CN103256060B CN201310188613.8A CN201310188613A CN103256060B CN 103256060 B CN103256060 B CN 103256060B CN 201310188613 A CN201310188613 A CN 201310188613A CN 103256060 B CN103256060 B CN 103256060B
Authority
CN
China
Prior art keywords
grouting
excavation
wall
mylonite
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310188613.8A
Other languages
English (en)
Other versions
CN103256060A (zh
Inventor
马栋
朱卫东
常志军
孙明彪
龙彬
王晓岭
邓雄武
刘改英
谭忠盛
李涛
黄立新
王武现
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
China Railway 16th Bureau Group Co Ltd
Original Assignee
Beijing Jiaotong University
China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University, China Railway 16th Bureau Group Co Ltd filed Critical Beijing Jiaotong University
Priority to CN201310188613.8A priority Critical patent/CN103256060B/zh
Publication of CN103256060A publication Critical patent/CN103256060A/zh
Application granted granted Critical
Publication of CN103256060B publication Critical patent/CN103256060B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明涉及富水软弱糜棱岩大断面隧道围岩加固及开挖方法,包括以下步骤:开挖前,在掌子面上半断面施作止浆墙;止浆墙强度稳定后,布设注浆孔;通过高压、劈裂、挤密注浆方法注浆,注浆终压不小于4Mpa;注浆结束后,对开挖各部均设一检查孔,取芯检验注浆效果;步骤四检验合格后,破除止浆墙,开始挖掘;挖掘结束后,进入下一循环的步骤一至步骤五直至整个隧道挖掘结束。本发明的有益效果为:针对富水软弱糜棱岩大断面隧道,能够有效实现围岩的超前加固。在Ⅵ级围岩条件下,实现了大断面开挖掘进,克服了以往双侧壁导坑法和CRD法存在的限制大型机械使用、临时支护多、各工序施工干扰大等不利因素。

Description

富水软弱糜棱岩大断面隧道围岩加固及开挖方法
技术领域
本发明涉及隧道加固及挖掘技术领域,尤其涉及富水软弱糜棱岩大断面隧道围岩加固及开挖方法。
背景技术
糜棱岩是韧性变形条件下形成的断层岩,由基质和碎斑构成。糜棱岩为强烈破碎塑变作用所形成的岩石,往往分布于断裂带两侧,因为压扭应力的作用,使得岩石发生错动、颗粒破碎。由于糜棱岩自身组成和结构的特点,对水的敏感性极强,常规渗透注浆难以加固。隧道开挖后,糜棱岩围岩在渗水和开挖扰动作用下,强度指标迅速下降,自稳时间在1小时左右,如不及时进行支护,掌子面极易失稳,造成涌泥、溜坍,初期支护变形难以稳定,使得隧道施工难度大为增加。目前,富水糜棱岩隧道按Ⅵ级围岩设计施工,常规的超前加固方法(如小导管、大管棚注浆等)仍不能达到预期的围岩加固效果,因此现有针对Ⅵ级围岩施工的双侧壁导坑法及CRD法都难以应用。
发明内容
本发明的目的是提供富水软弱糜棱岩大断面隧道围岩加固及开挖方法,以克服目前现有技术存在的上述不足。
本发明的目的是通过以下技术方案来实现:
一种富水软弱糜棱岩大断面隧道围岩加固及开挖方法,包括以下步骤:
步骤一:开挖前,在掌子面上半断面施作止浆墙;
步骤二:止浆墙强度稳定后,布设注浆孔;
步骤三:通过高压、劈裂、挤密注浆方法注浆,注浆终压不小于4Mpa;
步骤四:注浆结束后,对开挖各部均设一检查孔,取芯检验注浆效果;
步骤五:步骤四检验合格后,破除止浆墙,开始挖掘;
步骤六:挖掘结束后,进入下一循环的步骤一至步骤五直至整个隧道挖掘结束。
进一步的,步骤一中的所述的止浆墙为厚度大于普通止浆墙厚度的混凝土止浆墙,止浆墙嵌入开挖轮廓线外不少于50cm。
进一步的,步骤二中注浆孔布置有三个终孔断面。所述终孔断面的终孔至少在开挖轮廓线外5m范围内,终孔间距最大不超过3m,扩散半径不超过2m,其中最外层终孔断面较内层两个终孔断面增加布置3环注浆孔,以保证下一循环施作止浆墙时围岩的稳定。
进一步的,步骤三中注浆方法为前进式注浆。注浆实施的顺序为先外圈、后内圈;外圈采用水泥和水玻璃双液浆,内圈采用水泥浆。
进一步的,步骤三注浆过程中根据糜棱岩含水量的分布设置引水导管,以实现糜棱岩的快速排水固结。步骤三注浆过程中沿隧道拱部开挖轮廓线加设管棚。
进一步的,步骤五开挖采用三台阶大拱脚七步开挖法。步骤五开挖过程中根据围岩和支护变形监控的量测结果,及时调整支护参数,加设临时支撑以及预留一定的初期支护补强空间。
本发明的有益效果为:针对富水软弱糜棱岩大断面隧道,能够有效实现围岩的超前加固。实现了富水软弱糜棱岩大断面隧道的快速施工,有效控制了围岩与初期支护变形。在Ⅵ级围岩条件下,实现了大断面开挖掘进,克服了以往双侧壁导坑法和CRD法存在的限制大型机械使用、临时支护多、各工序施工干扰大等不利因素。
附图说明
下面根据附图对本发明作进一步详细说明。
图1是本发明实施例所述止浆墙及注浆孔的纵向剖面图;
图2是本发明实施例所述三台阶大拱脚七步开挖法施工工序图;
图3是本发明实施例所述终孔断面结构示意图之一;
图4是本发明实施例所述终孔断面结构示意图之二。
图中:
1、注浆孔;2、引水导管;3、止浆墙;4、开挖轮廓线;5、注浆加固范围;6、注浆孔浆液扩散范围;7、内轨顶面;8、上台阶上半断面开挖底部线;9、固定锚杆;10、隧道中线;11、锁脚锚管;12、大拱脚钢架。
具体实施方式
如图1-4所示,本发明实施例所述的富水软弱糜棱岩大断面隧道围岩加固及开挖方法,包括以下步骤:
步骤一:开挖前,在掌子面上半断面施作止浆墙3;
步骤二:止浆墙3强度稳定后,布设注浆孔1;
步骤三:通过高压、劈裂、挤密注浆方法注浆,注浆终压不小于4Mpa;
步骤四:注浆结束后,对开挖各部均设一检查孔,取芯检验注浆效果;
步骤五:步骤四检验合格后,破除止浆墙3,开始挖掘;
步骤六:挖掘结束后,进入下一循环的步骤一至步骤五直至整个隧道挖掘结束。
步骤一中的所述的止浆墙3为厚度大于普通止浆墙厚度的混凝土止浆墙,止浆墙3嵌入开挖轮廓线4外不少于50cm。步骤二中注浆孔1布置有三个终孔断面。所述终孔断面的终孔至少在开挖轮廓线4外5m范围内,终孔间距最大不超过3m,扩散半径不超过2m,其中最外层终孔断面较内层两个终孔断面增加布置3环注浆孔1,以保证下一循环施作止浆墙3时围岩的稳定。步骤三中注浆方法为前进式注浆。注浆实施的顺序为先外圈、后内圈;外圈采用水泥和水玻璃双液浆,内圈采用水泥浆。步骤三注浆过程中根据糜棱岩含水量的分布设置引水导管2,以实现糜棱岩的快速排水固结。步骤三注浆过程中沿隧道拱部开挖轮廓线4加设管棚。步骤五开挖采用三台阶大拱脚七步开挖法。步骤五开挖过程中根据围岩和支护变形监控的量测结果,及时调整支护参数,加设临时支撑以及预留一定的初期支护补强空间。
本发明提供的富水软弱糜棱岩大断面隧道围岩加固及开挖方法,注浆前,在掌子面上半断面施作较大厚度混凝土止浆墙3,止浆墙3嵌入开挖轮廓线4外不少于50cm。
如图1所示,在止浆墙3混凝土达到一定强度后,开始布设注浆孔1,每一循环注浆长度根据糜棱岩富水程度及稳定性确定,一般不小于25m,注浆孔1按照A、B、C三个终孔断面布置,终孔至少在开挖轮廓线4外5m范围,终孔间距最大不超过3m,扩散半径按2m设计。
如图3和图4所示,B1—B31是B序孔终孔位置,C1—C79是C序孔终孔位置。其中C序终孔断面较A、B序终孔断面增加布置3环注浆孔1,以保证下一循环施作止浆墙3时围岩的稳定。
注浆采用前进式注浆,注浆实施的顺序为先外圈、后内圈;外圈采用水泥-水玻璃双液浆,内圈采用水泥浆,注浆终压不小于4MPa。注浆过程中根据糜棱岩含水量的分布动态设置引水导管2,以实现糜棱岩的快速排水固结。为了进一步提高糜棱岩的承载能力,沿隧道拱部开挖轮廓线4加设超长大管棚。注浆结束后,对开挖各部均设一检查孔,取芯检验注浆效果,检查合格后方可进行开挖。
如图2所示,Ⅰ—Ⅶ为掌子面三台阶大拱脚法开挖工序。隧道开挖采用三台阶七步法,辅以大拱脚施工工艺,大拱脚钢架设在开挖Ⅰ部拱脚处,各开挖台阶钢架接头处设置锁脚锚管。开挖前采用松动爆破配合液压冲击锤破除止浆墙3,开挖采用人工配合挖掘机作业。开挖过程中根据围岩和支护变形监控量测结果,及时调整支护参数,必要时加设临时支撑、预留一定的初期支护补强空间等措施,施工时仰拱距掌子面距离不超过15m,二衬距掌子面距离不超过30m。本循环开挖结束后,开始施作下一循环的止浆墙。
本技术发明经过秀宁隧道出口段(350m)富水软弱糜棱岩加固和开挖施工,验证了其有效性和可靠性。解决了秀宁隧道VI级围岩条件下围岩失稳的难题,实现了富水软弱糜棱岩大断面隧道的快速施工。
本发明不局限于上述最佳实施方式,任何人在本发明的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本发明的保护范围之内。

Claims (1)

1.一种富水软弱糜棱岩大断面隧道围岩加固及开挖方法,包括以下步骤:
步骤一:开挖前,在掌子面上半断面施作止浆墙(3);
步骤二:止浆墙(3)强度稳定后,布设注浆孔(1);
步骤三:通过高压、劈裂、挤密注浆方法注浆,注浆终压不小于4Mpa;
步骤四:注浆结束后,对开挖各部均设一检查孔,取芯检验注浆效果;以及
步骤五:步骤四检验合格后,破除止浆墙(3),开始挖掘;
其特征在于:步骤一中,所述的止浆墙(3)为厚度大于普通止浆墙厚度的混凝土止浆墙,止浆墙(3)嵌入开挖轮廓线(4)外不少于50cm;
步骤二中,注浆孔(1)布置有三个终孔断面;
所述终孔断面的终孔至少在开挖轮廓线(4)外5m范围内,终孔间距最大不超过3m,扩散半径不超过2m,其中最外层终孔断面较内层两个终孔断面增加布置3环注浆孔(1);
步骤三中,注浆方法为前进式注浆;注浆实施的顺序为先外圈、后内圈,其中外圈采用水泥和水玻璃双液浆,内圈采用水泥浆;注浆过程中,根据糜棱岩含水量的分布设置引水导管(2);注浆过程中,沿隧道拱部开挖轮廓线(4)加设管棚;
步骤五中,开挖采用三台阶大拱脚七步开挖法;开挖过程中,根据围岩和支护变形监控的量测结果,及时调整支护参数,加设临时支撑以及预留初期支护补强空间。
CN201310188613.8A 2013-05-18 2013-05-18 富水软弱糜棱岩大断面隧道围岩加固及开挖方法 Active CN103256060B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310188613.8A CN103256060B (zh) 2013-05-18 2013-05-18 富水软弱糜棱岩大断面隧道围岩加固及开挖方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310188613.8A CN103256060B (zh) 2013-05-18 2013-05-18 富水软弱糜棱岩大断面隧道围岩加固及开挖方法

Publications (2)

Publication Number Publication Date
CN103256060A CN103256060A (zh) 2013-08-21
CN103256060B true CN103256060B (zh) 2015-01-14

Family

ID=48960237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310188613.8A Active CN103256060B (zh) 2013-05-18 2013-05-18 富水软弱糜棱岩大断面隧道围岩加固及开挖方法

Country Status (1)

Country Link
CN (1) CN103256060B (zh)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103742158B (zh) * 2014-01-02 2015-12-02 中铁工程设计咨询集团有限公司 倾斜隧道的超前支护和挖掘方法
CN105649652B (zh) * 2016-02-25 2018-03-30 北京市政建设集团有限责任公司 一种软弱围岩隧道修建的实时监控注浆加固方法
CN105888699A (zh) * 2016-06-23 2016-08-24 中铁四局集团有限公司 一种黄土隧道抗沉降支承结构及其施工方法
CN106499423A (zh) * 2016-11-23 2017-03-15 中铁十八局集团有限公司 一种隧洞施工中反向大管棚施工方法
CN107060821A (zh) * 2017-03-24 2017-08-18 中铁十六局集团第五工程有限公司 一种掌子面多岩性支护方法
CN107542479A (zh) * 2017-09-28 2018-01-05 中国建筑第八工程局有限公司 顶管注浆加固施工方法
CN107725056A (zh) * 2017-10-13 2018-02-23 中铁五局集团有限公司 一种穿越淤泥质地层隧道全环超前快速注浆施工方法
CN109139022B (zh) * 2018-07-10 2019-12-20 新疆乌京铁建轨道交通有限公司 一种抗活动断层错动的装配式衬砌隧道修建方法
CN109139048B (zh) * 2018-09-04 2020-05-15 中铁十二局集团有限公司 一种超前小导管注浆结构及其施工方法
CN109184742B (zh) * 2018-09-19 2020-04-07 中国水利水电第四工程局有限公司 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN111287769A (zh) * 2020-02-28 2020-06-16 贵州建工集团第六建筑工程有限责任公司 一种隧道围岩超前注浆加固结构及其施工方法
CN111691899A (zh) * 2020-06-02 2020-09-22 中铁十五局集团有限公司 一种基于全断面注浆的crd开挖下穿桥梁隧道的施工方法
CN111894635B (zh) * 2020-08-13 2022-03-15 高军 一种高压劈裂注浆改性加固破碎围岩隧道方法
CN113175336A (zh) * 2021-06-15 2021-07-27 中交二公局萌兴工程有限公司 隧道断层破碎带排水施工方法
CN115247565A (zh) * 2022-06-02 2022-10-28 中铁十六局集团有限公司 隧道富水断层突涌体快速安全处置方法
CN115306439A (zh) * 2022-08-09 2022-11-08 中铁十六局集团路桥工程有限公司 一种适用于大跨扩建隧道的围岩预加固施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638987B (zh) * 2009-07-24 2013-05-01 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN101709651A (zh) * 2009-12-21 2010-05-19 中铁隧道勘测设计院有限公司 海底隧道的注浆堵水方法
CN101994513B (zh) * 2010-10-30 2013-01-02 中铁十二局集团第二工程有限公司 上半断面完成全断面帷幕注浆隧道施工方法
CN202645592U (zh) * 2011-12-28 2013-01-02 中铁十九局集团轨道交通工程有限公司 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙
CN102493822B (zh) * 2011-12-29 2014-04-02 中铁二十三局集团有限公司 一种通过富水断层影响带的隧道的帷幕注浆施工方法

Also Published As

Publication number Publication date
CN103256060A (zh) 2013-08-21

Similar Documents

Publication Publication Date Title
CN103256060B (zh) 富水软弱糜棱岩大断面隧道围岩加固及开挖方法
CN102953739B (zh) 一种暗挖地铁车站的双向开洞方法
CN102996133B (zh) 适用于软弱围岩隧道斜井与正洞交汇处的施工方法
CN103410527B (zh) 围岩中含湿陷性黄土和软岩的隧道初期支护施工方法
CN104533446A (zh) 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的施工方法及其结构
CN111119935B (zh) 一种巷道松软破碎构造围岩多层次注浆加固方法
CN103628894B (zh) 一种基于变角伞状超前注浆的富水断层破碎带垮塌巷道巷修方法
CN203476347U (zh) 一种用于湿陷性黄土隧道的初期支护装置
CN105350973A (zh) 一种大跨断面黄土隧道下穿高速公路的施工方法
CN104818991A (zh) 一种浅埋偏压残坡积土隧道的施工方法
CN104405411B (zh) 超大变断面隧道支护结构
CN105041325A (zh) 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN109404005A (zh) 暗挖隧道小洞进大洞预加固体系及施工方法
CN103615273A (zh) 方钢约束混凝土拱架壁后充填锚注支护体系及施工方法
CN104405399A (zh) 一种穿越流沙地层隧道开挖支护体工法
CN102312672A (zh) 一种适应复杂多变地质条件的大断面隧道快速施工方法
CN104314585A (zh) 隧道全断面预加固方法及结构
CN103628885A (zh) 一种超浅埋隧道出洞盖挖施工方法
CN107725056A (zh) 一种穿越淤泥质地层隧道全环超前快速注浆施工方法
CN104533451A (zh) 在散体碎石土及破碎围岩中的隧道超前预支护技术
CN102817621B (zh) 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法
CN110005439A (zh) 一种盾构近间距过先行隧道的施工方法
WO2020248429A1 (zh) 一种筏板基础高层建筑物加固抬升方法
CN110761811A (zh) 一种层状软岩隧道非对称支护结构及施工方法
CN103628886A (zh) 富水高地应力条件下软弱围岩隧道的开挖方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING JIAOTONG UNIVERSITY

Effective date: 20141010

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ma Dong

Inventor after: Li Tao

Inventor after: Huang Lixin

Inventor after: Wang Wuxian

Inventor after: Wang Tao

Inventor after: Zhu Weidong

Inventor after: Chang Zhijun

Inventor after: Sun Mingbiao

Inventor after: Long Bin

Inventor after: Wang Xiaoling

Inventor after: Deng Xiongwu

Inventor after: Liu Gaiying

Inventor after: Tan Zhongsheng

Inventor before: Zhu Weidong

Inventor before: Chang Zhijun

Inventor before: Sun Mingbiao

Inventor before: Long Bin

Inventor before: Wang Xiaoling

Inventor before: Deng Xiongwu

Inventor before: Liu Gaiying

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHU WEIDONG CHANG ZHIJUN SUN MINGBIAO LONG BIN WANG XIAOLING DENG XIONGWU LIU GAIYING TO: MA DONG ZHU WEIDONG CHANG ZHIJUN SUN MINGBIAO LONG BIN WANG XIAOLING DENG XIONGWU LIU GAIYING TAN ZHONGSHENG LI TAO HUANG LIXIN WANG WUXIAN WANG TAO

TA01 Transfer of patent application right

Effective date of registration: 20141010

Address after: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Applicant after: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Applicant after: Beijing Jiaotong University

Address before: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Applicant before: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant