CN104135387B - Network management data processing visual monitoring method based on meta-model topology - Google Patents

Network management data processing visual monitoring method based on meta-model topology Download PDF

Info

Publication number
CN104135387B
CN104135387B CN201410394069.7A CN201410394069A CN104135387B CN 104135387 B CN104135387 B CN 104135387B CN 201410394069 A CN201410394069 A CN 201410394069A CN 104135387 B CN104135387 B CN 104135387B
Authority
CN
China
Prior art keywords
data
information
data processing
task
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410394069.7A
Other languages
Chinese (zh)
Other versions
CN104135387A (en
Inventor
王炳亮
袁明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Communication Information System Co Ltd
Original Assignee
Inspur Communication Information System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Communication Information System Co Ltd filed Critical Inspur Communication Information System Co Ltd
Priority to CN201410394069.7A priority Critical patent/CN104135387B/en
Publication of CN104135387A publication Critical patent/CN104135387A/en
Application granted granted Critical
Publication of CN104135387B publication Critical patent/CN104135387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Debugging And Monitoring (AREA)
  • Computer And Data Communications (AREA)

Abstract

The invention provides a network management data processing visual monitoring method based on meta-model topology, which comprises the following steps: 1) the method comprises the steps of combing IT equipment models and connection related to a network management system by extracting data models and associations related to objects and tasks in the data processing process of the network management system, and generating a two-stage nested end-to-end data processing topology by taking the attribution relationship of the objects, the tasks and the equipment as a point of coincidence; 2) by means of detecting the running state of equipment, network connectivity and task processing progress, analyzing task processing logs and analyzing data effectiveness, the detection result is output in real time and attached to various objects of a data processing topology, visual and effective monitoring means of a network management real-time data processing process are achieved, network management maintenance personnel are assisted, and pre-problem prevention, post-influence assessment and reason tracing are achieved.

Description

A kind of network management data based on meta-model topology processes method for visually monitoring
Technical field
The present invention relates to a kind of technical field of the computer network, specifically a kind of webmaster number based on meta-model topology According to treatment method for visually monitoring.
Background technology
The treatment of network management system normal data includes gathering, parses, is put in storage, collecting, using etc. step.For expansion, mainly Flow includes:Timing slave unit, OMC extract raw data file and are transferred to NM server first, by parsing generation standard Enter library file, realize data loading;If equipment manufacturer's open database, directly by data mapping ruler, it is directly realized by Data loading;Data enter each producer's original table by collection, parsing, storage this moment, collect into normalization for different type Tables of data, further collects the business summary sheet into business personnel's concern, and line number is entered eventually through functional forms such as form, special topics According to presentation with application.
From said process, data processing runs through whole webmaster, and treatment effeciency directly determines whole webmaster system with quality System application effect.For network management system, because data source is numerous, interface mode is different, and the production of data is by the multistage Realize, data source is in itself, network transmission, each step of data processing process go wrong and can influence webmaster application effect.Having must Real-time detection is carried out to system overall data process situation, and processing condition data is examined with reference to relevant investigation rule It is disconnected, note abnormalities, notify attendant.
The technical scheme closest with the application motion is patent document in the prior art《A kind of monitoring data collection converges The method and system of total state》, application number:200610114116.3.The program describes a kind of monitoring data collection and collects shape The method of state, including:The collection summary status information of each Data Migration point in A, detection collection aggregation process.B, according to each The configuration information of Data Migration point, each Data Migration point is sorted out according to attribute, and generation includes leading for each Data Migration point Boat tree;The Data Migration point of concern is found out from navigation tree, using the task in the configuration information and collection summary status of focus Status information, data integrity information, generate the topological diagram information centered on focused data migration point, and show topological diagram.
4th, the shortcoming of prior art and the application motion technical problem to be solved
For being primarily present following shortcoming in the prior art described in the technical scheme of prior art " three, ":
1. monitoring content is not comprehensive, and whether prior art is only monitored from the complete angle of data, and data The guarantee for the treatment of needs to consider whether data complete, the data factor such as whether whether consistent, data reasonable.
2. case study stationkeeping ability is weak, and prior art only finds the abnormal problem of data processing step, then Presented by patterned means, can only be by positioning problems to certain data problem point, it is impossible to which the root to producing problem is carried out Analyse in depth.
The content of the invention
Method for visually monitoring is processed it is an object of the invention to provide a kind of network management data based on meta-model topology.
The purpose of the present invention is realized in the following manner, including following content:
A, be related to object, the data model of task and associate in network management system data handling procedure by extracting, carded web The information technoloy equipment model that guard system is related to be connected, the attaching relation with object, task and equipment as corresponding point, generate two-level nested , data processing end to end topology;
B, by testing equipment operation conditions, network connectivty, task treatment progress, parsing task treatment daily record, analysis Data validity means, export testing result and are attached to the types of objects of data processing topology in real time, realize that webmaster is counted in real time According to directly perceived, the effective monitoring means of processing procedure, Network Management and Maintenance personnel are assisted, realize prevention of problem, afterwards influence property in advance Assessment is traced to the source with reason, and implementation steps are as follows:
Step 1 data processing synthesis Topology g eneration
Step 2 data handling procedure information and satellite information are extracted
Be attached on topological diagram for data handling procedure and satellite information by step 3;
Step 1, data processing synthesis Topology g eneration
Firstly, it is necessary to be related to data processing object, the model of task object in extracting network management data processing procedure and associate Relation, wherein data object include producer's file, manufacturer data table, original document, enter library file, producer's original table, webmaster and return One changes table, service application table, Report form application;Task object includes that file acquisition tasks, file analysis storage task, database are straight It is reappointed or reelected consecutively business, database and collects task, the incidence relation generation primary data treatment topology according to above-mentioned meta-model;
Secondly, the information technoloy equipment connection topology that combing network management system is related to;
Finally, as corresponding point, generation processes end to the affiliation with object, task and information technoloy equipment towards whole network management data To end, two-level nested comprehensive topological diagram;
Based on comprehensive topological diagram, data processing object, base attribute, the exception rules of each step process task can be checked, Network traffic and time delay early warning rule between each server basic configuration information, load early warning rule, server, for above-mentioned It is related to the meta model information of the data processing of each side and information technoloy equipment resource voluntarily to complete combing or extraction by each webmaster;
Step 2, data handling procedure information and satellite information are comprehensively extracted, and are comprised the steps of:
A, by " process analysis instrument " passively obtain processing procedure information:
In task scheduling system serial or parallel data handling procedure, after the completion of task scheduling, by MQ to subsequent treatment Process analysis procedure analysis module sends scheduling triggering message, and after receiving message, lexical analysis instrument reads data handling procedure daily record, extracts Operation information, analyzes checking process quality of data situation, is incorporated to data quality information storehouse;
B, by " result detection instrument " active obtaining deal with objects information:
Active detecting data file quantity, size, the information of information bar number;This secondary data of correlation table place in Test database Manage bar number, field are air situation condition, the validity of index;The accuracy of Testing index algorithm, the object information that active is checked is entered Data quality information storehouse;
C, reception webmaster information technoloy equipment and network state information:
By the running status of message interface real-time reception webmaster relevant device, including each service load condition, O/I pressures Power, internal memory utilization power, kernel process state;Database positioning, including database process, load condition, table space;Server Between network state, the information of reception is entered data quality information storehouse by including network delay, network packet loss rate, shake;
D, reception auxiliary information:
The abnormal all kinds of auxiliary informations of data processing, including webmaster producer may result in by message interface real-time reception Webmaster edition upgrading plan, network engineering cut-over plan, equipment manufacturer and software release upgrade plan, the information of reception is entered Data quality information storehouse;
E, according to rule generation data processing problem:
By above step a to step d, realize being managed collectively network management data processing relevant information, contrast combing For the exception rules that process task, process object, device network are all types of, data processing problem is generated simultaneously according to reference format It is pushed in problem base, directly can be externally issued in the form of alerting or problem is attached on topological diagram, for above-mentioned exception Rule voluntarily completes combing by each webmaster;
Step 3, data handling procedure and satellite information are attached on topological diagram
Testing result is exported in real time and is attached in the comprehensive topological diagram types of objects of step 1 generation, realize that webmaster is real-time Directly perceived, the effective monitoring means of data handling procedure;
Can the following information of monitor in real time based on topological diagram:
(1) whether data processing object is abnormal, including whether rationally data file quantity, size, information bar number, tables of data Number of data, field are air situation condition, and whether index accurate, and normal process object is presented with white, exception object in topology with Red is marked;
(2) whether data processing task is abnormal, including whether whether whether task process start, be timely completed, hang, pin To collection, parsing storage, each generic task for collecting, normal process task represents that abnormal task is in topology with red line with black line Represent;
(3) webmaster information technoloy equipment, using whether abnormal with network state, including data-source device, acquisition server, database The cpu load of server and other application servers, O/I pressure, internal memory are utilized, kernel process state, database process, load Situation, table space, network delay, network packet loss rate, shake, for such monitoring, according to regular thresholding by state be divided into normally, Abnormal, serious three-level, the equipment of different conditions is identified with green, yellow, red respectively on topological diagram.
It is of the invention compared with immediate prior art, with advantages below:
1st, the data processing of information that can be monitored is comprehensive.Due to using the analysis of processing procedure concatenation, the treatment knot that are driven with MQ Two technologies of fruit active detecting, it would be preferable to support to each step object of the data processing, integrality of process task, promptness, accurate Property carries out overall monitor;In addition by probe technique, equipment, the network state of influence data processing are obtained in real time, realize data The required i.e. finding of processing relevant information.
2nd, data processing problem positioning analysis ability is strong.This programme is using Topology g eneration and nested skill based on model interaction The comprehensive topology of data processing that art is realized, carries all information that can trigger data hidden danger.By positioning problems to certain data After problem points, device network operation conditions, the auxiliary information that can be belonged to according to problem points find the root of generation problem.
Brief description of the drawings
Fig. 1 is the data processing topological structure schematic diagram of prior art;
Fig. 2 is meta-model incidence relation generation primary data treatment topological structure schematic diagram;
Fig. 3 is the information technoloy equipment connection topological structure schematic diagram that combing network management system is related to;
Fig. 4 be towards the treatment of whole network management data end to end, the comprehensive topological structure schematic diagram of two-level nested;
Fig. 5 is that general steps describe topological diagram.
Specific embodiment
It is described in detail below to of the invention with reference to Figure of description.
A kind of network management data based on meta-model topology of the invention processes method for visually monitoring, and main contents include:
On the one hand be related to object, the data model of task and associate in network management system data handling procedure by extracting, comb The information technoloy equipment model that is related to of reason network management system be connected, the attaching relation with object, task and equipment as corresponding point, generation two-stage Nesting, the topology of data processing end to end.
On the other hand, by testing equipment operation conditions, network connectivty, task treatment progress, parsing task treatment day The means such as will, analyze data validity, export testing result and are attached to the types of objects of data processing topology in real time, realize net Directly perceived, the effective monitoring means of pipe real time data processing process.Network Management and Maintenance personnel are assisted, prevention of problem, thing in advance is realized Influence property assessment afterwards is traced to the source with reason.Comprise the following steps that:
Step 1, data processing synthesis Topology g eneration
Firstly, it is necessary to be related to data processing object, the model of task object in extracting network management data processing procedure and associate Relation.Wherein data object includes producer's file, manufacturer data table, original document, enters library file, producer's original table, webmaster and return One changes table, service application table, Report form application;Task object includes that file acquisition tasks, file analysis storage task, database are straight It is reappointed or reelected consecutively business, database and collects task.Incidence relation generation primary data treatment topology according to above-mentioned meta-model, below figure 2:
Secondly, the information technoloy equipment connection topology that combing network management system is related to, as shown in Figure 3:
Finally, as corresponding point, generation processes end to the affiliation with object, task and information technoloy equipment towards whole network management data To end, two-level nested comprehensive topological diagram.As shown in Figure 4
Based on comprehensive topological diagram, data processing object, base attribute, the exception rules of each step process task can be checked, Network traffic and time delay early warning rule between each server basic configuration information, load early warning rule, server.For above-mentioned It is related to the meta model information of the data processing of each side and information technoloy equipment resource voluntarily to complete combing or extraction by each webmaster, specific side Method this programme is no longer elaborated.
Step 2, data handling procedure information and satellite information are comprehensively extracted, and are comprised the steps of:
A, by " process analysis instrument " passively obtain processing procedure information:
In task scheduling system serial or parallel data handling procedure, after the completion of task scheduling, by MQ to subsequent treatment Process analysis procedure analysis module sends scheduling triggering message, and after receiving message, lexical analysis instrument reads data handling procedure daily record, extracts Operation information, analyzes checking process quality of data situation, is incorporated to data quality information storehouse;
B, by " result detection instrument " active obtaining deal with objects information:
Active detecting data file quantity, size, the information of information bar number;This secondary data of correlation table place in Test database Manage bar number, field are air situation condition, the validity of index;The accuracy of Testing index algorithm, the object information that active is checked is entered Data quality information storehouse;
C, reception webmaster information technoloy equipment and network state information:
By the running status of message interface real-time reception webmaster relevant device, including each service load condition, O/I pressures Power, internal memory utilization power, kernel process state;Database positioning, including database process, load condition, table space;Server Between network state, the information of reception is entered data quality information storehouse by including network delay, network packet loss rate, shake;
D, reception auxiliary information:
The abnormal all kinds of auxiliary informations of data processing, including webmaster producer may result in by message interface real-time reception Webmaster edition upgrading plan, network engineering cut-over plan, equipment manufacturer and software release upgrade plan, the information of reception is entered Data quality information storehouse;
E, according to rule generation data processing problem:
By above step a to step d, realize being managed collectively network management data processing relevant information, contrast combing For the exception rules that process task, process object, device network are all types of, data processing problem is generated simultaneously according to reference format It is pushed in problem base, directly can be externally issued in the form of alerting or problem is attached on topological diagram, for above-mentioned exception Rule voluntarily completes combing by each webmaster;Particular content is no longer elaborated.
General steps description is as shown in Figure 5:
Step 3, data handling procedure and satellite information are attached on topological diagram
Testing result is exported in real time and is attached in the comprehensive topological diagram types of objects of step 1 generation, realize that webmaster is real-time Directly perceived, the effective monitoring means of data handling procedure.
Can the following information of monitor in real time based on topological diagram:
(1) whether data processing object is abnormal, including whether rationally data file quantity, size, information bar number, tables of data Number of data, field are air situation condition, and whether index is accurate.Normal process object with white present, exception object in topology with Red is marked.
(2) whether data processing task is abnormal, including whether whether whether task process start, be timely completed, hang, pin Collection, parsing are put in storage, each generic task such as collect.Normal process task represents that abnormal task is in topology with red line with black line Represent.
(3) webmaster information technoloy equipment, using whether abnormal with network state, including data-source device, acquisition server, database The cpu load of server and other application servers, O/I pressure, internal memory are utilized, kernel process state, database process, load Situation, table space, network delay, network packet loss rate, shake etc..For such monitoring, state is divided into just according to regular thresholding Often, abnormal, serious three-level, the equipment of different conditions is identified with green, yellow, red respectively on topological diagram.
In addition to the technical characteristic described in specification, the known technology of those skilled in the art is.

Claims (1)

1. a kind of network management data based on meta-model topology processes method for visually monitoring, it is characterised in that including following content:
A, be related to object, the data model of task and associate in network management system data handling procedure by extracting, carded web piping The information technoloy equipment model that is related to of system be connected, the attaching relation with object, task and equipment as corresponding point, generate two-level nested, The topology of data processing end to end;
B, by testing equipment operation conditions, network connectivty, task treatment progress, parsing task treatment daily record, analyze data Validity means, export testing result and are attached to the types of objects of data processing topology in real time, realize at webmaster real time data Directly perceived, the effective monitoring means of reason process, assist Network Management and Maintenance personnel, realize prevention of problem, the afterwards assessment of influence property in advance Traced to the source with reason, implementation steps are as follows:
Step 1 data processing synthesis Topology g eneration
Step 2 data handling procedure information and satellite information are extracted
Be attached on topological diagram for data handling procedure and satellite information by step 3;
Step 1, data processing synthesis Topology g eneration
Firstly, it is necessary to it is related to the model and incidence relation of data processing object, task object in extracting network management data processing procedure, Wherein data object include producer's file, manufacturer data table, original document, enter library file, producer's original table, webmaster normalization Table, service application table, Report form application;Task object includes file acquisition tasks, file analysis storage task, direct-connected of database Business, database collect task, the incidence relation generation primary data treatment topology according to above-mentioned meta-model;
Secondly, the information technoloy equipment connection topology that combing network management system is related to;
Finally, the affiliation with object, task and information technoloy equipment is as corresponding point, and generation is end-to-end towards the treatment of whole network management data , the comprehensive topological diagram of two-level nested;
Based on comprehensive topological diagram, data processing object, base attribute, the exception rules of each step process task can be checked, each clothes Network traffic and time delay early warning rule, are related to for above-mentioned between business device basic configuration information, load early warning rule, server The data processing of each side and the meta model information of information technoloy equipment resource voluntarily complete combing or extraction by each webmaster;
Step 2, data handling procedure information and satellite information are comprehensively extracted, and are comprised the steps of:
A, by " process analysis instrument " passively obtain processing procedure information:
In task scheduling system serial or parallel data handling procedure, after the completion of task scheduling, by MQ to subsequent processes Analysis module sends scheduling triggering message, and after receiving message, lexical analysis instrument reads data handling procedure daily record, extracts operation Information, analyzes checking process quality of data situation, is incorporated to data quality information storehouse;
B, by " result detection instrument " active obtaining deal with objects information:
Active detecting data file quantity, size, the information of information bar number;This data processing bar of correlation table in Test database Number, field are air situation condition, the validity of index;The accuracy of Testing index algorithm, data are entered by the object information that active is checked Quality information storehouse;
C, reception webmaster information technoloy equipment and network state information:
By the running status of message interface real-time reception webmaster relevant device, including the load condition of each service, O/I pressure, Internal memory utilization power, kernel process state;Database positioning, including database process, load condition, table space;Between server Network state, including network delay, network packet loss rate, shake, data quality information storehouse is entered by the information of reception;
D, reception auxiliary information:
The abnormal all kinds of auxiliary informations of data processing may result in by message interface real-time reception, including webmaster producer net Pipe edition upgrading plan, network engineering cut-over plan, equipment manufacturer and software release upgrade plan, data are entered by the information of reception Quality information storehouse;
E, according to rule generation data processing problem:
By above step a to step d, realize being managed collectively network management data processing relevant information, contrast being directed to for combing The all types of exception rules of process task, process object, device network, generate data processing problem and push according to reference format To in problem base, directly can externally be issued in the form of alerting or problem is attached on topological diagram, for above-mentioned exception rules Combing is voluntarily completed by each webmaster;
Step 3, data handling procedure and satellite information are attached on topological diagram
Testing result is exported in real time and is attached in the comprehensive topological diagram types of objects of step 1 generation, realize webmaster real time data Directly perceived, the effective monitoring means of processing procedure;
Can the following information of monitor in real time based on topological diagram:
(1) whether data processing object is abnormal, including whether rationally data file quantity, size, information bar number, data table data Bar number, field are air situation condition, and whether index is accurate, and normal process object is presented with white, and exception object is in topology with red Mark;
(2) whether data processing task is abnormal, including whether whether whether task process start, be timely completed, hang, for adopting Collection, parsing storage, each generic task for collecting, normal process task represent that abnormal task is represented in topology with red line with black line;
(3) webmaster information technoloy equipment, using whether abnormal with network state, including data-source device, acquisition server, database service The cpu load of device and other application servers, O/I pressure, internal memory are utilized, kernel process state, database process, load feelings Condition, table space, for such monitoring, be divided into for state according to regular thresholding normal, different by network delay, network packet loss rate, shake Often, serious three-level, the equipment of different conditions is identified with green, yellow, red respectively on topological diagram.
CN201410394069.7A 2014-08-12 2014-08-12 Network management data processing visual monitoring method based on meta-model topology Active CN104135387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410394069.7A CN104135387B (en) 2014-08-12 2014-08-12 Network management data processing visual monitoring method based on meta-model topology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410394069.7A CN104135387B (en) 2014-08-12 2014-08-12 Network management data processing visual monitoring method based on meta-model topology

Publications (2)

Publication Number Publication Date
CN104135387A CN104135387A (en) 2014-11-05
CN104135387B true CN104135387B (en) 2017-06-16

Family

ID=51807916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410394069.7A Active CN104135387B (en) 2014-08-12 2014-08-12 Network management data processing visual monitoring method based on meta-model topology

Country Status (1)

Country Link
CN (1) CN104135387B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105656659A (en) * 2014-12-02 2016-06-08 中兴通讯股份有限公司 Management method and device for network element upgrade
CN105844390B (en) * 2016-03-21 2022-08-30 天津智融创新科技发展有限公司 Data quality tracing method and device and hardware processor
CN105871611A (en) * 2016-03-31 2016-08-17 浪潮通信信息系统有限公司 Network management system supervision platform and supervision method
CN108268565B (en) * 2017-01-04 2020-11-03 北京京东尚科信息技术有限公司 Method and system for processing user browsing behavior data based on data warehouse
CN107124321A (en) * 2017-07-10 2017-09-01 山东浪潮商用系统有限公司 A kind of network operation condition predicting model based on big data
CN110611576B (en) * 2018-06-14 2023-05-09 亿阳信通股份有限公司 Data quality monitoring method, device, equipment and storage medium
CN111461527A (en) * 2020-03-30 2020-07-28 广东电网有限责任公司 Equipment quality evaluation method based on remote operation of distribution network
CN113127413B (en) * 2021-05-12 2024-03-01 北京红山信息科技研究院有限公司 Operator data processing method, device, server and storage medium
CN114039857B (en) * 2021-10-11 2024-05-03 浪潮通信信息系统有限公司 Group client private line-to-line topology processing system and method
CN115277819A (en) * 2022-07-29 2022-11-01 四川启睿克科技有限公司 Automatic generation method and system for overall situation of business system
CN116192649A (en) * 2023-02-07 2023-05-30 浪潮通信信息系统有限公司 Service data integrity analysis method based on model topology
CN117424850B (en) * 2023-10-30 2024-08-09 北京优特捷信息技术有限公司 Abnormal link aggregation method, query method, device, equipment and medium
CN117170981A (en) * 2023-11-01 2023-12-05 中国电子科技集团公司第十五研究所 Multitasking process monitoring method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1489078A (en) * 2002-09-11 2004-04-14 �Ҵ���˾ Method and apparatus for managing attached relation in distribution-type system
CN101170454A (en) * 2006-10-27 2008-04-30 亿阳信通股份有限公司 A method and system for monitoring data collection and summary status
CN102930393A (en) * 2012-10-25 2013-02-13 海南电网公司 Comprehensive power grid information display visualization system
CN103177391A (en) * 2013-01-31 2013-06-26 李生林 Equipment monitoring system based on three-dimensional real scenes and system integration method based on three-dimensional real scenes
CN103646355A (en) * 2013-12-06 2014-03-19 广东电网公司电力科学研究院 Rapid construction and analysis method for power-grid topology relation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1489078A (en) * 2002-09-11 2004-04-14 �Ҵ���˾ Method and apparatus for managing attached relation in distribution-type system
CN101170454A (en) * 2006-10-27 2008-04-30 亿阳信通股份有限公司 A method and system for monitoring data collection and summary status
CN102930393A (en) * 2012-10-25 2013-02-13 海南电网公司 Comprehensive power grid information display visualization system
CN103177391A (en) * 2013-01-31 2013-06-26 李生林 Equipment monitoring system based on three-dimensional real scenes and system integration method based on three-dimensional real scenes
CN103646355A (en) * 2013-12-06 2014-03-19 广东电网公司电力科学研究院 Rapid construction and analysis method for power-grid topology relation

Also Published As

Publication number Publication date
CN104135387A (en) 2014-11-05

Similar Documents

Publication Publication Date Title
CN104135387B (en) Network management data processing visual monitoring method based on meta-model topology
CN105653444B (en) Software defect fault recognition method and system based on internet daily record data
CN104598367B (en) Data center's event of failure management specialty and method
CN107943668A (en) Computer server cluster daily record monitoring method and monitor supervision platform
KR101611166B1 (en) System and Method for Deducting about Weak Signal Using Big Data Analysis
US20170109657A1 (en) Machine Learning-Based Model for Identifying Executions of a Business Process
CN106209405B (en) Method for diagnosing faults and device
CN105721193A (en) Method and device for system information monitoring
US20170109668A1 (en) Model for Linking Between Nonconsecutively Performed Steps in a Business Process
CN106815125A (en) A kind of log audit method and platform
CN108964995A (en) Log correlation analysis method based on time shaft event
CN103761173A (en) Log based computer system fault diagnosis method and device
Jin et al. An anomaly detection algorithm for microservice architecture based on robust principal component analysis
CN107872454A (en) A kind of monitoring of ultra-large type internet platform protection based on security rank threat information and analysis system and method based on big data technology
CN117971606B (en) Log management system and method based on elastic search
CN108304382B (en) Quality analysis method and system based on text data mining in manufacturing process
CN110262949A (en) Smart machine log processing system and method
CN114297460A (en) Distributed dynamically configurable crawler platform and crawler method
CN112948436A (en) Alarm work order merging method, device, equipment and storage medium
CN102346901A (en) Internet medicine trading subject credit assessment system and method
CN106789251A (en) Net silver running state monitoring system and method
CN106534784A (en) Acquisition analysis storage statistical system for video analysis data result set
CN101277218B (en) Dynamic analysis system and method for network alarm
CN106844170A (en) A kind of troubleshooting, the influence face method and apparatus of analysis failure
CN112306820A (en) Log operation and maintenance root cause analysis method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 250100 Ji'nan high tech Zone, Shandong, No. 1036 wave road

Patentee after: Tianyuan Communication Information System Co., Ltd.

Address before: 250101 Ji'nan high tech Zone, Shandong, No. 1036 wave road

Patentee before: Langchao Communication Information System Co., Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 250100 S06 tower, 1036, Chao Lu Road, hi tech Zone, Ji'nan, Shandong.

Patentee after: INSPUR COMMUNICATION AND INFORMATION SYSTEM Co.,Ltd.

Address before: No. 1036, Shandong high tech Zone wave road, Ji'nan, Shandong

Patentee before: INSPUR TIANYUAN COMMUNICATION INFORMATION SYSTEM Co.,Ltd.