CN103790558B - Demixing injection-production interlock coupling process method - Google Patents

Demixing injection-production interlock coupling process method Download PDF

Info

Publication number
CN103790558B
CN103790558B CN201210432495.6A CN201210432495A CN103790558B CN 103790558 B CN103790558 B CN 103790558B CN 201210432495 A CN201210432495 A CN 201210432495A CN 103790558 B CN103790558 B CN 103790558B
Authority
CN
China
Prior art keywords
production
injection
oil reservoir
water
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210432495.6A
Other languages
Chinese (zh)
Other versions
CN103790558A (en
Inventor
崔玉海
古光明
丁晓芳
孟永
杨勇
徐福海
马来增
刘晋伟
李蓉
赵天浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co filed Critical China Petroleum and Chemical Corp
Priority to CN201210432495.6A priority Critical patent/CN103790558B/en
Publication of CN103790558A publication Critical patent/CN103790558A/en
Application granted granted Critical
Publication of CN103790558B publication Critical patent/CN103790558B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The invention provides a kind of demixing injection-production interlock coupling process method, this demixing injection-production interlock coupling process method comprises: step 1, chooses water injection well and producing well; Step 2, according to the oil reservoir situation that this water injection well and this producing well pass, divides reservoir layer position; Step 3, when according to this oil reservoir layer position, when being judged as the layer of energy stabilization, stable yield, water filling, while exploitation; Step 4, gathers oil reservoir development index; And step 5, when according to this oil reservoir development index, when judging to need to change oil production, regulate oil production equipment to control oil production and to regulate.This demixing injection-production interlock coupling process method effectively can overcome seperated layer water injection, oil production by layer singles solely struggle against the defect existed, stratum UNICOM corresponding situation, water status etc. can be understood by monitoring regulation and control, for oil reservoir research provides strong technical support, develop oil reservoir each layer of position efficiently.

Description

Demixing injection-production interlock coupling process method
Technical field
The present invention relates to oil-field flooding and oil production technology technology, particularly relate to a kind of demixing injection-production interlock coupling process method.
Background technology
Demixing injection-production technology is the important development approach of oil reservoir with multiple series of strata, and traditional method is well water filling, well recovery, and seperated layer water injection, oil production by layer are implemented all separately, and seperated layer water injection and oil production by layer do not build close links.As patent: CN201020280845.8 selective flow string can realize when motionless full well flow string, complete to look in water blockoff layering or close layer and produce or selectively change producing zone position, and this selective flow string simplicity of design, operation are reliable, cost of production and labour intensity low.The method of adjustment of patent CN200710144495.5 oil field injection and extraction system in ultra-high water-containing period: adjustment is optimized to injection and extraction system, the end hole of the row of adopting between note between metaideophone is adopted to form the injection-production method of horizontal linear injection pattern, or metaideophone corner well forms the injection-production method of five-spot areal well pattern, or the end hole of metaideophone oil recovery well array forms the injection-production method of vertical linear injection pattern, or interval metaideophone corner well forms the injection-production method of block water injection unit, or the end hole of interval metaideophone oil recovery well array forms longitudinally two row's water injection wells and presss from both sides three mining oil wells, the injection-production method of the ranks shape injection pattern adopted between middle ware note, it is between 160 ~ 190m that well spacing adjusts to average distance.Patent CN200510043317.4 oil well: after conventional waterflooding technique shutoff high permeability zone, then take to inject bubble Lei Xier and maybe can improve the method for the expansion-resisting agent of earth formation, with less permeable layer water-taking efficiency in improving.Patented technology CN200910083119.9: be a kind of method improving water drive recovery factor of thick positive rhythm reservoir, is specifically related to a kind of horizontal well gel deep rock tunneling and improves positive rhythm thick formation reservoir water drive method; At the high permeability zone horizontal well drilling of positive rhythm thick formation, inject gel by horizontal well to high permeability zone, in high permeability zone, set up the checkdam consistent with high permeability zone height.These technology are all only for water injection well or producing well, and its major defect existed is: seperated layer water injection, oil production by layer design separately, implement, and correlation is poor; Seperated layer water injection and oil production by layer, note adopts correspondence difference; Be unfavorable for understanding oil reservoir situation; Be unfavorable for balanced exploitation; Be unfavorable for supplementary stratum energy, affect oil recovery.We have invented a kind of new demixing injection-production interlock coupling process method for this reason, solve above technical problem.
Summary of the invention
The object of this invention is to provide one and can implement high efficiency regulatory the Technology of Layered Water Injection, the demixing injection-production interlock coupling process method of selective layering oil production technology technology can be implemented.
Object of the present invention realizes by following technical measures: demixing injection-production interlock coupling process method, and this demixing injection-production interlock coupling process method comprises: step 1, chooses water injection well and producing well; Step 2, according to the oil reservoir situation that this water injection well and this producing well pass, divides reservoir layer position; Step 3, when according to this oil reservoir layer position, when being judged as the layer of energy stabilization, stable yield, water filling, while exploitation; Step 4, gathers oil reservoir development index; And step 5, when according to this oil reservoir development index, when judging to need to change oil production, regulate oil production equipment to control oil production and to regulate.
Object of the present invention also realizes by following technical measures:
This water injection well and this producing well are each passed through one or more oil recovery, water filling layer position, this one or more oil recovery, water filling layer position and this water injection well and the mutual UNICOM of this producing well.
In step 3, when according to this oil reservoir layer position, be judged as that height oozes, High water cut, ultra-high water-containing layer time, carry out stopping production, stopping note.
In step 3, when according to this oil reservoir layer position, be judged as energy shortage, yield poorly low pressure layer time, water filling builds the pressure makeup energy.
In step 3, when according to this oil reservoir layer position, when being judged as the layer that energy is sufficient, pressure is high, output is high, pressure release exploitation is carried out.
This oil reservoir development index comprises oilfield injection-production ratio, the strata pressure of oil reservoir, oil reservoir UNICOM situation and reservoir characteristics parameter.
In steps of 5, when according to this oil reservoir development index, when judging to need to change water injection rate, regulate the water volume control device of reservoir layer position changing water injection rate.
In steps of 5, when according to this oil reservoir development index, when judging to need to change water drive direction, change the water filling situation of this water injection well, change flow field state.
Demixing injection-production interlock coupling process method in the present invention, the result studied according to oil reservoir and oil reservoir are to demixing injection-production technique requirement, seperated layer water injection and layering oil production technology are carried out the method for integral process design and implementation, really realize multilayer to replace note and adopt coupling linkage, change flow location form, slow down water logging speed, reduce longitudinal interlayer interference, improve plane water drive swept volume.Demixing injection-production interlock coupling process method key realizes every development parameters by demixing injection-production tubing string or demixing injection-production regulation and control tubing string: water injection pressure, water injection rate, oil production, formation pressure etc., grasp oil reservoir situation to greatest extent, expand and inject water swept volume, realize stratum energy to supplement, improve reservoir withdrawal, improve oil recovery.The present invention compared with prior art tool has the following advantages: 1, realize reservoir water and to build the pressure raising stratum energy; 2, pressure release exploitation is realized; 3, the connection situation of the corresponding series of strata of oil-water well is understood; 4, reservoir water status is understood; 5, control implanted layer interlayer difference, realize interlayer and inject balanced; 6, production control interlayer difference, realizes producing zone balanced production; 7, change flow location form, improve note and adopt corresponding rate; 8, improve effective water injection rate, reduce inefficient water injection amount; 9, realize multilayer to replace note and adopt interlock, improve recovery ratio.Demixing injection-production interlock coupling process method in the present invention passes through integrated design, at any time according to the change of oil reservoir situation, change the mode of production simultaneously thus realize multilayer and replace note and adopt coupling linkage, change flow location form, slow down water logging speed, reduce longitudinal interlayer interference, improve plane water drive swept volume.
Accompanying drawing explanation
Fig. 1 is the flow chart of a specific embodiment of demixing injection-production of the present invention interlock coupling process method.
Detailed description of the invention
For making above and other object of the present invention, feature and advantage can become apparent, cited below particularly go out preferred embodiment, and coordinate institute's accompanying drawings, be described in detail below.
As shown in Figure 1, Fig. 1 is the flow chart of a specific embodiment of demixing injection-production of the present invention interlock coupling process method.
In step 101, choose water injection well and producing well.In one embodiment, according to oil reservoir scheme, beat water injection well and producing well or select the water injection well developed and producing well.Water injection well and producing well are each passed through one or more oil recovery, water filling layer position, and each layer of position may be all mutual UNICOM with water injection well and producing well.Flow process enters into step 102.
In step 102, according to the oil reservoir situation that water injection well and producing well pass, reservoir layer position is divided.Distinguish for the reservoir layer position being in different development phases or different physical property, generally can be divided into following four kinds of situations: to ooze for height, High water cut, ultra-high water-containing layer, do not possess the layer of economic worth, flow process enters into step 103; For energy shortage, the low pressure layer that yields poorly, flow process enters into step 104; For the layer of energy stabilization, stable yield, flow process enters into step 105; The layer sufficient for energy, pressure is high, output is high, flow process enters into step 106.
In step 103, height to be oozed, High water cut, ultra-high water-containing layer, do not possess the layer of economic worth, carry out stopping production, stopping note.Flow process enters into step 107.
In step 104, water filling is carried out for energy shortage, the low pressure layer that yields poorly and to build the pressure makeup energy, improve strata pressure, and do not produce, reach after certain requirement until energy and exploit again.Flow process enters into step 107.
In step 105, for carried out one side water filling of energy stabilization, stable yield, exploitation, realizes balanced production.Flow process enters into step 107.
In step 106, the layer sufficient for energy, pressure is high, output is high, carries out pressure release exploitation.Flow process enters into step 107.
In step 107, gather oil reservoir development index.After same working system a period of time, or according to water injection well, the manufacturing parameter test of producing well, the situation of change of reservoir pressure can be recognized, oil reservoir UNICOM situation, reservoir characteristics parameter (oil-containing, moisture etc.), and oilfield injection-production ratio, the strata pressure of oil reservoir, oil reservoir UNICOM situation, reservoir characteristics parameter (oil-containing, moisture etc.) etc., along with the progress of oil reservoir development, these development index can constantly adjust, at this moment water injection rate and oil production will be adjusted at any time, simultaneously in order to better reach oil-water displacement efficiency, water drive direction (situation of note adopted by especially many wells) may be changed, oil is driven to producing well to greatest extent.When according to oil reservoir development index, when judging to need adjustment water injection rate, flow process enters into step 108.When according to oil reservoir development index, when judging to need adjustment oil production, flow process enters into step 109.When according to oil reservoir development index, when judging to need adjustment to change water drive direction, flow process enters into step 110.
In step 108, changing water injection rate, changing water injection rate by regulating the water volume control device of corresponding reservoir layer position;
In step 109, change oil production, can control oil production by regulating oil production equipment and regulate.
In step 110, change water drive direction, adopt two notes, for one and adopt three notes, two and adopt two notes, two and adopt many well groups such as three notes and close the situation noted and adopt, the water filling situation that can change water injection well (refers to the situation described by step 103-106,4 kinds of situations can be changed mutually), change flow field state.

Claims (7)

1. demixing injection-production interlock coupling process method, is characterized in that, this demixing injection-production interlock coupling process method comprises:
Step 1, chooses water injection well and producing well;
Step 2, according to the oil reservoir situation that this water injection well and this producing well pass, divides reservoir layer position;
Step 3, when according to this oil reservoir layer position, when being judged as the layer of energy stabilization, stable yield, water filling, while exploitation;
Step 4, gathers oil reservoir development index; And
Step 5, when according to this oil reservoir development index, when judging to need to change oil production, regulates oil production equipment to control oil production and to regulate;
This water injection well and this producing well are each passed through one or more oil recovery, water filling layer position, this one or more oil recovery, water filling layer position and this water injection well and the mutual UNICOM of this producing well.
2. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in step 3, when according to this oil reservoir layer position, be judged as that height oozes, High water cut, ultra-high water-containing layer time, carry out stopping production, stopping note.
3. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in step 3, when according to this oil reservoir layer position, be judged as energy shortage, yield poorly low pressure layer time, water filling builds the pressure makeup energy.
4. demixing injection-production interlock coupling process method according to claim 1, is characterized in that, in step 3, when according to this oil reservoir layer position, when being judged as the layer that energy is sufficient, pressure is high, output is high, carries out pressure release exploitation.
5. demixing injection-production interlock coupling process method according to claim 1, it is characterized in that, this oil reservoir development index comprises oilfield injection-production ratio, the strata pressure of oil reservoir, oil reservoir UNICOM situation and reservoir characteristics parameter.
6. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in steps of 5, when according to this oil reservoir development index, when judging to need to change water injection rate, regulates the water volume control device of reservoir layer position changing water injection rate.
7. demixing injection-production interlock coupling process method according to claim 1, is characterized in that, in steps of 5, when according to this oil reservoir development index, when judging to need to change water drive direction, changes the water filling situation of this water injection well, changes flow field state.
CN201210432495.6A 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method Expired - Fee Related CN103790558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210432495.6A CN103790558B (en) 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210432495.6A CN103790558B (en) 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method

Publications (2)

Publication Number Publication Date
CN103790558A CN103790558A (en) 2014-05-14
CN103790558B true CN103790558B (en) 2016-04-20

Family

ID=50666570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210432495.6A Expired - Fee Related CN103790558B (en) 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method

Country Status (1)

Country Link
CN (1) CN103790558B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234673B (en) * 2014-07-30 2015-12-30 中国石油大学(华东) Consider the stratified reservoir multi-zone flow regulating method of interlayer interference
CN106801596A (en) * 2015-11-26 2017-06-06 中国石油化工股份有限公司 The new method that marine water injection well water filling interval is divided
CN107869332A (en) * 2016-09-22 2018-04-03 中国石油化工股份有限公司 A kind of oil well monitor control system and method
CN108316898B (en) * 2018-01-04 2021-01-26 中国石油天然气股份有限公司 Oil field horizontal well segmented free corresponding control oil extraction process
CN111088969B (en) * 2018-10-23 2022-03-29 中国石油天然气股份有限公司 Method and device for determining separate injection scheme of water injection well and storage medium
CN111749657B (en) * 2019-03-29 2022-06-03 中国石油天然气股份有限公司 Well pattern layered mining method and device
CN112112617B (en) * 2019-06-04 2024-03-01 中国石油化工股份有限公司 Method for developing thick-layer sand conglomerate oil reservoir by ectopic energy storage fracturing
CN110872942B (en) * 2019-10-24 2021-09-28 中国石油化工股份有限公司 Research method for contribution of different acting forces to recovery ratio in oil reservoir injection-production coupling mode
CN113969770B (en) * 2020-07-23 2024-07-16 中国石油化工股份有限公司 High-pressure energy storage-body-to-body release type volumetric water drive development method for side water reservoir water body
CN113464098B (en) * 2021-07-01 2023-07-04 中国科学院武汉岩土力学研究所 CO (carbon monoxide) 2 Geological storage method and system thereof
CN117744897B (en) * 2024-02-21 2024-05-10 中国石油大学(华东) Layered injection and production interval combination and interval injection and production allocation integrated optimization method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2203405C1 (en) * 2002-07-29 2003-04-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of development of oil field
CN201209417Y (en) * 2008-04-28 2009-03-18 中国石油新疆油田公司采油工艺研究院 Concentric double tube zonal injection wellhead device
CN102213087A (en) * 2010-04-12 2011-10-12 北京大学 Throughout and displacement combined microbial oil recovery method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2203405C1 (en) * 2002-07-29 2003-04-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of development of oil field
CN201209417Y (en) * 2008-04-28 2009-03-18 中国石油新疆油田公司采油工艺研究院 Concentric double tube zonal injection wellhead device
CN102213087A (en) * 2010-04-12 2011-10-12 北京大学 Throughout and displacement combined microbial oil recovery method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
不动管柱交替注采耦合技术的实验;隋春艳;《石油天然气学报》;20120930;第34卷(第9期);第279-281页 *
注水井分层智能联动调配系统;刘永胜;《石油仪器》;20070228;第21卷(第1期);第62-63页 *

Also Published As

Publication number Publication date
CN103790558A (en) 2014-05-14

Similar Documents

Publication Publication Date Title
CN103790558B (en) Demixing injection-production interlock coupling process method
CN102913221B (en) Volume transformation process of low permeability reservoir
CN103174403B (en) Gravity and steam flooding combined mining method for thick-layer interlayer-containing common heavy oil reservoir
CN102606129B (en) Method and system for thin interbed oilfield development
CN102852496B (en) Medium-deep heavy oil reservoir exploitation method
CN113738317A (en) Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal
CN103046910B (en) Water drive development method for oil reservoir in ultrahigh water cut period
CN101818620B (en) Mining method for maximum reservoir contact well
CN104141481A (en) Horizontal well spacing method for ultra-low permeability tight reservoir
CN206174945U (en) Three branch U type well multiple spot well pattern mining system are adopted altogether to three gas
CN106437674A (en) Imitation horizontal well waterflooding well pattern adapting method
CN105672978A (en) Horizontal moving type five-point horizontal well three-dimensional well pattern well spacing method
CN109209306A (en) Horizontal well CO injection for ultra-low permeability tight oil reservoir2Asynchronous throughput energy supplementing method
CN102493788A (en) Drainage gas recovery method for high-coal-rank coal bed gas well
CN107269255B (en) Method and device for exploiting compact oil through inter-cluster oil displacement
CN101876241A (en) Method for improving water drive recovery ratio of positive rhythm thick oil layer
CN106437642A (en) Injection-production asynchronous mining method for horizontal well of fractured reservoir
CN104963721A (en) Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes
CN108915649A (en) A kind of oil reservoir pressure is stifled to drive technology pattern preferred method
CN201763308U (en) Fishbone well type structure
CN107246254A (en) Coal-based gas U-shaped well drilling and development method
US20240117714A1 (en) Method for increasing crude oil production by co2 storage in aquifer and dumpflooding
RU2550642C1 (en) Method of oil field development with horizontal wells
CN103628848B (en) Multidirectional interlayer displacement in flooding oil production method and system
CN204252974U (en) Horizontal well type structure for deep block fractured reservoir development

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20201102