CN103174292A - Pouring construction method of frame structure with concrete nodes of multiple mark numbers - Google Patents

Pouring construction method of frame structure with concrete nodes of multiple mark numbers Download PDF

Info

Publication number
CN103174292A
CN103174292A CN2013100719142A CN201310071914A CN103174292A CN 103174292 A CN103174292 A CN 103174292A CN 2013100719142 A CN2013100719142 A CN 2013100719142A CN 201310071914 A CN201310071914 A CN 201310071914A CN 103174292 A CN103174292 A CN 103174292A
Authority
CN
China
Prior art keywords
construction
concrete
frame
frame column
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100719142A
Other languages
Chinese (zh)
Other versions
CN103174292B (en
Inventor
王惠荣
尚润祥
王文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taihang Construction Development Co Ltd
Original Assignee
Shanxi Taihang Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taihang Construction Development Co Ltd filed Critical Shanxi Taihang Construction Development Co Ltd
Priority to CN201310071914.2A priority Critical patent/CN103174292B/en
Publication of CN103174292A publication Critical patent/CN103174292A/en
Application granted granted Critical
Publication of CN103174292B publication Critical patent/CN103174292B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to concrete pouring construction methods of constructional engineering, in particular to a pouring construction method of a frame structure with concrete nodes of multiple mark numbers, and solves the problem that at present, node portions are often of poor construction quality when a traditional method is used for pouring concrete of multiple mark numbers. The pouring construction method of the frame structure with the concrete nodes of multiple mark numbers comprises the following steps: carrying out steel bar banding of frame columns according to the design and the construction scheme of the frame structure, carrying out template supporting and arranging construction of frame columns, beams and plates according to the construction scheme, carrying out steel bar banding of the beams and the plates according to structural design and the construction scheme, and banding a steel wire net (1) vertically on the banded internal surrounding frame columns of the steel bars of the beams and the plates, wherein the steel wire net (1) is 500 m to 600 m away from the periphery of the frame columns. The pouring construction method of the frame structure with the concrete nodes of multiple mark numbers is reasonable in design, convenient to operate, fast in construction, and capable of controlling the construction quality of concrete of different mark numbers.

Description

Frame construction multiaspect concrete joint pouring construction method
Technical field
The present invention relates to concrete job practices in construction work, be specially a kind of frame construction multiaspect concrete joint pouring construction method.
Background technology
In present framework design, between interior each construction part of same floor, contiguous floors frame column, strength grade of concrete is usually different, how to guarantee the concrete construction quality of different labels, particularly the construction quality of the contact site of frame column high-grade concrete and beam, plate weak concrete (being node), become the Focal point and difficult point that this type of Construction Quality is controlled.At present often there is the not good problem of construction quality in traditional method building the concrete Nodes of multiaspect.
Summary of the invention
Often there is the not good problem of construction quality in order to solve at present traditional method in the present invention building the concrete Nodes of multiaspect, and a kind of frame construction multiaspect concrete joint pouring construction method is provided.
The present invention adopts following technical scheme to realize:
A kind of frame construction multiaspect concrete joint pouring construction method comprises the steps:
(1), according to framework design and constructure scheme, carry out the frame column reinforcing bar binding;
(2), according to constructure scheme, carry out the formwork erection construction of frame column, beam, plate;
(3), according to structure design and constructure scheme, carry out beam, the colligation of slab muscle;
(4), in the beam of colligation, slab muscle around the vertical metal binding wire net of frame column (being that gauze wire cloth is erectility), described gauze wire cloth is apart from frame column periphery 500-600mm;
(5), concreting: the frame column concrete of first building high grade, when a frame column build complete after, build immediately the beam of this root post periphery, the weak concrete of plate, then build next root frame column concrete, the construction of frame construction concrete is completed in operation and so forth.
in above-mentioned job practices, step (1), (2), (3) be all conventional existing building job practices, step (4), (5) be the core of the inventive method, at beam, in slab muscle process of binding, along frame column periphery 500-600mm place metal binding wire net, gauze wire cloth can play to the high-grade concrete of pouring frame post effective iris action, can make different labels frame column and beam again, board concrete obtains fully effectively contact at the gauze wire cloth place, simultaneously in concreting process, first build the frame column concrete of high grade, casting beams again, the plate weak concrete.Based on said process, by gauze wire cloth being set and controlling different labels concrete order, effectively guarantee the concrete construction quality of different labels, the construction quality of frame column high-grade concrete and beam, plate weak concrete contact site (being Nodes) particularly, construct complete after, identify through relevant departments, concrete construction quality meets the relevant specification of country requirement fully, has obtained good economic results in society.
Preferably, the continuous colligation of described gauze wire cloth is two-layer, more is conducive to guarantee the concrete construction quality of different labels.
Preferably, in order to guarantee the continuity of concrete pouring construction, improve efficiency of construction and speed, adopt in the step of described method (5) A, B two complete equipments to carry out concrete pouring construction, namely the A complete equipment carries out the frame column concrete pouring construction, when a frame column build complete after, the B complete equipment carries out corresponding beam, board concrete pouring construction immediately, the A complete equipment carries out pouring construction to next root frame column simultaneously, and the construction of frame construction concrete is completed in operation and so forth.
The inventive method is reasonable in design, easy and simple to handle, construction is quick, can effectively control the concrete construction quality of different labels, similar construction had good reference, obtained social benefit preferably, solved present traditional method and often had the not good problem of construction quality building the concrete Nodes of multiaspect.
Description of drawings
Fig. 1 is frame construction post, beam, plate node construction floor map.
Fig. 2 is frame construction post, beam, plate node construction generalized section.
In figure, the 1-gauze wire cloth.
The specific embodiment
Below in conjunction with accompanying drawing, specific embodiments of the invention are elaborated.
A kind of frame construction multiaspect concrete joint casting construction method comprises the steps:
(1), according to framework design and constructure scheme, carry out the frame column reinforcing bar binding;
(2), according to constructure scheme, carry out the formwork erection construction of frame column, beam, plate;
(3), according to structure design and constructure scheme, carry out beam, the colligation of slab muscle;
(4), in the beam of colligation, slab muscle around the vertical metal binding wire net 1 of frame column, described gauze wire cloth 1 is apart from frame column periphery 500-600mm, as shown in Figure 1, 2;
(5), concreting: the frame column concrete of first building high grade, when a frame column build complete after, build immediately the beam of this root post periphery, the weak concrete of plate, then build next root frame column concrete, the construction of frame construction concrete is completed in operation and so forth.
During concrete enforcement, in order to guarantee the continuity of concrete pouring construction, improve efficiency of construction and speed, adopt in the step of said method (5) A, B two complete equipments to carry out concrete pouring construction, namely the A complete equipment carries out the frame column concrete pouring construction, when a frame column build complete after, the B complete equipment carries out corresponding beam, board concrete pouring construction immediately, the A complete equipment carries out pouring construction to next root frame column simultaneously, and the construction of frame construction concrete is completed in operation and so forth.
Gauze wire cloth 1 can be 500mm, 520mm, 550mm, 570mm, 600mm etc. apart from the distance of frame column, colligation is two-layer continuously for gauze wire cloth, and two-layer gauze wire cloth can abut against together, also can separate certain distance, without specific (special) requirements, those skilled in the art can easily grasp.Described two-layer gauze wire cloth more can play to the high-grade concrete of pouring frame post effective iris action, and the different labels frame column is effectively contacted with beam, board concrete, further is conducive to guarantee the concrete construction quality of different labels.
Take positive coal hospital general emergency care of trauma Inpatient Building engineering as example, this engineering is positioned at positive coal hospital general institute, and underground two layers, six layers on the ground, subsidiary annex, form of structure is frame construction.This engineering structures is complicated, relates to the concrete of multiple intensity in construction, specifically sees the following form:
Sun coal hospital general emergency care of trauma Inpatient Building engineering concrete design strength statistical form
Sequence number Floor The engineering position Concrete class The engineering position Concrete class
1 The basis The basis The C45 water-tight concrete —— ——
2 -2 layers Frame column C50 Beam, plate C35
3 -1 layer, 1 layer Frame column C50 Beam, plate C35
4 2 layers Frame column C45 Beam, plate C35
5 Mechanical floor, 3 layers, 4 layers Frame column C40 Beam, plate C35
6 5 layers, 6 layers Frame column C35 Beam, plate C30
As can be seen from the above table, between interior each construction part of same floor, contiguous floors frame column, strength grade of concrete is all different, how to guarantee the concrete construction quality of different labels, the construction quality of frame column and beam, plate contact site particularly becomes the Focal point and difficult point of quality control.Adopting the extension gauze wire cloth and controlling varying strength concrete construction method sequentially and control construction quality.Engineering went into operation in March, 2011, in October, 2012 completion.Construct complete after, identify through relevant departments, concrete construction quality meets the national regulation requirement.After coming into operation, operational effect is good, does not find any architecture quality problem.

Claims (3)

1. a frame construction multiaspect concrete joint casting construction method, comprise the steps:
(1), according to framework design and constructure scheme, carry out the frame column reinforcing bar binding;
(2), according to constructure scheme, carry out the formwork erection construction of frame column, beam, plate;
(3), according to structure design and constructure scheme, carry out beam, the colligation of slab muscle;
It is characterized in that:
(4), in the beam of colligation, slab muscle around the vertical metal binding wire net of frame column (1), described gauze wire cloth (1) is apart from frame column periphery 500-600mm;
(5), concreting: the frame column concrete of first building high grade, when a frame column build complete after, build immediately the beam of this root post periphery, the weak concrete of plate, then build next root frame column concrete, the construction of frame construction concrete is completed in operation and so forth.
2. frame construction multiaspect concrete joint casting construction method according to claim 2, it is characterized in that: the continuous colligation of described gauze wire cloth is two-layer.
3. frame construction multiaspect concrete joint casting construction method according to claim 1 and 2, it is characterized in that: adopt A, B two complete equipments to carry out concrete pouring construction in step (5), be that the A complete equipment carries out the frame column concrete pouring construction, when a frame column build complete after, the B complete equipment carries out corresponding beam, board concrete pouring construction immediately, the A complete equipment carries out pouring construction to next root frame column simultaneously, and the construction of frame construction concrete is completed in operation and so forth.
CN201310071914.2A 2013-03-07 2013-03-07 Frame construction multiaspect concrete joint pouring construction method Active CN103174292B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310071914.2A CN103174292B (en) 2013-03-07 2013-03-07 Frame construction multiaspect concrete joint pouring construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310071914.2A CN103174292B (en) 2013-03-07 2013-03-07 Frame construction multiaspect concrete joint pouring construction method

Publications (2)

Publication Number Publication Date
CN103174292A true CN103174292A (en) 2013-06-26
CN103174292B CN103174292B (en) 2015-09-02

Family

ID=48634437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310071914.2A Active CN103174292B (en) 2013-03-07 2013-03-07 Frame construction multiaspect concrete joint pouring construction method

Country Status (1)

Country Link
CN (1) CN103174292B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405133A (en) * 2014-12-17 2015-03-11 中建五局蚌埠建筑工程有限公司 Combined type separation device for high-grade concrete and low-grade concrete
CN110761402A (en) * 2019-10-10 2020-02-07 上海欧跃建筑安装工程有限公司 Concrete pouring construction method for hysteresis synchronization construction of same floor of building floor slab
CN111622356A (en) * 2020-04-22 2020-09-04 上海二十冶建设有限公司 Construction method for beam-slab-column joints of frame structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5682717A (en) * 1994-11-30 1997-11-04 Carranza-Aubry; Rene Prefabricated support elements and method for implementing monolithic nodes
CN101289879A (en) * 2008-06-02 2008-10-22 南通华新建工集团有限公司 Concrete beam-column node construction method
CN201228395Y (en) * 2008-06-25 2009-04-29 江苏江都建设工程有限公司 Concrete pouring structure of beam-column node
CN101487293A (en) * 2008-06-25 2009-07-22 江苏江都建设工程有限公司 Concreting method with different intensity grades for beam column nodes
US20100071315A1 (en) * 2008-09-22 2010-03-25 Composite Frame, Inc. Composite concrete column and construction method using the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5682717A (en) * 1994-11-30 1997-11-04 Carranza-Aubry; Rene Prefabricated support elements and method for implementing monolithic nodes
CN101289879A (en) * 2008-06-02 2008-10-22 南通华新建工集团有限公司 Concrete beam-column node construction method
CN201228395Y (en) * 2008-06-25 2009-04-29 江苏江都建设工程有限公司 Concrete pouring structure of beam-column node
CN101487293A (en) * 2008-06-25 2009-07-22 江苏江都建设工程有限公司 Concreting method with different intensity grades for beam column nodes
US20100071315A1 (en) * 2008-09-22 2010-03-25 Composite Frame, Inc. Composite concrete column and construction method using the same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
韩铁军,刘学科,刘少福: "高层建筑多强度等级混凝土施工技术", 《城市道桥与防洪》, no. 8, 31 August 2009 (2009-08-31), pages 155 - 157 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405133A (en) * 2014-12-17 2015-03-11 中建五局蚌埠建筑工程有限公司 Combined type separation device for high-grade concrete and low-grade concrete
CN104405133B (en) * 2014-12-17 2016-03-09 中建五局蚌埠建筑工程有限公司 Combined type height low grade concrete separator
CN110761402A (en) * 2019-10-10 2020-02-07 上海欧跃建筑安装工程有限公司 Concrete pouring construction method for hysteresis synchronization construction of same floor of building floor slab
CN110761402B (en) * 2019-10-10 2020-12-29 上海欧跃建筑安装工程有限公司 Concrete pouring construction method for hysteresis synchronization construction of same floor of building floor slab
CN111622356A (en) * 2020-04-22 2020-09-04 上海二十冶建设有限公司 Construction method for beam-slab-column joints of frame structure

Also Published As

Publication number Publication date
CN103174292B (en) 2015-09-02

Similar Documents

Publication Publication Date Title
Kannan et al. Constructability assessment of climbing formwork systems using building information modeling
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN203238780U (en) Prefabricated stirrup cage of beam column core area
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN103174292A (en) Pouring construction method of frame structure with concrete nodes of multiple mark numbers
CN103896127A (en) Connecting structure of construction hoist and building climbing formwork frame
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN104947804B (en) A kind of steel bracket and the construction method that beam-column node structure is built using it
CN202899441U (en) Tool type support
CN207260605U (en) A kind of super plane structure construction material transport system
CN102322138A (en) The modular sliding formwork
CN204850469U (en) Commercial mansion system that builds
CN203603073U (en) Reinforced concrete lattice type composite platform beam of elevated station
CN102777026A (en) Method for constructing ultra-long rear casting plate supporting system by using Bailey frames
CN202596161U (en) Combined formwork device of HR heavy type gantry and reinforced concrete temporary structural column
Asadi et al. A comparative study for evaluation of different form work systems utilization in construction projects
CN205100543U (en) Novel construction system of commercial mansion
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN202925887U (en) A slab-column shear wall structure building based on prefabricated reinforced concrete hollow formworks
CN103015704A (en) Slab column-shear wall structure building based on precast reinforced concrete hollow formworks and construction method thereof
CN203429868U (en) Construction structure of unbonded pre-stressed cast-in-place reinforced concrete hollow slabs
CN203383563U (en) Fast assembled communication iron tower
CN203213022U (en) Mobile temporary prestress tensioning anchor block

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant