CN103215897A - 一种斜拉桥合拢施工方法 - Google Patents

一种斜拉桥合拢施工方法 Download PDF

Info

Publication number
CN103215897A
CN103215897A CN2013100997171A CN201310099717A CN103215897A CN 103215897 A CN103215897 A CN 103215897A CN 2013100997171 A CN2013100997171 A CN 2013100997171A CN 201310099717 A CN201310099717 A CN 201310099717A CN 103215897 A CN103215897 A CN 103215897A
Authority
CN
China
Prior art keywords
cable
bridge
closure
construction section
wheel machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100997171A
Other languages
English (en)
Other versions
CN103215897B (zh
Inventor
孙运国
何立忠
邓鸣
齐怀展
闫燕红
郑连生
刘永亮
谢春光
胡惜亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN MUNICIPAL ENGINEERING INST
Original Assignee
TIANJIN MUNICIPAL ENGINEERING INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN MUNICIPAL ENGINEERING INST filed Critical TIANJIN MUNICIPAL ENGINEERING INST
Priority to CN201310099717.1A priority Critical patent/CN103215897B/zh
Publication of CN103215897A publication Critical patent/CN103215897A/zh
Application granted granted Critical
Publication of CN103215897B publication Critical patent/CN103215897B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种斜拉桥合拢施工方法,其特征在于:该施工方法中包括如下步骤:桥面吊机前移就位,悬臂端斜拉索第二次张拉,使理论倒拆模型中的该斜拉索索长与该索第二次张拉后索长相等时,在合拢阶段的施工荷载作用下,合拢缝的内力计算值为0。本斜拉桥合拢施工方法,利用二次拉索的方法消除理论倒退分析与实际正装施工的闭合差;在施工过程中,利用吊机自重与反吊力作为压重使悬臂端下压合拢。通过本发明的施工方法,减少了以往斜拉桥合拢中压重、调索等施工工艺造成的工程费用、时间,并能确保桥梁的线形和内力满足设计要求。

Description

一种斜拉桥合拢施工方法
技术领域
本发明属于桥梁施工方法领域,特别是一种斜拉桥合拢施工方法。
背景技术
合拢状态是整个斜拉桥施工过程中悬臂最大和最危险的状态,主桥合拢段施工是主桥贯通的最后工序,合拢段的施工受到温度、斜拉索索力、梁段自重与临时荷载等各方面因素的影响,施工质量的优劣直接影响到整个结构的受力状态和使用寿命,故合拢段施工显得尤其重要。因此,采用安全、适用的方法快速实现全桥合拢对斜拉桥来说具有非常重要的意义。
目前,斜拉桥合拢采取的分析方法主要包括正装分析、倒拆分析,采取的措施主要包括斜拉索调索、压重等措施。但这些措施往往需要较大的时间、费用,且对成桥内力状态存在一定影响。
发明内容
本发明的目的在于克服现有技术的不足,提供一种斜拉桥合拢施工方法,其可节约桥梁施工的时间、费用,同时保证桥梁的线形和内力满足设计要求。
本发明解决其技术问题是采取以下技术方案实现的:
一种斜拉桥合拢施工方法,其特征在于:该施工方法的步骤为:
⑴、施工悬臂端最外侧梁端,对该梁端斜拉索第一次张拉;
⑵、桥面吊机前移就位,悬臂端斜拉索第二次张拉,使理论倒拆模型中的该斜拉索索长与该索第二次张拉后索长相等时,在合拢阶段的施工荷载作用下,合拢缝的内力计算值为0;
⑶、吊装支架施工段置于支架上,顶推就位;
⑷、安装边墩支座上盖板固定螺栓;
⑸、桥面吊机起吊支架施工段吊耳,调整悬臂端段合拢口至合拢高程;
⑹、对合拢口48小时温度、尺寸变形进行精确测量,确定合拢段下料参数并下料;
⑺、支架施工段向边墩倒退一定距离,桥面吊机后移一定距离后就位,吊装合拢段,与悬臂端拼装焊接;
⑻、桥面吊机前移就位,桥面吊机起吊支架施工段吊耳,将合拢段合拢口下压至支架施工段合拢口高程;
⑼、顶推支架施工段,支架施工段与合拢段合拢口精确匹配;
⑽、合拢缝临时锁定、焊接合拢;
⑾、拆除桥面吊机,拆除支架施工段支架,最外端斜拉索索力调整,使此时斜拉索的索长达到理想成桥状态下的索长;
⑿、安装纵向抗震阻尼器,拆除塔梁临时约束;
⒀、拆除塔梁临时垫块;
⒁、完成斜拉桥合拢施工。
而且,所述步骤⑻中,利用吊机自重与反吊力作为压重,使合拢段合拢口下压至支架施工段合拢口高程。
本发明的优点和积极效果是:
本斜拉桥合拢施工方法,利用二次拉索的方法消除理论倒退分析与实际正装施工的闭合差;在施工过程中,利用吊机自重与反吊力作为压重使悬臂端下压合拢。通过本发明的施工方法,减少了以往斜拉桥合拢中压重、调索等施工工艺造成的工程费用、时间,并能确保桥梁的线形和内力满足设计要求。
附图说明
图1为本发明的施工方法的流程示意图。
具体实施方式
下面结合附图、通过具体实施例对本发明作进一步详述。以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种斜拉桥合拢施工方法,是基于以下理论:用倒退分析法模拟合拢状态,并对施工进行指导的思路如下图所示:在最大悬臂端梁段吊装后将最大悬臂端对应斜拉索张拉至一定索力,使在合拢阶段的施工荷载作用下,合拢缝的内力计算值为0;在实际施工过程中,增加一个合拢后二次张拉最外端斜拉索索的施工过程,使此时斜拉索的无应力索长达到理想成桥状态下的无应力索长。
本发明施工方法的步骤为:
⑴、施工悬臂端最外侧梁端,对该梁端斜拉索第一次张拉。
⑵、桥面吊机前移就位,悬臂端斜拉索第二次张拉,使理论倒拆模型中的该斜拉索索长与该索第二次张拉后索长相等时,在合拢阶段的施工荷载作用下,合拢缝的内力计算值为0。
⑶、吊装支架施工段置于支架上,顶推就位。
⑷、安装边墩支座上盖板固定螺栓。
⑸、桥面吊机起吊支架施工段吊耳,调整悬臂端段合拢口至合拢高程;
⑹、对合拢口48小时温度、尺寸变形进行精确测量,确定合拢段下料参数并下料。
⑺、支架施工段向边墩倒退一定距离,桥面吊机后移一定距离后就位,吊装合拢段,与悬臂端拼装焊接。
⑻、桥面吊机前移就位,桥面吊机起吊支架施工段吊耳,利用吊机自重与反吊力作为压重,将合拢段合拢口下压至支架施工段合拢口高程。
⑼、顶推支架施工段,支架施工段与合拢段合拢口精确匹配。
⑽、合拢缝临时锁定、焊接合拢。
⑾、拆除桥面吊机,拆除支架施工段支架,最外端斜拉索索力调整,使此时斜拉索的索长达到理想成桥状态下的索长。
⑿、安装纵向抗震阻尼器,拆除塔梁临时约束。
⒀、拆除塔梁临时垫块。
⒁、完成斜拉桥合拢施工。
尽管为说明目的公开了本发明的实施例和附图,但是本领域的技术人员可以理解:在不脱离本发明及所附权利要求的精神和范围内,各种替换、变化和修改都是可能的,因此,本发明的范围不局限于实施例和附图所公开的内容。

Claims (2)

1.一种斜拉桥合拢施工方法,其特征在于:该施工方法的步骤为:
⑴、施工悬臂端最外侧梁端,对该梁端斜拉索第一次张拉;
⑵、桥面吊机前移就位,悬臂端斜拉索第二次张拉,使理论倒拆模型中的该斜拉索索长与该索第二次张拉后索长相等时,在合拢阶段的施工荷载作用下,合拢缝的内力计算值为0;
⑶、吊装支架施工段置于支架上,顶推就位;
⑷、安装边墩支座上盖板固定螺栓;
⑸、桥面吊机起吊支架施工段吊耳,调整悬臂端段合拢口至合拢高程;
⑹、对合拢口48小时温度、尺寸变形进行精确测量,确定合拢段下料参数并下料;
⑺、支架施工段向边墩倒退一定距离,桥面吊机后移一定距离后就位,吊装合拢段,与悬臂端拼装焊接;
⑻、桥面吊机前移就位,桥面吊机起吊支架施工段吊耳,将合拢段合拢口下压至支架施工段合拢口高程;
⑼、顶推支架施工段,支架施工段与合拢段合拢口精确匹配;
⑽、合拢缝临时锁定、焊接合拢;
⑾、拆除桥面吊机,拆除支架施工段支架,最外端斜拉索索力调整,使此时斜拉索的索长达到理想成桥状态下的索长;
⑿、安装纵向抗震阻尼器,拆除塔梁临时约束;
⒀、拆除塔梁临时垫块;
⒁、完成斜拉桥合拢施工。
2.根据权利要求1所述的斜拉桥合拢施工方法,其特征在于:所述步骤⑻中,利用吊机自重与反吊力作为压重,使合拢段合拢口下压至支架施工段合拢口高程。
CN201310099717.1A 2013-03-26 2013-03-26 一种斜拉桥合拢施工方法 Active CN103215897B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310099717.1A CN103215897B (zh) 2013-03-26 2013-03-26 一种斜拉桥合拢施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310099717.1A CN103215897B (zh) 2013-03-26 2013-03-26 一种斜拉桥合拢施工方法

Publications (2)

Publication Number Publication Date
CN103215897A true CN103215897A (zh) 2013-07-24
CN103215897B CN103215897B (zh) 2015-03-25

Family

ID=48814022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310099717.1A Active CN103215897B (zh) 2013-03-26 2013-03-26 一种斜拉桥合拢施工方法

Country Status (1)

Country Link
CN (1) CN103215897B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556573A (zh) * 2013-10-08 2014-02-05 中交第二航务工程局有限公司 一种平行钢绞线斜拉索张拉控制方法
CN105970814A (zh) * 2016-05-20 2016-09-28 中建三局基础设施工程有限公司 一种跨铁路既有线平转桥梁合龙段施工方法
CN106702910A (zh) * 2016-12-29 2017-05-24 中交第三航务工程局有限公司 一种双塔双索面矮塔斜拉桥的主梁施工工艺
CN109778716A (zh) * 2019-01-04 2019-05-21 腾达建设集团股份有限公司 悬臂桥梁合拢口的平面位置调整方法
CN111335168A (zh) * 2020-03-09 2020-06-26 西南交通大学 千米级混合梁斜拉桥合龙方法
CN112376440A (zh) * 2020-11-05 2021-02-19 中交第三航务工程局有限公司 一种斜拉桥的主梁无合拢吊装的施工工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2494743A1 (fr) * 1980-11-25 1982-05-28 Bouygues Sa Procede et dispositif pour prolonger une portion d'ouvrage, notamment une portion de tablier de pont, avec des voussoirs, en utilisant une poutre haubannee
CN101195987A (zh) * 2007-12-27 2008-06-11 中交第二航务工程局有限公司 斜拉桥中跨顶推辅助合龙工艺及梁段拉移组合装置
CN101644030A (zh) * 2007-12-27 2010-02-10 中交第二航务工程局有限公司 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置
CN101864735A (zh) * 2010-07-16 2010-10-20 中铁二局股份有限公司 高速铁路斜拉连续刚构组合桥合拢段施工方法
CN101935985A (zh) * 2010-09-19 2011-01-05 湖南路桥建设集团公司 一种斜拉桥钢箱梁中跨合拢方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2494743A1 (fr) * 1980-11-25 1982-05-28 Bouygues Sa Procede et dispositif pour prolonger une portion d'ouvrage, notamment une portion de tablier de pont, avec des voussoirs, en utilisant une poutre haubannee
CN101195987A (zh) * 2007-12-27 2008-06-11 中交第二航务工程局有限公司 斜拉桥中跨顶推辅助合龙工艺及梁段拉移组合装置
CN101644030A (zh) * 2007-12-27 2010-02-10 中交第二航务工程局有限公司 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置
CN101864735A (zh) * 2010-07-16 2010-10-20 中铁二局股份有限公司 高速铁路斜拉连续刚构组合桥合拢段施工方法
CN101935985A (zh) * 2010-09-19 2011-01-05 湖南路桥建设集团公司 一种斜拉桥钢箱梁中跨合拢方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李乔等: "特大跨度斜拉桥变形的几何非线性效应分析", 《西南交通大学学报》, no. 2, 30 April 2007 (2007-04-30) *
欧阳永金等: "独塔单索面单排索预应力混凝土部分斜拉桥施工控制", 《桥梁建设》, no. 6, 31 December 2002 (2002-12-31) *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556573A (zh) * 2013-10-08 2014-02-05 中交第二航务工程局有限公司 一种平行钢绞线斜拉索张拉控制方法
CN103556573B (zh) * 2013-10-08 2015-08-12 中交第二航务工程局有限公司 一种平行钢绞线斜拉索张拉控制方法
CN105970814A (zh) * 2016-05-20 2016-09-28 中建三局基础设施工程有限公司 一种跨铁路既有线平转桥梁合龙段施工方法
CN106702910A (zh) * 2016-12-29 2017-05-24 中交第三航务工程局有限公司 一种双塔双索面矮塔斜拉桥的主梁施工工艺
CN109778716A (zh) * 2019-01-04 2019-05-21 腾达建设集团股份有限公司 悬臂桥梁合拢口的平面位置调整方法
CN111335168A (zh) * 2020-03-09 2020-06-26 西南交通大学 千米级混合梁斜拉桥合龙方法
CN112376440A (zh) * 2020-11-05 2021-02-19 中交第三航务工程局有限公司 一种斜拉桥的主梁无合拢吊装的施工工艺

Also Published As

Publication number Publication date
CN103215897B (zh) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103215897B (zh) 一种斜拉桥合拢施工方法
CN201943007U (zh) 活动支架不变幅架梁吊机
CN102251483A (zh) 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法
CN102953553A (zh) 一种利用臂架变幅机构进行大跨度管桁架安装的方法
CN110205940A (zh) 0#块施工托架及其反拉预压方法
CN104195948A (zh) 桥梁悬吊管道顶推安装施工方法
CN104801836A (zh) 海上风力发电导管架基础法兰安装方法
CN104314009B (zh) 大节段提升机构及使用方法
CN203173749U (zh) 液压复式起重机塔架组装整体式竖向自顶升装置
CN205112085U (zh) 一种液压内模施工系统
CN105803948A (zh) 斜拉桥宽幅pk组合箱梁的防错台施工方法
CN102635070B (zh) 斜拉桥钢塔互拉式竖向转体施工方法
CN202643084U (zh) 拆除、安装钢梁的小型吊具
CN109252682A (zh) 一种索承结构斜撑杆安装方法
CN102877657B (zh) 大跨度h型钢平面组合结构张弦梁高空换索施工方法
CN210066499U (zh) 一种悬索桥钢梁空中精准对接系统
CN105438982A (zh) 高炉热风炉炉箅子的快速更换方法
CN204371545U (zh) 一种电站叶轮检修装置
CN108709761A (zh) 电动葫芦试验台轨距调整装置
CN104018680A (zh) 一种大跨度实腹式弧形梁的提升方法
CN203373116U (zh) 一种钢桥板单元翻身工装
CN208803363U (zh) 一种带轨道悬臂拼装钢桁架桥
CN203319620U (zh) 一种便携式起重器
CN203033649U (zh) 一种箱型梁体吊装装置
CN201296785Y (zh) 设置在电解铝厂检修通道处的轨道提升机组

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant