CN102094419A - 地基中存在粉质沙层的钻孔桩成型方法 - Google Patents

地基中存在粉质沙层的钻孔桩成型方法 Download PDF

Info

Publication number
CN102094419A
CN102094419A CN 201110056717 CN201110056717A CN102094419A CN 102094419 A CN102094419 A CN 102094419A CN 201110056717 CN201110056717 CN 201110056717 CN 201110056717 A CN201110056717 A CN 201110056717A CN 102094419 A CN102094419 A CN 102094419A
Authority
CN
China
Prior art keywords
hole
opaque
sand bed
ground
drilled pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110056717
Other languages
English (en)
Inventor
贾建国
马祥春
李永卿
李自林
石绍立
孔祥阳
恽振波
罗彬�
刘振
何震
张志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Tianjin Urban Construction College
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Tianjin Urban Construction College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd, Tianjin Urban Construction College filed Critical China Railway Sixth Group Co Ltd
Priority to CN 201110056717 priority Critical patent/CN102094419A/zh
Publication of CN102094419A publication Critical patent/CN102094419A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种地基中存在粉质沙层的钻孔桩成型方法。该方法是在地基中存在粉质沙层的情况下,首先扩大上部桩孔的孔径至粉质沙层下1.5米,然后将钢管护壁放置在钻孔内粉质沙层部位,同时在桩孔内加入膨润性黄土来增加泥浆的比重,以彻底阻止活动的流砂进入桩孔中而形成流砂层,这样不仅能够正常清孔,而且不会影响正常的施工操作,所施工以后的钻孔桩质量好。另外,由于钢管护壁的成本较低,所以不会大幅度增加施工成本。

Description

地基中存在粉质沙层的钻孔桩成型方法
技术领域
[0001] 本发明属于土建工程技术领域,特别是涉及一种地基中存在粉质沙层的钻孔桩成 型方法。
背景技术
[0002] 钻孔桩通常是利用钻机在工程现场的地基中形成桩孔,并在桩孔内放置钢筋笼、 灌注混凝土而制成。在房建工程桩基础施工及桥梁工程桩基础施工中,当地基中存在位于 地下水位下的较松散粉质沙层时,加之地下水的影响,如果按照常规的钻孔桩施工方法直 接进行施工,钻孔时灌注的泥浆就不能提供足够的护壁压力以保持孔壁的稳定性,因此在 桩孔内局部将会形成流砂层,而且在清孔时还会迅速形成新的流砂层,这样不仅不能正常 清孔,而且钢筋笼也无法放入桩孔内,所以无法完成混凝土的浇灌,结果将会影响钻孔桩的 成桩质量,严重时甚至导致桩孔坍塌而不能成孔。
发明内容
[0003] 为了解决上述问题,本发明的目的在于提供一种遇到粉质沙层时能够正常施工, 并且成桩质量好的地基中存在粉质沙层的钻孔桩成型方法。
[0004] 为了达到上述目的,本发明提供的地基中存在粉质沙层的钻孔桩成型方法包括按 顺序进行的下列步骤:
[0005] 1)在工程现场的地基上待钻孔处埋设孔口护筒;
[0006] 2)利用钻机上的钻杆从孔口护筒处向下垂直钻孔至设计标高,同时灌注泥浆护 壁,然后取出钻杆;
[0007] 3)第一次清孔;
[0008] 4)当发现上述地基中存在粉质沙层时,测定该粉质沙层的部位及厚度;
[0009] 5)扩大上部桩孔的孔径至粉质沙层下1. 5米;
[0010] 6)将钢管护壁放入上述上部桩孔的底部而将粉质沙层遮挡住;
[0011] 7)在桩孔内加入膨润性黄土来增加泥浆的比重,以彻底阻止活动的流砂进入桩孔 中;
[0012] 8)在整个桩孔内安放钢筋笼及导管,然后第二次清孔;
[0013] 9)最后按照常规的方式测桩孔底沉渣、悬挂隔水栓、灌注水下混凝土、剪断铁丝隔 水栓使其下落孔底、连续灌注混凝土的同时上提导管、混凝土灌注完毕,直到混凝土固结即 可完成整个钻孔桩成型过程。
[0014] 所述的钢管护壁的长度比粉质沙层的厚度大3m,并且上下端距离粉质沙层上下表 面各1. 5mο
[0015] 所述的钢管护壁的厚度为4mm。
[0016] 所述的上部桩孔的直径比钢管护壁的外径大0. 05m。
[0017] 本发明提供的地基中存在粉质沙层的钻孔桩成型方法是在地基中存在粉质沙层的情况下,首先扩大上部桩孔的孔径至粉质沙层下1.5米,然后将钢管护壁放置在钻孔内 粉质沙层部位,同时在桩孔内加入膨润性黄土来增加泥浆的比重,以彻底阻止活动的流砂 进入桩孔中而形成流砂层,这样不仅能够正常清孔,而且不会影响正常的施工操作,所施工 以后的钻孔桩质量好。另外,由于钢管护壁的成本较低,所以不会大幅度增加施工成本。
附图说明
[0018] 图1为采用本发明提供的地基中存在粉质沙层的钻孔桩成型方法时钻孔、钻孔桩 及钢管护壁纵向结构剖视图。
具体实施方式
[0019] 下面结合附图和具体实施例对本发明提供的地基中存在粉质沙层的钻孔桩成型 方法进行详细说明。
[0020] 如图1所示,本发明提供的地基中存在粉质沙层的钻孔桩成型方法包括按顺序进 行的下列步骤:
[0021] 1)在工程现场的地基上待钻孔处埋设孔口护筒1 ;
[0022] 2)利用钻机上的钻杆从孔口护筒1处向下垂直钻孔至设计标高,同时灌注泥浆护 壁,然后取出钻杆;在钻进过程中,要合理掌握钻进参数及钻进速度。
[0023] 3)第一次清孔;
[0024] 4)当发现上述地基中存在粉质沙层2时,测定该粉质沙层2的部位及厚度;
[0025] 5)扩大上部桩孔的孔径至粉质沙层2下1. 5米;
[0026] 6)将钢管护壁3放入上述上部桩孔的底部而将粉质沙层2遮挡住;
[0027] 7)在桩孔内加入膨润性黄土来增加泥浆的比重,以彻底阻止活动的流砂进入桩孔 中;
[0028] 8)在整个桩孔内安放钢筋笼4及导管,然后第二次清孔;钢筋笼4 一般由现场按 设计要求制作,当遇到粉质沙层时,钻孔桩的结构应为上大下小,此时钢筋笼4的主筋需要 在变截面处弯折。
[0029] 9)最后按照常规的方式测桩孔底沉渣、悬挂隔水栓、灌注水下混凝土、剪断铁丝隔 水栓使其下落孔底、连续灌注混凝土的同时上提导管、混凝土灌注完毕,直到混凝土固结即 可完成整个钻孔桩成型过程。成孔施工应一次性不间断地完成,成孔完毕至灌注混凝土的 间隔时间不宜大于Mh。
[0030] 所述的钢管护壁3的长度比粉质沙层2的厚度大3m,并且上下端距离粉质沙层2 上下表面各1. 5mο
[0031] 所述的钢管护壁3的厚度为4mm。
[0032] 所述的上部桩孔的直径比钢管护壁3的外径大0. 05m。
[0033] 某大桥是一座2_56m的简支系杆拱桥。桥位处的地质依次为粘土、液化中砂层和 承载力500KPa的均质混合岩层,均质混合岩层距地表约为10m。由于土质原因,在桥墩桩基 础的钻孔桩施工时形成了流砂现象。本申请人采用上述施工方法对桩基流砂进行了处理, 顺利地完成了施工任务。

Claims (4)

1. 一种地基中存在粉质沙层的钻孔桩成型方法,其特征在于:所述的地基中存在粉质 沙层的钻孔桩成型方法包括按顺序进行的下列步骤:1)在工程现场的地基上待钻孔处埋设孔口护筒(1);2)利用钻机上的钻杆从孔口护筒(1)处向下垂直钻孔至设计标高,同时灌注泥浆护 壁,然后取出钻杆;3)第一次清孔;4)当发现上述地基中存在粉质沙层(¾时,测定该粉质沙层O)的部位及厚度;5)扩大上部桩孔的孔径至粉质沙层(¾下1. 5米;6)将钢管护壁(¾放入上述上部桩孔的底部而将粉质沙层(¾遮挡住;7)在桩孔内加入膨润性黄土来增加泥浆的比重,以彻底阻止活动的流砂进入桩孔中;8)在整个桩孔内安放钢筋笼(4)及导管,然后第二次清孔;9)最后按照常规的方式测桩孔底沉渣、悬挂隔水栓、灌注水下混凝土、剪断铁丝隔水栓 使其下落孔底、连续灌注混凝土的同时上提导管、混凝土灌注完毕,直到混凝土固结即可完 成整个钻孔桩成型过程。
2.根据权利要求1所述的地基中存在粉质沙层的钻孔桩成型方法,其特征在于:所述 的钢管护壁(3)的长度比粉质沙层O)的厚度大:3m,并且上下端距离粉质沙层(2)上下表 面各1. 5mο
3.根据权利要求1所述的地基中存在粉质沙层的钻孔桩成型方法,其特征在于:所述 的钢管护壁(3)的厚度为4mm。
4.根据权利要求1所述的地基中存在粉质沙层的钻孔桩成型方法,其特征在于:所述 的上部桩孔的直径比钢管护壁(3)的外径大0.05m。
CN 201110056717 2011-03-09 2011-03-09 地基中存在粉质沙层的钻孔桩成型方法 Pending CN102094419A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110056717 CN102094419A (zh) 2011-03-09 2011-03-09 地基中存在粉质沙层的钻孔桩成型方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110056717 CN102094419A (zh) 2011-03-09 2011-03-09 地基中存在粉质沙层的钻孔桩成型方法

Publications (1)

Publication Number Publication Date
CN102094419A true CN102094419A (zh) 2011-06-15

Family

ID=44127670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110056717 Pending CN102094419A (zh) 2011-03-09 2011-03-09 地基中存在粉质沙层的钻孔桩成型方法

Country Status (1)

Country Link
CN (1) CN102094419A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912789A (zh) * 2012-10-24 2013-02-06 中色十二冶金建设有限公司 喀斯特地貌下机械成孔技术
CN103867120A (zh) * 2014-03-24 2014-06-18 卢耒运 特殊地质条件下钻孔灌注桩的施工方法
CN104264679A (zh) * 2014-09-23 2015-01-07 国家电网公司 一种输电铁塔基础大口径水下灌注桩施工方法
CN104727307A (zh) * 2015-02-03 2015-06-24 合肥市市政设计院有限公司 用于地下的变截面桩柱施工方法
CN103867120B8 (zh) * 2014-03-24 2016-05-04 卢来运 特殊地质条件下钻孔灌注桩的施工方法
CN111851479A (zh) * 2020-07-30 2020-10-30 陕西龙海新创基础工程有限公司 一种在砂层或碎石层中施工沉管夯扩灌注桩的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19945894A1 (de) * 1999-09-24 2001-03-29 Schorr Claus Peter Verfahren und dazugehöriges Arbeitsgerät zum Erstellen einer Wand im Boden in Anlehnung an das sogenannte Schmalwandverfahren
CN1490467A (zh) * 2003-08-05 2004-04-21 胡柏英 一种复合摩擦桩的结构及其施工方法
CN101397797A (zh) * 2008-09-26 2009-04-01 中冶建工有限公司 流沙质层桩基护壁的施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19945894A1 (de) * 1999-09-24 2001-03-29 Schorr Claus Peter Verfahren und dazugehöriges Arbeitsgerät zum Erstellen einer Wand im Boden in Anlehnung an das sogenannte Schmalwandverfahren
CN1490467A (zh) * 2003-08-05 2004-04-21 胡柏英 一种复合摩擦桩的结构及其施工方法
CN101397797A (zh) * 2008-09-26 2009-04-01 中冶建工有限公司 流沙质层桩基护壁的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《浙江海洋学院学报(自然科学版)》 20100731 邹海江,方良平 穿越流砂层钻孔灌注桩施工难题解决方法 377-381 1-4 第29卷, 第4期 2 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912789A (zh) * 2012-10-24 2013-02-06 中色十二冶金建设有限公司 喀斯特地貌下机械成孔技术
CN102912789B (zh) * 2012-10-24 2014-12-10 中色十二冶金建设有限公司 喀斯特地貌下机械成孔方法
CN103867120A (zh) * 2014-03-24 2014-06-18 卢耒运 特殊地质条件下钻孔灌注桩的施工方法
CN103867120B (zh) * 2014-03-24 2016-02-03 卢耒运 特殊地质条件下钻孔灌注桩的施工方法
CN103867120B8 (zh) * 2014-03-24 2016-05-04 卢来运 特殊地质条件下钻孔灌注桩的施工方法
CN104264679A (zh) * 2014-09-23 2015-01-07 国家电网公司 一种输电铁塔基础大口径水下灌注桩施工方法
CN104264679B (zh) * 2014-09-23 2016-03-30 国家电网公司 一种输电铁塔基础大口径水下灌注桩施工方法
CN104727307A (zh) * 2015-02-03 2015-06-24 合肥市市政设计院有限公司 用于地下的变截面桩柱施工方法
CN111851479A (zh) * 2020-07-30 2020-10-30 陕西龙海新创基础工程有限公司 一种在砂层或碎石层中施工沉管夯扩灌注桩的方法

Similar Documents

Publication Publication Date Title
CN101560770B (zh) 一种深建筑基坑支护体系
CN204370431U (zh) 一种咬合长短桩围护结构
CN104631438B (zh) 长螺旋钻孔压灌混凝土抗拔桩施工方法
CN101503879B (zh) 防止沉井倾斜的预控方法
CN103669365A (zh) 一种外斜拉内斜撑人字型基坑支护桩及其施工方法
CN104947682A (zh) 一种基坑支护施工方法及其装置
CN102094419A (zh) 地基中存在粉质沙层的钻孔桩成型方法
CN204356780U (zh) 一种用于深基坑支护结构的预制异形空腹桩
CN201991013U (zh) 一种塔吊钢管混凝土高桩塔基结构
CN106013171B (zh) 一种深基坑侧壁的半刚性半柔性支护结构和方法
CN201762702U (zh) 钻孔咬合桩
CN204825923U (zh) 一种接力式基坑支护结构
CN204959787U (zh) 一种新型塔吊组合式基础
CN102330436A (zh) 一种用于半岩土层超深圆形旋流池的组合支护结构及方法
CN204780990U (zh) 一种复合式挡土墙结构
CN104264684B (zh) 一种用于深基坑支护结构的预制异形空腹桩及其施工方法
CN103215958A (zh) 膨胀土地区深基坑降水与支护施工方法
CN204780944U (zh) 一种基坑边附加式挡土构造
CN204898700U (zh) 一种桥梁基础结构
CN103046556B (zh) 无内撑环形围护结构及其制作方法
CN204326119U (zh) 一种桩筏基础抗浮结构
CN210263075U (zh) 一种排栅式管桩后注浆内锚外止水支护体系
CN103015433A (zh) 一种超大直径圆方形组合的深基坑施工方法
CN204715364U (zh) 一种基坑支护装置
CN204059372U (zh) 一种垂直岩体永久性支护装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110615