CN103205964A - 使用钢管柱接桩的灌注桩施工方法 - Google Patents

使用钢管柱接桩的灌注桩施工方法 Download PDF

Info

Publication number
CN103205964A
CN103205964A CN2013101104164A CN201310110416A CN103205964A CN 103205964 A CN103205964 A CN 103205964A CN 2013101104164 A CN2013101104164 A CN 2013101104164A CN 201310110416 A CN201310110416 A CN 201310110416A CN 103205964 A CN103205964 A CN 103205964A
Authority
CN
China
Prior art keywords
steel pipe
pipe column
cast
pile
pile extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101104164A
Other languages
English (en)
Other versions
CN103205964B (zh
Inventor
梁彦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.
Original Assignee
MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd filed Critical MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310110416.4A priority Critical patent/CN103205964B/zh
Publication of CN103205964A publication Critical patent/CN103205964A/zh
Application granted granted Critical
Publication of CN103205964B publication Critical patent/CN103205964B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

本发明提供一种使用钢管柱接桩的灌注桩施工方法,其包括:a)形成桩孔,并在形成桩孔的过程中自动形成泥浆护壁;b)制作钢管柱接桩,所述钢管柱接桩包括钢管和钢筋笼,所述钢管底端固定至所述钢筋笼顶端;c)将所述钢管柱接桩吊装并定位到桩孔内;d)通过所述钢管柱接桩上的注浆管向桩孔内连续灌注混凝土;以及e)向所述钢管柱接桩及桩孔壁之间填土。本发明提供一种使用钢管柱接桩的灌注桩的施工方法,使得在地下工程的施工过程中,可以提高灌注桩的一体性,从而提高灌注桩的成桩质量,并且减少了灌注桩的施工工序。

Description

使用钢管柱接桩的灌注桩施工方法
技术领域
本发明涉及建筑领域,具体说,涉及一种使用钢管柱接桩的灌注桩的施工方法。
背景技术
目前,随着城市的规模不断增长,人们越来越关注对城市地下空间进行开发利用,使用钢管柱接桩的灌注桩是应用范围广泛的浇筑多层地下室和其他多层地下结构的有效基础结构,尤其是在跨度大的地下工程经常使用。钢管柱接桩结构主要是指在采用钢筋笼和钢管柱组合方式共同作为灌注桩的支撑骨架。
现有的使用钢管柱接桩的灌注桩的施工方法,通常是对钢筋笼和钢管柱分别施工,即首先将钢筋笼吊装到桩孔内,由钢筋笼上方的导管向桩孔内连续灌注混凝土至钢筋笼顶端附近,以形成钢筋笼部分的灌注桩;然后在地表上采用定位仪器,将直径小于钢筋笼的钢管柱放置到钢筋笼内部的混凝土中进行固定,再次由钢管柱上方的导管向桩孔内连续灌注混凝土,以形成钢管柱部分的灌注桩。
这种方法的缺点是,对钢筋笼和钢管柱作为两个独立的部分,分别吊装、分别施工灌注,混凝土的凝结也不在同一时间段内完成,不但会影响灌注桩的一体性以及整体性,而且施工工序重复,施工工期长。
发明内容
本发明就是为了解决上述问题而做出的。具体说,本发明的目的在于,提供一种使用钢管柱接桩的灌注桩的施工方法,使得在地下工程的施工过程中,可以提高灌注桩的一体性,从而提高灌注桩的成桩质量,并且减少了灌注桩的施工工序。
为了实现上述目的,本发明提供一种使用钢管柱接桩的灌注桩的施工方法,该方法包括:a)形成桩孔,并在形成桩孔的过程中自动形成泥浆护壁;b)制作钢管柱接桩,所述钢管柱接桩包括钢管和钢筋笼,所述钢管底端固定至所述钢筋笼顶端;c)将所述钢管柱接桩吊装并定位到桩孔内;d)通过所述钢管柱接桩上的注浆管向桩孔内连续灌注混凝土;以及e)向所述钢管柱接桩及桩孔壁之间填土。
优选地,在步骤a)之前还包括埋设护筒。
优选地,所述桩孔是变径桩或等直径桩。
优选地,所述钢管上设有多个溢出孔,所述溢出孔上方附近设有阻滤网,所述阻滤网下方至钢管底部设有多个限位器。
另外,优选地,所述阻滤网包括密目丝网和弹性垫圈。
从上面的描述和实践可知,根据本发明,在地下工程施工过程中,采用本发明所述的钢管柱接桩形成灌注桩,将钢筋笼和钢管柱连接为一体,形成钢管柱接桩,提高了灌注桩的一体性,优化了灌注桩的整体性,从而提高灌注桩的成桩质量;而且,通过本施工方法,避免了施工过程的施工步骤重复,减少了灌注桩的施工工序,从而节省了施工工期。
附图说明
图1a-1e示出了本发明的一个实施例所述的使用钢管柱接桩的灌注桩的施工方法的施工方法;
图2示出了本发明的一个实施例所述的钢管柱示意图;以及
图3示出了本发明的一个实施例所述的阻滤网示意图。
具体实施方式
下面将参考附图来描述本发明所述的使用钢管柱接桩的灌注桩的施工方法的实施例。本领域的普通技术人员可以认识到,在不偏离本发明的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,附图和描述在本质上是说明性的,而不是用于限制权利要求的保护范围。此外,在本说明书中,相同的附图标记表示相同或相似的部分。
下面将描述本发明的一个实施例所述的使用钢管柱接桩的灌注桩的施工方法。图1a-1e是示意图,示出了本发明的一个实施例所述的灌注桩施工方法。图2示出了本发明的一个实施例所述的钢管柱示意图。图3示出了本发明的一个实施例所述的阻滤网示意图。
如图1a所示,首先,可以埋设钢护筒10,钢护筒10可以防止桩孔20孔口的坍塌。接着,选择适合的方法和钻具,形成桩孔20,在形成桩孔20的过程中自动形成泥浆护壁。优选地,桩孔20可以是变径桩,也可以是等直径桩。通常桩基础采用变径桩,例如支盘桩结构,支盘桩可以提供可靠地支撑力和抗拔力。
如图1b所示,制作钢管柱接桩100,钢管柱接桩100包括钢管柱110和钢筋笼120,钢管柱110底端固定至钢筋笼120顶端,这里,固定是指将钢管柱110的底端焊接在钢筋笼120的顶端。其中,钢管柱110与钢筋笼120轴向重合。如图2所示,钢管柱110的底端附近不均匀分布多个溢出孔111,溢出孔111上方附近设有阻滤网112,阻滤网112下方至钢管柱110底部设有多个限位器113。限位器113可以固定钢管柱110的位置,同时为阻滤网112提供支撑。混凝土由钢管柱110下方的溢出孔111进入到钢筋笼120及桩孔20内部。混凝土凝固时,可以加强钢筋柱110与钢筋笼120的整体性。如图3所示,在限位器113上方设有阻滤网112,阻滤网112包括密目丝网112a和弹性垫圈112b,通常,将密目丝网112a通过绑扎或焊接的方式固定到限位器113上。密目丝网112a较柔软,网孔较小,密目丝网112a可以阻截颗混凝土进到钢管柱110内部,弹性垫圈112b可以阻截混凝土进到钢管柱111与桩孔壁之间。
如图1c所示,将钢管柱接桩100吊装并定位到桩孔20内,使得钢管柱接桩100与桩孔20轴向重合,为了避免钢管柱接桩100在桩孔20内发生倾斜,对钢管柱接桩100采用地面定位,通常在钢管柱接桩100上方的钢管柱110的顶端位置进行定位。清理桩孔20内部残渣。
如图1d所示,在桩孔20内放入钢管柱接桩100后,向桩孔20内灌注混凝土。通过钢管柱接桩100上方的注浆管30向桩孔20内连续灌注混凝土,将导管30由钢管柱110以及钢筋笼120的内部放置在桩孔20底部附近,在连续向桩孔20内灌注混凝土的同时,不断地提高导管20出口的位置,通常保证导管20出口的位置没入混凝土内部2m,阻滤网112可以阻截钢管柱110外侧混凝土通过,可以通过测量钢管柱110外侧混凝土的液面高度进行检测。待混凝土初凝后拔出钢护筒10。
如图1e所示,由于钢管柱接桩100的钢管柱110直径小于钢筋笼120直径,为了加固钢管柱110与钢筋笼120的稳定性,向钢管柱接桩100及桩孔壁之间填土,例如砂砾等。这样,灌注桩就形成了。
将钢管柱和钢筋笼固定为一体,制作成钢管柱接桩结构,钢管柱接桩整体结构吊装到桩孔内,对钢管柱和钢筋笼同时进行灌注,可以避免钢管柱和钢筋笼分别施工、分别灌注的繁杂工序,使得整体结构性得到了优化;同时避免了分别施工过程中,钢管柱与钢筋笼可能不在同一条直线上,影响一体性的情况发生。
从上面的描述和实践可知,根据本发明,在地下工程施工过程中,采用本发明所述的钢管柱接桩形成灌注桩,将钢筋笼和钢管柱连接为一体,形成钢管柱接桩,提高了灌注桩的一体性,优化了灌注桩的整体性,从而提高灌注桩的成桩质量;而且,通过本施工方法,避免了施工过程的施工步骤重复,减少了灌注桩的施工工序,从而节省了施工工期。
如上参照附图以示例的方式描述了本发明所述的使用钢管柱接桩的灌注桩的施工方法。但是,本领域技术人员应当理解,对于上述方法,还可以在不脱离本发明内容的基础上做出各种改进和组合。因此,本发明的保护范围应当由所附的权利要求书的内容确定。

Claims (5)

1.一种使用钢管柱接桩的灌注桩施工方法,包括:
a)形成桩孔,并在形成桩孔的过程中自动形成泥浆护壁;
b)制作钢管柱接桩,所述钢管柱接桩包括钢管和钢筋笼,所述钢管底端固定至所述钢筋笼顶端;
c)将所述钢管柱接桩吊装并定位到桩孔内;
d)通过所述钢管柱接桩上的注浆管向桩孔内连续灌注混凝土;以及
e)向所述钢管柱接桩及桩孔壁之间填土。
2.如权利要求1所述的使用钢管柱接桩的灌注桩施工方法,其中,在步骤a)之前还包括埋设护筒。
3.如权利要求1所述的使用钢管柱接桩的灌注桩施工方法,其中,所述桩孔是变径桩或等直径桩。
4.如权利要求1所述的使用钢管柱接桩的灌注桩施工方法,其中,所述钢管上设有多个溢出孔,所述溢出孔上方附近设有阻滤网,所述阻滤网下方至钢管底部设有多个限位器。
5.如权利要求1所述的使用钢管柱接桩的灌注桩施工方法,其中,所述阻滤网包括密目丝网和弹性垫圈。
CN201310110416.4A 2013-04-01 2013-04-01 使用钢管柱接桩的灌注桩施工方法 Active CN103205964B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310110416.4A CN103205964B (zh) 2013-04-01 2013-04-01 使用钢管柱接桩的灌注桩施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310110416.4A CN103205964B (zh) 2013-04-01 2013-04-01 使用钢管柱接桩的灌注桩施工方法

Publications (2)

Publication Number Publication Date
CN103205964A true CN103205964A (zh) 2013-07-17
CN103205964B CN103205964B (zh) 2015-06-10

Family

ID=48753356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310110416.4A Active CN103205964B (zh) 2013-04-01 2013-04-01 使用钢管柱接桩的灌注桩施工方法

Country Status (1)

Country Link
CN (1) CN103205964B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141301A (zh) * 2014-03-25 2014-11-12 中国建筑第四工程局有限公司 在旋挖桩孔内安装逆作钢管柱的施工方法及结构
CN104153403A (zh) * 2014-08-08 2014-11-19 中国建筑第八工程局有限公司 逆作法灌注桩静载试桩的施工方法
CN104358262A (zh) * 2014-09-29 2015-02-18 中国建筑第八工程局有限公司 一种可拆卸工具式深基坑内支撑引柱及施工方法
CN104727307A (zh) * 2015-02-03 2015-06-24 合肥市市政设计院有限公司 用于地下的变截面桩柱施工方法
CN105274984A (zh) * 2014-06-05 2016-01-27 中天建设集团有限公司 一种双重套管全回转施工立柱桩方法
CN105544549A (zh) * 2016-01-28 2016-05-04 上海建工二建集团有限公司 一种防止一柱一桩钢管柱反浆接头装置及其施工方法
CN105839621A (zh) * 2016-03-30 2016-08-10 上海城建市政工程(集团)有限公司 一种突变截面及异性材料钻孔桩的实施方法
CN107127437A (zh) * 2017-06-29 2017-09-05 宜昌海天超声技术有限公司 一种钢筋笼(骨架)滚焊机的自动变径装置
CN109680978A (zh) * 2019-02-15 2019-04-26 深圳市市政工程总公司 地下室增层托换施工方法
CN111021343A (zh) * 2019-11-27 2020-04-17 中国建筑第八工程局有限公司 立柱桩的施工方法
CN111677285A (zh) * 2020-06-20 2020-09-18 中铁十九局集团第一工程有限公司 一种桥梁墩柱混凝土导管法浇筑施工工艺
CN111945714A (zh) * 2020-08-19 2020-11-17 深圳中汉建设工程集团有限公司 钢套管导向法结合钢立柱插设施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000220140A (ja) * 1999-02-02 2000-08-08 Nkk Corp 場所打ち鋼管コンクリート杭及びその施工方法
JP2001348866A (ja) * 2000-06-09 2001-12-21 Marugo Foundation Corp オールケーシング工法による場所打ち鋼管コンクリート杭の施工法
CN201241335Y (zh) * 2008-07-01 2009-05-20 北京住总集团有限责任公司 地下工程中的桩柱合一基础结构
CN102041806A (zh) * 2009-10-22 2011-05-04 中冶天工建设有限公司 钻孔灌注桩中插入钢柱的施工方法
CN102493446A (zh) * 2011-11-22 2012-06-13 中冶天工集团有限公司 防止混凝土外溢的钢管柱及其安装方法
CN102900076A (zh) * 2012-10-24 2013-01-30 广东省第四建筑工程公司 混凝土桩钢管柱连续施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000220140A (ja) * 1999-02-02 2000-08-08 Nkk Corp 場所打ち鋼管コンクリート杭及びその施工方法
JP2001348866A (ja) * 2000-06-09 2001-12-21 Marugo Foundation Corp オールケーシング工法による場所打ち鋼管コンクリート杭の施工法
CN201241335Y (zh) * 2008-07-01 2009-05-20 北京住总集团有限责任公司 地下工程中的桩柱合一基础结构
CN102041806A (zh) * 2009-10-22 2011-05-04 中冶天工建设有限公司 钻孔灌注桩中插入钢柱的施工方法
CN102493446A (zh) * 2011-11-22 2012-06-13 中冶天工集团有限公司 防止混凝土外溢的钢管柱及其安装方法
CN102900076A (zh) * 2012-10-24 2013-01-30 广东省第四建筑工程公司 混凝土桩钢管柱连续施工方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141301B (zh) * 2014-03-25 2016-04-13 中国建筑第四工程局有限公司 在旋挖桩孔内安装逆作钢管柱的施工方法及结构
CN104141301A (zh) * 2014-03-25 2014-11-12 中国建筑第四工程局有限公司 在旋挖桩孔内安装逆作钢管柱的施工方法及结构
CN105274984A (zh) * 2014-06-05 2016-01-27 中天建设集团有限公司 一种双重套管全回转施工立柱桩方法
CN104153403B (zh) * 2014-08-08 2016-08-17 中国建筑第八工程局有限公司 逆作法灌注桩静载试桩的施工方法
CN104153403A (zh) * 2014-08-08 2014-11-19 中国建筑第八工程局有限公司 逆作法灌注桩静载试桩的施工方法
CN104358262A (zh) * 2014-09-29 2015-02-18 中国建筑第八工程局有限公司 一种可拆卸工具式深基坑内支撑引柱及施工方法
CN104727307A (zh) * 2015-02-03 2015-06-24 合肥市市政设计院有限公司 用于地下的变截面桩柱施工方法
CN105544549A (zh) * 2016-01-28 2016-05-04 上海建工二建集团有限公司 一种防止一柱一桩钢管柱反浆接头装置及其施工方法
CN105839621A (zh) * 2016-03-30 2016-08-10 上海城建市政工程(集团)有限公司 一种突变截面及异性材料钻孔桩的实施方法
CN107127437A (zh) * 2017-06-29 2017-09-05 宜昌海天超声技术有限公司 一种钢筋笼(骨架)滚焊机的自动变径装置
CN109680978A (zh) * 2019-02-15 2019-04-26 深圳市市政工程总公司 地下室增层托换施工方法
CN111021343A (zh) * 2019-11-27 2020-04-17 中国建筑第八工程局有限公司 立柱桩的施工方法
CN111677285A (zh) * 2020-06-20 2020-09-18 中铁十九局集团第一工程有限公司 一种桥梁墩柱混凝土导管法浇筑施工工艺
CN111945714A (zh) * 2020-08-19 2020-11-17 深圳中汉建设工程集团有限公司 钢套管导向法结合钢立柱插设施工方法

Also Published As

Publication number Publication date
CN103205964B (zh) 2015-06-10

Similar Documents

Publication Publication Date Title
CN103205964B (zh) 使用钢管柱接桩的灌注桩施工方法
CN103195076B (zh) 淤泥质深基坑塔吊基础施工方法
CN102286984A (zh) 一种止水帷幕及其施工方法
CN101328712A (zh) 一种适用于软土及带障碍物土层中的咬合桩施工方法
CN102286981A (zh) 一种止水帷幕及其施工方法
CN104060615B (zh) 利用新建基坑支护结构清除地下障碍物的施工方法
CN102605773B (zh) 注浆成型扩底钻孔灌注桩的施工方法及其挤扩装置
CN103132537A (zh) 钢格构柱回字型混凝土承台组合式塔吊基础结构及施工方法
CN102535519A (zh) 地下连续墙工字钢接头结构及其施工方法
CN202194149U (zh) 一种止水帷幕
CN108316670B (zh) 一种既有建筑地基基础下钢管托换施工方法
CN104775439B (zh) 一种基坑支护止水一体化结构及其施工方法
CN204753628U (zh) 一种可周转的逆作法钢管柱调垂导向装置
CN107313430A (zh) 三面临近建筑物的深大基坑分区施工方法
CN103437375A (zh) 一种盖挖逆作下后起钢管柱的分节定位安装方法
KR101267565B1 (ko) 지하 역타 시공시 코어부 구조물 시공 방법
CN110439025A (zh) 一种狭小空间下门架式建筑物桩基托换结构及施工方法
CN113216215A (zh) 一种复杂环境下深沟槽支护逆作施工方法
CN105804090B (zh) 一种室内桩墙支护结构及其施工方法
CN113431097A (zh) 一种紧邻深基坑工程浅基础建筑保护结构及施工方法
KR100849226B1 (ko) ClP에 의한 흙막이 가시설 및 이 시공 방법
CN105274997B (zh) 筋式托架和利用该托架施工顶道钢管支撑及顶板的方法
KR101358471B1 (ko) 복합 강관파일을 이용한 건축물
KR100926323B1 (ko) 소구경 강관을 이용한 지하 증축 공법
CN102094419A (zh) 地基中存在粉质沙层的钻孔桩成型方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 100028, Daxing District economic and Technological Development Zone, Kangding street, No. 1, 2, six or seven, Beijing

Patentee after: MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.

Address before: 100028, Beijing, Chaoyang District, No. 28, west of China Metallurgical Building, 18 and 19

Patentee before: MCC Communication Engineering Technology Co., Ltd.