CN203260979U CN 201320302284 CN201320302284U CN203260979U CN 203260979 U CN203260979 U CN 203260979U CN 201320302284 CN201320302284 CN 201320302284 CN 201320302284 U CN201320302284 U CN 201320302284U CN 203260979 U CN203260979 U CN 203260979U
Authority
CN
China
Prior art keywords
cover plate
faulting
slab ends
slab
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320302284
Other languages
Chinese (zh)
Inventor
彭文明
袁琼
胡小红
王达会
邓乐荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN 201320302284 priority Critical patent/CN203260979U/en
Application granted granted Critical
Publication of CN203260979U publication Critical patent/CN203260979U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a cable trench and a cover plate thereof preventing a lot of surface water from entering the cable trench. The cover plate of the cable trench comprises a cover plate body of a flat-plate structure. Two longitudinal ends of the cover plate body are provided with an upper staggered platform and a lower staggered platform respectively. The upper and lower staggered platforms are matched with each other in shape. One portion of the lower staggered platform, which is adjacent to the cover plate body, is provided with a horizontal water-collecting through groove. The upper and lower staggered platforms may have flat-plate structures with the same longitudinal length or corresponding concave and convex structures. The cable trench comprises a base plate, side walls and the cover plates. The side walls are above the ground level. Each cover plate comprises a cover plate body of a flat-plate structure. Two longitudinal ends of the cover plate body are provided with an upper staggered platform and a lower staggered platform respectively. The upper and lower staggered platforms are matched with each other in shape. One portion of the lower staggered platform, which is adjacent to the cover plate body, is provided with a horizontal water-collecting through groove. The adjacent cover plates are overlapped through the upper and lower staggered platforms. The cable trench and the cover plate thereof are simple to use, remarkable in effects, and particularly suitable for being used in flood discharge atomization regions and heavy rainfall regions.

Description

Cable trough and cover plate thereof
Technical field
The utility model relates to a kind of cable trough and cover plate thereof, especially a kind of cable trough and cover plate thereof that is applicable to flood-discharge atomizing district and heavy showers area.
Background technology
The cables such as the power supply supply between building, signal transmission, communication, the cable that project scale is little is thinner, less, can adopt electric pole to support, but the cable between the hydroelectric project building is thicker, many, heavier, the employing electric pole is dangerous, usually adopts the cable trough of excavation to lay.Cable trough is the underground designated lane of cabling on engineering, comprise base plate, sidewall and cover plate, backplane is generally excavated according to certain gradient along landform, because maintenance needs, cover plate requires and can open, cover plate generally is supported on sidewall, and the crane span structure of cabling is by dowel or be bolted on sidewall.The cable trough base plate is generally comparatively smooth-going, and cover plate also adopts dull and stereotyped, simple in structure usually.
But when laying above-mentioned normal cable ditch in the flood-discharge atomizing district, surface water easily flows into cable trough from the gap between cover plate, will have following point: the first, and a large amount of insulated streams enter cable trough easily destroy by rush of water cable and crane span structure; The second, long-term moist environment is serious to the corrosion failure of cable trough concrete and crane span structure.
How avoiding a large amount of insulated streams to enter cable trough, and reduce as far as possible rainwater and invade cable trough, is the problem that needs solve.
The utility model content
Easily flow into the deficiency of cable trough in order to overcome existing cable ditch surface water, technical problem to be solved in the utility model is to provide a kind of cable trough and cover plate thereof of avoiding a large amount of insulated streams to enter.
The technical scheme that its technical problem that solves the utility model adopts is: cable channel cover plate, be included as the cover board body of slab construction, vertical two ends of described cover board body are respectively arranged with faulting of slab ends and lower faulting of slab ends, the shape of the shape of upper faulting of slab ends and lower faulting of slab ends cooperatively interacts, and lower faulting of slab ends and cover board body adjacent position has the catchment recess that lateral direction penetrating arranges.
Described cover plate is prefabricated reinforced concrete structure.
Described upper faulting of slab ends is the consistent slab construction of longitudinal length with lower faulting of slab ends.
Described upper faulting of slab ends and lower faulting of slab ends are mutually corresponding concaveconvex structure.
Adopt the cable trough of above-mentioned cable channel cover plate, the base plate, sidewall and the cover plate that comprise cable trough, described sidewall is above ground level, cover plate covers on sidewall, described cover plate is included as the cover board body of slab construction, vertical two ends of cover board body are respectively arranged with faulting of slab ends and lower faulting of slab ends, the shape of the shape of upper faulting of slab ends and lower faulting of slab ends cooperatively interacts, the adjacent position of lower faulting of slab ends and cover board body is provided with the catchment recess that lateral direction penetrating arranges, and mutually overlaps by upper faulting of slab ends separately, lower faulting of slab ends between adjacent cover plate.
The sidewall of described base plate and its both sides is integrated the xoncrete structure of building.
The beneficial effects of the utility model are: simple and easy to do, successful, especially be suitable for flood-discharge atomizing district and heavy showers the area.
Description of drawings
Fig. 1 is the floor map of the utility model cable trough.
Fig. 2 is the A-A vertical section schematic diagram of Fig. 1.
Fig. 3 is the B-B schematic cross section of Fig. 1.
Fig. 4 is the arrangement of reinforcement schematic diagram of the utility model cable channel cover plate.
Fig. 5 is the partial enlarged drawing of K section in Fig. 2.
Fig. 6 is the schematic diagram that the utility model cable channel cover plate adopts another kind of faulting of slab ends form.
Be labeled as 1-base plate, 2-sidewall, 3-cover plate, 4-ground in figure, the horizontal arrangement of reinforcement of 11-cover plate, 12-cover plate longitudinal reinforcement, 30-cover board body, the upper faulting of slab ends of 31-, faulting of slab ends under 32-, the 33-catchment recess, 34-cover plate gap, 40-above-ground route, the overhead height of H-sidewall, the longitudinal length of L-faulting of slab ends.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further illustrated.
As Fig. 1~shown in Figure 6, cable channel cover plate of the present utility model, be included as the cover board body 30 of slab construction, vertical two ends of described cover board body 30 are respectively arranged with upper faulting of slab ends 31 and the lower faulting of slab ends 32 that cooperatively interacts, the adjacent position of lower faulting of slab ends 32 and cover board body 30 has the catchment recess 33 that lateral direction penetrating arranges, efflux from groove two ends after the surface water that flows down along cover plate 3 is collected by catchment recess 33, the surface water that enters cable trough reduces in a large number, thereby has extended the useful life of cable trough.
Described cover plate 3 is prefabricated reinforced concrete structure, guarantees the globality of cover plate 3, and only need to do simple transformation to existing mold when prefabricated cover plate 3 can obtain corresponding faulting of slab ends and sink structure, and demoulding difficulty does not increase substantially, and the installation of cover plate 3 is convenient too.
As Fig. 1~shown in Figure 5, described upper faulting of slab ends 31 can be the consistent slab construction of longitudinal length with lower faulting of slab ends 32, in general recommendations this moment, the thickness of faulting of slab ends 31 and lower faulting of slab ends 32 is 1/2 of cover plate 3 thickness, and upper and lower faulting of slab ends makes also has certain cross spacing function between its adjacent cover plate.
As shown in Figure 6, described upper faulting of slab ends 31 and lower faulting of slab ends 32 are mutually corresponding concaveconvex structure, catchment recess 33 can be considered as the part of lower faulting of slab ends 32, and the upper and lower faulting of slab ends of such concaveconvex structure makes also has better cross spacing function between its adjacent cover plate, prevent the horizontal sliding of cover plate.
As Fig. 1~shown in Figure 6; Cable trough of the present utility model comprises the base plate 1 of cable trough; Sidewall 2 and cover plate 3; Described sidewall 2 above ground level 4; Cover plate 3 covers on sidewall 2; Cover plate 3 adopts above-mentioned cable channel cover plate of the present utility model; Pass through upper faulting of slab ends 31 separately between adjacent cover plate 3; Lower faulting of slab ends 32 overlaps mutually; To no longer include the gap of direct and cable trough internal communication between cover plate 3; Secondly; Even at upper faulting of slab ends 31; Still there is the gap in lower faulting of slab ends 32; But surface water also more easily flows to catchment recess 33 rather than flows in cable trough; Therefore; The surface water that enters cable trough reduces in a large number; Thereby extended the useful life of cable trough.
Further that for guaranteeing the stabilized structure of base plate 1 and sidewall, best described base plate 1 is integrated the xoncrete structure of building with the sidewall 2 of its both sides.
The cable trough and the cover plate thereof that design like this have the following advantages:
The first, the cable protection performance is good.Cable trough sidewall 2 is above the ground level, and avoids large flow surface water to flow into the cable trough cable that destroys by rush of water, and the protective value of cable is had obvious superiority.
The second, structure durability can be good.The utility model cable trough at utmost avoids surface water and rainwater to flow into, and has reduced oxidation and the erosion damage of water to concrete and crane span structure, has strengthened the durability of structure.
The 3rd, making, construction, maintenance and pedestrian are convenient.Cable channel cover plate is above the ground level, and is interconnected, and all can be used as the walkway during daily and flood discharge heavy showers; Simultaneously, the prefabricated reinforced concrete cover plate all provides convenience preferably at aspects such as processing and fabricating, carrying construction and ordinary maintenances.

Claims (6)

1. cable channel cover plate, be included as the cover board body (30) of slab construction, it is characterized in that: vertical two ends of described cover board body (30) are respectively arranged with faulting of slab ends (31) and lower faulting of slab ends (32), the shape of the shape of upper faulting of slab ends (31) and lower faulting of slab ends (32) cooperatively interacts, and lower faulting of slab ends (32) and cover board body (30) adjacent position has the catchment recess (33) that lateral direction penetrating arranges.
2. cable channel cover plate as claimed in claim 1, it is characterized in that: described cover plate (3) is prefabricated reinforced concrete structure.
3. cable channel cover plate as claimed in claim 1 is characterized in that: described upper faulting of slab ends (31) is the consistent slab construction of longitudinal length with lower faulting of slab ends (32).
4. cable channel cover plate as claimed in claim 1 is characterized in that: described upper faulting of slab ends (31) and lower faulting of slab ends (32) are mutually corresponding concaveconvex structure.
5. adopt claim 1; 2; The cable trough of 3 or 4 described cable channel cover plates; The base plate (1) that comprises cable trough; Sidewall (2) and cover plate (3); It is characterized in that: described sidewall (2) (4) above ground level; Cover plate (3) covers on sidewall (2); Described cover plate (3) is included as the cover board body of slab construction; Vertical two ends of cover board body (30) are respectively arranged with faulting of slab ends (31) and lower faulting of slab ends (32); The shape of the shape of upper faulting of slab ends (31) and lower faulting of slab ends (32) cooperatively interacts; The adjacent position of lower faulting of slab ends (32) and cover board body (30) is provided with the catchment recess (33) that lateral direction penetrating arranges; Pass through upper faulting of slab ends (31) separately between adjacent cover plate (3); Lower faulting of slab ends (32) is overlap joint mutually.
6. cable trough as claimed in claim 5 is characterized in that: described base plate (1) is integrated the xoncrete structure of building with the sidewall (2) of its both sides.
CN 201320302284 2013-05-29 2013-05-29 Cable trench and cover plate thereof Expired - Lifetime CN203260979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320302284 CN203260979U (en) 2013-05-29 2013-05-29 Cable trench and cover plate thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320302284 CN203260979U (en) 2013-05-29 2013-05-29 Cable trench and cover plate thereof

Publications (1)

Publication Number Publication Date
CN203260979U true CN203260979U (en) 2013-10-30

Family

ID=49473517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320302284 Expired - Lifetime CN203260979U (en) 2013-05-29 2013-05-29 Cable trench and cover plate thereof

Country Status (1)

Country Link
CN (1) CN203260979U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103928897A (en) * 2014-04-30 2014-07-16 国家电网公司 Cable trench and water inflow preventing method for cable trench
CN105048392A (en) * 2015-07-14 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Cable trench sealing cover plate
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103928897A (en) * 2014-04-30 2014-07-16 国家电网公司 Cable trench and water inflow preventing method for cable trench
CN103928897B (en) * 2014-04-30 2016-05-18 国家电网公司 A kind of cable duct and the anti-inlet method of cable duct
CN105048392A (en) * 2015-07-14 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Cable trench sealing cover plate
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof

Similar Documents

Publication Publication Date Title
CN205530344U (en) Utility tunnel is pour to split type no mould
CN203260979U (en) Cable trench and cover plate thereof
CN203808215U (en) Side slope drainage and protection structure
CN203260980U (en) Anti-ponding cable trench and cover plate thereof
CN203387141U (en) Draining-type cable trench
CN210561541U (en) Prefabricated assembled municipal concrete pavement
CN104120696B (en) Environment-friendly type slope sticking type trashrack structure and construction method thereof
CN204920961U (en) Adopt underground station of prefabricated component construction
CN203113335U (en) Counterfort type U-type groove retaining structure
CN206099263U (en) Assembled cable duct bank mounting structure
CN106437842B (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant
CN205911724U (en) Interval strong and weak magnetron line arrangement structure in tram engineering ground
CN201801811U (en) Invisible rainwater collecting device applied to viaduct with flat slope
CN205444258U (en) Highway subtracts vibration isolation integrated configuration in succession
CN204125968U (en) The anti-water collecting device of a kind of cable shaft
CN209923841U (en) Reinforced concrete highway structure
CN203066097U (en) Piled raft foundation structure of stub-type pile bearing platform structure
CN203808025U (en) Intercepting ditch structure for steeper terrain
CN203213143U (en) Construction structure of diversion trench for water pump installation base
CN202220345U (en) Drain pipe system below community driveway
CN219910090U (en) Basement roof tower crane opening water interception device
CN105089024A (en) Underground workshop outgoing line arrangement mode and structure
CN205804278U (en) A kind of assembled long piled wharf superstructure system
CN208039225U (en) High-speed railway rail bank protection drain bar
CN203151049U (en) Cable trench suitable for hill slope terrain

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: HYDROCHINA CHENGDU ENGINEERING Corp.

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: POWERCHINA Chengdu Engineering Corporation Limited

C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + R

Free format text: FORMER NAME: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: POWERCHINA Chengdu Engineering Co.,Ltd.

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: HYDROCHINA CHENGDU ENGINEERING Corp.

CX01 Expiry of patent term

Granted publication date: 20131030

CX01 Expiry of patent term