CN105274984A - 一种双重套管全回转施工立柱桩方法 - Google Patents

一种双重套管全回转施工立柱桩方法 Download PDF

Info

Publication number
CN105274984A
CN105274984A CN201410246208.1A CN201410246208A CN105274984A CN 105274984 A CN105274984 A CN 105274984A CN 201410246208 A CN201410246208 A CN 201410246208A CN 105274984 A CN105274984 A CN 105274984A
Authority
CN
China
Prior art keywords
sleeve
inner sleeve
pile
reinforcing cage
lattice column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410246208.1A
Other languages
English (en)
Inventor
刘玉涛
肖婷
傅婧
戴传新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201410246208.1A priority Critical patent/CN105274984A/zh
Publication of CN105274984A publication Critical patent/CN105274984A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种双重套管全回转施工立柱桩方法,包括以下步骤:桩机定位;下压内套管;内套管成孔;清除障碍物;吊放并焊接钢筋笼;将格构柱挂在内套筒边缘;安放混凝土导管;提出内外套管;回填粗砂。本发明提供一种适用于各种复杂土质,且成桩时间短,有效解决钢立柱顶标高下降问题的施工方法,把钢立柱下沉量控制在误差允许的范围内,保证了成桩质量。

Description

一种双重套管全回转施工立柱桩方法
技术领域
本发明涉及一种双重套管全回转施工立柱桩方法。
背景技术
随着国内经济快速发展,大中型都市的城市建设再开发项目、旧城区改造、地铁隧道、地下围护结构等项目越来越多,经常遇到地下岩石或者残留旧混凝土结构等障碍物,此类地下工程施工,因地层不均匀、地质坚硬,通常利用桩基支撑受力。现今的桩基施工本都采用“万能的施工技术”——全回转套管方法,可以有效地解决上述地质问题。然而,套管在全回转提升过程中带动混凝土,致使钢筋笼受扭,同时钢筋笼在钢立柱的重压下弯曲变形,长度变短,最后造成钢立柱桩顶标高下降。
发明内容
本发明的目的在于解决上述技术难题,提供一种双重套管全回转施工立柱桩方法,套管插入时全回转钻进,拔管时外套管能有效隔绝内套管和土体之间的部分摩擦力,进而可以采用微旋转方式提升套管,减少钢筋受扭,有效解决立柱桩的沉降问题。
为实现上述目的,本发明采用如下方案:一种双重套管全回转施工立柱桩方法,主要包括以下步骤。
步骤一:桩机定位,采用全回转套管方式,先压入外套管(长度约15m),并取土。
步骤二:下压内套管,使其刚好达到入岩的深度并取土成孔。
步骤三:在内套管成孔过程中,利用冲抓斗挖掘取土。
步骤四:套管钻进过程中遇到地下障碍物时,先用套筒靴高速旋转切割漂石等障碍物,对于套管内的障碍物用十字冲锤击碎,再使用冲抓斗将套管内被冲碎的障碍物捞出。
步骤五:成孔过程中地下水从套管与土体缝隙间渗出,用取水器在孔内取水。
步骤六:待内套管成孔后,吊放钢筋笼,钢筋笼用吊钩挂在内套筒壁上,并在钢筋笼底加设钢板,并焊接。
步骤七:格构柱与套筒边相平的位置四边焊上吊钩,格构柱四面采用钢筋头斜向与钢筋笼纵筋焊牢,待格构柱深入时,吊钩挂在内套筒边缘上。
步骤八:格构柱吊装完成后,安放混凝土导管。
步骤九:在浇筑混凝土之前,靠钻机的提升力+微小旋转(非360°旋转)提出第一节内套管。
步骤十:当混凝土灌注达到桩顶设计标高,停止混凝土浇灌,并在混凝土初凝前拆除内套管上的钢筋笼及格构柱吊钩,同样靠钻机的提升力+微小旋转(非360°旋转)提出剩余内套管以及外套管。
步骤十一:混凝土终凝后,孔口回填粗砂充满外套管留下的空隙以及桩顶以上空腔,防止桩倾斜、移动。
有益效果:
本发明采用上述技术方案提供双重套管全回转施工立柱桩方法,压入时,全回转套管施工,切削能力强,遇到障碍物时能很快切削完继续钻进,因此适用于各种复杂土质,且成桩时间短;提升时,采用微旋转双套管方式,减少钢筋受扭,有效解决钢立柱顶标高下降的问题,把钢立柱下沉量在误差允许的范围内,保证了成桩质量。
附图说明
图1为双重套管全回转施工立柱桩的立面图。
图2为双重套管全回转施工立柱桩的平面图。
具体实施方式
下面结合具体实例对本发明的工作原理作进一步的详细说明。
实施例一:
本实例的工程概况为:某奥体中心主体育场第一检录处工程总建筑面积216000㎡,地下一层地上六层,主体育场为8万座特级特大型体育建筑,其中第一检录处及能源中心为大型体育建筑附属建筑,主体育场看台和附属用房为钢筋混凝土框架剪力墙结构。由于该工程靠近河道,原土基层为细砂层,地基承载力不足。
采用本发明的方法施工,同样设计使用桩径为1000mm的立柱桩,桩长7m,立柱桩采用的是360°双套管全回转钻机施工。具体步骤如下:第一,桩机定位,采用全回转套管方式,先压入外套管(长度约9m),并取土;第二,更换内套管对应的抱管器,内套管的管径较外套管小20cm,其外径与桩径相同,下压内套管,下压深度至桩底设计标高以下3m左右,使其刚好达到入岩的深度并取土成孔;第三,在内套管成孔过程中,利用冲抓斗挖掘取土;当上一节套管即将压入土体时(高于钻机平台以上1.2m~1.5m),接下一节钢套管,接管后检测垂直度,发现套管倾斜马上用抱管器进行纠偏调整,而后继续下压取土,直至遇到障碍物;第四,套管钻进过程中遇到地下障碍物时,先用套筒靴高速旋转切割漂石等障碍物,对于套管内的障碍物用十字冲锤击碎,再使用冲抓斗将套管内被冲碎的障碍物捞出;第五,成孔过程中地下水从套管与土体缝隙间渗出,用取水器在孔内取水,取水器容量约0.6m3,同时套管继续向下钻进,截断承压水;第六,待内套管成孔后,吊放钢筋笼。钢筋笼用吊钩挂在内套筒壁上(安装钢筋笼时应采取有效措施保证钢筋笼标高的准确性,为防止拔套管时钢筋笼上浮,在钢筋笼底加设5mm厚的钢板,并焊接);第七,钢筋笼顶与格构柱搭接3m左右,格构柱四面采用钢筋头斜向与钢筋笼纵筋焊牢,间距10cm一道,焊接长度不小于10mm,钢筋具有一定长度形成柔性连接,以便能使格构柱作相对微量调整。格构柱与套筒边相平的位置四边焊上吊钩,待格构柱深入时,吊钩挂在内套筒边缘上;第八,格构柱吊装完成后,安放混凝土导管,导管不得弯曲、凹陷,接头须用密封圈封实阻水,导管入孔深度控制在距孔底50cm左右;第九,在浇筑混凝土之前,靠钻机的提升力+微小旋转(非360°旋转)提出第一节内套管;第十,在随后混凝土浇筑过程中,格构柱以下正常浇筑,浇筑至格构柱位置时,严格控制浇筑速度,仔细观察泛浆情况及导管内下料情况,发现问题及时处理,第十一,当混凝土灌注达到桩顶设计标高,且保证泛浆达到设计和规范规定高度后,停止混凝土浇灌,并在混凝土初凝前拆除内套管上的钢筋笼及格构柱吊钩,同样靠钻机的提升力+微小旋转(非360°旋转)提出剩余内套管以及外套管,第十二,混凝土终凝后,孔口回填粗砂充满外套管留下的空隙以及桩顶以上空腔,防止桩倾斜、移动。
实施例二:
本实例的工程概况为:某改建工程总建筑面积72512.7㎡,建筑高度172.1m,由一栋46层塔楼、地上5层的商业用房及地下3层车库和设备用房组成,。基坑开挖深度为15.00m,局部坑中坑挖深18.70m。由于改建工程基础内留置就混凝土等障碍物,比较坚硬。
采用本发明的方法施工,作为竖向承力构件的钢立柱桩桩径为1000mm,桩长13.9m,钢立柱桩采用的是360°双套管全回转钻机施工。其中φ1000套管外径1000mm(与立柱桩直径相同),内径880mm;φ1200套管外径1200mm,内径1070mm。在钻机就位后,先压入φ1200直径的套管(长度约15m),并取土;然后更换φ1000套管对应的抱管器,下压φ1000套管,并取土成孔;浇混凝土之前靠钻机的提升力+微小旋转(非360°旋转)提出第一节φ1000直径的套管;混凝土浇筑完成后,同样靠钻机的提升力+微小旋转(非360°旋转)提出剩余φ1000套管以及φ1200套管。
通过在φ1000套管外侧加上φ1200套管,减少了φ1000套管与土体的摩擦,使φ1000套管在微旋转的情况下提升出孔,对钢筋笼的影响减小,减少钢筋受扭,有效解决立柱桩的沉降问题。

Claims (11)

1.一种双重套管全回转施工立柱桩方法,减少钢筋受扭,有效解决立柱桩的沉降问题,其特征在于以下技术步骤:
步骤一:桩机定位,采用全回转套管方式,先压入外套管(长度约15m),并取土。
2.步骤二:下压内套管,使其刚好达到入岩的深度并取土成孔。
3.步骤三:在内套管成孔过程中,利用冲抓斗挖掘取土。
4.步骤四:套管钻进过程中遇到地下障碍物时,先用套筒靴高速旋转切割漂石等障碍物,对于套管内的障碍物用十字冲锤击碎,再使用冲抓斗将套管内被冲碎的障碍物捞出。
5.步骤五:成孔过程中地下水从套管与土体缝隙间渗出,用取水器在孔内取水。
6.步骤六:待内套管成孔后,吊放钢筋笼,钢筋笼用吊钩挂在内套筒壁上,并在钢筋笼底加设钢板,并焊接。
7.步骤七:格构柱与套筒边相平的位置四边焊上吊钩,格构柱四面采用钢筋头斜向与钢筋笼纵筋焊牢,待格构柱深入时,吊钩挂在内套筒边缘上。
8.步骤八:格构柱吊装完成后,安放混凝土导管。
9.步骤九:在浇筑混凝土之前,靠钻机的提升力+微小旋转(非360°旋转)提出第一节内套管。
10.步骤十:当混凝土灌注达到桩顶设计标高,停止混凝土浇灌,并在混凝土初凝前拆除内套管上的钢筋笼及格构柱吊钩,同样靠钻机的提升力+微小旋转(非360°旋转)提出剩余内套管以及外套管。
11.步骤十一:混凝土终凝后,孔口回填粗砂充满外套管留下的空隙以及桩顶以上空腔,防止桩倾斜、移动。
CN201410246208.1A 2014-06-05 2014-06-05 一种双重套管全回转施工立柱桩方法 Pending CN105274984A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410246208.1A CN105274984A (zh) 2014-06-05 2014-06-05 一种双重套管全回转施工立柱桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410246208.1A CN105274984A (zh) 2014-06-05 2014-06-05 一种双重套管全回转施工立柱桩方法

Publications (1)

Publication Number Publication Date
CN105274984A true CN105274984A (zh) 2016-01-27

Family

ID=55144744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410246208.1A Pending CN105274984A (zh) 2014-06-05 2014-06-05 一种双重套管全回转施工立柱桩方法

Country Status (1)

Country Link
CN (1) CN105274984A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677170A (zh) * 2017-01-24 2017-05-17 上海长凯岩土工程有限公司 一种钢构件结合水泥浆形成受力体的施工方法
CN108221973A (zh) * 2017-09-22 2018-06-29 上海市政工程设计研究总院(集团)有限公司 一种phc管桩作支撑体系格构柱的连接器
CN112177528A (zh) * 2020-08-21 2021-01-05 中冶天工集团有限公司 一种利用全回转钻机清除地下障碍物的施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4439116A1 (de) * 1994-11-02 1996-05-09 Jossif Dr Ing Ladyshenskij Ortbetonpfahl und Verfahren zu seiner Herstellung
CN1986975A (zh) * 2006-11-13 2007-06-27 福建永强岩土工程有限公司 全套管大直径振动取土灌注桩施工方法
CN101638891A (zh) * 2009-08-18 2010-02-03 上海市第二建筑有限公司 全套管旋进隔离桩施工方法
KR20110072814A (ko) * 2009-12-23 2011-06-29 대림산업 주식회사 지표 부근의 상단부 직경이 확대된 변단면 기초 말뚝의 시공방법
CN102900076A (zh) * 2012-10-24 2013-01-30 广东省第四建筑工程公司 混凝土桩钢管柱连续施工方法
CN103074891A (zh) * 2013-01-29 2013-05-01 浙江信博城市建设有限公司 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN103205964A (zh) * 2013-04-01 2013-07-17 中冶交通工程技术有限公司 使用钢管柱接桩的灌注桩施工方法
CN103603342A (zh) * 2013-11-01 2014-02-26 中冶天工上海十三冶建设有限公司 大直径组合套管超长灌注桩施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4439116A1 (de) * 1994-11-02 1996-05-09 Jossif Dr Ing Ladyshenskij Ortbetonpfahl und Verfahren zu seiner Herstellung
CN1986975A (zh) * 2006-11-13 2007-06-27 福建永强岩土工程有限公司 全套管大直径振动取土灌注桩施工方法
CN101638891A (zh) * 2009-08-18 2010-02-03 上海市第二建筑有限公司 全套管旋进隔离桩施工方法
KR20110072814A (ko) * 2009-12-23 2011-06-29 대림산업 주식회사 지표 부근의 상단부 직경이 확대된 변단면 기초 말뚝의 시공방법
CN102900076A (zh) * 2012-10-24 2013-01-30 广东省第四建筑工程公司 混凝土桩钢管柱连续施工方法
CN103074891A (zh) * 2013-01-29 2013-05-01 浙江信博城市建设有限公司 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN103205964A (zh) * 2013-04-01 2013-07-17 中冶交通工程技术有限公司 使用钢管柱接桩的灌注桩施工方法
CN103603342A (zh) * 2013-11-01 2014-02-26 中冶天工上海十三冶建设有限公司 大直径组合套管超长灌注桩施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677170A (zh) * 2017-01-24 2017-05-17 上海长凯岩土工程有限公司 一种钢构件结合水泥浆形成受力体的施工方法
CN108221973A (zh) * 2017-09-22 2018-06-29 上海市政工程设计研究总院(集团)有限公司 一种phc管桩作支撑体系格构柱的连接器
CN108221973B (zh) * 2017-09-22 2024-01-26 上海市政工程设计研究总院(集团)有限公司 一种phc管桩作支撑体系格构柱的连接器
CN112177528A (zh) * 2020-08-21 2021-01-05 中冶天工集团有限公司 一种利用全回转钻机清除地下障碍物的施工方法
CN112177528B (zh) * 2020-08-21 2022-05-13 中冶天工集团有限公司 一种利用全回转钻机清除地下障碍物的施工方法

Similar Documents

Publication Publication Date Title
JP7177554B2 (ja) 壁沈下施工方法
CN108914931B (zh) 一种装配式竖向盾构环型基桩与施工方法
CN104612162B (zh) 一种地铁车站深基坑开挖施工方法
CN106013053B (zh) 一种用于建造地下车库沉井的钢板桩支护施工方法
CN102383431B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN110735432B (zh) 盾构过侵限隧道范围内桩基清除及参数控制方法
CN104563098A (zh) 一种超大直径全钢护筒干作业成孔灌注桩施工方法
CN110258582B (zh) 基于钢管桩与拉森钢板的斜支撑基坑支护结构及施工方法
CN108457282A (zh) 深水硬岩无封底钢板桩围堰施工方法
CN112482364A (zh) 滨海地区强腐蚀性软弱地质条件下的旋挖灌注桩施工工艺
CN110629747A (zh) 复杂地质条件下桩基础全套管全回转施工工艺
CN108222944A (zh) 一种改进的沉井法掘进竖井施工方法
CN111560962A (zh) 一种回填区基坑支护结构及其施工方法
CN105714769A (zh) 一种抗滑灌注桩施工方法
CN208088288U (zh) 大粒径碎块石高填区桩基快速成孔结构
CN107700479A (zh) 一种大直径钻孔桩的施工方法
CN104863183B (zh) 大断面隧道近接建筑物施工隔离减震桩结构及施工方法
CN105274984A (zh) 一种双重套管全回转施工立柱桩方法
CN204311456U (zh) 基坑加固结构
CN113216215A (zh) 一种复杂环境下深沟槽支护逆作施工方法
CN209760299U (zh) 一种避免房屋拆迁的明暗挖结合地铁车站结构
CN102094419A (zh) 地基中存在粉质沙层的钻孔桩成型方法
CN105484270A (zh) 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法
CN102758434B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN109989346A (zh) 桥梁大直径预制混凝土管柱基础及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160127

WD01 Invention patent application deemed withdrawn after publication