CN203808215U - Side slope drainage and protection structure - Google Patents
Side slope drainage and protection structure Download PDFInfo
- Publication number
- CN203808215U CN203808215U CN201420147475.9U CN201420147475U CN203808215U CN 203808215 U CN203808215 U CN 203808215U CN 201420147475 U CN201420147475 U CN 201420147475U CN 203808215 U CN203808215 U CN 203808215U
- Authority
- CN
- China
- Prior art keywords
- catchwater
- side slope
- barricade
- slope
- plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009412 basement excavation Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 4
- 239000010865 sewage Substances 0.000 abstract description 2
- 238000002955 isolation Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 239000011435 rock Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 241000826860 Trapezium Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000003670 easy-to-clean Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- -1 silt Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Abstract
The utility model discloses a side slope drainage and protection structure, and belongs to the technical field of hydropower station foundation engineering. The side slope drainage and protection structure comprises a transverse catchwater dug under a side slope, a catchwater bottom plate paved at the bottom surface of the catchwater, and catchwater sidewalls arranged on two side walls of the catchwater, wherein one side, away from the side slope, of the catchwater is provided with a barricade, the top surface of the barricade is higher than the upper edge surface of the catchwater, and a plane with certain width is reserved between the catchwater and the barricade and is provided with a hardened layer. According to the technical scheme, the catchwater structure is arranged at the opening of a gully of the side slope, so running water and sundries from the gully can be effectively dispersed, in addition the barricade higher than the catchwater is arranged for further protection and isolation, and infrastructures under the side slope are enabled not to be damaged and polluted by sewage and the sundries flowing out of the gully of the side slope.
Description
Technical field
The utility model belongs to power station Foundation Design technical field, relates to gutter and the safeguard structure thereof at the side slope coombe exit or entrance of a clitch, a kind of power station, specifically relates to a kind of slope drainage and safeguard structure.
Background technology
Build among mountain more in the power station of China, and in construction period, engineering troop is stationed, and often has the infrastructure such as a lot of houses, warehouse, equipment and need to build or be parked near the region, level land of side slope.Through rain drop erosion year in year out, side slope face often can form either large or small coombe.Due to the formation complexity of coombe, in the time meeting with heavy rain and flood, generally all with the multiple foreign material such as silt, rock ballast, all converge in coombe under row, and flowing velocity is fast, impact force is large, easily damages being arranged near the infrastructure such as warehouse, house and power plant building the side slope coombe exit or entrance of a clitch, and surrounding enviroment are polluted.And general gutter is difficult to effectively evacuate the foreign material that side slope coombe is gone out, and easily alluvial, not easy to clean.
Utility model content
In order to address the above problem, the utility model provides a kind of slope drainage and safeguard structure, has reached the filth-discharging effect that intercepts water preferably.
The utility model is achieved by following technical solution.
A kind of slope drainage and safeguard structure, the catchwater abutment wall that is included in the horizontal catchwater excavating under side slope, the catchwater base plate that is laid on catchwater bottom surface and is arranged at catchwater two side, establish barricade at described catchwater away from side slope one side, the end face of described barricade is higher than gutter top edge face, between described catchwater and barricade, leave the plane of certain width, and establish hardened layer in this plane.
Described barricade is concrete structure, and its end face exceeds the top edge face 1.2~2m of catchwater.
Plane width between described catchwater and barricade is 0.6~1.2m; Between described catchwater and side slope, be provided with the passage that width is 1.5~3m.
The beneficial effects of the utility model are:
A kind of slope drainage described in the utility model and safeguard structure, by arrange catchwater structure at side slope coombe exit or entrance of a clitch place, can effectively evacuate flowing water and foreign material from coombe, and arrange and further protect and isolate higher than the barricade of catchwater, reached the effect that ensures the sewage foreign material damage and pollution that under side slope, each infrastructure is not overflowed by catchwater; Once catchwater in service invention alluvial can be cleared up by desilting equipment on the reserved passage in both sides, gutter, is convenient to Maintenance and Repair, and not can with live greening and the mutual interference of operational management phase in region under side slope; In addition, in the time occurring compared with great flood, barricade exceeds the structure of catchwater, has greatly increased the sectional area of drainage section, and drainability increases, and has improved its protection effect to the infrastructure such as warehouse, house of arranging on side slope lower platform.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure: 1-catchwater, 2-catchwater abutment wall, 3-catchwater base plate, 4-hardened layer, 5-barricade, 6-side slope.
Detailed description of the invention
Further describe the technical solution of the utility model below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1, a kind of slope drainage described in the utility model and safeguard structure, be included in the horizontal catchwater 1 of 6 times excavations of side slope, be laid on the catchwater base plate 3 of catchwater 1 bottom surface and be arranged at the catchwater abutment wall 2 of catchwater 1 two side, establish the barricade 5 of concrete structure at described catchwater 1 away from side slope 6 one sides, the end face of described barricade 5 is higher than gutter 1 top edge face 1.2~2m, between described catchwater 1 and barricade 5, leave the plane that width is 0.6~1.2m, and in this plane, establish hardened layer 4, as walkway, between described catchwater 1 and side slope 6, establish the passage that width is 1.5~3m simultaneously, as equipment and the artificial channel of later stage desilting, strengthened appearance water sectional area simultaneously, in the time having super large flood and mud-rock flow to attack, can possess stronger drainability.
The material of catchwater base plate 3 and catchwater abutment wall 2 can be the plain concrete of C15~C20 strength grade, also can adopt stone masonry, but surface need adopt ordinary mortar to wipe one's face after stone masonry completes, gutter base plate 3 thickness 0.2~0.4m, gutter abutment wall 2 thickness 0.3~0.5m; Hardened layer 4 adopts the plain concrete construction of C15~C20 strength grade, thickness 0.2~0.5m; Barricade 5 adopts the plain concrete construction of strength grade >=C20, and cross section is the right-angled trapezium of the thick 0.3~0.5m in top, is slope away from catchwater 1 one sides, and slope is than 1:0.1~1:0.5.
When construction:
First,, along side slope 6 bottom transverse excavation catchwaters 1, then carry out the construction of catchwater base plate 3 and catchwater abutment wall 2; Then carry out concrete guard wall 5 and construct, last plane reserved between barricade 5 and catchwater 1 is laid hardened layer 4, and the plane between smooth catchwater 1 and side slope 6, completes construction.
Embodiment of the present utility model is not limited to above-described embodiment, within the various variations of making under the prerequisite that does not depart from the utility model aim all belong to protection domain of the present utility model.
Claims (4)
1. a slope drainage and safeguard structure, be included under side slope (6) excavation horizontal catchwater (1), be laid on the catchwater base plate (3) of catchwater (1) bottom surface and be arranged at the catchwater abutment wall (2) of catchwater (1) two side, it is characterized in that: establish barricade (5) at described catchwater (1) away from side slope (6) one sides, the end face of described barricade (5) is higher than gutter (1) top edge face, between described catchwater (1) and barricade (5), leave the plane of certain width, and in this plane, establish hardened layer (4).
2. a kind of slope drainage according to claim 1 and safeguard structure, is characterized in that: described barricade (5) is concrete structure, and its end face exceeds the top edge face 1.2~2m of catchwater (1).
3. a kind of slope drainage according to claim 1 and safeguard structure, is characterized in that: the plane width between described catchwater (1) and barricade (5) is 0.6~1.2m.
4. a kind of slope drainage according to claim 1 and safeguard structure, is characterized in that: between described catchwater (1) and side slope (6), be provided with the passage that width is 1.5~3m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420147475.9U CN203808215U (en) | 2014-03-28 | 2014-03-28 | Side slope drainage and protection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420147475.9U CN203808215U (en) | 2014-03-28 | 2014-03-28 | Side slope drainage and protection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203808215U true CN203808215U (en) | 2014-09-03 |
Family
ID=51446994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420147475.9U Expired - Lifetime CN203808215U (en) | 2014-03-28 | 2014-03-28 | Side slope drainage and protection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203808215U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104653195A (en) * | 2015-01-21 | 2015-05-27 | 长安大学 | Gully landform tunnel portal structure and construction method thereof |
CN106355538A (en) * | 2016-08-26 | 2017-01-25 | 中国地质科学院探矿工艺研究所 | Collapse prevention and control engineering system |
CN107643111A (en) * | 2017-10-11 | 2018-01-30 | 贵州省水利水电勘测设计研究院 | A kind of low discharge monitors weir flow measurement structure |
CN109811800A (en) * | 2019-03-19 | 2019-05-28 | 中建四局第一建筑工程有限公司 | A kind of bottom plate rear pouring tape construction optimization processing structure |
CN110145007A (en) * | 2019-04-01 | 2019-08-20 | 中铁第四勘察设计院集团有限公司 | The drainage system of Dumping Sites |
CN114319401A (en) * | 2017-12-27 | 2022-04-12 | 中交路桥华南工程有限公司 | Foundation pit slope drainage system |
-
2014
- 2014-03-28 CN CN201420147475.9U patent/CN203808215U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104653195A (en) * | 2015-01-21 | 2015-05-27 | 长安大学 | Gully landform tunnel portal structure and construction method thereof |
CN106355538A (en) * | 2016-08-26 | 2017-01-25 | 中国地质科学院探矿工艺研究所 | Collapse prevention and control engineering system |
CN107643111A (en) * | 2017-10-11 | 2018-01-30 | 贵州省水利水电勘测设计研究院 | A kind of low discharge monitors weir flow measurement structure |
CN114319401A (en) * | 2017-12-27 | 2022-04-12 | 中交路桥华南工程有限公司 | Foundation pit slope drainage system |
CN109811800A (en) * | 2019-03-19 | 2019-05-28 | 中建四局第一建筑工程有限公司 | A kind of bottom plate rear pouring tape construction optimization processing structure |
CN110145007A (en) * | 2019-04-01 | 2019-08-20 | 中铁第四勘察设计院集团有限公司 | The drainage system of Dumping Sites |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203808215U (en) | Side slope drainage and protection structure | |
CN101476305B (en) | Mud-stone flow discharge guiding groove based on step anti-flushing notched sill group and use thereof | |
CN107542149A (en) | A kind of pavement comprehensive pipe network and drainage system | |
CN104912036A (en) | A flow-disturbing and energy-dissipating full-lining debris flow drainage groove, and a construction method and application of the same | |
CN204825931U (en) | Protective structure is administered to side slope | |
CN102373675B (en) | Fabricated culvert member and construction method thereof | |
CN107542152A (en) | A kind of pavement comprehensive pipe network and drainage system | |
CN104120696B (en) | Environment-friendly type slope sticking type trashrack structure and construction method thereof | |
CN202440766U (en) | Water-drainage open cut tunnel aqueduct of road cut section | |
CN204898465U (en) | Ecological drainage facility of permafrost region dish | |
CN204728280U (en) | A kind of full lined debris flow drainage groove of flow-disturbing energy dissipating | |
CN207567892U (en) | A kind of large size karst depression flood drainage system | |
CN202247924U (en) | Assembled steel structure open caisson in pipe jacking construction | |
CN215630021U (en) | Highway bridge construction foundation ditch protector | |
CN205502070U (en) | A dual -purpose underground gallery structure | |
CN203260979U (en) | Cable trench and cover plate thereof | |
CN203947557U (en) | Enclosure wall discharge structure | |
CN203808025U (en) | Intercepting ditch structure for steeper terrain | |
CN204644998U (en) | A kind of light and shade double-decker gutter | |
CN204418195U (en) | There is sealing and the open caisson subtracting heavy function | |
CN210507520U (en) | City utility tunnel structure | |
CN209652882U (en) | Temporarily use access gallery structure | |
CN202148479U (en) | Earth surface rainwater permeator | |
CN207828803U (en) | A kind of Box-shaped Drainage Culvert of combination retaining wall | |
CN207176874U (en) | A kind of pavement comprehensive pipe network and drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140903 |