CN103195067A - 一种深基坑淤泥质粉质粘土垫层施工方法 - Google Patents

一种深基坑淤泥质粉质粘土垫层施工方法 Download PDF

Info

Publication number
CN103195067A
CN103195067A CN2013101052189A CN201310105218A CN103195067A CN 103195067 A CN103195067 A CN 103195067A CN 2013101052189 A CN2013101052189 A CN 2013101052189A CN 201310105218 A CN201310105218 A CN 201310105218A CN 103195067 A CN103195067 A CN 103195067A
Authority
CN
China
Prior art keywords
construction
foundation
cushion layer
foundation pit
silty clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101052189A
Other languages
English (en)
Inventor
房政
韩斯明
吴晴冬
李永
喻其风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2013101052189A priority Critical patent/CN103195067A/zh
Publication of CN103195067A publication Critical patent/CN103195067A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

一种深基坑淤泥质粉质粘土垫层施工方法,先将拉森钢板柱支护内的基坑开挖清淤至设计标高,验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆,再在竹篱笆上铺设两层彩条布,然后再进行垫层砼施工;待垫层砼强度合格后进行底板基础的施工;其施工步骤如下:1)基坑开挖、清淤;2)验槽、满铺竹篱笆;3)上铺彩条布:在竹篱笆上铺设两层彩条布,然后再进行垫层砼施工;待垫层砼强度合格后进行底板基础的施工。本发明深基坑淤泥质粉质粘土垫层施工方法操作简单,方便快捷,安全可靠,大大缩短了建筑物基础的施工工期,提高了工效,降低了成本。

Description

一种深基坑淤泥质粉质粘土垫层施工方法
技术领域
本发明属地基基础施工方法,适用于深基坑淤泥质粉质粘土垫层的施工。
背景技术
现有建筑工程施工中,经常遇到一种深基坑淤泥质粉质粘土垫层施工,如果施工方法不当,因质量难以保证会导致返工,增加成本,延误工期,造成较大的经济损失。
发明内容
本发明的目的就是要解决以上问题,提供一种深基坑淤泥质粉质粘土垫层施工方法,操作简单,方便快捷,安全可靠,大大缩短了建筑物基础的施工工期,提高了工效,降低了成本。
本发明的技术方案是这样得以实现的,一种深基坑淤泥质粉质粘土垫层施工方法,其特点是:先将拉森钢板柱支护内的基坑开挖清淤至设计标高,验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆,再在竹篱笆上铺设两层彩条布,然后再进行垫层砼施工;待垫层砼强度合格后进行底板基础的施工;其施工步骤如下:
1)基坑开挖、清淤:先将拉森钢板柱支护内的基坑土方,根据图纸设计尺寸开挖、清淤至设计标高;
2)验槽、满铺竹篱笆:将基坑淤泥平整,验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆;
3)上铺彩条布:在竹篱笆上铺设两层彩条布,然后再进行垫层砼施工;待垫层砼强度合格后进行底板基础的施工。
本发明深基坑淤泥质粉质粘土垫层施工方法操作简单,方便快捷,安全可靠,大大缩短了建筑物基础的施工工期,提高了工效,降低了成本。
附图说明
图1是本发明的立面图。
图中:1、拉森钢板桩  2、彩条布  3、竹篱笆 4、垫层砼 5、底板基础。
具体实施方式
如图1所示,本发明先将拉森钢板柱1支护内的基坑开挖清淤至设计标高,验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆3,再在竹篱笆3上铺设两层彩条布2,然后再进行垫层砼4施工;待垫层砼4强度合格后进行底板基础5的施工。
深基坑淤泥质粉质粘土垫层施工方法按如下步骤进行:
第一步,基坑开挖、清淤。先将拉森钢板柱1支护内的基坑开挖清淤至设计标高。
第二步,验槽、满铺竹篱笆。验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆3。
第三步,上铺彩条布。在竹篱笆3上铺设两层彩条布2,然后再进行垫层砼4施工;待垫层砼4强度合格后进行底板基础5的施工。

Claims (1)

1.一种深基坑淤泥质粉质粘土垫层施工方法,其特征在于:先将拉森钢板柱支护内的基坑开挖清淤至设计标高,验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆,再在竹篱笆上铺设两层彩条布,然后再进行垫层砼施工;待垫层砼强度合格后进行底板基础的施工;其施工步骤如下:
1)基坑开挖、清淤:先将拉森钢板柱支护内的基坑土方,根据图纸设计尺寸开挖、清淤至设计标高;
2)验槽、满铺竹篱笆:将基坑淤泥平整,验槽合格后在淤泥质粉质粘土上满铺一层竹篱笆;
3)上铺彩条布:在竹篱笆上铺设两层彩条布,然后再进行垫层砼施工;待垫层砼强度合格后进行底板基础的施工。
CN2013101052189A 2013-03-29 2013-03-29 一种深基坑淤泥质粉质粘土垫层施工方法 Pending CN103195067A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101052189A CN103195067A (zh) 2013-03-29 2013-03-29 一种深基坑淤泥质粉质粘土垫层施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101052189A CN103195067A (zh) 2013-03-29 2013-03-29 一种深基坑淤泥质粉质粘土垫层施工方法

Publications (1)

Publication Number Publication Date
CN103195067A true CN103195067A (zh) 2013-07-10

Family

ID=48717870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101052189A Pending CN103195067A (zh) 2013-03-29 2013-03-29 一种深基坑淤泥质粉质粘土垫层施工方法

Country Status (1)

Country Link
CN (1) CN103195067A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821149A (zh) * 2014-02-28 2014-05-28 中天建设集团有限公司 大型深基坑留坡挖土及坑中坑混凝土后浇施工工法
CN105625435A (zh) * 2014-10-30 2016-06-01 五冶集团上海有限公司 海积岛屿多截面、多层次异型设备深基坑快速成型方法
CN106284288A (zh) * 2016-08-30 2017-01-04 福州皇家地坪有限公司 一种双滚动式粘结双平面碎石的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5652221A (en) * 1979-10-01 1981-05-11 Miyoshi Sangyo Kk Forming method for foundation pillar and excavated pit liner
CN101787701A (zh) * 2010-03-16 2010-07-28 标力建设集团有限公司 电梯井基坑松木桩支护施工工法
CN102094425A (zh) * 2010-12-24 2011-06-15 中铁六局集团有限公司 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法
CN102337739A (zh) * 2010-07-19 2012-02-01 蔡继锋 大空隙非砂类(无砂)真空预压软土地基处理方法
CN202466597U (zh) * 2012-03-16 2012-10-03 北京市市政工程设计研究总院 “半逆作”环形板支撑体系超大地铁深基坑施工结构
CN102966109A (zh) * 2012-11-05 2013-03-13 天津二十冶建设有限公司 软土地基带状深基坑封底施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5652221A (en) * 1979-10-01 1981-05-11 Miyoshi Sangyo Kk Forming method for foundation pillar and excavated pit liner
CN101787701A (zh) * 2010-03-16 2010-07-28 标力建设集团有限公司 电梯井基坑松木桩支护施工工法
CN102337739A (zh) * 2010-07-19 2012-02-01 蔡继锋 大空隙非砂类(无砂)真空预压软土地基处理方法
CN102094425A (zh) * 2010-12-24 2011-06-15 中铁六局集团有限公司 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法
CN202466597U (zh) * 2012-03-16 2012-10-03 北京市市政工程设计研究总院 “半逆作”环形板支撑体系超大地铁深基坑施工结构
CN102966109A (zh) * 2012-11-05 2013-03-13 天津二十冶建设有限公司 软土地基带状深基坑封底施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821149A (zh) * 2014-02-28 2014-05-28 中天建设集团有限公司 大型深基坑留坡挖土及坑中坑混凝土后浇施工工法
CN105625435A (zh) * 2014-10-30 2016-06-01 五冶集团上海有限公司 海积岛屿多截面、多层次异型设备深基坑快速成型方法
CN106284288A (zh) * 2016-08-30 2017-01-04 福州皇家地坪有限公司 一种双滚动式粘结双平面碎石的方法
CN106284288B (zh) * 2016-08-30 2018-08-17 福州皇家地坪有限公司 一种双滚动式粘结双平面碎石的方法

Similar Documents

Publication Publication Date Title
CN103422501B (zh) 砂层地质中的抗浮锚杆结构及其施工方法
CN102425173B (zh) 深基坑土方开挖方法
CN104131565B (zh) 一种逆作土方正作开挖的施工方法
CN101509261B (zh) 一种用于软弱地基上超高压输电线铁塔的桩板基础的施工方法
CN108755698B (zh) 一种陡坡松散堆积体大倾斜岩面基础施工方法
CN103290848B (zh) 一种大直径弧形钢板桩组合基坑支护结构及其施工方法
CN101793023A (zh) 一种基坑施工方法
CN201972155U (zh) 一种钢板桩逆作法基坑支护结构
CN102359112A (zh) 利用钢箱桩进行基坑围护的方法
CN103233444A (zh) 水下抛石基床和边坡防冲刷结构及其施工方法
CN103410152A (zh) 一种用于狭长深基坑土方开挖的施工方法
CN101736756B (zh) 软土地基逆作隔层施工方法
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN203939036U (zh) 一种适用于河道的钢板桩围堰结构
CN103195067A (zh) 一种深基坑淤泥质粉质粘土垫层施工方法
CN104264684B (zh) 一种用于深基坑支护结构的预制异形空腹桩及其施工方法
CN203716046U (zh) 一种基坑土方运输钢栈桥
CN101824825B (zh) 一种深基坑明挖施工方法
CN103215965A (zh) 层板式高桩承台塔吊基础结构及施工方法
CN108118689B (zh) 一种可部分循环使用预制地下连续墙、吊具以及施工方法
CN204356780U (zh) 一种用于深基坑支护结构的预制异形空腹桩
CN109972644B (zh) 顶推用沉井装置及其施工方法
CN103132531A (zh) 基坑支护体系施工方法
CN104131578B (zh) 流塑状土质下地下室承台底板倒置施工工艺及结构
CN207295746U (zh) 一种筒型基础钢板桩组合式围堰

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130710