CN106499423A - 一种隧洞施工中反向大管棚施工方法 - Google Patents
一种隧洞施工中反向大管棚施工方法 Download PDFInfo
- Publication number
- CN106499423A CN106499423A CN201611035645.4A CN201611035645A CN106499423A CN 106499423 A CN106499423 A CN 106499423A CN 201611035645 A CN201611035645 A CN 201611035645A CN 106499423 A CN106499423 A CN 106499423A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- construction
- reverse
- rock
- daguanpeng
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
Abstract
本发明公开了一种隧洞施工中反向大管棚施工方法,所述方法包括如下步骤:(1)、人工开挖纵向导坑,穿过围岩破碎带,挖掘管棚作业区;(2)、施做反向超前大管棚;(3)、开挖围岩破碎带。本发明具有快速方便、施工步骤少、安全可靠的优点,采用它不但能有效的提高隧洞施工的安全,保证施工人员的安全,而且缩短了施工周期,节约了成本和时间。
Description
技术领域
本发明涉及一种隧洞施工方法,特别是一种隧洞施工中反向大管棚施工方法。
背景技术
随着国家工程建设中隧道建设越来越多,隧道需要穿越不良地质区段的施工也越来越多。在施工过程中,常常需要穿越围岩破碎带,在穿越围岩破碎带时,已施工段由于围岩的不稳定,不具备正向施工大管棚的条件。现有的处理方法只能慢慢进行挖掘,不但延长了施工周期,而且,围岩破碎带容易塌陷,导致安全事故的发生。
发明内容
本发明的目的就是提供一种能有效保证施工安全的隧洞施工中反向大管棚施工方法。
本发明的目的是通过这样的技术方案实现的,一种隧洞施工中反向大管棚施工方法,其特征是,所述方法包括如下步骤:
1)、人工开挖纵向导坑,穿过围岩破碎带,挖掘管棚作业区;
从隧洞顶人工开挖纵向导坑,使纵向导坑穿过围岩破碎带进入稳定围岩段,在稳定围岩段内人工开挖横向导洞,同步支立门型钢架;横向导洞开挖完成后,在门型钢架内侧架立环形钢拱架,对环形钢拱架喷锚支护,喷锚支护完成后,切除门型钢架,形成管棚作业间。
2)、施做反向超前大管棚;
利用管棚工作间向围岩破碎带施做反向超前大管棚,并注浆加固围岩破碎带。
3)、开挖围岩破碎带;
采用台阶法及左右导坑法开挖穿过围岩破碎带,每循环开挖完成后立即采用钢拱架和锚喷联合支护围岩,保证施工安全。
为了防止破碎围岩垮塌,在第2)步中,反向超前大管棚需穿过围岩破碎带且进入已支护围岩段至少2-3米。
为了保证施工安全,开挖围岩破碎带前施做超前注浆小导管,在反向超前大管棚和超前注浆小导管的安全防护下,对围岩破碎带进行开挖。
由于采用了上述技术方案,本发明具有快速方便、施工步骤少、安全可靠的优点,采用它不但能有效的提高隧洞施工的安全,保证施工人员的安全,而且缩短了施工周期,节约了成本和时间。
附图说明
本发明的附图说明如下:
图1为本发明的平面结构示意图;
图2为本发明的立体结构示意图。
具体实施方式
下面结合附图对本发明的具体实施方式作进一步详细的说明,但本发明并不局限于这些实施方式,任何在本实施例基本精神上的改进或替代,仍属于本发明权利要求所要求保护的范围。
实施例1:如图1、2所示,一种隧洞施工中反向大管棚施工方法,所述方法包括如下步骤:
1)、人工开挖纵向导坑,穿过围岩破碎带,挖掘管棚作业区;
从隧洞顶人工开挖纵向导坑1,使纵向导坑1穿过围岩破碎带2进入稳定围岩段3,在稳定围岩段3内人工开挖横向导洞,同步支立门型钢架;横向导洞开挖完成后,在门型钢架内侧架立环形钢拱架,对环形钢拱架喷锚支护,喷锚支护完成后,切除门型钢架,形成管棚作业间5。
2)、施做反向超前大管棚;
利用管棚工作间5向围岩破碎带2施做反向超前大管棚6,并注浆加固围岩破碎带2,反向超前大管棚6需穿过围岩破碎带2且进入已支护围岩段7至少2-3米。
3)、开挖围岩破碎带;
采用台阶法及左右导坑法开挖穿过围岩破碎带2,每循环开挖完成后立即采用钢拱架和锚喷联合支护围岩,保证施工安全。
为了提高施工安全,在第3)步中,开挖围岩破碎带2前施做超前注浆小导管8,在反向超前大管棚6和超前注浆小导管8的安全防护下,对围岩破碎带2进行开挖。
通过上述方法,不但提高了施工的安全性,而且,施工周期大大缩短,比现有的方法缩短至少2个月,节约了成本和时间。
Claims (6)
1.一种隧洞施工中反向大管棚施工方法,其特征是,所述方法包括如下步骤:
1)、人工开挖纵向导坑,穿过围岩破碎带,挖掘管棚作业区;
2)、施做反向超前大管棚;
3)、开挖围岩破碎带。
2.如权利要求1所述的隧洞施工中反向大管棚施工方法,其特征是,所述第1)步中,其具体操作如下:从隧洞顶人工开挖纵向导坑(1),使纵向导坑(1)穿过围岩破碎带(2)进入稳定围岩段(3),在稳定围岩段(3)内人工开挖横向导洞,同步支立门型钢架;横向导洞开挖完成后,在门型钢架内侧架立环形钢拱架,对环形钢拱架喷锚支护,喷锚支护完成后,切除门型钢架,形成管棚作业间(5)。
3.如权利要求2所述的隧洞施工反向大管棚施工方法,其特征是,所述第2)步中,其具体操作如下:利用管棚工作间(5)向围岩破碎带(2)施做反向超前大管棚(6),并注浆加固围岩破碎带(2)。
4.如权利要求3所述的隧洞施工反向大管棚施工方法,其特征是,所述第3)步中,其具体操作如下:采用台阶法及左右导坑法开挖穿过围岩破碎带(2),每循环开挖完成后立即采用钢拱架和锚喷联合支护围岩,保证施工安全。
5.如权利要求3所述隧道施工反向大管棚施工方法,其特征是:在第(2)步中,反向超前大管棚(6)需穿过围岩破碎带(2)且进入已支护围岩段(7)至少2-3米。
6.如权利要求4所述的隧洞施工反向大管棚施工方法,其特征是:在第3)步中,开挖围岩破碎带(2)前施做超前注浆小导管(8),在反向超前大管棚(6)和超前注浆小导管(8)的安全防护下,对围岩破碎带(2)进行开挖。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035645.4A CN106499423A (zh) | 2016-11-23 | 2016-11-23 | 一种隧洞施工中反向大管棚施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035645.4A CN106499423A (zh) | 2016-11-23 | 2016-11-23 | 一种隧洞施工中反向大管棚施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106499423A true CN106499423A (zh) | 2017-03-15 |
Family
ID=58327890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611035645.4A Pending CN106499423A (zh) | 2016-11-23 | 2016-11-23 | 一种隧洞施工中反向大管棚施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106499423A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09119284A (ja) * | 1995-10-24 | 1997-05-06 | Tokyo Electric Power Co Inc:The | トンネル掘削方法 |
CN103256060A (zh) * | 2013-05-18 | 2013-08-21 | 中铁十六局集团有限公司 | 富水软弱糜棱岩大断面隧道围岩加固及开挖方法 |
CN203756182U (zh) * | 2014-04-04 | 2014-08-06 | 湖南省高速公路建设开发总公司 | 一种应用于软弱岩质区域浅埋公路隧道的支护结构 |
CN203847129U (zh) * | 2014-05-29 | 2014-09-24 | 山东大学 | 一种用于软弱破碎不均匀地层隧道施工的支护装置 |
CN104481550A (zh) * | 2014-10-23 | 2015-04-01 | 中国二十冶集团有限公司 | 一种隧道塌方处理超前支护方法 |
-
2016
- 2016-11-23 CN CN201611035645.4A patent/CN106499423A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09119284A (ja) * | 1995-10-24 | 1997-05-06 | Tokyo Electric Power Co Inc:The | トンネル掘削方法 |
CN103256060A (zh) * | 2013-05-18 | 2013-08-21 | 中铁十六局集团有限公司 | 富水软弱糜棱岩大断面隧道围岩加固及开挖方法 |
CN203756182U (zh) * | 2014-04-04 | 2014-08-06 | 湖南省高速公路建设开发总公司 | 一种应用于软弱岩质区域浅埋公路隧道的支护结构 |
CN203847129U (zh) * | 2014-05-29 | 2014-09-24 | 山东大学 | 一种用于软弱破碎不均匀地层隧道施工的支护装置 |
CN104481550A (zh) * | 2014-10-23 | 2015-04-01 | 中国二十冶集团有限公司 | 一种隧道塌方处理超前支护方法 |
Non-Patent Citations (1)
Title |
---|
王辉: "盘岭公路隧道断层破碎带反向施工技术", 《科技资讯》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105257301B (zh) | 一种浅埋暗挖隧道软弱围岩塌方加固处理方法 | |
CN106522963A (zh) | 一种tbm隧洞施工卡机脱困方法 | |
CN102182472B (zh) | 隧道塌方空腔的回填修复方法 | |
CN202690082U (zh) | 一种预防隧道变形沉降的组合钢架结构 | |
CN101963060B (zh) | 基于钢管拱肋支护结构的隧道施工方法 | |
CN107355226B (zh) | Tbm施工隧洞断层破碎带洞段处理结构 | |
CN107448214B (zh) | 大型地质构造裂隙煤岩体超深孔高压两巷预注浆方法 | |
CN104564085B (zh) | 城市超浅埋条件下超大断面隧道开挖综合施工方法 | |
CN101864963A (zh) | 一种大断面黄土隧道施工方法 | |
CN105257295A (zh) | 一种基于台阶开挖法的隧道微台阶开挖施工工艺 | |
CN107975383B (zh) | 地下洞室丁字型交叉口开挖支护施工方法 | |
CN108286442A (zh) | 适用于软弱围岩隧道两台阶一次快速封闭成环的开挖方法 | |
CN107100631B (zh) | 穿越活断层隧道二次衬砌的修建方法 | |
CN101545376A (zh) | 小断面隧道横向进入超大断面隧道的施工方法 | |
CN110924958B (zh) | 一种利用服务隧道对主洞关门塌方的处置方法 | |
AU2014292699A1 (en) | Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same | |
CN110529151A (zh) | 一种综掘工作面分级分区综合加固过陷落柱方法 | |
CN103437783A (zh) | 浅埋暗挖大跨度隧道导洞拱盖组合施工工法 | |
CN106121717A (zh) | 一种煤矿掘进工作面高冒区注浆处理方法 | |
CN111472801A (zh) | 浅埋暗挖排水廊道下穿既有线的施工方法 | |
CN103806916A (zh) | 一种盾构快速检修井的施工工艺 | |
CN108222945B (zh) | 利用主、辅分层坑道开挖特大断面地铁暗挖车站的施工方法 | |
CN104060997A (zh) | 盾构穿越检查井的施工方法 | |
CN106499423A (zh) | 一种隧洞施工中反向大管棚施工方法 | |
CN106522972A (zh) | 一种tbm刀盘和护盾卡机处理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |
|
RJ01 | Rejection of invention patent application after publication |