CN206110181U CN201621156423.3U CN201621156423U CN206110181U CN 206110181 U CN206110181 U CN 206110181U CN 201621156423 U CN201621156423 U CN 201621156423U CN 206110181 U CN206110181 U CN 206110181U
Authority
CN
China
Prior art keywords
layer
cabin
partition wall
wall
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621156423.3U
Other languages
Chinese (zh)
Inventor
全明
徐家伟
陈万涛
宋天军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201621156423.3U priority Critical patent/CN206110181U/en
Application granted granted Critical
Publication of CN206110181U publication Critical patent/CN206110181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a stable and the manifold circular tube type city underpass of function of overall structure. This circular tube type city underpass, including the passageway main part that is the cylinder, the axial of the middle part edge passageway main part of passageway main part is provided with vertical bearing dividing wall, still be provided with bearing soleplate in the passageway main part, bearing soleplate separates the passageway main part in proper order for the rainwater layer from lower to upper, synthesizes layer, people's bank of china layer, first lane layer, second lane layer and top layer, it is provided with the comprehensive layer partition wall in two sides to synthesize the in situ, it is separated for the reserve cabin of rainwater, heating power cabin, natural air cabin and bilge tank by vertical bearing dividing wall and comprehensive layer partition wall to synthesize the layer, be provided with explosion -proof cofferdam in the natural air cabin. Pass through the vertical bearing dividing wall that sets up for the overall structure of this underpass is stable, separate the passageway main part for the multilayer through setting up bearing soleplate to set up the partition wall and be a plurality of function cabins with each layer partition, satisfied many functional requirement in city.

Description

Circular pipe type Urban Underground Passage
Technical field
This utility model belongs to civilian infrastructure field, and in particular to a kind of circular pipe type Urban Underground Passage.
Background technology
As the demand of the urban public utilities such as the expansion of city size, power supply, plumbing, road, communication also increases therewith Plus.For effectively utilizes Urban spatial recourses, often build a plurality of underpass in Urban Underground, by electric power, communication, heating power and The various municipal pipelines such as plumbing and passing road etc. are included in the lump.
, there is problems with the less Urban Underground synthesis corridor of existing diameter:Firstth, single function or function are not neat enough Entirely, and not integrate with subterranean tunnel traffic;Secondth, as comprehensive corridor is located underground, rainwater, sewage and other each function pipelines Integrated can not take into account;3rd, the expanding function needed for urban future development is not reserved.Therefore, often lead to urban construction Middle Urban Underground Passage is excavated repeatedly, is built repeatedly, is not only caused above ground structure many and is disperseed, and floor space is big, damages scape See, and expend substantial amounts of fund.And the overall structure of the existing Urban Underground synthesis corridor being relatively large in diameter is often unstable, exist Larger potential safety hazard.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of overall structure and stablizes and circular pipe type city vdiverse in function City's underpass.
This utility model solves the technical scheme adopted by its technical problem:Circular pipe type Urban Underground Passage, including being in Columnar channel body, the middle part of the channel body have a vertical load-bearing dividing wall along the axially arranged of channel body, described It is additionally provided with bearing soleplate in channel body, channel body is divided into the bearing soleplate rainwater layer, comprehensive from lower to upper successively Layer, people's row layer, first lane layer, second lane layer and top layers are closed, two sides synthetic layer partition wall, institute in the synthetic layer, is provided with State synthetic layer and rainwater reserved space, heating power cabin, natural gas cabin and bilge tank be divided into by vertical load-bearing dividing wall and synthetic layer partition wall, Explosiveproof isolation cabin is provided with the natural gas cabin.
It is further that the rainwater layer is divided into two heavy caliber rainwater cabins by vertical load-bearing dividing wall.
It is further in people's row layer, to be provided with two dough figurine row layer partition wall, people's row layer is separated by vertical load-bearing Wall and people's row layer partition wall are divided into two people's row cabins and two single-sided arrangement cabins.
It is further that the first lane layer is divided into two first current cabins by vertical load-bearing dividing wall, described the First lane layer partition wall is provided with one current cabin, the first current cabin is divided into and vertical load-bearing by the first lane layer partition wall The first adjacent garage cabin of dividing wall and first fire escape adjacent with the side wall of channel body.
It is further that the both sides of first garage cabin width are respectively arranged with anti-collision wall.
It is further that the second lane layer is divided into two second current cabins by vertical load-bearing dividing wall, described the Second lane layer partition wall is provided with two current cabins, the second current cabin is divided into and vertical load-bearing by the second lane layer partition wall The second adjacent garage cabin of dividing wall and second fire escape adjacent with the side wall of channel body.
It is further that the both sides of second garage cabin width are respectively arranged with anti-collision wall.
It is further in the top layers, to be provided with two sides top layers partition wall, the top layers are separated by vertical load-bearing Wall and top layers partition wall are divided into two reserved cabins and two pipe gallery cabins.
The beneficial effects of the utility model are:By vertical load-bearing dividing wall is arranged in channel body, the ground is strengthened Lower channel so that its overall structure is stable;Channel body is divided in multilamellar, and synthetic layer by setting bearing soleplate and is set The two sides synthetic layer partition wall put is divided into rainwater reserved space, heating power cabin, natural gas cabin and bilge tank, is realized and is open to traffic, OK The functions such as people, draining, blowdown, heat supply and supply, are effectively utilized Urban spatial recourses, meet the growth requirement in city.
Description of the drawings
Fig. 1 is enforcement structural representation of the present utility model;
It is labeled as in figure:Channel body 100, rainwater layer 110, heavy caliber rainwater cabin 111, synthetic layer 120, rainwater reserved space 121st, heating power cabin 122, natural gas cabin 123, bilge tank 124, people's row layer 130, people's row cabin 131, single-sided arrangement cabin 132, the first car Channel layer 140, the first garage cabin 141, the first fire escape 142, second lane layer 150, the second garage cabin 151, second evacuate logical Road 152, top layers 160, reserved cabin 161, pipe gallery cabin 162, vertical load-bearing dividing wall 210, bearing soleplate 220, synthetic layer Partition wall 230, people's row layer partition wall 240, first lane layer partition wall 250, second lane layer partition wall 260, anti-collision wall 270, top layers every Wall 280.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in figure 1, circular pipe type Urban Underground Passage, including cylindrical circular channel body 100, the channel body There is vertical load-bearing dividing wall 210 at 100 middle part along the axially arranged of channel body 100, is additionally provided with the channel body 100 Channel body 100 is divided into rainwater layer 110, synthetic layer from lower to upper successively for bearing soleplate 220, the bearing soleplate 220 120th, people's row layer 130, first lane layer 140, second lane layer 150 and top layers 160, are provided with two in the synthetic layer 120 Face synthetic layer partition wall 230, it is standby that the synthetic layer 120 is divided into rainwater by vertical load-bearing dividing wall 210 and synthetic layer partition wall 230 Cabin 121, heating power cabin 122, natural gas cabin 123 and bilge tank 124, are provided with explosiveproof isolation cabin in the natural gas cabin 123.Its In, channel body 100 can be formed, or formed by pipe-plate lining by armored concrete is prefabricated;Vertical load-bearing Dividing wall 210 is vertically arranged in the middle part of channel body 100, and the apical support of vertical load-bearing dividing wall 210 is in channel body 100 Top, for strengthening the overall structure of channel body 100.Bearing soleplate 220 is polylith, and seals setting by channel body About 100 separate;Rainwater layer 110 is mainly used in arrange outside urban rainwater, and people's row layer 130 is mainly used in the current use of people, the One track layer 140 and second lane layer 150 are respectively used to vehicle pass-through;Top layers 160 usually reserve layer, to meet city Expanding function needed for future development, for example:For arranging intelligent management system, fire prevention system etc..Rainwater reserved space 121 can The assisted drainage when rainwater is excessive, increases the displacement of the circular pipe type Urban Underground Passage;Heating power cabin 122 is used for city heat supply; Explosiveproof isolation cabin is provided with natural gas cabin 123, for conveying natural gas;Bilge tank 124 is used for urban sewage.
Specifically, the rainwater layer 110 is divided into two heavy caliber rainwater cabins 111 by vertical load-bearing dividing wall 210.
Again as shown in figure 1, being provided with two dough figurine row layer partition wall 240 in people's row layer 130, people's row layer 130 is erected Two people's row cabins 131 and two single-sided arrangement cabins 132 are divided into load-bearing dividing wall 210 and people's row layer partition wall 240.
Preferably, the first lane layer 140 is divided into two first current cabins by vertical load-bearing dividing wall 210, described Be provided with first lane layer partition wall 250 in first current cabin, the first lane layer partition wall 250 by the first current cabin be divided into The first adjacent garage cabin 141 of vertical load-bearing dividing wall 210 and first fire escape adjacent with the side wall of channel body 100 142.When unexpected traffic accident can occur in the first garage cabin 141 by the first fire escape 142, crowd is evacuated in time.
On the basis of the above, it is to avoid vehicle from breaking vertical load-bearing dividing wall 210 and first lane layer partition wall 250, described The both sides of 141 width of the first garage cabin are respectively arranged with anti-collision wall 270.
Preferably, the second lane layer 150 is divided into two second current cabins by vertical load-bearing dividing wall 210, described Be provided with second lane layer partition wall 260 in second current cabin, the second lane layer partition wall 260 by the second current cabin be divided into The second adjacent garage cabin 151 of vertical load-bearing dividing wall 210 and second fire escape adjacent with the side wall of channel body 100 152.When unexpected traffic accident can occur in the second garage cabin 151 by the second fire escape 152, crowd is evacuated in time.
On the basis of the above, it is to avoid vehicle from breaking vertical load-bearing dividing wall 210 and second lane layer partition wall 260, described The both sides of 151 width of the second garage cabin are respectively arranged with anti-collision wall 270.
Preferably, the clear span in the first garage cabin 141 and the second garage cabin 151 is 9m, clear height and is 3.5m;Wherein, One garage cabin 141 includes two wide driving bands and the band that stops in emergency of an a width of 2m for being 3.5m;Wrap in the second garage cabin 151 Include two wide driving bands and the band that stops in emergency of an a width of 2m for being 3.5m.
Specifically, two sides top layers partition wall 280 is provided with top layers 160, the top layers 160 are by vertical load-bearing Dividing wall 210 and top layers partition wall 280 are divided into two reserved cabins 161 and two pipe gallery cabins 162.

Claims (8)

1. circular pipe type Urban Underground Passage, including cylindrical circular channel body (100), it is characterised in that:The channel body (100) middle part has in vertical load-bearing dividing wall (210), the channel body (100) along the axially arranged of channel body (100) Bearing soleplate (220) is additionally provided with, channel body (100) is divided into rainwater by the bearing soleplate (220) from lower to upper successively Layer (110), synthetic layer (120), people's row layer (130), first lane layer (140), second lane layer (150) and top layers (160), Two sides synthetic layer partition wall (230) is provided with the synthetic layer (120), the synthetic layer (120) is by vertical load-bearing dividing wall And synthetic layer partition wall (230) is divided into rainwater reserved space (121), heating power cabin (122), natural gas cabin (123) and bilge tank (210) (124), explosiveproof isolation cabin is provided with the natural gas cabin (123).
2. circular pipe type Urban Underground Passage as claimed in claim 1, it is characterised in that:The rainwater layer (110) is vertically held Weight dividing wall (210) is divided into two heavy caliber rainwater cabins (111).
3. circular pipe type Urban Underground Passage as claimed in claim 1, it is characterised in that:It is provided with people's row layer (130) Two dough figurines row layer partition wall (240), people's row layer (130) are separated by vertical load-bearing dividing wall (210) and people's row layer partition wall (240) For two people's row cabins (131) and two single-sided arrangement cabins (132).
4. circular pipe type Urban Underground Passage as claimed in claim 1, it is characterised in that:The first lane layer (140) is erected Two first current cabins are divided into load-bearing dividing wall (210), be provided with first lane layer partition wall in the described first current cabin (250), the first current cabin is divided into adjacent with vertical load-bearing dividing wall (210) the by the first lane layer partition wall (250) One garage cabin (141) and first fire escape (142) adjacent with the side wall of channel body (100).
5. circular pipe type Urban Underground Passage as claimed in claim 4, it is characterised in that:First garage cabin (141) width The both sides in direction are respectively arranged with anti-collision wall (270).
6. the circular pipe type Urban Underground Passage as described in claim 1,2,3,4 or 5, it is characterised in that:The second lane layer (150) two second current cabins are divided into by vertical load-bearing dividing wall (210), in the described second current cabin, are provided with second lane Second current cabin is divided into and vertical load-bearing dividing wall (210) phase by layer partition wall (260), the second lane layer partition wall (260) The second adjacent garage cabin (151) and second fire escape (152) adjacent with the side wall of channel body (100).
7. circular pipe type Urban Underground Passage as claimed in claim 6, it is characterised in that:Second garage cabin (151) width The both sides in direction are respectively arranged with anti-collision wall (270).
8. the circular pipe type Urban Underground Passage as described in claim 1,2,3,4 or 5, it is characterised in that:The top layers (160) Two sides top layers partition wall (280) is provided with inside, the top layers (160) are by vertical load-bearing dividing wall (210) and top layers partition wall (280) it is divided into two reserved cabins (161) and two pipe gallery cabins (162).
CN201621156423.3U 2016-10-24 2016-10-24 Circular tube type city underpass Active CN206110181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621156423.3U CN206110181U (en) 2016-10-24 2016-10-24 Circular tube type city underpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621156423.3U CN206110181U (en) 2016-10-24 2016-10-24 Circular tube type city underpass

Publications (1)

Publication Number Publication Date
CN206110181U true CN206110181U (en) 2017-04-19

Family

ID=58527675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621156423.3U Active CN206110181U (en) 2016-10-24 2016-10-24 Circular tube type city underpass

Country Status (1)

Country Link
CN (1) CN206110181U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653908A (en) * 2017-11-01 2018-02-02 沈阳建筑大学 Double Circle underground traffic and pipe gallery combined system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653908A (en) * 2017-11-01 2018-02-02 沈阳建筑大学 Double Circle underground traffic and pipe gallery combined system

Similar Documents

Publication Publication Date Title
CN106013225B (en) Six layers of circular traffic, pipe gallery and sponge Urban Underground Complex
CN203476345U (en) Multifunctional multilayer municipal tunnel
CN106013221B (en) Four layers of class rectangle Urban Underground Complex
CN106013215B (en) Three layers of class rectangle Urban Underground Complex
CN106013223B (en) Elliptical section Urban Underground Complex
CN105971009B (en) Five layers of circular Urban Underground Complex
CN204919244U (en) Open type road that sinks
CN206110182U (en) Three large -scale arcading city utility tunnel
CN106436755A (en) Four-layer stair-like city underground comprehensive body
CN206110181U (en) Circular tube type city underpass
CN206319337U (en) Large-scale square tube type Urban Underground comprehensive tunnel
CN106013222B (en) Three circular cross section Urban Underground Complexes
CN206189448U (en) Elliptical section city underground complex
CN206110177U (en) Current corridor in circular tube type city underground
CN106638682A (en) Efficient-seismic-reduction quasi-rectangular city underground architecture complex
CN106013226B (en) Double Circle section Urban Underground Complex
CN206090613U (en) Ungulate city of span underground complex
CN110847662A (en) Warehouse type ultra-deep underground three-dimensional intelligent garage and construction method thereof
CN106013224B (en) The ungulate Urban Underground Complex of span
CN209816915U (en) Double-circular shield construction comprehensive pipe gallery
CN210509196U (en) Large-section tunnel structure of hard rock stratum underground excavation single-layer lining subway parking line
CN107419948A (en) A kind of dual peacetime Underground Urban Complex
CN206110168U (en) Three -layer quasi -rectangular city underground complex
CN106013938A (en) Overground and underground urban traffic and pipe network complex
CN206110171U (en) Double circle section city underground complex

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant