CN205804333U CN201620558116.1U CN201620558116U CN205804333U CN 205804333 U CN205804333 U CN 205804333U CN 201620558116 U CN201620558116 U CN 201620558116U CN 205804333 U CN205804333 U CN 205804333U
Authority
CN
China
Prior art keywords
retaining wall
cage
installing
normal
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620558116.1U
Other languages
Chinese (zh)
Inventor
陈飞
陈凯华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201620558116.1U priority Critical patent/CN205804333U/en
Application granted granted Critical
Publication of CN205804333U publication Critical patent/CN205804333U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal, described instrument includes retaining wall, cylindric casing, I-steel, steel reinforcement cage, extravasating hole;Being provided with steel reinforcement cage in described cylindric casing, the outside of described cylindric casing is provided with retaining wall, and described retaining wall is funnel-form, and the top of described retaining wall is provided with extravasating hole;Fixing beam it is provided with bottom described retaining wall.The utility model has the advantages that: rational in infrastructure, tool making technique is simple, easy for installation, can effectively control steel reinforcement cage vibration problems in hoisting process, and can prevent aperture soil stone from falling at the bottom of hole, it is ensured that pile quality meets national regulation and design requirement, repeatable utilization, reduces construction cost.

Description

A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal
Technical field
This utility model relates to a kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal.
Background technology
In the construction of dry working system cast-in-situ bored pile, hole wall slump, soil stone fall into and steel reinforcement cage is installed off normal and caused steel The problems such as tendon protective layer is too small always affect the key factor of construction quality and efficiency of construction.After pore-forming, steel reinforcement cage was sling Owing to its swing arm is longer, quality is relatively big in journey, the amplitude of oscillation cannot be effectively controlled, and can clash into unavoidably when being seated to aperture and protect Cylinder, causes collapse hole or aperture soil stone to fall into, and increases sediment thickness at the bottom of hole, causes actual hole depth not to be inconsistent with design requirement, and reinforcing bar is pacified Put less than projected depth.Additionally, the swing laid of steel reinforcement cage and perpendicularity problem also can affect efficiency of construction, improve artificial become This.
Utility model content
This utility model is for the deficiency of existing product, and provides one to prevent dry operation borehole filling pile cage of reinforcement from installing The instrument of off normal.Technical problem to be solved in the utility model is:
A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal of the present utility model, described instrument includes Retaining wall, cylindric casing, I-steel, steel reinforcement cage, extravasating hole;In described cylindric casing, steel reinforcement cage, described cylindrical shape are installed The outside of casing is provided with retaining wall, and described retaining wall is funnel-form, and the top of described retaining wall is provided with extravasating hole;Bottom described retaining wall It is provided with fixing beam.
Further, described fixing beam is I-steel.
Further, the diameter of described retaining wall upper end is not less than 2 times of steel reinforcement cage diameter.
Further, four fixing beams of the equidistant vertical welding of bottom surrounding of described cylindric casing, described fixing beam Length is not less than the 1/2 of the difference of the upper and lower bore of retaining wall.
The beneficial effects of the utility model are: rational in infrastructure, and tool making technique is simple, easy for installation, can effectively control Steel reinforcement cage vibration problems in hoisting process, and can prevent aperture soil stone from falling at the bottom of hole, it is ensured that pile quality meets state's domestic discipline and family rules Model and design requirement, repeatable utilization, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is top view of the present utility model.
In figure: retaining wall 1-1, cylindric casing 1-2, fixing beam 1-3, steel reinforcement cage 1-4, extravasating hole 1-5.
Detailed description of the invention
Below in conjunction with embodiment, the utility model will be further described.
A kind of instrument preventing from doing operation borehole filling pile cage of reinforcement installation off normal of the present utility model is mainly by retaining wall 1- 1, cylindric casing 1-2, fixing beam 1-3, steel reinforcement cage 1-4, extravasating hole 1-5 composition.
Described instrument includes retaining wall 1-1, cylindric casing 1-2, I-steel 1-3, steel reinforcement cage 1-4, extravasating hole 1-5;Described Being provided with steel reinforcement cage 1-4 in cylindric casing 1-2, the outside of described cylindric casing 1-2 is provided with retaining wall 1-1, described retaining wall 1-1 is funnel-form, and the top of described retaining wall 1-1 is provided with extravasating hole 1-5;Fixing beam 1-3 it is provided with bottom described retaining wall 1-1.
Described fixing beam 1-3 is I-steel.
The diameter of described retaining wall 1-1 upper end is not less than 2 times of steel reinforcement cage 1-4 diameter.
The fixing beam 1-3 of the equidistant vertical welding of bottom surrounding four, described fixing beam 1-3 of described cylindric casing 1-2 Length not less than the upper and lower bore of retaining wall 1-1 difference 1/2.
In manufacturing process, determine funnel retaining wall 1-1 lower end diameter d, root according to the size in Pile Foundations Design drawing king-pile footpath Retaining wall 1-1 and cylindric casing 1-2 wall thickness is selected, to ensure that this instrument is not affecting steel reinforcement cage 1-4 according to thickness of protection tier Lay smoothly on the premise of installation.Retaining wall 1-1 upper end diameter D is not less than 2 times of steel reinforcement cage diameter, to guarantee that steel reinforcement cage is along leakage Bucket slips into funnel in hole.Extravasating hole 1-5, in order to lift and to overflow slurry.Equidistant vertically in the bottom surrounding of cylindric casing 1-2 Welding four fixing beam 1-3, fixing beam 1-3 length is not less than 1/2D-d, to ensure that this instrument is in steel reinforcement cage installation process Balance and stable.Cylindric casing 1-2 stretches into a length of 1m ~ 2m in hole.The welding of each component all uses full weld.In this practicality In the installation process of new tool, should slowly stretch in hole, avoid touching hole wall as far as possible.This instrument should be disposed vertically, and works as hole During ground out-of-flatness around, should be first by Land leveling bottom fixing beam 1-3, it is ensured that each fixing beam 1-3's is highly consistent.At reinforcing bar In cage 1-4 installation process, by winching at the bottom of steel reinforcement cage 1-4 on retaining wall 1-1, steel reinforcement cage 1-4 is slowly put into hole along retaining wall 1-1 In, after steel reinforcement cage installs, i.e. carry out concreting.
A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal of the present utility model, rational in infrastructure, work Tool processing technology is simple, easy for installation, can effectively control steel reinforcement cage vibration problems in hoisting process, and can prevent aperture soil Stone falls at the bottom of hole, it is ensured that pile quality meets national regulation and design requirement, repeatable utilization, reduces construction cost.
The foregoing is only embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, every Utilize equivalent structure or equivalence flow process conversion that this utility model description made, or be directly or indirectly used in other phases The technical field closed, is the most in like manner included in scope of patent protection of the present utility model.

Claims (4)

1. preventing dry operation borehole filling pile cage of reinforcement from installing an instrument for off normal, it is characterized in that, described instrument includes retaining wall (1-1), cylindric casing (1-2), I-steel, steel reinforcement cage (1-4), extravasating hole (1-5);Peace in described cylindric casing (1-2) Equipped with steel reinforcement cage (1-4), the outside of described cylindric casing (1-2) is provided with retaining wall (1-1), and described retaining wall (1-1) is in funnel Shape, the top of described retaining wall (1-1) is provided with extravasating hole (1-5);Described retaining wall (1-1) bottom is provided with fixing beam (1-3).
A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal the most according to claim 1, its feature It is that described fixing beam (1-3) is I-steel.
A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal the most according to claim 1, its feature It is that the diameter of described retaining wall (1-1) upper end is not less than 2 times of steel reinforcement cage (1-4) diameter.
A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal the most according to claim 1, its feature It is, four fixing beams (1-3) of the equidistant vertical welding of bottom surrounding of described cylindric casing (1-2), described fixing beam (1-3) Length not less than retaining wall (1-1) up and down bore difference 1/2.
CN201620558116.1U 2016-06-12 2016-06-12 A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal Active CN205804333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620558116.1U CN205804333U (en) 2016-06-12 2016-06-12 A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620558116.1U CN205804333U (en) 2016-06-12 2016-06-12 A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal

Publications (1)

Publication Number Publication Date
CN205804333U true CN205804333U (en) 2016-12-14

Family

ID=58142434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620558116.1U Active CN205804333U (en) 2016-06-12 2016-06-12 A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal

Country Status (1)

Country Link
CN (1) CN205804333U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387328A (en) * 2022-07-26 2022-11-25 河南黄河河务局工程建设中心 Construction method of beach area cast-in-place pile based on overlong spiral drilling machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387328A (en) * 2022-07-26 2022-11-25 河南黄河河务局工程建设中心 Construction method of beach area cast-in-place pile based on overlong spiral drilling machine
CN115387328B (en) * 2022-07-26 2024-02-13 河南黄河河务局工程建设中心 Beach cast-in-place pile construction method based on ultra-long spiral drilling machine

Similar Documents

Publication Publication Date Title
CN104018512B (en) The caisson sinking construction method dynamic to environment micro-turbulence
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN102635113A (en) Construction method for hydraulic vibrating sinking pipe cast-in-place piles
CN101761237A (en) Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN205712137U (en) Foundation pit supporting construction
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN103015427B (en) Hole pile underwater concrete pouring positioning device and positioning device thereof
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN204608815U (en) Raft plate gravity offshore wind turbine foundation
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN204780969U (en) Compound bored concrete pile basis of expanding of large -scale transmission tower
CN104878786A (en) Inclined-straight alternating group piles-soil-structure interaction experiment model
CN109944244A (en) A kind of anti-float anchor rod and its construction method
CN103243740A (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN205804333U (en) A kind of instrument preventing dry operation borehole filling pile cage of reinforcement from installing off normal
CN103758132A (en) Construction technology of cantilever piling and supporting structure combined with sloping
CN103147435A (en) Method for treating construction engineering foundation in gob
CN209891202U (en) Anti-floating anchor rod
CN204753656U (en) A clump of piles - soil - structure interact experimental model directly replaces to one side
CN103147469B (en) Vertical compression-resistance static load test method for foundation pile of high-rise building
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
CN203049588U (en) Pit-in-pit cylindrical mould
CN210238518U (en) Underwater concrete pouring height control device
CN106930274A (en) The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant