CN103147461B - A kind of pipe gallery and control centre's connecting joint structure - Google Patents
A kind of pipe gallery and control centre's connecting joint structure Download PDFInfo
- Publication number
- CN103147461B CN103147461B CN201310107304.3A CN201310107304A CN103147461B CN 103147461 B CN103147461 B CN 103147461B CN 201310107304 A CN201310107304 A CN 201310107304A CN 103147461 B CN103147461 B CN 103147461B
- Authority
- CN
- China
- Prior art keywords
- chamber
- joint structure
- cabin
- connecting joint
- substructure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
- Building Environments (AREA)
Abstract
The present invention is specifically related to a kind of pipe gallery and control centre's connecting joint structure, the two ends of described connecting joint structure are connected with pipe gallery main line, one sidewall is connected with control centre, described connecting joint structure is divided into two cabins or many cabins by the vertical partition wall in some roads, and be provided with plate in a level within it, so that each cabin in connecting joint structure is divided into superstructure chamber and substructure chamber; Connection stair are provided with between the described superstructure chamber in each cabin and substructure chamber; Labeled door is laid with between cabin in described superstructure chamber and substructure chamber and cabin; In described level, plate offers hole, walk for pipeline.Advantage of the present invention, moves towards to separate by personnel's transit route and pipeline by plate in level; Completely independent with the fire compartmentation reached between each cabin by arranging labeled door on vertical partition wall, improve safety; By arranging the damage that collecting well brings to pipeline effectively to avoid rain leakage on the base plate of substructure.
Description
Technical field
The invention belongs to pipe gallery technical field, be specifically related to a kind of pipe gallery and control centre's connecting joint structure.
Background technology
Pipe gallery is a kind of novel municipal pipeline tunnel, in recent years along with domestic urbanization advances, Xincheng District is at planning construction pipe gallery more and more, at present in Shanghai, Kunming, Guangzhou, Suzhou, Shenyang, Suzhou, the ground planning constructions such as Wuxi are more than the pipe gallery of 300km, the pipeline that pipe gallery holds comprises power cable, communication and control optical cable, high-quality (impurity) water pipe, hot-water line, cooling pipeline etc., according to the system layout of pipe gallery, need a certain position near pipe gallery is along the line that one control centre of place is set, one section of interface channel is set from control centre to pipe gallery main line, solution personnel are needed to pass through during intersection between interface channel and piping lane main line and the normal pass of piping lane gut line, also to meet the independence of fire compartmentation simultaneously.
Traditional way adopts and simply punches on piping lane, and be connected with the interface channel leading to control centre, contradiction substantially and between unresolved pipeline curves and personnel pass through, also upset independently fire compartmentation, add construction costs, there is many hidden danger after building up in engineering in security, waterproof, seepage control etc.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of pipe gallery and control centre's connecting joint structure are provided, this connecting joint structure is by arranging in a level plate connected node to be divided into upper and lower double-layer structure chamber, and labeled door laid by vertical partition wall between each cabin, pipeline trend current with the personnel of properly settling and fire compartmentation independently problem
The object of the invention realizes being completed by following technical scheme:
A kind of pipe gallery and control centre's connecting joint structure, the two ends of described connecting joint structure are connected with described pipe gallery main line, one sidewall is connected with described control centre, described connecting joint structure is divided into two cabins or many cabins by the vertical partition wall in some roads, it is characterized in that being provided with plate in a level in described connecting joint structure, so that each cabin in described connecting joint structure is divided into superstructure chamber and substructure chamber; Connection stair are provided with between the described superstructure chamber in each cabin and substructure chamber; Labeled door is laid with between cabin in described superstructure chamber and substructure chamber and cabin; In described level, plate offers hole, walk for pipeline.
Described hole is arranged in the both sides of the described level plate in each cabin.
Described connecting joint structure is in the plane wider than described 1.5 ~ 2.0 meters, pipe gallery main line plane, and the sidewall at described connected node width expansion place and the standard section of described pipe gallery main line are 30 ~ 45 degree of angles of cut.
One sidewall in described superstructure chamber is furnished with hole, to be connected with described control centre.
One sidewall in described substructure chamber is furnished with hole, to be connected with described control centre.
Collecting well is provided with in each cabin in described substructure chamber.
Described stair in each cabin are positioned on this cabin longitudinal centre line.
Advantage of the present invention is, personnel's transit route and pipeline are moved towards to separate by plate in level, superstructure chamber facilitates the movement of persons, and substructure chamber facilitates pipelining, and idle space, for stacking instrument, facilitates engineering to overhaul, and reduces construction costs; By arranging labeled door on vertical partition wall, between each cabin and while control centre's conversion, making each fire compartmentation completely independent to reach meeting personnel, improving safety; By arranging the damage that collecting well brings to pipeline effectively to avoid rain leakage on the base plate in substructure chamber.
Accompanying drawing explanation
Fig. 1 is that the base plate plane of connecting joint structure in the present invention arranges schematic diagram;
Fig. 2 is that the middle board plane of connecting joint structure in the present invention arranges schematic diagram;
Fig. 3 is that the top plate plant tilting of connecting joint structure in the present invention arranges schematic diagram;
Fig. 4 is the A-A generalized section of connecting joint structure in the present invention;
Fig. 5 is the B-B generalized section of connecting joint structure in the present invention.
Detailed description of the invention
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that the understanding of technician of the same trade:
Be respectively as marked 1-13 in Fig. 1-5, figure: base plate 1, collecting well 2, labeled door 3, vertical partition wall 4, stair 5, middle plate 6, hole 7, interface channel 8, hole 9, top board 10, superstructure chamber 11, substructure chamber 12, pipeline 13.
Embodiment: the present embodiment is specifically related to the connecting joint structure of a kind of pipe gallery and control centre, this connecting joint structure is arranged between pipe gallery main line and control centre, personnel and pipeline can lead to pipe gallery main line by control centre, pipeline in pipe gallery main line can lay operation normally, independently route is kept between personnel and pipeline, keep independently fire compartmentation simultaneously, by rational node size, reduce cost.
As Figure 1-5, connected node is specially a box cavity body structure, and its lateral wall widens 1.5 ~ 2m relative to the standard section of pipe gallery main line, and width expansion place sidewall and main line standard section are 30 ~ 45 degree of angles of cut; The object of planar dimension local wide is the stairway width requirement meeting follow-up setting.By vertical partition wall 4, this cavity is divided into left and right two cabins, and in cavity, is provided with in a level plate 6 so that this cavity is divided into superstructure chamber 11 and substructure chamber 12, substructure 11 is for pipelining, and superstructure 12 is passed through for personnel; The two ends in the superstructure chamber 11 of connected node are connected with pipe gallery main line, and on the sidewall in superstructure chamber 11, offer hole to be connected with interface channel 8, interface channel 8 leads to control centre simultaneously.The upper and lower part of vertical partition wall 4 is provided with first class labeled door 3, passes through in order to make carrying out personnel between left and right two cabins and keep the fire district between each cabin independent separately; In level respectively in left and right two cabins, plate 6 arranges stair 5 between two parties, what pipeline 13 was reserved in both sides lays space, stair 5 extend on base plate 1 from middle plate 6, the conversion of personnel between superstructure chamber 11 and substructure chamber 12 is facilitated to pass through, for guaranteeing that fire prevention between superstructure chamber 11 and substructure chamber 12 is independent, the stair 5 hole place on middle plate 6 is provided with can the fireproof cover plate of folding; Some holes 7 are offered at the two ends of middle plate 6, hole 7 is arranged near the side wall surface in each cabin, namely near the sidewall of left and right cabin sidewall and vertical partition wall 4, enter substructure chamber 12 from superstructure chamber 11 through hole 7 to make the pipeline 13 laid in pipe gallery main line, and lay along both sides, each cabin, wear through the hole 7 of the other end more afterwards and be back to superstructure chamber 11(as shown in Figure 5), this kind arranges structure can make pipelining and personnel's passage space separate, and has influence on the safety of pipeline 13 when avoiding superstructure chamber 11 or control centre to catch fire; In the right cabin communicated with interface channel 8, plate 6 is provided with hole 7, personal cable can enter control centre thus; In left and right two cabins in substructure chamber 12, arrange collecting well 2, discharging water for collection structure percolating water and row of conduits is rinse water, and is expelled to road rain water system by pump machine.
Staff, when carrying out space transforming, can pass through back and forth in superstructure chamber 11, and enters in substructure chamber 12 by stair 5; Substructure chamber 12 is specifically for laying the line 13, and pipeline 13 guiding being arranged in superstructure chamber 11 can be entered substructure by hole 7 cleverly that be opened on middle plate 6, to make the current and pipelining of personnel be independent of each other, simultaneously by labeled door 3 to make the fire compartmentation between each cabin independent separately.
Different according to the depth of burying of connecting joint structure, when pipe gallery main line is connected with substructure chamber 12, when control centre is also connected with substructure chamber 12, then pipeline 13 enters superstructure chamber 11 through hole 7 and lays, and wears back in substructure chamber 12 through the hole 7 of the other end; When pipe gallery main line is connected with substructure chamber 12, when control centre is connected with superstructure chamber 11, then laying not do and change to pipeline, continues to lay along substructure chamber 12.
Traditional way adopts and simply punches, do not solve pipeline curve and personnel pass through between contradiction, also upset independently fire compartmentation, added construction costs, there is many hidden danger after building up in engineering in security, waterproof, seepage control etc.The subject matter that the present embodiment is connected with pipe gallery main line for control centre carries out combing, its core is by various system and tissue, move towards to separate by personnel's transit route and pipeline, thus mix the situation with contradiction both thoroughly solving, what make fire compartmentation independently becomes simple, effectively can utilize the inner space of intersection simultaneously, reduce construction costs.
Claims (5)
1. a pipe gallery and control centre's connecting joint structure, the two ends of described connecting joint structure are connected with described pipe gallery main line, one sidewall is connected with described control centre, described connecting joint structure is divided into many cabins by the vertical partition wall in some roads, it is characterized in that being provided with plate in a level in described connecting joint structure, so that each cabin in described connecting joint structure is divided into superstructure chamber and substructure chamber, superstructure chamber is used for personnel and passes through, and substructure chamber is used for pipelining; Connection stair are provided with between the described superstructure chamber in each cabin and substructure chamber; Labeled door is laid with between cabin in described superstructure chamber and substructure chamber and cabin; In described level, plate two ends offer hole, enter described substructure chamber for the described pipeline laid from described pipe gallery main line lay from described superstructure chamber through one end described hole, and wear through the described hole of the other end and be back to described superstructure chamber.
2. a kind of pipe gallery according to claim 1 and control centre's connecting joint structure, is characterized in that described hole is arranged in the both sides of the described level plate in each cabin.
3. a kind of pipe gallery according to claim 1 and control centre's connecting joint structure, the sidewall that it is characterized in that described superstructure chamber is furnished with hole, to be connected with described control centre.
4. a kind of pipe gallery according to claim 1 and control centre's connecting joint structure, is provided with collecting well in each cabin that it is characterized in that described substructure chamber.
5. a kind of pipe gallery according to claim 1 and control centre's connecting joint structure, is characterized in that the described stair in each cabin are positioned on this cabin longitudinal centre line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310107304.3A CN103147461B (en) | 2013-03-29 | 2013-03-29 | A kind of pipe gallery and control centre's connecting joint structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310107304.3A CN103147461B (en) | 2013-03-29 | 2013-03-29 | A kind of pipe gallery and control centre's connecting joint structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103147461A CN103147461A (en) | 2013-06-12 |
CN103147461B true CN103147461B (en) | 2015-09-16 |
Family
ID=48545754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310107304.3A Active CN103147461B (en) | 2013-03-29 | 2013-03-29 | A kind of pipe gallery and control centre's connecting joint structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103147461B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912101B (en) * | 2015-06-15 | 2017-06-27 | 上海市政工程设计研究总院(集团)有限公司 | The driving splicing structure and its construction method of a kind of pipe gallery |
CN105673022A (en) * | 2016-03-28 | 2016-06-15 | 北京市政建设集团有限责任公司 | Comprehensive pipe gallery for CRD mined tunnel and construction method of comprehensive pipe gallery |
CN108018870A (en) * | 2016-10-31 | 2018-05-11 | 浙江鑫宙竹基复合材料科技有限公司 | A kind of node room for the compound pipe gallery of bamboo |
CN106844938B (en) * | 2017-01-18 | 2018-02-23 | 悉地(苏州)勘察设计顾问有限公司 | One kind is dry, branch line pipe gallery intersection precast construction |
CN109083196B (en) * | 2018-09-30 | 2024-04-02 | 广西壮族自治区城乡规划设计院 | Utility tunnel composite node structure |
CN110331738B (en) * | 2019-06-21 | 2021-03-30 | 成都市人防建筑设计研究院 | Comprehensive pipe gallery of people-carrying anti-protection system matched with high-grade civil defense target |
CN110952591A (en) * | 2019-10-29 | 2020-04-03 | 上海市政工程设计研究总院(集团)有限公司 | Connection node from control center to comprehensive pipe gallery |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1319704A (en) * | 2000-08-31 | 2001-10-31 | 北京市城建建筑设计研究院有限公司 | underground comprehesive pipe gallery and system for comprehensive developing and utilizing underground space |
CN2661777Y (en) * | 2003-12-19 | 2004-12-08 | 南京鸿宇市政设施投资管理有限责任公司 | Municipal underground pipeline lane |
CN101566067A (en) * | 2009-06-03 | 2009-10-28 | 北京首钢国际工程技术有限公司 | Entire-underground cable tunnel safety manhole being used also as ventilation shaft |
CN201437729U (en) * | 2009-04-20 | 2010-04-14 | 上海市政工程设计研究总院 | Cross-shaped intersection for comprehensive pipe canals |
EP2317074B1 (en) * | 2009-11-03 | 2011-11-02 | Silvino Pompeu Santos | Tunnel multi-storey |
CN102383807A (en) * | 2011-09-28 | 2012-03-21 | 上海市城市建设设计研究院 | Longitudinal evacuation structure of underground tunnel and underground tunnel |
-
2013
- 2013-03-29 CN CN201310107304.3A patent/CN103147461B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1319704A (en) * | 2000-08-31 | 2001-10-31 | 北京市城建建筑设计研究院有限公司 | underground comprehesive pipe gallery and system for comprehensive developing and utilizing underground space |
CN2661777Y (en) * | 2003-12-19 | 2004-12-08 | 南京鸿宇市政设施投资管理有限责任公司 | Municipal underground pipeline lane |
CN201437729U (en) * | 2009-04-20 | 2010-04-14 | 上海市政工程设计研究总院 | Cross-shaped intersection for comprehensive pipe canals |
CN101566067A (en) * | 2009-06-03 | 2009-10-28 | 北京首钢国际工程技术有限公司 | Entire-underground cable tunnel safety manhole being used also as ventilation shaft |
EP2317074B1 (en) * | 2009-11-03 | 2011-11-02 | Silvino Pompeu Santos | Tunnel multi-storey |
CN102383807A (en) * | 2011-09-28 | 2012-03-21 | 上海市城市建设设计研究院 | Longitudinal evacuation structure of underground tunnel and underground tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN103147461A (en) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147461B (en) | A kind of pipe gallery and control centre's connecting joint structure | |
CN103195083B (en) | A kind of pipe gallery crossover node structure | |
CN106013215B (en) | Three layers of class rectangle Urban Underground Complex | |
CN106013221B (en) | Four layers of class rectangle Urban Underground Complex | |
CN208363127U (en) | A kind of retaining wall structure of combined type high-speed rail platform | |
CN107131001A (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN106013223B (en) | Elliptical section Urban Underground Complex | |
CN103410175A (en) | Water seepage control construction method for karst water-rich geological underground structure waterproof construction | |
CN203256774U (en) | Underground cable trench construction structure for electric engineering | |
CN207700219U (en) | A kind of pipe gallery in more cabins | |
CN107460887A (en) | A kind of subway station of shield two layer of space combination | |
CN110424454A (en) | Build together method and the structure of building together of pipe gallery and subway station | |
CN210529750U (en) | Cable type utility tunnel system | |
CN106013222B (en) | Three circular cross section Urban Underground Complexes | |
CN108374432A (en) | Pipe gallery integration exploitation is total to the open-cut station of structure with subway | |
CN205894103U (en) | Prefabricated parabola type utility tunnel | |
CN208121811U (en) | Pipe gallery integration exploitation and subway are total to the open-cut station of structure | |
CN204258213U (en) | A kind of cable trough structure through body of wall place | |
CN103195084A (en) | Diversion node structure of integrated pipe gallery | |
CN105804772A (en) | Active and passive combined waterproof structure for tunnel | |
CN206903689U (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN203260979U (en) | Cable trench and cover plate thereof | |
CN205604295U (en) | Utility tunnel dog -house structure | |
CN109469099A (en) | Assembled underground pipe gallery | |
CN206309401U (en) | A kind of tunnel duct piece of good waterproof performance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |