CN103243719B - Use the rock-fill concrete ramp structure of stone masonry template - Google Patents

Use the rock-fill concrete ramp structure of stone masonry template Download PDF

Info

Publication number
CN103243719B
CN103243719B CN201310190607.6A CN201310190607A CN103243719B CN 103243719 B CN103243719 B CN 103243719B CN 201310190607 A CN201310190607 A CN 201310190607A CN 103243719 B CN103243719 B CN 103243719B
Authority
CN
China
Prior art keywords
template
stone masonry
slope
rock
fill concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310190607.6A
Other languages
Chinese (zh)
Other versions
CN103243719A (en
Inventor
邵颖
谢遵党
杨维九
尹德文
杨顺群
王改会
唐林
刘军
韩健
包芬芬
何楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201310190607.6A priority Critical patent/CN103243719B/en
Publication of CN103243719A publication Critical patent/CN103243719A/en
Application granted granted Critical
Publication of CN103243719B publication Critical patent/CN103243719B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Retaining Walls (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of rock-fill concrete ramp structure using stone masonry template, including slope building basis;Slope template that building basis in slope is made up of stone masonry at least two-layer from bottom to top and pour rock-fill concrete and form, the height of every layer is 1.0 1.5 meters;The slope template section structure that stone masonry is constituted is right-angled trapezium, the ramp angles that the hypotenuse of described right-angled trapezium is basic equal to described slope building with the angle a of bottom.The invention has the advantages that the slope template section being made up of stone masonry due to every layer is ladder structure of right angle, therefore, be vertical inside stone masonry template, it is simple to the work stone of rock-fill concrete puts in storage and pours;The outside gradient of stone masonry template is identical with design ramp slope, and owing to rigidity, the structural behaviour of stone masonry belong to the same order of magnitude with rock-fill concrete, therefore stone masonry template part of displacement based on the later stage is no longer is removed, and undertakes upper load.

Description

Use the rock-fill concrete ramp structure of stone masonry template
Technical field
The present invention relates to rock-fill concrete ramp structure, especially relate to use the rock-fill concrete ramp structure of stone masonry template.
Background technology
In Hydraulic and Hydro-Power Engineering, designing requirement according to engineering operation safety or building functions, when building basis is seated at big rigidity loading end, for meeting requirement, building basis is generally located in the rock foundation that bearing capacity is higher, foundation deformation modulus is bigger.But, due to complexity and the inhomogeneities of distribution of strata of engineering geology, Building Design base surface usually can not be connected smoothly with on bedrock surface elevation, there is building basis and comes to nothing phenomenon.For solving the problems referred to above, in engineering, generally employing plain concrete or stone masonry backfill, dry lean concrete rolls the methods such as displacement and carries out stiffening basic ground, from 2005, begin with rock-fill concrete and carry out building foundation replacement consolidation process in Hydraulic and Hydro-Power Engineering.
Rock-fill concrete is the most emerging a kind of New Building Materials, and concrete construction technology needs to be further improved and develops.Rock-fill concrete is used to carry out the building foundation replacement of building foundation replacement, especially slope, the method that there is presently no maturation.Conventional method is to arrange oblique template, and the method increasing self-compacting concrete consumption pours.The lateral pressure produced in casting process due to rock-fill concrete is much larger than normal concrete, and therefore, oblique template to seek template self provides higher intensity, this adds increased construction costs, extends the working cycle, and difficulty of construction improves the most accordingly.
Summary of the invention
Present invention aim at providing a kind of structurally simple, economical practicality, be easy to the rock-fill concrete ramp structure using stone masonry template of constructing operation.
For achieving the above object, the present invention takes following technical proposals:
The rock-fill concrete ramp structure of employing stone masonry template of the present invention, including slope building basis;Slope template that building basis in described slope is made up of stone masonry at least two-layer from bottom to top and pour rock-fill concrete and form, the height of every layer is 1.0-1.5 rice;The slope template section structure that described stone masonry is constituted is right-angled trapezium, the ramp angles that the hypotenuse of described right-angled trapezium is basic equal to described slope building with the angle a of bottom.
The invention has the advantages that and described slope building basis instrument is become multiple structure from bottom to top, and every layer is arranged to the slope template that is made up of stone masonry and pours rock-fill concrete and form.Owing to the slope template section being made up of stone masonry of every layer is ladder structure of right angle, therefore, it is vertical inside stone masonry template, it is simple to the work stone of rock-fill concrete puts in storage and pours;The outside gradient of stone masonry template is identical with design ramp slope, and owing to rigidity, the structural behaviour of stone masonry belong to the same order of magnitude with rock-fill concrete, therefore stone masonry template part of displacement based on the later stage is no longer is removed, and undertakes upper load.
Accompanying drawing explanation
Fig. 1 is the top view on building basis, slope of the present invention.
Fig. 2 is that the A-A of Fig. 1 is to cross-sectional view.
Detailed description of the invention
As shown in Figure 1, 2, the rock-fill concrete ramp structure of employing stone masonry template of the present invention, including building basis, slope 1;The structure on building basis, described slope 1 is three layers of slope template being made up of stone masonry 2 from bottom to top and pours rock-fill concrete 3 and form, and the height of every layer is 1.0-1.5 rice;Slope template 2 section structure that described stone masonry is constituted is right-angled trapezium, and the angle a of the hypotenuse of described right-angled trapezium and bottom is equal to the ramp angles on building basis, described slope 1.

Claims (1)

1. use a rock-fill concrete ramp structure for stone masonry template, including slope building basis (1);It is characterized in that: described slope building basis (1) the slope template (2) that is made up of stone masonry at least two-layer from bottom to top and pour rock-fill concrete (3) and form, the height of every layer is 1.0-1.5 rice;Slope template (2) section structure that described stone masonry is constituted is right-angled trapezium, and the angle a of the hypotenuse of described right-angled trapezium and bottom is equal to the ramp angles of described slope building basis (1).
CN201310190607.6A 2013-05-22 2013-05-22 Use the rock-fill concrete ramp structure of stone masonry template Active CN103243719B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310190607.6A CN103243719B (en) 2013-05-22 2013-05-22 Use the rock-fill concrete ramp structure of stone masonry template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310190607.6A CN103243719B (en) 2013-05-22 2013-05-22 Use the rock-fill concrete ramp structure of stone masonry template

Publications (2)

Publication Number Publication Date
CN103243719A CN103243719A (en) 2013-08-14
CN103243719B true CN103243719B (en) 2016-08-03

Family

ID=48923571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310190607.6A Active CN103243719B (en) 2013-05-22 2013-05-22 Use the rock-fill concrete ramp structure of stone masonry template

Country Status (1)

Country Link
CN (1) CN103243719B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376505B (en) * 2020-12-07 2022-11-29 王世博 Fixing support plate for water conservancy slope protection construction

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08193331A (en) * 1995-01-13 1996-07-30 Fujita Corp Embankment development method
JP3579388B2 (en) * 2001-10-25 2004-10-20 俊夫 中村 Leaning type retaining wall structure, inverted trapezoid indeterminate leaning type leaning wall structure, and multi-stage leaning type retaining wall
CN100453740C (en) * 2006-10-13 2009-01-21 河海大学 Impurifying ecological bank-protection combined system
CN201280723Y (en) * 2008-10-28 2009-07-29 长江水利委员会长江科学院 Geogrid pannier net slope protection
CN101509243A (en) * 2009-03-13 2009-08-19 山东大学 Ecological shore protection method for stepwise shore
CN201952776U (en) * 2010-12-16 2011-08-31 上海勘测设计研究院 Bank protection structure
CN102277860B (en) * 2010-12-28 2013-09-25 沈阳市利千水利技术开发有限责任公司 Construction method for fill mortar junction stone dam of mortar stone precast block masonry dam shell
CN102535511A (en) * 2012-01-11 2012-07-04 重庆大学 Grouted rubble and concrete combined gravity retaining wall
CN202509465U (en) * 2012-03-29 2012-10-31 中国十九冶集团有限公司 Mud stone-laying retaining wall structure of river-interception-type tailing reservoir gushing water section
CN202787282U (en) * 2012-09-25 2013-03-13 赵振国 Step type wet masonry rock berm roadbed side slope
CN103061310B (en) * 2012-11-23 2015-03-04 浙江工业大学 Ecological habitat revetment
CN203284782U (en) * 2013-05-22 2013-11-13 黄河勘测规划设计有限公司 Rock-fill concrete slope structure with masonry template

Also Published As

Publication number Publication date
CN103243719A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN103205965B (en) Root pressure grouting pile and construction method thereof
CN103422510A (en) Steel pipe frame type cofferdam structure and construction method
CN101949226B (en) Cross construction method for large pool body
CN202865855U (en) Stabilizing plate type anchoring pile retaining structure
CN1804239A (en) Construction method for deformation resistant building foundation in subsidence area
CN103243719B (en) Use the rock-fill concrete ramp structure of stone masonry template
CN203701124U (en) Pile foundation with cement slurry injected in steel pipe with openings in side wall
CN107700480A (en) A kind of concrete-pile suitable for basement process
CN203284782U (en) Rock-fill concrete slope structure with masonry template
CN202865863U (en) Basic structure of heavy piece lifting frame
CN102116024B (en) Static pressure multilayer radial enlarging grouting pile and construction method thereof
CN204385743U (en) A kind of pile foundation in deep water steel pile casting construction system
CN105507328B (en) Foundation pit arch retaining structure and its construction method
CN105862898B (en) The design method of foundation settlement is reduced on upper hard lower subgrade soil site
CN205907683U (en) Composite set is used in construction of back pressure steel form dado in manual hole digging pile
CN104120714B (en) The construction method of hand excavated pile
CN205907688U (en) Manual hole digging pile construction is with self - leveling back pressure device
CN205205830U (en) Elevator well with even mattress layer
CN205804333U (en) A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal
CN204401570U (en) A kind of stake formula concrete checkdam structure
CN204024174U (en) A kind of anti-uplift pressure pond
CN203200764U (en) Foundation ditch stand column structure and foundation ditch internal supporting structure
CN204225131U (en) A kind of foundation pit supporting construction
CN204225127U (en) Foundation pit supporting construction
CN203361138U (en) Rear implantation pile of expanded-base pier pit underpinning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Shao Ying

Inventor after: Bao Fenfen

Inventor after: He Nan

Inventor after: Xie Zundang

Inventor after: Yang Weijiu

Inventor after: Yin Dewen

Inventor after: Yang Shunqun

Inventor after: Wang Gaihui

Inventor after: Tang Lin

Inventor after: Liu Jun

Inventor after: Han Jian

Inventor before: Li Zemin

Inventor before: Yang Shunqun

Inventor before: Shao Ying

Inventor before: Liu Jun

Inventor before: Bao Fenfen

Inventor before: Han Jian

Inventor before: He Nan

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder