CN103195084A - Diversion node structure of integrated pipe gallery - Google Patents
Diversion node structure of integrated pipe gallery Download PDFInfo
- Publication number
- CN103195084A CN103195084A CN2013101073185A CN201310107318A CN103195084A CN 103195084 A CN103195084 A CN 103195084A CN 2013101073185 A CN2013101073185 A CN 2013101073185A CN 201310107318 A CN201310107318 A CN 201310107318A CN 103195084 A CN103195084 A CN 103195084A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- node structure
- chamber
- cabin
- steering node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Body Structure For Vehicles (AREA)
Abstract
The invention particularly relates to a diversion node structure of an integrated pipe gallery. A horizontal middle plate is arranged inside the diversion node structure of the integrated pipe gallery to divide the diversion node structure of the integrated pipe gallery into an upper layer structural cavity and a lower layer structural cavity, stairs which are used for communicating the upper layer structural cavity with the lower layer structural cavity are arranged in all cabins respectively, and fireproof doors are arranged on all vertical separating walls inside the lower layer structural cavity. The diversion node structure has the advantages that the horizontal middle plate is used for separating paths for personnel conversion from pipelines, the upper layer structural cavity can facilitate normal laying and operation of pipelines along a main line, and a certain space is increased in the lower layer structural cavity to stack tools, so that the engineering maintenance can be facilitated, and the engineering cost can be reduced; simultaneously, fireproof doors are arranged on all vertical separating walls inside the lower layer structural cavity, so that all fire compartments are completely independent at the same time of personnel conversion among all cabins, and the safety can be improved; and a water-collecting well is arranged on a base plate of the lower layer structural cavity to effectively prevent pipeline damage caused by rain water leakage.
Description
Technical field
The invention belongs to pipe gallery design of node technical field, be specifically related to a kind of pipe gallery steering node structure.
Background technology
Pipe gallery is a kind of novel municipal pipeline tunnel, in recent years along with domestic urbanization advances, Xincheng District is at the planning construction pipe gallery more and more, at present in Shanghai, Kunming, Guangzhou, Suzhou, Shenyang, Suzhou, ground planning constructions such as Wuxi surpass the pipe gallery of 300km, the pipeline that pipe gallery holds comprises power cable, communication and control optical cable, high-quality (impurity) water pipe, hot-water line, cooling pipeline etc., section according to pipe gallery is arranged, the requirement of engineering that has is set to two cabins or three cabins, because pipe gallery is the wire tunnel, the both sides in each cabin all are laid with pipeline, for satisfying the maintainer forwards an other cabin to from a cabin demand, a node need be set, can satisfy personnel to realize between the cabin current and do not influence the normal operation of piping lane main line gut line, also will satisfy the independence of fire compartmentation simultaneously.
Traditional way is in the pipe gallery open top, and personnel need arrive ground by catladder from a cabin, and then arrives an other cabin by catladder, and the shortcoming of this way is that personnel overhaul inconvenience, has increased the hidden danger of piping lane security and rain leakage simultaneously.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of pipe gallery steering node structure is provided, this pipe gallery steering node structure is by arranging in the level plate so that pipe gallery steering node structure is divided into upper and lower double-layer structure chamber, and each the vertical partition wall in the substructure chamber lays labeled door, thereby satisfies the required function demand.
The object of the invention realizes being finished by following technical scheme:
A kind of pipe gallery steering node structure, described pipe gallery steering node structure is divided into two cabins or many cabins by the vertical partition wall in some roads, it is characterized in that being provided with plate in the level in the described pipe gallery steering node structure, so that described pipe gallery steering node structure is divided into superstructure chamber and substructure chamber, be furnished with the stair that are communicated with described superstructure chamber and substructure chamber in each cabin respectively, be positioned on each described vertical partition wall in described substructure chamber and be furnished with labeled door.
Described stair plate place in described level extends to base plate place, described substructure chamber.
Described pipe gallery steering node structure outwards enlarges 1.5~2.0 meters on plane width, the standard section of described pipe gallery steering node structure width expansion place sidewall and described pipe gallery main line is 30~45 degree angles of cut.
Be provided with collecting well on the described substructure chamber base plate in each cabin.
When described pipe gallery steering node structure is the above many cabins in three cabins or three cabins, dislocation layout before and after the described stair each cabin in.
Described stair in each cabin are positioned on this cabin longitudinal centre line.
Advantage of the present invention is, separate with the pipeline trend by the route of plate in the level with personnel's conversion, and the superstructure chamber makes things convenient for pipeline normally to lay operation along main line, and the substructure chamber has increased segment space and has been used for the stacking instrument, makes things convenient for engineering to overhaul, the reduction construction costs; By each the vertical partition wall in the substructure chamber labeled door is set simultaneously, makes each fire compartmentation independent fully to reach satisfying when personnel change between each cabin, improve safety; And by the base plate in the substructure chamber damage of collecting well effectively to avoid rain leakage to bring to pipeline is set.
Description of drawings
Fig. 1 arranges schematic diagram for the base plate plane of pipe gallery steering node structure among the present invention;
Fig. 2 arranges schematic diagram for the middle board plane of pipe gallery steering node structure among the present invention;
Fig. 3 is the top board layout schematic diagram of pipe gallery steering node structure among the present invention;
Fig. 4 is the A-A generalized section of pipe gallery steering node structure among the present invention;
Fig. 5 is the B-B generalized section of pipe gallery steering node structure among the present invention;
Fig. 6 is to be the pipe gallery steering node floor map of three cabin structures among the present invention.
The specific embodiment
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
As Fig. 1-6, mark 1-11 is respectively among the figure: stair 1, collecting well 2, vertical partition wall 3, vertical partition wall 3.1, vertical partition wall 3.2, base plate 4, labeled door 5, middle plate 6, top board 7, substructure chamber 8, superstructure chamber 9, stair 10, stair 11.
Embodiment one: present embodiment is specifically related to a kind of pipe gallery steering node structure, is applicable to the normal current and maintenance of the personnel between two pipe gallery cabins, cabin and does not influence pipeline and normally lay, and reduces the size of node simultaneously, reduces the cost of building.
Shown in Fig. 1-5, pipe gallery satisfies the position that personnel carry out space conversion at needs and is called the steering node structure, the planar dimension at pipe gallery steering node structure place is local to be enlarged, being specially in the plane, width outwards enlarges 2 meters, width expansion place sidewall and main line standard section are 30~45 degree angles of cut, and the local purpose that enlarges of planar dimension is to satisfy the stairway width requirement of follow-up setting.The structure at this pipe gallery steering node place is divided into two cabin structures by vertical partition wall 3, be left cabin and right cabin, and by plate in the level 6 the steering node structure is divided into superstructure chamber 9 and substructure chamber 8, namely by the separation of plate 6 in the level, make to have superstructure chamber 9 and substructure chamber 8 respectively in left cabin and the right cabin.Piping lane main line and superstructure chamber 9 are in same level height and are interconnected, and the pipeline that lays in the piping lane main line still is laid in the superstructure chamber 9, and 8 of substructures are as personnel's passage space; Arrange between superstructure chamber 9 in left and right two cabins and the substructure chamber 8 respectively and be communicated with stair 1, stair 1 arrange between two parties, and on middle plate 6, extend on the base plate 4 in the substructure chamber 8, the width of stair 1 is 1 meter, stair provided pipe wire routing space, 1 both sides and personnel's passage space on superstructure chamber 9; Be arranged in to be reserved with on the vertical partition wall 3.2 of level plate 6 belows and be not less than 1 meter wide, 2 meters high holes, this hole has been communicated with left and right two cabins in the substructure chamber 8, this place, hole is equipped with first class labeled door 5, to keep the fire prevention between left and right two cabins independent, also can satisfy the conversion between maintainer's freight space simultaneously; In left and right two cabins in substructure chamber 8 collecting well 2 is set all, be used for collecting that each cabin inner structure percolating water and row of conduits discharge water is rinse water, and is expelled to the road rain water system by the pump machine.In order to make each fire compartmentation independent, but be arranged in the fire prevention cover plate that place, stair 1 hole on the level plate 6 is provided with folding in left and right two cabins.
The maintainer is carrying out locus when conversion, can arrive left cabin lower floor from upper strata, left cabin by stair 1, enters right cabin lower floor in left cabin lower floor by labeled door, enters upper strata, right cabin by stair 1 from right cabin lower floor again; In the process of conversion, should in time close fire prevention cover plate and the labeled door 5 at stair 1 hole place, the fire of leaping up when preventing that fire from taking place.
Steering node is as the important node of pipe gallery between the cabin, need to satisfy and normally lay operation, satisfy between personnel compartment current independent with fire compartmentation simultaneously, traditional way is in the pipe gallery open top, personnel need arrive ground by catladder from a cabin, and then arriving an other cabin by catladder, the shortcoming of this way is that personnel overhaul inconvenience, has increased the hidden danger of piping lane security and rain leakage simultaneously.Present embodiment carries out combing at the subject matter of changing between the pipe gallery cabin, its core is that various functions are carried out system and tissue, the route that is about to change between personnel compartment separates with the pipeline trend, thereby thoroughly address the above problem, the vertical partition wall 3.2 of middle plate 6 belows punches and arranges labeled door 5, when satisfying personnel and passing through, also make fire compartmentation independent fully, in substructure chamber 8, increase simultaneously segment space and be used for the stacking instrument, made things convenient for the engineering maintenance, reduced construction costs.
Embodiment two: as shown in Figure 6, the present embodiment content is for realizing the intercommunication between three cabin bodies, do not influence pipeline to reach normal current and maintenance and normally lays.This pipe gallery steering node is divided into the I cabin by vertical partition wall 3, II cabin and III cabin, take equally in position of conversion point double-decker to be set, be that with the difference of embodiment one freight space has increased by a cabin, each cabin inner structure is constant, still be to have superstructure chamber 9 and substructure chamber 8 in each cabin respectively, be provided with between superstructure chamber 9 in each cabin and the substructure chamber 8 respectively and be communicated with stair 1, stair 1 arrange between two parties, on middle plate 6, extend on the base plate 4 in the substructure chamber 8, vertical partition wall 3.2 between cabin in level below the plate 6 and the cabin is reserved with and is not less than 1 meter wide, 2 meters high holes, this hole has been communicated with the substructure chamber 8 in adjacent two cabins, this place, hole is equipped with first class labeled door 5, to keep the fire prevention between adjacent two cabins independent, also can satisfy maintainer's freight space conversion simultaneously; In each cabin in substructure chamber 8, be provided with collecting well 2.Stair in I cabin, II cabin and the III cabin are respectively stair 1, stair 10 and stair 11, the wherein setting of should staggering of the stair in each cabin, the i.e. situation that should not exist three adjacent stair to be set up in parallel, therefore can stair 1 and stair 10 are arranged side by side, and with stair 11 dislocation, as shown in Figure 6, can certainly stair 1 and stair 11 are arranged side by side, and misplace with stair 10.
Claims (6)
1. pipe gallery steering node structure, described pipe gallery steering node structure is divided into two cabins or many cabins by the vertical partition wall in some roads, it is characterized in that being provided with plate in the level in the described pipe gallery steering node structure, so that described pipe gallery steering node structure is divided into superstructure chamber and substructure chamber, be furnished with the stair that are communicated with described superstructure chamber and substructure chamber in each cabin respectively, be positioned on each described vertical partition wall in described substructure chamber and be furnished with labeled door.
2. a kind of pipe gallery steering node structure according to claim 1 is characterized in that described stair plate place in described level extends to base plate place, described substructure chamber.
3. a kind of pipe gallery steering node structure according to claim 1, it is characterized in that described pipe gallery steering node structure outwards enlarges 1.5~2.0 meters on plane width, the standard section of described pipe gallery steering node structure width expansion place sidewall and described pipe gallery main line is 30~45 degree angles of cut.
4. a kind of pipe gallery steering node structure according to claim 1 is characterized in that being provided with collecting well on the described substructure chamber base plate in each cabin.
5. a kind of pipe gallery steering node structure according to claim 1, when it is characterized in that described pipe gallery steering node structure is the above many cabins in three cabins or three cabins, dislocation layout before and after the described stair each cabin in.
6. a kind of pipe gallery steering node structure according to claim 1 is characterized in that the described stair in each cabin are positioned on this cabin longitudinal centre line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101073185A CN103195084A (en) | 2013-03-29 | 2013-03-29 | Diversion node structure of integrated pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101073185A CN103195084A (en) | 2013-03-29 | 2013-03-29 | Diversion node structure of integrated pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103195084A true CN103195084A (en) | 2013-07-10 |
Family
ID=48717887
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101073185A Pending CN103195084A (en) | 2013-03-29 | 2013-03-29 | Diversion node structure of integrated pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195084A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487818A (en) * | 2018-11-30 | 2019-03-19 | 广西壮族自治区城乡规划设计院 | A kind of construction method of pipe gallery combined joint |
CN109487817A (en) * | 2018-11-28 | 2019-03-19 | 广西壮族自治区城乡规划设计院 | A kind of three cabin intersection bar construction of piping lane road |
CN109487819A (en) * | 2018-11-30 | 2019-03-19 | 广西壮族自治区城乡规划设计院 | A kind of pipe gallery and its construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1603525A (en) * | 2004-11-09 | 2005-04-06 | 上海市政工程设计研究院 | Integrated pipe canal |
CN201437729U (en) * | 2009-04-20 | 2010-04-14 | 上海市政工程设计研究总院 | Cross-shaped intersection for comprehensive pipe canals |
EP2317074A1 (en) * | 2009-11-03 | 2011-05-04 | Silvino Pompeu Santos | Multi-deck tunnel |
CN102660961A (en) * | 2012-06-06 | 2012-09-12 | 上海市城市建设设计研究总院 | Integral underground comprehensive pipe rack |
-
2013
- 2013-03-29 CN CN2013101073185A patent/CN103195084A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1603525A (en) * | 2004-11-09 | 2005-04-06 | 上海市政工程设计研究院 | Integrated pipe canal |
CN201437729U (en) * | 2009-04-20 | 2010-04-14 | 上海市政工程设计研究总院 | Cross-shaped intersection for comprehensive pipe canals |
EP2317074A1 (en) * | 2009-11-03 | 2011-05-04 | Silvino Pompeu Santos | Multi-deck tunnel |
CN102660961A (en) * | 2012-06-06 | 2012-09-12 | 上海市城市建设设计研究总院 | Integral underground comprehensive pipe rack |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487817A (en) * | 2018-11-28 | 2019-03-19 | 广西壮族自治区城乡规划设计院 | A kind of three cabin intersection bar construction of piping lane road |
CN109487817B (en) * | 2018-11-28 | 2020-12-01 | 广西壮族自治区城乡规划设计院 | Three cabin crossing steel bar structure in gallery |
CN109487818A (en) * | 2018-11-30 | 2019-03-19 | 广西壮族自治区城乡规划设计院 | A kind of construction method of pipe gallery combined joint |
CN109487819A (en) * | 2018-11-30 | 2019-03-19 | 广西壮族自治区城乡规划设计院 | A kind of pipe gallery and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195083B (en) | A kind of pipe gallery crossover node structure | |
CN103147461B (en) | A kind of pipe gallery and control centre's connecting joint structure | |
CN106013225B (en) | Six layers of circular traffic, pipe gallery and sponge Urban Underground Complex | |
CN105544605B (en) | A kind of modular assembly formula pipe gallery | |
CN104420480B (en) | The method for arranging of Collapsible Loess District comprehensive pipe network and structure | |
CN105971009B (en) | Five layers of circular Urban Underground Complex | |
CN103195084A (en) | Diversion node structure of integrated pipe gallery | |
CN106013215A (en) | Three-layer rectangle-like urban underground complex | |
CN206189462U (en) | Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line | |
CN107171189A (en) | A kind of cable tunnel integrated with substation equipment basis | |
CN204538483U (en) | Rack bus-type prefabricated cabin | |
CN206110182U (en) | Three large -scale arcading city utility tunnel | |
CN102434016A (en) | Scheme for designing three-dimensional carport frame structure across midair of wide type road | |
CN103661405A (en) | Underground all-node transfer station of urban railway system | |
CN106013222B (en) | Three circular cross section Urban Underground Complexes | |
CN206319337U (en) | Large-scale square tube type Urban Underground comprehensive tunnel | |
CN103669142A (en) | Arrangement-type full-intercommunication vertical crossing structure | |
CN206144599U (en) | Tunnel emergency evacuation and rescue system | |
CN112681039A (en) | Multi-energy public infrastructure corridor | |
CN109469099A (en) | Assembled underground pipe gallery | |
CN110139529A (en) | A kind of modular data center | |
CN102134857B (en) | Underground vehicle driving channel | |
CN107059521B (en) | Underground four-layer three-dimensional overlapping type transportation junction structure | |
CN209482454U (en) | A kind of building subterranean layer pipeline arrangement framework | |
CN206110181U (en) | Circular tube type city underpass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130710 |