum
window
rope
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310182456XA
Other languages
English (en)
Other versions
CN103264952B (zh
Inventor
魏发利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201310182456.XA priority Critical patent/CN103264952B/zh
Publication of CN103264952A publication Critical patent/CN103264952A/zh
Application granted granted Critical
Publication of CN103264952B publication Critical patent/CN103264952B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Abstract

本发明公开了一种采用导杆吊装就位转炉塔楼汽包的施工方法,其特征在于:按以下步骤进行:1、制作导杆,导杆的右端较长,用于吊载、固定汽包,在顶头有一个用于牵引导向的圆环。导杆中间焊接一块用于穿吊车吊钩的吊耳。吊杆的左端较短,用于配重,在顶头焊有一个用于系牵引绳的圆环。2、检测导杆载荷平衡性。3、起吊前准备工作,一要在塔楼内安装好汽包的就位托架,二要检查汽包导入就位的窗口位置是否与汽包平行一致,三要将导入绳索系好。4、吊装汽包,将汽包通过窗口导入塔楼内部并就位在汽包托架上。本发明的优点是简单、快捷、安全、可靠、实用和节省费用,还可以用于其它工程设备就位吊装。

Description

一种采用导杆吊装就位转炉塔楼汽包的施工方法
技术领域
本发明涉及冶金设备安装施工技术领域,尤其是涉及一种采用导杆吊装就位转炉塔楼汽包的施工方法,适用于转炉塔楼汽化烟道冷却系统的汽包的施工。
背景技术
目前,在马钢清洁能源改建工程中,转炉塔楼的主要工程内容,就是新建汽化烟道冷却系统的转炉采用汽化烟道冷却系统的转炉,其中,汽包是气化冷却系统体积最大,重量最重的单体设备,直径3000mm、长度14000mm、壁厚45mm、重量约30t。汽包安装在转炉塔楼28m高平台上,由于没有天车,因此汽包吊装就位成了整个工程的难点。
发明内容
本发明的目的就是针对现有技术存在的缺点,提供一种采用导杆吊装就位转炉塔楼汽包的施工方法,一种能够解决汽包高空吊装、平移、就位的难题。
本发明的目的是这样实现的:一种采用导杆吊装就位转炉塔楼汽包的施工方法,其特征在于:按以下步骤进行:
1、制作导杆
根据所吊装的汽包的直径、长短、重量和将要导入的长度,用槽钢制作一根导杆。导杆的右端较长,用于吊载、固定汽包,在顶头有一个用于牵引导向的圆环,固定汽包的上方焊有两个防滑点。导杆中间焊接一块用于穿吊车吊钩的吊耳。吊杆的左端较短,用于配重,在顶头焊有一个用于系牵引绳的圆环,在固定配重位置焊有一个防滑点。
2、检测导杆载荷平衡性
将汽包用钢带、螺栓固定在导杆较长的一端防滑点内,选择配重,轻微提起,做好平衡实验。地面安装结束后,用吊车通过导杆将汽包缓慢提起离开地面,检测导杆载荷汽包与配重之间是否平衡、稳定。
3、起吊前准备工作
一要在塔楼内安装好汽包的就位托架,二要检查汽包导入就位的窗口位置是否与汽包平行一致,必要时在墙上重开一个窗口,三要将导入绳索一头从塔楼准备导入汽包位置的窗口抛下,系在导杆右端的圆环上,另一头由在塔楼窗口的施工人员牵引;导杆左端的圆环系两根牵引绳,用于控制导杆和汽包摆动,引导导杆、汽包就位导入方向。
4、吊装汽包
当汽包吊到窗口位置时,下面俩个控制牵引绳的人员,用绳索调整好导杆和汽包导入位置,上面窗口控制导入绳索的人员,要缓慢通过绳索,将导杆和汽包一端对准窗口,吊车司机要控制吊车吊杆缓慢移动,配合窗口控制导入绳索的人员,将汽包通过窗口导入塔楼内部并就位在汽包托架上。汽包就位后,解开系在导杆上的钢带,通过绳索缓慢将导杆从窗口送出去。
与现有技术相比,本发明的优点是:简单、快捷、安全、可靠、实用和节省费用,还可以用于其它工程设备就位吊装。
附图说明
图1:一种采用导杆吊装就位转炉塔楼汽包的施工方法示意图。
图中:1、吊车  2、圆环  3、配重  4、防滑点  5、吊耳  6、导杆  7、汽包  8、托架。
具体实施方式
为进一步描述本发明,下面结合实施例和附图对本发明作进一步描述。
如图所示,一种采用导杆吊装就位转炉塔楼汽包的施工方法,其特征在于:按以下步骤进行:
1、制作导杆
根据所吊装的汽包7的直径、长短、重量和将要导入的长度,用槽钢制作一根导杆6。导杆6的右端较长,用于吊载、固定汽包7,在顶头有一个用于牵引导向的圆环2,固定汽包位置的外侧焊有两个防滑点4。导杆6中间焊接一块用于穿吊车1吊钩的吊耳5。吊杆6的左端较短,用于配重,在顶头焊有一个用于系牵引绳的圆环2,在固定配重3位置焊有一个防滑点4。
2、检测导杆载荷平衡性
将汽包7用钢带、螺栓固定在导杆6较长的一端防滑点4内,选择配重3,轻微提起,做好平衡实验。地面安装结束后,用吊车1通过导杆6将汽包7缓慢提起离开地面,检测导杆6载荷汽包7与配重3之间是否平衡、稳定。
3、起吊前准备工作
一要在塔楼内安装好汽包7的就位托架8,二要检查汽包7导入就位的窗口位置是否与汽包7平行一致,必要时在墙上重开一个窗口,三要将导入绳索一头从塔楼准备导入汽包7位置的窗口抛下,系在导杆6右端的圆环2上,另一头由在塔楼窗口的施工人员牵引;导杆6左端的圆环2系两根牵引绳,用于控制导杆6和汽包7摆动,引导导杆6、汽包7就位导入方向。
4、吊装汽包
当汽包7吊到窗口位置时,下面两个控制牵引绳的人员,用绳索调整好导杆6和汽包7导入位置,上面窗口控制导入绳索的人员,要缓慢通过绳索,将导杆6和汽包7一端对准窗口,吊车1司机要控制吊车1吊杆缓慢移动,配合窗口控制导入绳索的人员,将汽包7通过窗口导入塔楼内部并就位在汽包7托架8上。汽包7就位后,解开系在导杆6上的钢带,通过绳索缓慢将导杆6从窗口送出去。

Claims (1)

1.一种采用导杆吊装就位转炉塔楼汽包的施工方法,其特征在于:按以下步骤进行:
1)、制作导杆
根据所吊装的汽包(7)的直径、长短、重量和将要导入的长度,用槽钢制作一根导杆(6);导杆(6)右端较长,用于吊载、固定汽包(7),在顶头有一个用于牵引导向的圆环(2),固定汽包位置的外侧焊有两个防滑点(4);导杆(6)中间焊接一块用于穿吊车(1)吊钩的吊耳(5),吊杆(6)的左端较短,用于配重,在顶头焊有一个用于系牵引绳的圆环(2),在固定配重(3)位置焊有一个防滑点(4);
2)、检测导杆载荷平衡性
将汽包(7)用钢带、螺栓固定在导杆(6)较长的一端防滑点(4)内,选择配重(3),轻微提起,做好平衡实验;地面安装结束后,用吊车(1)通过导杆(6)将汽包(7)缓慢提起离开地面,检测导杆(6)载荷汽包(7)与配重(3)之间是否平衡、稳定;
3)、起吊前准备工作
一要在塔楼内安装好汽包(7)的就位托架(8),二要检查汽包(7)导入就位的窗口位置是否与汽包(7)平行一致,必要时在墙上重开一个窗口,三要将导入绳索一头从塔楼准备导入汽包(7)位置的窗口抛下,系在导杆(6)右端的圆环(2)上,另一头由在塔楼窗口的施工人员牵引;导杆(6)左端的圆环(2)系两根牵引绳,用于控制导杆(6)和汽包(7)摆动,引导导杆(6)、汽包(7)就位导入方向;
4)、吊装汽包
当汽包(7)吊到窗口位置时,下面俩个控制牵引绳的人员,用绳索调整好导杆(6)和汽包(7)导入位置,上面窗口控制导入绳索的人员,要缓慢通过绳索,将导杆(6)和汽包(7)一端对准窗口,吊车(1)司机要控制吊车(1)吊杆缓慢移动,配合窗口控制导入绳索的人员,将汽包(7)通过窗口导入塔楼内部并就位在汽包(7)托架(8)上;汽包(7)就位后,解开系在导杆(6)上的钢带,通过绳索缓慢将导杆(6)从窗口送出去。
CN201310182456.XA 2013-05-17 2013-05-17 一种采用导杆吊装就位转炉塔楼汽包的施工方法 Active CN103264952B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310182456.XA CN103264952B (zh) 2013-05-17 2013-05-17 一种采用导杆吊装就位转炉塔楼汽包的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310182456.XA CN103264952B (zh) 2013-05-17 2013-05-17 一种采用导杆吊装就位转炉塔楼汽包的施工方法

Publications (2)

Publication Number Publication Date
CN103264952A true CN103264952A (zh) 2013-08-28
CN103264952B CN103264952B (zh) 2015-07-15

Family

ID=49008632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310182456.XA Active CN103264952B (zh) 2013-05-17 2013-05-17 一种采用导杆吊装就位转炉塔楼汽包的施工方法

Country Status (1)

Country Link
CN (1) CN103264952B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103612994A (zh) * 2013-12-03 2014-03-05 四川电力建设三公司 汽包单吊点倾斜吊装方法及吊装装置
CN104860205A (zh) * 2015-04-22 2015-08-26 中国十七冶集团有限公司 行车扁担法吊装方法
CN105907916A (zh) * 2016-04-12 2016-08-31 中国十七冶集团有限公司 一种厂房封闭后转炉汽包就位的方法
CN108946470A (zh) * 2018-07-09 2018-12-07 莱芜钢铁集团有限公司 一种用于转炉整体烟道的更换方法
CN109160421A (zh) * 2018-08-24 2019-01-08 中船第九设计研究院工程有限公司 一种移动风雨棚的整体吊装系统
CN109611817A (zh) * 2018-11-23 2019-04-12 中冶宝钢技术服务有限公司 余热锅炉模块化蒸发器吊挂结构侧进式安装工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09290991A (ja) * 1996-04-26 1997-11-11 Asanumagumi:Kk 揚重用吊り設備
JP2002364178A (ja) * 2001-06-08 2002-12-18 Maeda Corp 資材吊り上げ装置
CN101249924A (zh) * 2007-10-29 2008-08-27 上汽通用五菱汽车股份有限公司 对工件进行吊装装配的方法及使用的悬挂式助力装置
CN101284626A (zh) * 2008-05-20 2008-10-15 上海电气电站设备有限公司 一种配重吊装的方法
CN101580211A (zh) * 2009-06-23 2009-11-18 中国电力科学研究院 大型电力设备安装用多功能组合式吊装构架

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09290991A (ja) * 1996-04-26 1997-11-11 Asanumagumi:Kk 揚重用吊り設備
JP2002364178A (ja) * 2001-06-08 2002-12-18 Maeda Corp 資材吊り上げ装置
CN101249924A (zh) * 2007-10-29 2008-08-27 上汽通用五菱汽车股份有限公司 对工件进行吊装装配的方法及使用的悬挂式助力装置
CN101284626A (zh) * 2008-05-20 2008-10-15 上海电气电站设备有限公司 一种配重吊装的方法
CN101580211A (zh) * 2009-06-23 2009-11-18 中国电力科学研究院 大型电力设备安装用多功能组合式吊装构架

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103612994A (zh) * 2013-12-03 2014-03-05 四川电力建设三公司 汽包单吊点倾斜吊装方法及吊装装置
CN103612994B (zh) * 2013-12-03 2015-10-28 四川电力建设三公司 汽包单吊点倾斜吊装方法
CN104860205A (zh) * 2015-04-22 2015-08-26 中国十七冶集团有限公司 行车扁担法吊装方法
CN104860205B (zh) * 2015-04-22 2017-06-20 中国十七冶集团有限公司 行车扁担法吊装方法
CN105907916A (zh) * 2016-04-12 2016-08-31 中国十七冶集团有限公司 一种厂房封闭后转炉汽包就位的方法
CN105907916B (zh) * 2016-04-12 2018-01-02 中国十七冶集团有限公司 一种厂房封闭后转炉汽包就位的方法
CN108946470A (zh) * 2018-07-09 2018-12-07 莱芜钢铁集团有限公司 一种用于转炉整体烟道的更换方法
CN109160421A (zh) * 2018-08-24 2019-01-08 中船第九设计研究院工程有限公司 一种移动风雨棚的整体吊装系统
CN109160421B (zh) * 2018-08-24 2020-04-28 中船第九设计研究院工程有限公司 一种移动风雨棚的整体吊装系统
CN109611817A (zh) * 2018-11-23 2019-04-12 中冶宝钢技术服务有限公司 余热锅炉模块化蒸发器吊挂结构侧进式安装工艺

Also Published As

Publication number Publication date
CN103264952B (zh) 2015-07-15

Similar Documents

Publication Publication Date Title
CN103264952B (zh) 一种采用导杆吊装就位转炉塔楼汽包的施工方法
CN201228206Y (zh) 自制小型吊车
CN105858435A (zh) 条状倾斜钢结构单台吊机吊装就位的工艺
CN104140037B (zh) 墙板吊装系统
CN104195948B (zh) 桥梁悬吊管道顶推安装施工方法
CN104477736A (zh) 一种井道电梯的安装方法
US9689257B2 (en) Guide rail rope deflection inhibition mechanism and method for parallel soft cable suspension system
CN102992203B (zh) 一种钢结构桥梁安装用简易吊装装置
CN202390116U (zh) 一种高强度小吨位起吊机
CN103922232B (zh) 一种自升式塔机降塔工艺
CN104695425A (zh) 一种钢筋笼吊装施工工艺
CN105040592B (zh) 一种平拉索桥及其架设方法
CN202148109U (zh) 一种矿用电梯多功能模拟实验系统
CN201678363U (zh) 精确定位起重机吊具
CN204057758U (zh) 一种用于大高度工业建筑内设备检修的起重装置
CN201762053U (zh) 简易自动起重吊杆
CN202744238U (zh) 一种自动控制平衡的塔式起重机
CN202575637U (zh) 退火炉检修用升降装置
CN205114823U (zh) 一种天轮或导向轮用的辅助起吊工具
CN204823625U (zh) 一种升降机吊笼门配重机构
CN201406267Y (zh) 用于混铁车检修的杆秤式平衡吊具
CN203938366U (zh) 墙板吊装系统
CN204827525U (zh) 一种射流风机防脱落预警装置
CN203728417U (zh) 皮带机滚筒的起吊装置
CN103803395A (zh) 液压马达安装吊梁及其应用

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant