CN103244140A - Method for arranging drilling chamber in backfill mining - Google Patents

Method for arranging drilling chamber in backfill mining Download PDF

Info

Publication number
CN103244140A
CN103244140A CN2013101840204A CN201310184020A CN103244140A CN 103244140 A CN103244140 A CN 103244140A CN 2013101840204 A CN2013101840204 A CN 2013101840204A CN 201310184020 A CN201310184020 A CN 201310184020A CN 103244140 A CN103244140 A CN 103244140A
Authority
CN
China
Prior art keywords
drilling chamber
obturation
arranging
stage casing
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101840204A
Other languages
Chinese (zh)
Inventor
唐绍辉
黄英华
文兴
尚振华
李伟明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN2013101840204A priority Critical patent/CN103244140A/en
Publication of CN103244140A publication Critical patent/CN103244140A/en
Pending legal-status Critical Current

Links

Images

Abstract

Disclosed is a method for arranging a drilling chamber in backfill mining. The method comprises the steps of during mining, forming a stable filling body through cemented filling after the last level mining is finished, during extraction of a replacing level, selectively arranging the drilling chamber of the replacing level in the last extracted and filled level filling body, tunneling the filling body from a connection roadway to a stope top from an air way, then, expanding slopes and brushing large sections to form the drilling chamber, performing hole-through to an air return way, and mining a next replacing level ore body in the drilling chamber. The method is simple to implement, reliable and practical, and after adoption of the method for arranging the drilling chamber in backfill mining, the strength of the filling body is weaker than that of the complete ore body, so that the working efficiency of tunneling projects is improved, ore body losses of a stope top structure are reduced simultaneously, and improvement of mine economic benefits is facilitated. Arranging positions of the drilling chamber can be selected reasonably according to actual conditions by means of the method.

Description

The method for arranging of drilling chamber in a kind of filling mining
Technical field
The present invention relates to the method for arranging of drilling chamber in a kind of filling mining, be particularly useful for adopting the mine of consolidated fill high-stage large diameter, deep borehole method mining, take over the selection of drilling chamber position, stage casing.
Background technology
In the mining process, the exploitation of a last stage casing finishes the back consolidated fill at present, and drilling chamber is often selected to be arranged in the complete ore body when taking over the stage casing back production, takes over the exploitation work of stage casing ore body then in drilling chamber.Adopt excavation works such as above-mentioned existing method for arranging connection roadway, drilling chamber difficulty relatively, efficient is not high, and the drilling chamber position is lower, easy ponding, and cause a large amount of ore bodies losses, be unfavorable for that resource reclaims.
Summary of the invention
The technical problem to be solved in the present invention is, overcomes the deficiency of existing arrangement, provides a kind of method for arranging simple, is conducive to improve the method for arranging of drilling chamber in the filling mining of production efficiency and resource recovery.
The technical solution adopted for the present invention to solve the technical problems is: the method for arranging of drilling chamber in a kind of filling mining, in the mining process, the exploitation of a last stage casing finishes the back consolidated fill and forms stable obturation, when taking over the back production in stage casing, the drilling chamber of taking over the stage casing is selected to be arranged in the last stage casing obturation of finishing back production and filling, obturation from air intake lane driving connection roadway to the stope top, expand group then, brush big section and form drilling chamber, hole-through to return airway, next in drilling chamber, take over the exploitation work of next stage casing ore body.
A described last stage casing obturation needs Stability Analysis of Structures to be beneficial to the digging of drilling chamber, and compressive strength reaches 2 ~ 3MPa, and adopts " worker " word steel-reinforcing bar-plank to carry out combined supporting to drilling chamber, and the supporting spacing is 1-2m; Need stay at the middle part during described driving drilling chamber and establish width is the preferred 3m of 2-4m() obturation bar post, vertically digging width by the slot raise position in obturation bar post is the cutting groove of 3 ~ 5m, is beneficial to the perforation of slot raise.
The present invention realizes simply, and is reliable and practical, adopt the method for arranging of drilling chamber in the filling mining after, because obturation is than complete ore body weak strength, improve the operating efficiency of excavation work, reduced the ore body loss of stope top structure simultaneously, be of value to the raising mine economic profit.Use the present invention, the border condition is carried out choose reasonable to the position of drilling chamber factually.
Description of drawings
Fig. 1 is drilling chamber of the present invention arrangement schematic diagram in a last stage casing obturation;
Fig. 2 is the I-I place generalized section of drilling chamber shown in Figure 1 arrangement in a last stage casing obturation;
Fig. 3 is the II-II generalized section of drilling chamber shown in Figure 1 arrangement in a last stage casing obturation.
Among the figure: 1-air intake lane, 2-return airway, 3-drilling chamber, the last stage casing obturation of 4-, 5-cutting groove, 6-obturation bar post, 7-slot raise, 8-connection roadway, next stage casing ore body of 9-.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples.
With reference to accompanying drawing, the method for arranging of drilling chamber in a kind of filling mining, in the mining process, big thick ore body particularly, the exploitation of a last stage casing finishes the back consolidated fill and forms stable obturation 4, when taking over the back production in stage casing, the drilling chamber 3 of taking over the stage casing is selected to be arranged in the last stage casing obturation 4 of finishing back production and filling, 1 driving connection roadway 8 expands group, the big section formation of brush drilling chamber 3 then to the obturation 4 at stope top from the air intake lane, hole-throughs to return airway 2; For guaranteeing the stability of drilling chamber 3 supportings, a last stage casing obturation 4 needs Stability Analysis of Structures to be beneficial to the digging of drilling chamber 3, and compressive strength reaches 2 ~ 3Mpa, and adopts " worker " word steel-reinforcing bar-plank to carry out combined supporting to drilling chamber, and the supporting spacing is 1m.Need stay at the middle part when tunneling drilling chamber 3 simultaneously and establish the obturation bar post 6 that width is 3m, vertically digging width by slot raise 7 positions in obturation bar post 6 is the cutting groove 5 of 4m, be beneficial to the perforation of slot raise 7, next in drilling chamber 3, take over the exploitation work of next stage casing ore body 9.
Arrange like this because obturation 4 than next complete stage casing ore body 9 weak strength, has improved the operating efficiency of excavation work, reduced the ore body loss of stope top structure simultaneously, be of value to the raising mine economic profit, this method for arranging is simple, practical.

Claims (3)

1. the method for arranging of drilling chamber in the filling mining, it is characterized in that: in the mining process, the exploitation of a last stage casing finishes the back consolidated fill and forms stable obturation, when taking over the back production in stage casing, the drilling chamber of taking over the stage casing is selected to be arranged in the last stage casing obturation of finishing back production and filling, obturation from air intake lane driving connection roadway to the stope top, expand group, the big section formation of brush drilling chamber then, hole-through to return airway, next in drilling chamber, take over the exploitation work of next stage casing ore body.
2. the method for arranging of drilling chamber in the filling mining according to claim 1, it is characterized in that: a last stage casing obturation compressive strength is 2 ~ 3MPa, and drilling chamber adopts " worker " word steel-reinforcing bar-plank to carry out combined supporting, and the supporting spacing is 1-2m.
3. the method for arranging of drilling chamber in the filling mining according to claim 1, it is characterized in that: driving need stay at the middle part during drilling chamber and establish the obturation bar post that width is 2-4m, and vertically digging width by the slot raise position in obturation bar post is the cutting groove of 3 ~ 5m.
CN2013101840204A 2013-05-17 2013-05-17 Method for arranging drilling chamber in backfill mining Pending CN103244140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101840204A CN103244140A (en) 2013-05-17 2013-05-17 Method for arranging drilling chamber in backfill mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101840204A CN103244140A (en) 2013-05-17 2013-05-17 Method for arranging drilling chamber in backfill mining

Publications (1)

Publication Number Publication Date
CN103244140A true CN103244140A (en) 2013-08-14

Family

ID=48923981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101840204A Pending CN103244140A (en) 2013-05-17 2013-05-17 Method for arranging drilling chamber in backfill mining

Country Status (1)

Country Link
CN (1) CN103244140A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1456788A (en) * 2003-06-06 2003-11-19 中南大学 Continuous mining process with deep hole dropping and top-bottom pillars mining in advance
CN201474347U (en) * 2009-09-02 2010-05-19 济南钢城矿业有限公司 Sublevel mining room
US20130071306A1 (en) * 2011-08-16 2013-03-21 John Camp Battery disposal system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1456788A (en) * 2003-06-06 2003-11-19 中南大学 Continuous mining process with deep hole dropping and top-bottom pillars mining in advance
CN201474347U (en) * 2009-09-02 2010-05-19 济南钢城矿业有限公司 Sublevel mining room
US20130071306A1 (en) * 2011-08-16 2013-03-21 John Camp Battery disposal system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周华林: "空场嗣后充填采矿法充填体合理强度分布规律研究", 《中国优秀硕士学位论文全文数据库》 *
费汉强: "大体积充填体下隔离中段凿岩硐室顶板安全厚度研究", 《采矿技术》 *

Similar Documents

Publication Publication Date Title
CN102080518B (en) Method for extracting gas from coal seam roof complex branched well
CN103557002B (en) A kind of mechanized concentrates drop shaft filling-up method
CN104047623B (en) A kind of big across cavern excavation construction method
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN102155232B (en) Construction method of large-span asymmetrical double-arch railway tunnel under terrain bias pressure condition
CN102865103B (en) Distributed using method for mine underground water
CN106050234B (en) The construction technology that underground water is protected in progress of coal mining
CN107905834A (en) A kind of hypotonic high prominent coal seam architecture gas production method
CN104131831A (en) Coal-bed gas well vertical three-dimensional united extraction method
CN103924975A (en) Water retaining method for coal mining process
CN103939135B (en) A kind of fully-mechanized mining working removes frame passage rapid constructing method
CN102080526A (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN103089266A (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
WO2017101634A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN104314569B (en) The exploitation method of a kind of deep Pore brine and low-grade solid kalium mine
CN103790558B (en) Demixing injection-production interlock coupling process method
CN206860155U (en) Coal-series gas U-shaped well drilling and fracturing structure
CN106014412B (en) The method that coal column group is left in a kind of residual exploiting field of ladder type construction filling second mining
CN102644476A (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN103362539A (en) Method for extracting pressure relief gas by retained roadway drill site drilling
CN107133381A (en) A kind of length determining method of roadway support anchor pole
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN103726847B (en) A kind of downhole jade ore deposit mining methods
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130814