CN103195167A - 超高变径钢管柱内混凝土顶升施工方法 - Google Patents
超高变径钢管柱内混凝土顶升施工方法 Download PDFInfo
- Publication number
- CN103195167A CN103195167A CN2013101235391A CN201310123539A CN103195167A CN 103195167 A CN103195167 A CN 103195167A CN 2013101235391 A CN2013101235391 A CN 2013101235391A CN 201310123539 A CN201310123539 A CN 201310123539A CN 103195167 A CN103195167 A CN 103195167A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- concrete
- pipe column
- jacking
- cement mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310123539.1A CN103195167B (zh) | 2013-04-10 | 2013-04-10 | 超高变径钢管柱内混凝土顶升施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310123539.1A CN103195167B (zh) | 2013-04-10 | 2013-04-10 | 超高变径钢管柱内混凝土顶升施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195167A true CN103195167A (zh) | 2013-07-10 |
CN103195167B CN103195167B (zh) | 2015-03-25 |
Family
ID=48717970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310123539.1A Active CN103195167B (zh) | 2013-04-10 | 2013-04-10 | 超高变径钢管柱内混凝土顶升施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195167B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986673A (zh) * | 2015-02-02 | 2016-10-05 | 任丘市永基建筑安装工程有限公司 | 组合模具内壁增加混凝土施工方法 |
CN107217851A (zh) * | 2017-07-05 | 2017-09-29 | 安徽送变电工程公司 | 钢管砼柱混凝土顶升灌注装置及其施工工艺 |
CN109025308A (zh) * | 2018-09-04 | 2018-12-18 | 安徽明光市瑞升机械有限公司 | 一种用于建筑施工中的防遗洒混凝土泵管系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08170368A (ja) * | 1994-12-16 | 1996-07-02 | Aihara Soken:Kk | 鉄骨コンクリートプレハブ工法 |
JPH10131300A (ja) * | 1996-10-29 | 1998-05-19 | Fujita Corp | 鉄骨の先行建方による建築物の施工方法 |
CN102168454A (zh) * | 2011-04-06 | 2011-08-31 | 中国二十二冶集团有限公司 | 自密实混凝土顶升止回装置 |
CN202324346U (zh) * | 2011-11-21 | 2012-07-11 | 陕西建工集团第二建筑工程有限公司 | 钢管混凝土柱管内混凝土泵送顶升施工装置 |
-
2013
- 2013-04-10 CN CN201310123539.1A patent/CN103195167B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08170368A (ja) * | 1994-12-16 | 1996-07-02 | Aihara Soken:Kk | 鉄骨コンクリートプレハブ工法 |
JPH10131300A (ja) * | 1996-10-29 | 1998-05-19 | Fujita Corp | 鉄骨の先行建方による建築物の施工方法 |
CN102168454A (zh) * | 2011-04-06 | 2011-08-31 | 中国二十二冶集团有限公司 | 自密实混凝土顶升止回装置 |
CN202324346U (zh) * | 2011-11-21 | 2012-07-11 | 陕西建工集团第二建筑工程有限公司 | 钢管混凝土柱管内混凝土泵送顶升施工装置 |
Non-Patent Citations (1)
Title |
---|
胡宏亮、沈春华、张波、何祥、王艳霞: "浅谈钢管混凝土柱混凝土顶升的施工技术", 《工业建筑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986673A (zh) * | 2015-02-02 | 2016-10-05 | 任丘市永基建筑安装工程有限公司 | 组合模具内壁增加混凝土施工方法 |
CN107217851A (zh) * | 2017-07-05 | 2017-09-29 | 安徽送变电工程公司 | 钢管砼柱混凝土顶升灌注装置及其施工工艺 |
CN109025308A (zh) * | 2018-09-04 | 2018-12-18 | 安徽明光市瑞升机械有限公司 | 一种用于建筑施工中的防遗洒混凝土泵管系统 |
Also Published As
Publication number | Publication date |
---|---|
CN103195167B (zh) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202039341U (zh) | 用于盾构隧道水下进洞工艺中洞门圈的土体加固装置 | |
CN102748038A (zh) | 一种全回收式盾构进出洞止水装置 | |
CN102808413B (zh) | 代筋内活塞分段注浆管及其施工方法 | |
CN104196489B (zh) | 一种柱梁式注浆装置及其封孔注浆工艺 | |
CN103195167B (zh) | 超高变径钢管柱内混凝土顶升施工方法 | |
CN207597408U (zh) | 一种深基坑降水井封井系统 | |
CN209145606U (zh) | 一种盾构接收加固结构 | |
CN204098504U (zh) | 一种防堵塞式钢管柱混凝土顶升装置 | |
CN204491645U (zh) | 一种深基坑降水封井装置 | |
CN103939688B (zh) | 一种用于地下玻璃钢夹砂管与钢管连接更换的输水管道 | |
CN106640097A (zh) | 一种新型盾构平衡始发及接收套筒装置 | |
CN203213297U (zh) | 减振型超高变径钢管柱内混凝土顶升装置 | |
CN108868786A (zh) | 一种盾构密闭始发接收新型钢套筒 | |
CN205475710U (zh) | 钢管柱混凝土顶升接口周转装置 | |
CN208105923U (zh) | 一种已有水池增加防水套管的连接节点结构 | |
CN211398995U (zh) | 一种压力输水管道钢岔管带水补强装置 | |
CN203213296U (zh) | 超高变径钢管柱内混凝土顶升装置 | |
CN203213610U (zh) | 一种钢管柱内混凝土的顶升装置 | |
CN104018475B (zh) | 一种埋藏式压力钢管回填灌浆结构及其灌浆工艺 | |
CN106836215A (zh) | 内外水压自动平衡钢护筒 | |
CN209924089U (zh) | 一种用于管道施工的骑马井装置 | |
CN207419484U (zh) | 压力钢管接触灌浆预埋管布置结构 | |
CN205778881U (zh) | 一种用于隧道超前小导管注浆的快速注浆装置 | |
CN207213171U (zh) | 一种顶管机进出洞用密封装置 | |
CN206016810U (zh) | 一种新型盾构平衡始发及接收套筒装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200325 Address after: 300451 No. 72, Hangzhou Road, Binhai New Area, Tianjin Co-patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd. Address before: 300456 No. 75, Xingang Road, Tanggu District, Tianjin Co-patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION NO.3 CONSTRUCTION ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CP03 | Change of name, title or address |
Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd. Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. Address before: No. 72 Hangzhou Road, Tianjin Binhai New Area, 300451 Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd. Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. |
|
CP03 | Change of name, title or address | ||
CP01 | Change in the name or title of a patent holder |
Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd. Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |