CN101644030A - 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置 - Google Patents

用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置 Download PDF

Info

Publication number
CN101644030A
CN101644030A CN200910150504A CN200910150504A CN101644030A CN 101644030 A CN101644030 A CN 101644030A CN 200910150504 A CN200910150504 A CN 200910150504A CN 200910150504 A CN200910150504 A CN 200910150504A CN 101644030 A CN101644030 A CN 101644030A
Authority
CN
China
Prior art keywords
closure
beam section
shifting
sides
combining device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910150504A
Other languages
English (en)
Other versions
CN101644030B (zh
Inventor
张鸿
刘先鹏
罗承斌
陈鸣
周汉发
张永涛
邓惠斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN 200910150504 priority Critical patent/CN101644030B/zh
Publication of CN101644030A publication Critical patent/CN101644030A/zh
Application granted granted Critical
Publication of CN101644030B publication Critical patent/CN101644030B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置,它是在完成合拢口两侧梁段施工后,在合拢口两侧梁段之间安装临时通道、劲性骨架并在合拢口两侧梁段上设置临时替代压载;调整两侧梁段后,将两侧梁段的劲性骨架连接成整体;将龙口两侧的梁段分别向岸侧拉移;桥面吊机抬吊合龙梁段,同时卸去梁段临时替代压载;合龙梁段进入合龙口,两侧梁段回移并与合龙梁段匹配;将合龙梁段与两侧梁段连接。本发明的方法综合了温度自然合龙和顶推合龙的优点,同时减少了利用温度合拢时,温度对成桥结构和线形的影响,又避免了顶推合龙施工时间长的问题,确保了施工进度。顶推辅助合龙工艺操作方便、容易控制、能确保施工精度。

Description

用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置
本专利申请是申请号为2007101690517,申请日为2007年12月27日,斜拉桥中跨顶推辅助合龙工艺及梁段拉移组合装置的分案申请。
技术领域
本发明属于斜拉桥中跨合龙施工,具体涉及一种斜拉桥中跨顶推辅助合龙方法及相关梁段拉移组合装置。
背景技术
对于斜拉桥中跨合龙,国内均采用温度自然合龙,国外一般采用顶推合龙。
温度自然合龙是根据合龙时的环境温度和合龙口配切合龙梁段(改变合龙梁段长度),通过两侧吊机抬吊梁段合龙,两条接缝同步焊接,按此工艺施工,合龙速度快,但一般会对成桥后主跨跨径长度、结构受力与线形产生一定影响,这是因为:中跨合龙设计基准温度为20℃,在该温度状态下进行中跨合龙,对永久结构不会产生不利影响,但在实际施工中,受合龙时机及其自然条件的影响,合龙时的环境和结构温度均与基准温度存在差异,这就会导致按测定的合龙口配切的合龙梁段长度与设计值出现一定差异,从而会产生以上影响。
顶推合龙是根据设计基准温度对合龙梁段下料,通过顶推合龙口两侧梁段后(改变合龙口长度),单侧吊机起吊梁段进入龙口,两条接缝分次焊接(异步焊接),按此工艺施工,能保证成桥后主跨跨径长度、结构受力与线形,但施工时间长,对处于最大单悬臂状态的钢箱梁来说,风险较大。
本发明的目的在于提供一种斜拉桥中跨顶推辅助合龙的梁段拉移组合装置,以实现斜拉桥中跨合龙的。
实现本发明目的的技术方案为:梁段拉移组合装置,它包括索塔上设置的底座,底座上设置支撑脚,支撑脚上连接穿心千斤顶,张拉杆穿过穿心千斤顶并与之连接,穿过穿心千斤顶张拉杆的端部与拉索连接;拉索的另一端铰接在钢箱梁上。
索塔与钢箱梁之间相对至少设置两对梁段拉移组合装置,其中两个梁段拉移组合装置朝向岸侧,另两个梁段拉移组合装置朝向江侧。
本发明的方法综合了温度自然合龙和顶推合龙的优点,同时减少了利用温度合拢时,温度对成桥结构和线形的影响,又避免了顶推合龙施工时间长的问题,确保了施工进度。顶推辅助合龙工艺操作方便、容易控制、能确保施工精度;梁段拉移组合装置;结构简单,操作简便,控制精度高,为中跨合龙施工发挥了重要的作用。
附图说明
图1斜拉桥中跨顶推辅助合龙工艺步骤一示意图。
图2斜拉桥中跨顶推辅助合龙工艺步骤二示意图。
图3斜拉桥中跨顶推辅助合龙工艺步骤三示意图。
图4斜拉桥中跨顶推辅助合龙工艺步骤四示意图。
图5斜拉桥中跨顶推辅助合龙工艺步骤五示意图。
图6斜拉桥中跨顶推辅助合龙工艺步骤七示意图。
图7斜拉桥中跨顶推辅助合龙工艺步骤八示意图。
图8梁段拉移组合装置结构示意图。
图9a~图9c梁段拉移组合装置在索塔与钢箱梁之间的布置示意图。
图10张拉杆、变径螺母与拉索锚头连接示意图。
具体实施方式
本实施例用于对本发明权利要求的解释,本发明的保护范围并不限于下列描述的内容。
如图1所示,合拢口两侧梁段的施工:合龙口两侧梁段100焊接完成,第一次张拉该梁段上斜拉索200和岸侧对应斜拉索;桥面吊机300解钩;第二次张拉合龙口两侧梁段上斜拉索和岸侧对应斜拉索。600为活动焊接平台。
如图2所示,桥面吊机300后移一个梁段,更换吊具(扁担梁);汽车吊400就位,拆除挂索平台201,安装临时通道502、劲性骨架500及临时替代压载501(总重为合龙梁段重量);
如图3所示,桥面吊机300前移至合龙梁段的吊装位置,检查车前移至合龙口附近。
如图4所示,调整梁段100的相对标高、合龙口宽(上下口)和轴线;将龙口两侧的劲性骨架500焊成整体;对合龙口进行连续监测;放松塔梁竖向临时固接索880部分索力(图9a),将龙口两侧的梁段分别向岸侧拉移;向岸侧拉动时,江侧梁段拉移组合装置800放松,岸侧梁段拉移组合装置801张拉(图9b),直至将梁段拉移到预定位置;江侧梁段拉移组合装置800和岸侧梁段拉移组合装置801结构相同。
如图5所示,运梁船抛锚定位;桥面吊机300抬吊合龙梁段,同时卸去梁段临时替代压载501。
如图6所示,合龙梁段700进入合龙口,两侧梁段回移,合龙梁段调位与合龙梁段匹配;两侧梁段回移时,江侧梁段拉移组合装置张拉,岸侧梁段拉移组合装置放松。将合龙梁段与两侧梁段接缝701同时焊接,并及时解除塔梁临时固接。
如图7所示,恢复调整过的索力;桥面吊机后退,检查车后退,拆除劲性骨架等结构,吊装风嘴。
如图8所示,梁段拉移组合装置包括索塔上设置的底座802,底座802上设置支撑脚803,支撑脚803上连接穿心千斤顶804,张拉杆805穿过穿心千斤顶804并与之连接,穿过穿心千斤顶的张拉杆805的端部与拉索806连接;拉索806的另一端铰接在钢箱梁900底板上。钢箱梁900下连接锚板807,锚板807铰接连接拉索锚头808,拉索锚头808与拉索806连接。张拉杆805的端部与拉索806连接结构为:张拉杆805通过锁紧螺母810与穿心千斤顶804连接,张拉杆805端部连接变径螺母812,变径螺母812与拉索锚头811连接,拉索锚头811连接拉索806。底座802设在索塔的下横梁901上。如图10所示。拉索锚头811是现有的斜拉索桥梁上将斜拉索锚固的通用的结构。
如图9b所示,索塔下横梁901与钢箱梁900之间相对至少设置两对对梁段拉移组合装置,每一对中的一个梁段拉移组合装置801朝向岸侧,另一个梁段拉移组合装置800朝向江侧。如图9c所示,本实施例中索塔下横梁901与钢箱梁900之间设置四对梁段拉移组合装置。

Claims (4)

1、一种用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置,其特征在于它包括索塔上设置的底座,底座上设置支撑脚,支撑脚上连接穿心千斤顶,张拉杆穿过穿心千斤顶并与之连接,穿过穿心千斤顶张拉杆的端部与拉索连接;拉索的另一端铰接在钢箱梁底板上。
2、如权利要求1所述用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置,其特征在于钢箱梁下连接锚板,锚板铰接连接拉索锚头,拉索锚头与拉索连接。
3、如权利要求1所述用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置,其特征在于底座设在索塔的下横梁上。
4、如权利要求1或3所述用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置,其特征在于索塔与钢箱梁之间相对至少设置两对梁段拉移组合装置,其中两个梁段拉移组合装置朝向岸侧,另两个梁段拉移组合装置朝向江侧。
CN 200910150504 2007-12-27 2007-12-27 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置 Expired - Fee Related CN101644030B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910150504 CN101644030B (zh) 2007-12-27 2007-12-27 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910150504 CN101644030B (zh) 2007-12-27 2007-12-27 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN 200710169051 Division CN101195987B (zh) 2007-12-27 2007-12-27 斜拉桥中跨顶推辅助合龙工艺

Publications (2)

Publication Number Publication Date
CN101644030A true CN101644030A (zh) 2010-02-10
CN101644030B CN101644030B (zh) 2011-10-19

Family

ID=41656076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910150504 Expired - Fee Related CN101644030B (zh) 2007-12-27 2007-12-27 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置

Country Status (1)

Country Link
CN (1) CN101644030B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864735A (zh) * 2010-07-16 2010-10-20 中铁二局股份有限公司 高速铁路斜拉连续刚构组合桥合拢段施工方法
CN103215897A (zh) * 2013-03-26 2013-07-24 天津市市政工程研究院 一种斜拉桥合拢施工方法
CN104631344A (zh) * 2015-03-09 2015-05-20 中国建筑土木建设有限公司路桥分公司 用于桥梁合拢的劲性骨架结构及其施工方法
CN108914763A (zh) * 2018-08-16 2018-11-30 中铁十七局集团第五工程有限公司 一种桥梁合龙劲性骨架快速锁定装置及其使用方法
CN109252446A (zh) * 2018-08-28 2019-01-22 中交武汉港湾工程设计研究院有限公司 钢箱梁纵向顶推合龙施工装置及其施工方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1749338A1 (ru) * 1989-11-28 1992-07-23 Государственный проектный и проектно-конструкторский институт по проектированию строительства мостов Устройство дл надвижки пролетных строений мостов на опоры
DE4306040C2 (de) * 1993-02-26 1995-03-30 Walter Dipl Ing Komm Verfahren und Vorrichtung zum Querverschub von überhöht hergestellten Brückenbauteilen
CN2620721Y (zh) * 2003-03-21 2004-06-16 柳州欧维姆机械股份有限公司 钢绞线拉索索力转换装置
CN200971475Y (zh) * 2006-07-28 2007-11-07 中铁工程设计咨询集团有限公司 钢拱桥拱肋大节段安装合龙提升系统

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864735A (zh) * 2010-07-16 2010-10-20 中铁二局股份有限公司 高速铁路斜拉连续刚构组合桥合拢段施工方法
CN103215897A (zh) * 2013-03-26 2013-07-24 天津市市政工程研究院 一种斜拉桥合拢施工方法
CN103215897B (zh) * 2013-03-26 2015-03-25 天津市市政工程研究院 一种斜拉桥合拢施工方法
CN104631344A (zh) * 2015-03-09 2015-05-20 中国建筑土木建设有限公司路桥分公司 用于桥梁合拢的劲性骨架结构及其施工方法
CN104631344B (zh) * 2015-03-09 2016-06-08 中国建筑土木建设有限公司路桥分公司 用于桥梁合拢的劲性骨架结构及其施工方法
CN108914763A (zh) * 2018-08-16 2018-11-30 中铁十七局集团第五工程有限公司 一种桥梁合龙劲性骨架快速锁定装置及其使用方法
CN108914763B (zh) * 2018-08-16 2024-02-20 中铁十七局集团第五工程有限公司 一种桥梁合龙劲性骨架快速锁定装置的使用方法
CN109252446A (zh) * 2018-08-28 2019-01-22 中交武汉港湾工程设计研究院有限公司 钢箱梁纵向顶推合龙施工装置及其施工方法
CN109252446B (zh) * 2018-08-28 2020-07-10 中交武汉港湾工程设计研究院有限公司 钢箱梁纵向顶推合龙施工装置及其施工方法

Also Published As

Publication number Publication date
CN101644030B (zh) 2011-10-19

Similar Documents

Publication Publication Date Title
CN101195987B (zh) 斜拉桥中跨顶推辅助合龙工艺
CN103541308B (zh) 变截面悬臂桥箱梁自锁同步顶推系统及施工方法
CN101644030B (zh) 用于斜拉桥中跨顶推辅助合龙的梁段拉移组合装置
CN101260650B (zh) 50m/1430t双幅整体箱梁架设工艺
CN109629440B (zh) 基于步履式三维液压顶推设备的钢箱梁顶推施工方法
CN102286935A (zh) 一种混合式结合梁斜拉桥全新施工方法
CN106522112B (zh) 斜拉桥边跨梁段架设系统及其方法
CN104727227B (zh) 一种中承式钢箱系杆拱桥敞口格构式钢梁整节段架设方法
CN103290784B (zh) 拱梁结合桥吊装施工方法
JP2018053496A (ja) 多径間連続橋の橋桁架設方法
CN109098099A (zh) 连续钢桁柔性拱桥快速施工方法
CN113846563B (zh) 一种大跨度斜拉桥边跨及辅助跨钢桁梁架设的施工方法
CN109629439B (zh) 一种独塔斜拉桥施工方法
CN101324054B (zh) 桥梁节段梁临时墩的顶推就位施工方法
CN109629449B (zh) 一种钢箱拱桥拱脚钢混结合段安装定位支架及对位方法
CN109680614B (zh) 装配式钢混组合桥梁超大型架桥机快速转移方法及设备
CN210370698U (zh) 一种棚洞衬砌拱部施工用移模台车
CN114703757B (zh) 斜拉桥钢横梁多功能支架及钢横梁的拼装方法
CN106192761A (zh) 一种在桥隧狭短过渡段拆解移动模架的方法
CN217325062U (zh) 斜拉桥索塔大吨位钢横梁的拼装滑移支架
CN212103678U (zh) 台阶式导梁前端结构
CN114250716A (zh) 一种中长跨度钢梁顶推施工长悬臂上墩结构及其方法
Däbritz Movable scaffolding systems
CN218989877U (zh) 大跨度钢桁梁桥双滑块顶推施工结构
CN217536681U (zh) 斜拉桥索塔大吨位钢混组合横梁的拼装支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20100210

Assignee: Long Highway Bridge Construction CCCC National Engineering Research Center Co., Ltd.

Assignor: China Communications 2nd Navigational Bureau

Contract record no.: 2013420000111

Denomination of invention: Beam section pulling, shifting and combining device used for spanning and pushing auxiliary closure in cable stayed bridge

Granted publication date: 20111019

License type: Exclusive License

Record date: 20130802

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111019

Termination date: 20171227

CF01 Termination of patent right due to non-payment of annual fee