CN103177391B - A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method - Google Patents

A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method Download PDF

Info

Publication number
CN103177391B
CN103177391B CN201310036817.XA CN201310036817A CN103177391B CN 103177391 B CN103177391 B CN 103177391B CN 201310036817 A CN201310036817 A CN 201310036817A CN 103177391 B CN103177391 B CN 103177391B
Authority
CN
China
Prior art keywords
data
module
facilities
equipment
dimensional live
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310036817.XA
Other languages
Chinese (zh)
Other versions
CN103177391A (en
Inventor
李生林
张恒
魏小涪
钟蔚
罗凯文
黎星辰
邓韧
蔡晖
谢昌华
李咏治
王朝霞
龚俊
陈扶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Logistical Engineering University of PLA
Original Assignee
Logistical Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Logistical Engineering University of PLA filed Critical Logistical Engineering University of PLA
Priority to CN201310036817.XA priority Critical patent/CN103177391B/en
Publication of CN103177391A publication Critical patent/CN103177391A/en
Application granted granted Critical
Publication of CN103177391B publication Critical patent/CN103177391B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a kind of facilities and equipment supervisory system integrated approach based on three-dimensional live.First, abundant maintenance data storehouse technology, is undertaken integrating, associating by the static data of three-dimensional live model bank and the dynamic data in facilities and equipment Monitor And Control Subsystem, realizes dynamic and the real-time of the displaying of three-dimensional live object information; Secondly, to the modeling in kind of intelligent facilities and equipment, form the three-dimensional pel of the facilities and equipment that can identify, extract the characteristic information of its intelligent facilities and equipment, set up intelligent facilities and equipment visual information data structure; Finally, use industrial data bridge and SOA technology, the real-time data integration gathered by intelligent facilities and equipment, on three-dimensional live figure, realizes information display and controls and statistical study, for keeper provides accurately real-time Visual Dynamic information, meet omnibearing monitoring demand.

Description

A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method
Technical field
The invention belongs to field of computer technology, relate to three-dimensional live emulation technology, technology of Internet of things, database technology and meta-synthetic engineering field, be specifically related to a kind of facilities and equipment supervisory system based on three-dimensional live and system integration method.
Background technology
Along with the development of three-dimensional live technology, geography information and visualization technique, three-dimensional live model replaces traditional two dimensional model just gradually, is widely used in the fields such as traffic system, Digital Campus, city management.Three-dimensional live model has the features such as directly perceived, true, abundant in content, user can be made visually to produce sensation on the spot in person, modeling and simulation are carried out to the things of real world, be exactly the target according to research and emphasis, in three dimensions the attributes such as its shape, material, illumination, color are studied, to reach the process that 3D reproduces.Outdoor scene three-dimensional modeling is carried out to real-world object, and in conjunction with technology such as network, software, controls, secondary development application is carried out to model, realize technology also just development and the application in people's live and work monitoring real-world object in three-dimensional model scene.
But, there is following problem in current most of three-dimensional live figure: one is making and a modeling of only paying attention to three-dimensional live, makes it more true to nature, lack research three-dimensional model how with the associating of object properties in database, make the content of model display abundanter, closing to reality more; Two is on three-dimensional live figure, only possess amplification, reduce, move, the anglec of rotation, the function such as to browse, and what lack with other management information system is integrated, such as Generalized Database System, industrial control system etc.; Three be only pay attention to topography and geomorphology, road piping, to be located point, the entity such as water system greening carries out modeling and plays up, ignore the modeling to special pel and mark, such as intellectual water meter, ammeter, valve, calorimeter, temperature-humidity monitoring instrument, the first-class facilities and equipment of monitoring camera; Four is only pay attention on three-dimensional live figure, show static constant model information, ignores the real time data Dynamic Display on three-dimensional live figure how intelligent facilities and equipment gathers by research, allows user intuitively can see the change of data, make decision-making more directly perceived.
In sum, current three-dimensional live technology mainly exist can not with database association, integration not, the problem such as poor real, reaction velocity be slow, seriously constrain the development of three-dimensional live technology in industrial control field and management information system field.
Summary of the invention
The object of the invention is the defect overcoming prior art, a kind of facilities and equipment supervisory system based on three-dimensional live and system integration method are provided.
Its technical scheme is:
Based on a facilities and equipment supervisory system for three-dimensional live, comprise facilities and equipment Monitor And Control Subsystem, three-dimensional live integral subsystem, three-dimensional live model bank and integrated database management subsystem, wherein:
Described facilities and equipment Monitor And Control Subsystem is for gathering the real-time accurate data passed back from various intelligent facilities and equipment, and described data are used to indicate the parameters such as power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation;
Described three-dimensional live integral subsystem is for realizing the function such as control, navigation, basic setup of three-dimensional live figure, and it is integrated to realize with integrated database management subsystem and facilities and equipment Monitor And Control Subsystem;
Described three-dimensional live model bank is for storing whole entity object and facilities and equipment pel that three-dimensional live figure shows, and described entity object and facilities and equipment pel mainly comprise topography and geomorphology, road piping, to be located point, water system greening and all kinds of intelligent facilities and equipment sterogram meta-model;
Integrated database management subsystem is used for the real time data that storage entity object properties, facilities and equipment information and facilities and equipment gather.
Further preferably, described facilities and equipment Monitor And Control Subsystem adopts B/S framework, with WinCC as Web server, client can carry out remote monitoring to equipment by browser, comprise real-time data acquisition module, intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module, wherein:
Described real-time data acquisition module, for carrying out Real-time Collection to barracks area installation equipment parameters, and the data collected are given collating sort and give described intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module;
Described intelligent power supply monitoring module, primarily of change distribution monitoring station, transformer economic operation monitoring station, user power utilization amount monitoring station composition, described change distribution monitoring station can realize real-time electric power data sampling and processing, complete parameters of electric power calculating, statistics, analyze, manage and store, utilize oracle database technology, realization is reliably integrated with other system, on the spot, remote centralized anti-misoperation control, operation, alarm procedure voice reading, without the need to installing any client software, realizing remote human-machine's interface display, inquiry of reporting to the police, electric energy collection the function such as to copy, changed into switchhouse monitoring of tools historical data curve map is provided, various reading statistical graph, realize electric energy historical data analysis statistics intuitively, described transformer economic operation monitoring station is applicable to the switchgear building of 2-3 platform parallel operation of transformers, transformer economic operation monitoring station is by gathering the state of each switch of changed into switchhouse, step down side three-phase voltage, current value, calculate 2 transformer current respectively, voltage effective value, active power, reactive power, applied power, power factor (PF) and transformer load coefficient, active energy, reactive energy, monitor as to 2 transformers, the master data of control and load prediction, due to the change of electric load moment, and the supervision to Transformer Operation Status, control, need the mean value considered and calculate in a period of time.Therefore, considering and get time period T=24h and calculate a mean value, adopting the calculated value by so processing as the basic data of monitoring device, with safety, the monitoring and controlling effectively realizing distribution substation transformer economic operation.Described user power utilization amount monitoring station can realize respectively carrying out Real-Time Monitoring by the electricity consumption data of electric unit to post, and whole system has that real-time is good, reliability high;
Described intelligent water supply monitoring module, for to the automatic gauge in pump house discharge pressure, water supply network pressure, post total water consumption, each point of family water consumption, landscaping of barracks area spray, bathroom and supervision, and give Decision Control workstation by reduced data, thus realize pump house water outlet Isobarically Control, for Decision Control workstation regulates user side taps automatically according to user's water quota, water consumption, payment situation, realize the automatic management of post water supply and provide reference with expense of the taking over management of water rate;
Described intelligent heating monitoring module, important service data for the subsystem that heats stores, analyze, the data acquisition process work to terminal temperature difference calorimeter can be completed simultaneously, described heating subsystem monitors station adopts WinCC configuration software, to the basic load of each heat supply center, history energy consumption record, the data such as weather conditions carry out real time monitoring, by data transfer layer, data are passed to Decision Control workstation simultaneously, can the reasonable power consumption values of automatic analysis, and contrast with actual operating data, finally provide foundation for managerial personnel provide energy-saving effect to assess, if energy consumption is abnormal, provide warning message, meanwhile, user can formulate corresponding form and trend record curve according to management process, the management documents such as histogram,
Described central air-conditioner monitoring module, can to the air-conditioning temperature controller be arranged in management and control building, be arranged on that the frequency-variable controller of air-conditioner host group, climate compensator, pipe temperature sensor, pipe pressure sensor and electric control valve carry out in real time, remote visualization monitors, by data transfer layer, data are passed to Decision Control workstation simultaneously, Decision Control can be carried out in real time according to central air conditioner subsystem terminal ruuning situation, automatically regulate main frame operate according to refrigeration or heating demands and working environment, save energy and reduce the cost;
Described ambient intelligence sensing module, be made up of water quality in-service monitoring, air quality supervision, detection supervision, elevator operation monitoring and humiture supervision, neighbourhood noise supervision, illuminance supervision etc., for the real-time perception of barracks environment, data filing and on-line analysis, described water quality in-service monitoring is by carrying out data acquisition to sampling of water quality unit, analytical test element (detecting instrument), can carry out in real time the water quality condition of post, telemonitoring, for post quality provides reference; Described air quality monitors and refers to and gathered by the parameters of observing and controlling extension set to the air quality instrument at scene, post and be uploaded to data server by data transfer layer, data server passes to environmental monitoring subsystem monitors station after taxonomic revision, thus realizes the telemonitoring to post air quality; Described fire alarm monitors the parameters referred to by real time monitoring fire detection unit, realize the remote monitoring of fire alarm, and data and Decision Control workstation are carried out real-time, interactive, for parameter reaches alarm threshold value, provide visual warning message and reference is provided; Described neighbourhood noise monitors and refers to by gathering and the noise monitoring terminal uploaded, comprise the noise data of front-end noise sampling unit and data processing unit, realize long-range, Real-Time Monitoring and the warning of barracks environment noise, the car movement data that described elevator operation monitoring is used for gathering carries out telemonitoring, data are passed to Decision Control workstation simultaneously, for the Based Intelligent Control of elevator, post are being run monitor with, new lift-mounting, described video monitoring is the real-time exhibition for video image.
Further preferably, described three-dimensional live integral subsystem comprises entity object relating module, real-time data integration module, pel labeling module, chart engage module, scene navigational module and three-dimensional and arranges module, wherein:
Entity object relating module is the mode called by Web service, realizes three-dimensional live object and associates one by one with the object in the object properties storehouse in integrated database management subsystem;
Real-time data integration module for the real time data in integrated database management subsystem is corresponding with the real-time device pel on three-dimensional live figure, the dynamically accurately situation of change of display data;
Pel labeling module is used for the characteristic type according to facilities and equipment, and on three-dimensional live figure, actual installation position marks facilities and equipment;
Chart engage module, for being classified by layer by the entity object on three-dimensional live figure, controls its lamination order and display effect;
Scene navigational module for realizing carrying out location, key area on three-dimensional live figure, carry out simulation according to the route of user annotation and cruise, carry out the function such as searching for according to keyword;
Three-dimensional arranges module for safeguarding three-dimensional live figure, and importing, the pipeline of entity attribute, chart engage and facilities and equipment control, the loading etc. of three-dimensional live.
Further preferably, described three-dimensional live model bank comprises live-action image acquisition module, data preprocessing module, scene modeling module, baked mapping module, outdoor scene rendering module, outdoor scene object storage module, wherein:
Live-action image acquisition module for gathering the pictorial information of digital elevation model (DEM), digital orthoimage (DOM) and actual scene, and is stored as the file layout that corresponding computing machine can identify;
Data preprocessing module is used for three-dimensional live material being carried out classification process, one is select the topomap of proper ratio chi as map basis, and import in d-making software, the information such as the point of dislocation, deviation or non-key key element, line, mark and filling pattern are carried out deleting and simplifying; Two is the local feature information with presentation of photo extracting shoot on location, forms fixing material and stores;
Scene modeling module is used for the scenario entities characteristic information according to data prediction, and the mode adopting polygon modeling, dough sheet modeling and NURBS modeling to combine, carries out modeling to various outdoor scene object, make it possess actual scene object essential characteristic;
The object model that baked mapping module is used for material and scene modeling module that data prediction is formed are formed synthesize, creates reflection, reflects, the multi-effect such as concavo-convex and hollow out, and the texture of increase model, makes the three-dimensional scenic of establishment more close to reality;
Outdoor scene rendering module, for increasing the effects such as bitmap texture, procedural texture, illumination or Z-Correct bump mapping Z-correct mapping on three-dimensional live model, finally forms scene effect true, true to nature;
Outdoor scene object storage module is used for the three-dimensional live category of model finally generated to be stored into three-dimensional live model bank as a file format, and is published on server shared.
Further preferably, described three-dimensional live model bank also comprises primitive features abstraction module and graphical element model sets up module, wherein:
Primitive features abstraction module, for extracting the common feature of all kinds of facilities and equipment, forms the unified pel with words identification, symbol logo and three-dimensional picture mark;
Graphical element model sets up module for the classification according to pel, sets up corresponding facilities and equipment graphical element model.
Further preferably, described integrated database management subsystem comprises entity object attribute library, facilities and equipment information bank and real-time data base, wherein:
Described entity object attribute is used to indicate title, purposes, building structure, quality, address, classification, personnel, land property right, land deeds, time, length, area, capacity, lives the information such as use, lease;
Described facilities and equipment information is used to indicate title, specifications and models, technical indicator, classification, quantity, price, production firm, purchases the information such as information, supply of material information, repair message, purposes, state, installation site;
Described real time data is used to indicate the parameters such as power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation.
Based on a facilities and equipment supervisory system integrated approach for three-dimensional live, complete according to the facilities and equipment supervisory system based on three-dimensional live of the present invention, specifically comprise the following steps:
1) three-dimensional live modeling technique is used, by the pictorial information of the digital elevation model (DEM) of collection, digital orthoimage (DOM) and actual scene, the d-making software of specialty is used to carry out pre-service, modeling, baked mapping, play up, the scene effect that final formation is true, true to nature, and be stored into three-dimensional live model bank, call for three-dimensional live integral subsystem;
2) extract the common feature of all kinds of facilities and equipment, form the unified pel with words identification, symbol logo and three-dimensional picture mark;
3) according to the classification of pel, set up corresponding facilities and equipment graphical element model, and use pel labeling module to be marked on three-dimensional live figure by the facilities and equipment pel set up;
4) will support that parameters data (such as power consumption, water consumption, gas consumption, pressure, flow velocity, liquid level, temperature, the humidity etc.) collection of the field apparatus that different communication protocol and standard analog signal export is come up by described real-time data acquisition module; Utilize the object being used for process control to connect and embed OPC (ObjectLinkingandEmbeddingforProcessControl,) real-time data communication technology, setting up opc server, after collating sort, giving opc server by gathering the data of coming up; WinCC server obtains the real time data of opc server end as OPC client, and shows intuitively in visual man-machine interface and store;
5) by industrial data bridge, set up the connection of opc server to described integrated database management subsystem, and the real time data that opc server is obtained with relational storage one to one in set up described real-time data base;
6) comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional live integral subsystem is realized: at code layer, a large amount of the sharing of using JavaEE platform to provide shares control, and the assembling realizing three-dimensional live integral subsystem and facilities and equipment Monitor And Control Subsystem basic function is merged;
7) in service layer, by SOA technology, realize from data source header to database, then merge to the full-range service of three-dimensional live integral subsystem.First, by described entity object relating module, the mode called with Web service, realizes three-dimensional live object and associates one by one with the object in the object properties storehouse in integrated database management subsystem; Secondly, by described real-time data integration module, in integrated database management subsystem, set up the corresponding relation of facilities and equipment pel and true facilities and equipment object, described corresponding relation comprises the content of two aspects: one is the corresponding relation of the static data realized in three-dimensional live pel and object properties storehouse; Two is corresponding relations of the dynamic data realized in three-dimensional live pel and real-time data base;
8) in system layer, pass through message passing mechanism, realize the synchronous of real time data and three-dimensional live integral subsystem, realize the comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional live integral subsystem, form the facilities and equipment supervisory system based on three-dimensional live.
Beneficial effect of the present invention: in terms of existing technologies, the three-dimensional live object that the present invention sets up associates one by one with object properties in database, not only comprise static data, but also comprise the data of dynamic change, make the content of model display abundanter, closing to reality more, and really achieve and industrial facility equipment control system integration, real time data Dynamic Display on three-dimensional live figure that intelligent facilities and equipment is gathered, allow user intuitively can see the change of data, make decision-making more quick directly perceived.
Accompanying drawing explanation
Fig. 1 is the structural representation of the facilities and equipment supervisory system that the present invention is based on three-dimensional live.
Embodiment
Technical scheme of the present invention is described in detail below in conjunction with accompanying drawing specific embodiment.
Embodiment:
1) digital elevation model (DEM) of certain location, warehouse is gathered, the pictorial information of digital orthoimage (DOM) and actual scene, use the d-making software (3DMarks of specialty again, OpenGL etc.) pre-service is carried out to the material gathered, modeling, baked mapping, play up, final formation is true, certain warehouse scene effect true to nature, and the outdoor scene photo in warehouse that will make, picture, or the image material such as video interception, the digital elevation model of warehouse periphery, digital orthoimage, topography and landform character model, and buildings, water system is afforested, the matter emulation model storage such as road piping are to three-dimensional live model bank, call for three-dimensional live integral subsystem,
2) described primitive features abstraction module is utilized, for facilities and equipments such as the water supply of installing in certain warehouse, power supply, heating, central air conditioner, environmental monitoring, video monitorings, analyze the feature of all kinds of facilities and equipment, and extract the general character of all kinds of facilities and equipment and exclusive feature, according to feature, facilities and equipment is classified, utilize described graphical element model to set up module, set up the unified graphical element model with words identification, symbol logo and three-dimensional picture mark;
3) according to the installation site of the graphical element model formed in step 2 and facilities and equipment reality, described pel labeling module is used to be marked on three-dimensional live figure by the facilities and equipment graphical element model set up;
4) support in the parameters data acquisition of the field apparatus that different communication protocol and standard analog signal export by described real-time data acquisition module by being arranged on certain store interior; Utilize the object being used for process control to connect and embed OPC (ObjectLinkingandEmbeddingforProcessControl,) real-time data communication technology, setting up opc server, after collating sort, giving opc server by gathering the data of coming up; WinCC server obtains the real time data of opc server end as OPC client, and shows intuitively in visual man-machine interface and store;
5) by industrial data bridge, set up the connection of opc server to described integrated database management subsystem, and the real time data that opc server is obtained with relational storage one to one with the described real-time data base set up;
6) comprehensive integration of certain warehouse facility monitoring of tools subsystem and three-dimensional live integral subsystem is realized:
A) at code layer, a large amount of the sharing of using JavaEE platform to provide shares control, and the assembling realizing three-dimensional live integral subsystem and facilities and equipment Monitor And Control Subsystem basic function is merged;
B) in service layer, by SOA technology, realize from data source header to database, then merge to the full-range service of three-dimensional live integral subsystem.First, by described entity object relating module, in the mode that Web service is called, realize three-dimensional live object to associate one by one with the object in the object properties storehouse in integrated database management subsystem, make the matter emulation models such as the greening of the buildings in warehouse, water system, road piping have more abundant attribute data, reflect objective world more truly; Secondly, by described real-time data integration module, in integrated database management subsystem, set up the corresponding relation of facilities and equipment pel and true facilities and equipment object, described corresponding relation comprises the content of two aspects: one is the corresponding relation of the static data realized in three-dimensional live pel and object properties storehouse; Two is corresponding relations of the dynamic data realized in three-dimensional live pel and real-time data base;
C) in system layer, pass through message passing mechanism, realize the synchronous of real time data and three-dimensional live integral subsystem, the comprehensive integration of Implementation repository facilities and equipment Monitor And Control Subsystem and three-dimensional live integral subsystem, the final facilities and equipment supervisory system formed based on three-dimensional live.
7) utilize described chart engage module to classify by layer to the entity object on warehouse three-dimensional live figure, control its lamination order and display effect;
8) described scene navigational module is utilized to realize on warehouse three-dimensional live figure, carrying out location, key area, carrying out simulation according to the route of user annotation and cruise, carry out the display function such as searching for according to keyword.
The above; be only the present invention's preferably embodiment; protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses, the simple change of the technical scheme that can obtain apparently or equivalence are replaced and are all fallen within the scope of protection of the present invention.

Claims (6)

1. based on a facilities and equipment supervisory system for three-dimensional live, it is characterized in that, comprise facilities and equipment Monitor And Control Subsystem, three-dimensional live integral subsystem, three-dimensional live model bank and integrated database management subsystem, wherein:
Described facilities and equipment Monitor And Control Subsystem is for gathering the real-time accurate data passed back from various intelligent facilities and equipment, and described data are used to indicate power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation;
Described three-dimensional live integral subsystem is for realizing the control of three-dimensional live figure, navigation, basic setup function, and it is integrated to realize with integrated database management subsystem and facilities and equipment Monitor And Control Subsystem; Described three-dimensional live integral subsystem comprises entity object relating module, real-time data integration module, pel labeling module, chart engage module, scene navigational module and three-dimensional and arranges module, wherein:
Entity object relating module is the mode called by Web service, realizes three-dimensional live object and associates one by one with the object in the object properties storehouse in integrated database management subsystem;
Real-time data integration module for the real time data in integrated database management subsystem is corresponding with the real-time device pel on three-dimensional live figure, the dynamically accurately situation of change of display data;
Pel labeling module is used for the characteristic type according to facilities and equipment, and on three-dimensional live figure, actual installation position marks facilities and equipment;
Chart engage module, for being classified by layer by the entity object on three-dimensional live figure, controls its lamination order and display effect;
Scene navigational module for realizing carrying out location, key area on three-dimensional live figure, carry out simulation according to the route of user annotation and cruise, carry out function of search according to keyword;
Three-dimensional arranges module for safeguarding three-dimensional live figure, and importing, the pipeline of entity attribute, chart engage and facilities and equipment control, the loading of three-dimensional live;
Described three-dimensional live model bank is for storing whole entity object and facilities and equipment pel that three-dimensional live figure shows, and described entity object and facilities and equipment pel mainly comprise topography and geomorphology, road piping, to be located point, water system greening and all kinds of intelligent facilities and equipment sterogram meta-model;
Integrated database management subsystem is used for the real time data that storage entity object properties, facilities and equipment information and facilities and equipment gather.
2. the facilities and equipment supervisory system based on three-dimensional live according to claim 1, it is characterized in that, described facilities and equipment Monitor And Control Subsystem adopts B/S framework, with WinCC as Web server, client can carry out remote monitoring to equipment by browser, comprise real-time data acquisition module, intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module, wherein:
Described real-time data acquisition module, for carrying out Real-time Collection to barracks area installation equipment parameters, and the data collected are given collating sort and give described intelligent power supply monitoring module, intelligent water supply monitoring module, intelligent heating monitoring module, central air-conditioner monitoring module, ambient intelligence sensing module and video monitoring module;
Described intelligent power supply monitoring module, primarily of change distribution monitoring station, transformer economic operation monitoring station, user power utilization amount monitoring station composition, described change distribution monitoring station can realize real-time electric power data sampling and processing, complete parameters of electric power calculating, statistics, analyze, manage and store, utilize oracle database technology, realization is reliably integrated with other system, on the spot, remote centralized anti-misoperation control, operation, alarm procedure voice reading, realize remote human-machine's interface display, warning is inquired about, function copied by electric energy collection, changed into switchhouse monitoring of tools historical data curve map is provided, various reading statistical graph, realize electric energy historical data analysis statistics intuitively, described transformer economic operation monitoring station is applicable to the switchgear building of 2-3 platform parallel operation of transformers, transformer economic operation monitoring station is by gathering the state of each switch of changed into switchhouse, step down side three-phase voltage, current value, calculate 2 transformer current respectively, voltage effective value, active power, reactive power, applied power, power factor (PF) and transformer load coefficient, active energy, reactive energy, monitor as to 2 transformers, the master data of control and load prediction, described user power utilization amount monitoring station can realize respectively carrying out Real-Time Monitoring by the electricity consumption data of electric unit to post,
Described intelligent water supply monitoring module, for to the automatic gauge in pump house discharge pressure, water supply network pressure, post total water consumption, each point of family water consumption, landscaping of barracks area spray, bathroom and supervision, and give Decision Control workstation by reduced data, thus realize pump house water outlet Isobarically Control, for Decision Control workstation regulates user side taps automatically according to user's water quota, water consumption, payment situation, realize the automatic management of post water supply and provide reference with expense of the taking over management of water rate;
Described intelligent heating monitoring module, important service data for the subsystem that heats stores, analyze, the data acquisition process work to terminal temperature difference calorimeter can be completed simultaneously, described heating subsystem monitors station adopts WinCC configuration software, to the basic load of each heat supply center, history energy consumption record, weather conditions carry out real time monitoring, by data transfer layer, data are passed to Decision Control workstation simultaneously, can the reasonable power consumption values of automatic analysis, and contrast with actual operating data, finally provide foundation for managerial personnel provide energy-saving effect to assess, if energy consumption is abnormal, provide warning message, meanwhile, user can formulate corresponding form and trend record curve according to management process, histogram,
Described central air-conditioner monitoring module, can to the air-conditioning temperature controller be arranged in management and control building, be arranged on that the frequency-variable controller of air-conditioner host group, climate compensator, pipe temperature sensor, pipe pressure sensor and electric control valve carry out in real time, remote visualization monitors, by data transfer layer, data are passed to Decision Control workstation simultaneously, Decision Control can be carried out in real time according to central air conditioner subsystem terminal ruuning situation, automatically regulate main frame operate according to refrigeration or heating demands and working environment, save energy and reduce the cost;
Described ambient intelligence sensing module, be made up of water quality in-service monitoring, air quality supervision, detection supervision, elevator operation monitoring and humiture supervision, neighbourhood noise supervision, illuminance supervision etc., for the real-time perception of barracks environment, data filing and on-line analysis, described water quality in-service monitoring is by carrying out data acquisition to sampling of water quality unit, analytical test element, can carry out in real time the water quality condition of post, telemonitoring, for post quality provides reference; Described air quality monitors and refers to and gathered by the parameters of observing and controlling extension set to the air quality instrument at scene, post and be uploaded to data server by data transfer layer, data server passes to environmental monitoring subsystem monitors station after taxonomic revision, thus realizes the telemonitoring to post air quality; Described fire alarm monitors the parameters referred to by real time monitoring fire detection unit, realize the remote monitoring of fire alarm, and data and Decision Control workstation are carried out real-time, interactive, for parameter reaches alarm threshold value, provide visual warning message and reference is provided; Described neighbourhood noise monitors and refers to by gathering and the noise monitoring terminal uploaded, and comprises the noise data of front-end noise sampling unit and data processing unit, realizes long-range, Real-Time Monitoring and the warning of barracks environment noise,
The car movement data that described elevator operation monitoring is used for gathering carries out telemonitoring, data are passed to Decision Control workstation simultaneously, for the Based Intelligent Control of elevator, post are being run monitor with, new lift-mounting, described video monitoring is the real-time exhibition for video image.
3. the facilities and equipment supervisory system based on three-dimensional live according to claim 1, it is characterized in that, described three-dimensional live model bank comprises live-action image acquisition module, data preprocessing module, scene modeling module, baked mapping module, outdoor scene rendering module, outdoor scene object storage module, wherein:
Live-action image acquisition module for gathering the pictorial information of digital elevation model (DEM), digital orthoimage (DOM) and actual scene, and is stored as the file layout that corresponding computing machine can identify;
Data preprocessing module is used for three-dimensional live material being carried out classification process, one is select the topomap of proper ratio chi as map basis, and import in d-making software, the information such as the point of dislocation, deviation or non-key key element, line, mark and filling pattern are carried out deleting and simplifying; Two is the local feature information with presentation of photo extracting shoot on location, forms fixing material and stores;
Scene modeling module is used for the scenario entities characteristic information according to data prediction, and the mode adopting polygon modeling, dough sheet modeling and NURBS modeling to combine, carries out modeling to various outdoor scene object, make it possess actual scene object essential characteristic;
The object model that baked mapping module is used for material and scene modeling module that data prediction is formed are formed synthesize, creates reflection, reflects, the multi-effect such as concavo-convex and hollow out, and the texture of increase model, makes the three-dimensional scenic of establishment more close to reality;
Outdoor scene rendering module, for increasing the effects such as bitmap texture, procedural texture, illumination or Z-Correct bump mapping Z-correct mapping on three-dimensional live model, finally forms scene effect true, true to nature;
Outdoor scene object storage module is used for the three-dimensional live category of model finally generated to be stored into three-dimensional live model bank as a file format, and is published on server shared.
4. the facilities and equipment supervisory system based on three-dimensional live according to claim 3, is characterized in that, described three-dimensional live model bank also comprises primitive features abstraction module and graphical element model sets up module, wherein:
Primitive features abstraction module, for extracting the common feature of all kinds of facilities and equipment, forms the unified pel with words identification, symbol logo and three-dimensional picture mark;
Graphical element model sets up module for the classification according to pel, sets up corresponding facilities and equipment graphical element model.
5. the facilities and equipment supervisory system based on three-dimensional live according to claim 1, is characterized in that, described integrated database management subsystem comprises entity object attribute library, facilities and equipment information bank and real-time data base, wherein:
Described entity object attribute is used to indicate title, purposes, building structure, quality, address, classification, personnel, land property right, land deeds, time, length, area, capacity, lives use, information of lease;
Described facilities and equipment information is used to indicate title, specifications and models, technical indicator, classification, quantity, price, production firm, purchases information, supply of material information, repair message, purposes, state, installation site information;
Described real time data is used to indicate power consumption, water consumption, heating amount, humiture, liquid level, pressure, valve state, motor start and stop, frequency converter ruuning situation, air quality situation, neighbourhood noise, monitoring camera situation parameter.
6. based on a facilities and equipment supervisory system integrated approach for three-dimensional live, it is characterized in that, the facilities and equipment supervisory system based on three-dimensional live according to claim 1 completes, and specifically comprises the following steps:
1) three-dimensional live modeling technique is used, by the pictorial information of the digital elevation model (DEM) of collection, digital orthoimage (DOM) and actual scene, the d-making software of specialty is used to carry out pre-service, modeling, baked mapping, play up, the scene effect that final formation is true, true to nature, and be stored into three-dimensional live model bank, call for three-dimensional live integral subsystem;
2) extract the common feature of all kinds of facilities and equipment, form the unified pel with words identification, symbol logo and three-dimensional picture mark;
3) according to the classification of pel, set up corresponding facilities and equipment graphical element model, and use pel labeling module to be marked on three-dimensional live figure by the facilities and equipment pel set up;
4) will support the parameters data acquisition of the field apparatus that different communication protocol and standard analog signal export comes by described real-time data acquisition module; Utilize the object being used for process control to connect and embed OPC (ObjectLinkingandEmbeddingforProcessControl,) real-time data communication technology, setting up opc server, after collating sort, giving opc server by gathering the data of coming up; WinCC server obtains the real time data of opc server end as OPC client, and shows intuitively in visual man-machine interface and store;
5) by industrial data bridge, set up the connection of opc server to described integrated database management subsystem, and the real time data that opc server is obtained with relational storage one to one in set up described real-time data base;
6) comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional live integral subsystem is realized: at code layer, a large amount of the sharing of using JavaEE platform to provide shares control, and the assembling realizing three-dimensional live integral subsystem and facilities and equipment Monitor And Control Subsystem basic function is merged;
7) in service layer, by SOA technology, realize from data source header to database, the full-range service arriving three-dimensional live integral subsystem again merges, first, by described entity object relating module, the mode called with Web service, realizes three-dimensional live object and associates one by one with the object in the object properties storehouse in integrated database management subsystem; Secondly, by described real-time data integration module, in integrated database management subsystem, set up the corresponding relation of facilities and equipment pel and true facilities and equipment object, described corresponding relation comprises the content of two aspects: one is the corresponding relation of the static data realized in three-dimensional live pel and object properties storehouse; Two is corresponding relations of the dynamic data realized in three-dimensional live pel and real-time data base;
8) in system layer, pass through message passing mechanism, realize the synchronous of real time data and three-dimensional live integral subsystem, realize the comprehensive integration of facilities and equipment Monitor And Control Subsystem and three-dimensional live integral subsystem, form the facilities and equipment supervisory system based on three-dimensional live.
CN201310036817.XA 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method Expired - Fee Related CN103177391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310036817.XA CN103177391B (en) 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310036817.XA CN103177391B (en) 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method

Publications (2)

Publication Number Publication Date
CN103177391A CN103177391A (en) 2013-06-26
CN103177391B true CN103177391B (en) 2016-01-27

Family

ID=48637224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310036817.XA Expired - Fee Related CN103177391B (en) 2013-01-31 2013-01-31 A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method

Country Status (1)

Country Link
CN (1) CN103177391B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110069045A (en) * 2019-04-11 2019-07-30 广州番禺职业技术学院 The unattended method of sewage treatment plant and intelligent management platform based on BIM, VR and Internet of Things

Families Citing this family (70)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761683B (en) * 2014-01-17 2017-02-01 广东电网公司电力科学研究院 Three-dimensional virtual visualization display method of thermal power plant
CN104768276B (en) * 2014-03-11 2018-04-03 北京博锐尚格节能技术股份有限公司 A kind of 3D illumination monitorings method, apparatus and system
CN104760853A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 Monitoring and controlling method, device and system for elevator running
CN105318196B (en) * 2014-07-21 2019-08-02 上海弘特自动化电气仪表有限公司 A kind of oil pipeline simulative surveillance method and system
CN104166697A (en) * 2014-08-04 2014-11-26 上海国际航运服务中心开发有限公司 Three-dimensional interactive navigation lock monitoring system
CN104135387B (en) * 2014-08-12 2017-06-16 浪潮通信信息系统有限公司 Network management data processing visual monitoring method based on meta-model topology
CN104616343B (en) * 2015-01-20 2017-09-22 武汉大势智慧科技有限公司 A kind of texture gathers the method and system mapped online in real time
CN105868211A (en) * 2015-01-22 2016-08-17 北京华烽泰特科技有限公司 Factory displaying method
CN104609134A (en) * 2015-02-04 2015-05-13 中交一航局安装工程有限公司 Intelligent temperature measuring monitoring system for belt conveyor rollers
CN104680252A (en) * 2015-02-13 2015-06-03 北京清控人居环境研究院有限公司 Online architecture system and online architecture system-based real-time water supply scheduling method
CN104680337A (en) * 2015-03-25 2015-06-03 上海化学工业区公共管廊有限公司 Common pipe rack comprehensive information operation system based on geographic information system
CN104766173B (en) * 2015-04-16 2018-08-10 淄博海源电子科技有限公司 Water system user cuts off the water the digitalized processing method of alarm
CN106597860A (en) * 2015-10-19 2017-04-26 上海澜腾智能科技有限公司 Household electrical appliance control system, and control device, construction method and control method thereof
US20170122773A1 (en) * 2015-10-30 2017-05-04 Global Design Corporation Ltd. Resource Consumption Monitoring System, Platform and Method
CN105893588B (en) * 2016-04-05 2019-04-30 东南大学 A kind of production of large scale city space energy consumption numerical map and display methods
CN107291766A (en) * 2016-04-10 2017-10-24 国网山东省电力公司经济技术研究院 Laterally specialty fusion, longitudinal province ground power network panoramic information display systems for running through of county
CN105824281B (en) * 2016-05-04 2019-03-08 周德恩 A kind of fire-fighting real-time monitoring system
CN105975591B (en) * 2016-05-09 2019-03-12 东南大学 A kind of production of urban global energy consumption numerical map and display methods and system
CN106096121B (en) * 2016-06-07 2019-03-19 武汉虹信技术服务有限责任公司 Intelligent building project method for drawing map based on universal map control
CN106384194B (en) * 2016-09-09 2020-07-10 国家电网公司 Electric power regulation and control method
CN106412526A (en) * 2016-11-15 2017-02-15 武汉市公安局公共交通分局 Police oblique-photography real 3D platform system and interface system thereof
CN106444593A (en) * 2016-12-12 2017-02-22 合肥华耀广告传媒有限公司 Building energy consumption monitor system based on 3D technology
CN106911682A (en) * 2017-02-17 2017-06-30 深圳市嘉力达节能科技股份有限公司 Building convergence method and device
CN107038754A (en) * 2017-03-15 2017-08-11 武汉华安科技股份有限公司 A kind of wisdom garden management system and method based on three-dimensional live
CN107146168A (en) * 2017-07-11 2017-09-08 大连锐勃电子科技有限公司 Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN107633423A (en) * 2017-08-31 2018-01-26 珠海格力电器股份有限公司 Resource processing method and device
CN107544383A (en) * 2017-09-08 2018-01-05 北京时代凌宇科技股份有限公司 A kind of residential property apparatus monitoring method and system
CN107842908B (en) * 2017-09-26 2020-01-03 国网浙江省电力公司杭州供电公司 Real-time heat supply load control method based on environmental parameter compensation
CN107729065B (en) * 2017-11-02 2021-07-20 港珠澳大桥管理局 Three-dimensional monitoring method and system
CN108268595B (en) * 2017-12-14 2018-11-27 特斯联(北京)科技有限公司 A kind of building operating facilities status monitoring and Visualized Analysis System based on Internet of Things
CN108205265A (en) * 2018-01-05 2018-06-26 日立楼宇技术(广州)有限公司 A kind of method, apparatus, computer equipment and the storage medium of elevator scenario simulation
CN108306414B (en) * 2018-01-10 2021-08-10 温州大学 Intelligent power distribution monitoring and control method and system
CN108241749B (en) * 2018-01-12 2021-03-26 新华智云科技有限公司 Method and apparatus for generating information from sensor data
CN108389241A (en) * 2018-03-01 2018-08-10 网易(杭州)网络有限公司 The methods, devices and systems of textures are generated in scene of game
CN108537877A (en) * 2018-03-07 2018-09-14 北京中科紫宸睿达科技有限公司 Visualizing monitor interface customizing generation method based on threedimensional model and device
CN108520474A (en) * 2018-04-12 2018-09-11 重庆电子工程职业学院 A kind of power analysis system and power analysis method
CN109059200A (en) * 2018-06-27 2018-12-21 珠海格力电器股份有限公司 AR-based air conditioner centralized control system and control method thereof
CN108681781B (en) * 2018-07-06 2024-01-30 南京航空航天大学 Subway operation and maintenance management information system and method based on three-dimensional Internet of things technology
CN109099552A (en) * 2018-08-13 2018-12-28 南京优助智能科技有限公司 Merge the central air conditioner end equipment control system and working method of spatial information
EP3623880A1 (en) * 2018-09-13 2020-03-18 Siemens Aktiengesellschaft Method for integrating data of assets of a technical installation into a platform, digital platform and computer program product
CN109445891B (en) * 2018-10-09 2022-08-12 北京国电智深控制技术有限公司 Picture configuration and display method, device and computer readable storage medium
CN109542736A (en) * 2018-12-21 2019-03-29 嘉兴蓝匠仓储系统软件有限公司 A kind of monitoring method for 3D monitoring software of storing in a warehouse
WO2020199077A1 (en) * 2019-04-01 2020-10-08 Honeywell International Inc. Building management system using video analytics
CN111783187B (en) * 2019-04-03 2023-12-22 京灯(广东)信息科技有限公司 Brightening sharing platform application system
CN110274565B (en) * 2019-04-04 2020-02-04 湖北音信数据通信技术有限公司 On-site inspection platform for adjusting image processing frame rate based on image data volume
CN110225296A (en) * 2019-04-15 2019-09-10 广东康云科技有限公司 Garden three-dimensional live intelligent control method, system and device
CN110415334B (en) * 2019-06-26 2023-03-10 广东康云科技有限公司 Real-scene three-dimensional model application system and method
CN110446022B (en) * 2019-08-16 2021-07-13 内蒙古蒙宇工程项目管理有限公司 Construction cost budgets facility case
CN111025962B (en) * 2019-11-26 2021-05-11 上海欣能信息科技发展有限公司 Panoramic-map-based indoor visual monitoring method for power transformation and distribution station
CN111104622A (en) * 2019-11-29 2020-05-05 武汉虹信技术服务有限责任公司 WEBGL-based three-dimensional GIS intelligent monitoring method and device
CN111144849A (en) * 2019-12-28 2020-05-12 镇江新一代信息技术产业研究院有限公司 Campus big data management system
CN111581196A (en) * 2020-04-29 2020-08-25 深圳市双合电气股份有限公司 Supply and distribution power grid intelligent data acquisition and arrangement system based on intelligent factory framework
CN111858799B (en) * 2020-06-28 2022-10-21 江苏核电有限公司 Dynamic marking and positioning method, system and equipment for panoramic image for nuclear power plant
CN111930056B (en) * 2020-07-31 2024-02-06 贵州优特云科技有限公司 Electric power monitoring system and method for intelligent building
CN112079214B (en) * 2020-09-01 2022-09-06 日立楼宇技术(广州)有限公司 Elevator waiting management system and control method thereof
CN112134355A (en) * 2020-09-03 2020-12-25 珠海许继芝电网自动化有限公司 Intelligent power distribution room visual display method and system
CN112291528B (en) * 2020-10-30 2023-03-24 天津飞眼无人机科技有限公司 Monitoring system map modular management method
CN112696787A (en) * 2020-12-29 2021-04-23 中国兵器装备集团自动化研究所 Panoramic three-dimensional visual intelligent monitoring system and method for medicament cleaning workshop
CN113393352B (en) * 2021-05-19 2022-02-01 江苏星月测绘科技股份有限公司 Smart city system based on digital twin technology
CN113726732B (en) * 2021-07-14 2023-05-19 华迪计算机集团有限公司 Monitoring and auxiliary decision making system and method for data machine room
CN113554755A (en) * 2021-07-30 2021-10-26 招商局重庆交通科研设计院有限公司 Remote online patrol method for electromechanical facilities of highway tunnel
CN113949847A (en) * 2021-09-30 2022-01-18 合肥佳讯科技有限公司 Three-dimensional model-based station intelligent monitoring system
CN114545872A (en) * 2021-12-15 2022-05-27 云南昆船烟草设备有限公司 Visual monitoring method and system for running state in production process of cigarette making machine equipment
CN114283251B (en) * 2021-12-28 2024-04-09 航天科工智能运筹与信息安全研究院(武汉)有限公司 Real-time access method for data of barracks and Internet of things sensing equipment based on three-dimensional scene
CN114462536A (en) * 2022-02-09 2022-05-10 国网宁夏电力有限公司吴忠供电公司 Method and system for generating labeled data set in entity scene
CN114863275B (en) * 2022-04-27 2022-12-09 北京良安科技有限公司 Three-dimensional mapping method, system, equipment and storage medium for granary
CN115186315B (en) * 2022-07-25 2023-05-23 成都安讯智服科技有限公司 Method and system for accurately positioning equipment in factory diagram for configuration software
CN115115352B (en) * 2022-08-29 2022-11-08 山东中鲁实业有限公司 Public equipment operation control system based on digital city operation management service
CN115410328B (en) * 2022-10-31 2022-12-27 北京中海兴达建设有限公司 Fire early warning method, device and equipment for construction site and readable storage medium
CN116934180B (en) * 2023-09-15 2023-12-08 恒实建设管理股份有限公司 Whole process consultation information management method, system, device and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034494A (en) * 2006-03-06 2007-09-12 上海宝信软件股份有限公司 Method for implementing real time monitoring using three-dimensional sight simulation
CN101256590A (en) * 2008-04-03 2008-09-03 北京艺龙天地文化传播有限公司 Simulation system for three-dimensional on-line virtual reality of environment combining with WebGis and method thereof
CN101714262A (en) * 2009-12-10 2010-05-26 北京大学 Method for reconstructing three-dimensional scene of single image
CN101820532A (en) * 2010-03-17 2010-09-01 上海大学 Method for realizing full three-dimensional intelligent virtual computer room
CN102833117A (en) * 2012-09-10 2012-12-19 山东省计算中心 Data center dynamic environment monitoring system and method on basis of IOT (Internet Of Things) technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034494A (en) * 2006-03-06 2007-09-12 上海宝信软件股份有限公司 Method for implementing real time monitoring using three-dimensional sight simulation
CN101256590A (en) * 2008-04-03 2008-09-03 北京艺龙天地文化传播有限公司 Simulation system for three-dimensional on-line virtual reality of environment combining with WebGis and method thereof
CN101714262A (en) * 2009-12-10 2010-05-26 北京大学 Method for reconstructing three-dimensional scene of single image
CN101820532A (en) * 2010-03-17 2010-09-01 上海大学 Method for realizing full three-dimensional intelligent virtual computer room
CN102833117A (en) * 2012-09-10 2012-12-19 山东省计算中心 Data center dynamic environment monitoring system and method on basis of IOT (Internet Of Things) technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110069045A (en) * 2019-04-11 2019-07-30 广州番禺职业技术学院 The unattended method of sewage treatment plant and intelligent management platform based on BIM, VR and Internet of Things

Also Published As

Publication number Publication date
CN103177391A (en) 2013-06-26

Similar Documents

Publication Publication Date Title
CN103177391B (en) A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method
KR101937096B1 (en) 3D monitoring server using 3D BIM object model and 3D monitoring system comprising it
Deng et al. From BIM to digital twins: A systematic review of the evolution of intelligent building representations in the AEC-FM industry.
Li et al. Traffic management and forecasting system based on 3d gis
CN114139264B (en) Building water system informatization wisdom fortune maintenance system based on BIM+GIS technique
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN110428135A (en) A kind of pipe gallery equipment condition monitoring management system
CN109460834A (en) Build operation management system and its management method
CN107464284A (en) Three-dimensional visualization property information management system based on mobile terminal
CN103778566A (en) Heat-engine plant monitoring and measuring method based on three-dimensional visualization demonstration
CN102243497A (en) Networking technology-based remote intelligent analysis service system used for engineering machinery
CN117015771A (en) System and method for processing and displaying information related to a property by developing and presenting a photogrammetric reality grid
KR101876114B1 (en) Terminal, server, system for 3d modeling and 3d modeling method using the same
CN106446033A (en) Potential safety hazard information management system and method for underground pipelines
CN206021323U (en) Digital building system
CN109446290A (en) A kind of intelligent three-dimensional virtual visualization meteorological equipment comprehensive coverage method
CN115758522A (en) Digital twin city management system and method
CN113885698A (en) Pipeline informatization management and control system
CN115859689B (en) Panoramic visualization digital twin application method
Zhao Research on management informatization construction of electric power enterprise based on big data technology
CN107392993A (en) A kind of power consumer digitizes panoramic view construction method
CN111784830A (en) Rule-based three-dimensional geographic information model space analysis method and system
CN108073996B (en) Urban energy panoramic interactive big data platform management system and method
CN113992891A (en) Visual application system based on video monitoring multi-information fusion
CN116542387A (en) Intelligent hydrologic system based on Unity3D

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: RARE SERVICE ENGINEERING COLLEGE OF CHINESE PLA.

Free format text: FORMER OWNER: LI SHENGLIN

Effective date: 20130723

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 401311 YUZHONG, CHONGQING TO: 400010 SHAPINGBA, CHONGQING

TA01 Transfer of patent application right

Effective date of registration: 20130723

Address after: 400010 Department of information engineering, PLA Logistics Engineering College, Shapingba University District, Chongqing

Applicant after: Logistical Engineering University of PLA

Address before: 401311 Yuzhong District, Chongqing, No. two Changjiang Road, No. 174

Applicant before: Li Shenglin

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20220131