CN103088266A - Forging method for foundation bolt - Google Patents

Forging method for foundation bolt Download PDF

Info

Publication number
CN103088266A
CN103088266A CN2012105118208A CN201210511820A CN103088266A CN 103088266 A CN103088266 A CN 103088266A CN 2012105118208 A CN2012105118208 A CN 2012105118208A CN 201210511820 A CN201210511820 A CN 201210511820A CN 103088266 A CN103088266 A CN 103088266A
Authority
CN
China
Prior art keywords
bolt
stove
temperature
warming
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105118208A
Other languages
Chinese (zh)
Other versions
CN103088266B (en
Inventor
王立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Qianqianhui Need Chemical Co ltd
Original Assignee
Anhui Liufang Zhonglian Mechanical Share Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Liufang Zhonglian Mechanical Share Co Ltd filed Critical Anhui Liufang Zhonglian Mechanical Share Co Ltd
Priority to CN201210511820.8A priority Critical patent/CN103088266B/en
Publication of CN103088266A publication Critical patent/CN103088266A/en
Application granted granted Critical
Publication of CN103088266B publication Critical patent/CN103088266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a forging method for a foundation bolt. The forging method comprises the following forging steps of: a, preparing rod blanks by a forging process, controlling the chemical components of the rod blanks to satisfy the following requirements in percentage by weight: 0.25%-0.35% of C, 0.15%-0.25% of Mn, 0.15%-0.35% of Si, 0.01%-0.04% of W, P being not less than 0.015% and not more than 0.025%, S being not less than 0.015% and not more than 0.035%, 0.15%-0.20% of Ni, 0.025%-0.045% of Zn, 0.02%-0.03% of Sn, not more than 0.02% o Cr, and the balance of iron. According to the forging method for the foundation bolt disclosed by the invention, the bolt is machined by adopting a cold extrusion process, the strength of the bolt is improved, the needed hardness value and strength value of the 12.9 high-strength bolt are achieved, and delayed fracture and fatigue fracture of the high-strength bolt are solved; and moreover, during the using process, the foundation bolt is reliable in connection and not easy to break, so that the service life of the bolt is prolonged, and the using needs of the high-strength bolt in various industries of the society are satisfied.

Description

The forging method of wall screw
Technical field
The present invention relates to the working method of bolt, especially a kind of forging method of wall screw.
Background technology
Wall screw is fastening piece commonly used in machinery industry, and present processing mode is generally the moulding of turning, and intensity often is difficult to guarantee, sometimes in use produce turn around, the dangerous phenomenon such as bar section fracture, endanger very large to industrial production.Therefore the wall screw production method is studied and improved, guaranteed the quality stability of high strength bolt, technology and expanding economy are had vital role.In addition, when bolt was in relatively moist environment, the corrosion that gets rusty easily finally caused fracture or crackle, forms potential accident source.
Given this, be necessary to provide a kind of working method of wall screw, produce the wall screw more corrosion-resistant, that intensity is higher.
Summary of the invention
The object of the invention is to avoid weak point of the prior art, and a kind of forging method of wall screw is provided.
Purpose of the present invention is as follows by the following technical programs:
The forging method of wall screw, procedure of processing comprises:
A, make bar material blank by casting technique, the weight percent of each chemical composition of control lever material blank should satisfy following requirement: C 0.25~0.35, Mn 0.15~0.25, Si 0.15~0.35, W 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni 0.15~0.20, Zn 0.025~0.045, Sn 0.02~0.03, Cr≤0.02, and surplus is iron;
B, the bar material after casting is carried out forging and molding processing, forge temperature and be controlled to be 600-650 ℃, forging covering thin layer plant ash on the impression inwall of mould, the granularity of plant ash is controlled to be the 200-300 order, forge number of times no more than 25 times, forge that two dental laminas by reciprocating type tooth roller push the bar material after moulding, by reciprocal action, screw thread is rolled over the type of making, form the outside screw of bolt;
C, thermal treatment, bolt is put into vacuum heat treatment furnace, when being warming up to 450 ± 10 ℃ with stove, the insulation 1-2 hour, when being warming up to 700 ± 10 ℃ with stove, the insulation 40-50 minute, when being warming up to 800-900 ℃ with stove, the insulation 4-5 hour, then the quenching of coming out of the stove, put into again stove after quenching, when being warming up to 550-650 ± 10 ℃ with stove, insulation 6-8 hour, the use of coming out of the stove again hardening liquid is cooling, put into again stove after cooling, when being warming up to 550-650 ℃ with stove, insulation 5-6 hour, then the water-cooled of coming out of the stove;
D, the bolt after thermal treatment is carried out sub-zero treatment, liquid nitrogen temperature is-125~-150 ℃, and the time of sub-zero treatment is 2-5 hour, and the isothermal time in liquid nitrogen is: the cross-sectional area of bolt multiply by 2~3min/mm 2, the bolt that after sub-zero treatment, temperature has been gone back up to room temperature is put into boiling water heating 60-80 minute of 100 ℃;
At first e, bonderizing carry out skimming treatment with 14% sodium hydroxide solution washing, and temperature is controlled between 55-60 ℃, and the time is 5-6 minute, then washing; Use again 55%KHSO 4Solution washing carries out cleanup acid treatment, and temperature is controlled at 18-20 ℃, and the time is 1-2 minute, then washing; In 40 ℃ of situations of temperature, immerse in Sodium dodecylbenzene sulfonate solution at last, temperature is controlled at 45-57 ℃, and the immersion time is 3 minutes, cleans up afterwards;
F, blackening process, be under the condition of 120~130 ℃ in temperature, bolt is placed in to process in sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 15~20min, more fully clean, obtain the finished product bolt after air-dry with water.
Described blackening process is under temperature is the condition of 125 ℃, bolt is placed in to process in sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 18min, more fully clean, obtain the finished product bolt after air-dry with water.
The forging method of wall screw of the present invention, adopt the processing of cold-extrusion technology bolt, improved the intensity of bolt, delayed fracture and the repeated stress failure of wall screw have been solved, in use connect reliable, frangibility, do not improved bolt life, satisfied social upper every profession and trade to the user demand of wall screw.
Beneficial effect of the present invention is:
1, refinement of the present invention the shaping complete processing of material, make wire rod hardness moderate, the surface has good phosphatization epithelium, lubricity is good, wire rod is without hydrogen embrittlement, plasticity-is good;
2, bolt of the present invention has carried out repeatedly thermal treatment, has improved the wall screw bulk strength, and the bolt precision is high, quality is good, and production efficiency is high, without cutting without waste material, unit cost descends greatly, has obtained bulk metal and has flowed to the consistent bolt of direction, has greatly improved its tensile strength;
3, the invention of thermal treatment process has broken through the limit of the alloy steel products of bolt prior heat treatment, the leading domestic Investment in fastener industry level of the characteristic of its super-strong and super-toughened property.
Embodiment
The invention will be further described with the following Examples:
The forging method of wall screw, procedure of processing comprises:
A, make bar material blank by casting technique, the weight percent of each chemical composition of control lever material blank should satisfy following requirement: C 0.25~0.35, Mn 0.15~0.25, Si 0.15~0.35, W 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni 0.15~0.20, Zn 0.025~0.045, Sn 0.02~0.03, Cr≤0.02, and surplus is iron;
B, the bar material after casting is carried out forging and molding processing, forge temperature and be controlled to be 600-650 ℃, forging covering thin layer plant ash on the impression inwall of mould, the granularity of plant ash is controlled to be the 200-300 order, forge number of times no more than 25 times, forge that two dental laminas by reciprocating type tooth roller push the bar material after moulding, by reciprocal action, screw thread is rolled over the type of making, form the outside screw of bolt;
C, thermal treatment, bolt is put into vacuum heat treatment furnace, when being warming up to 450 ± 10 ℃ with stove, the insulation 1-2 hour, when being warming up to 700 ± 10 ℃ with stove, the insulation 40-50 minute, when being warming up to 800-900 ℃ with stove, the insulation 4-5 hour, then the quenching of coming out of the stove, put into again stove after quenching, when being warming up to 550-650 ± 10 ℃ with stove, insulation 6-8 hour, the use of coming out of the stove again hardening liquid is cooling, put into again stove after cooling, when being warming up to 550-650 ℃ with stove, insulation 5-6 hour, then the water-cooled of coming out of the stove;
D, the bolt after thermal treatment is carried out sub-zero treatment, liquid nitrogen temperature is-125~-150 ℃, and the time of sub-zero treatment is 2-5 hour, and the isothermal time in liquid nitrogen is: the cross-sectional area of bolt multiply by 2~3min/mm 2, the bolt that after sub-zero treatment, temperature has been gone back up to room temperature is put into boiling water heating 60-80 minute of 100 ℃;
At first e, bonderizing carry out skimming treatment with 14% sodium hydroxide solution washing, and temperature is controlled between 55-60 ℃, and the time is 5-6 minute, then washing; Use again 55%KHSO 4Solution washing carries out cleanup acid treatment, and temperature is controlled at 18-20 ℃, and the time is 1-2 minute, then washing; In 40 ℃ of situations of temperature, immerse in Sodium dodecylbenzene sulfonate solution at last, temperature is controlled at 45-57 ℃, and the immersion time is 3 minutes, cleans up afterwards;
F, blackening process are under temperature is the condition of 125 ℃, bolt is placed in to process in sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 18min, more fully clean, obtain the finished product bolt after air-dry with water.
The bolt of producing according to the preparation method of wall screw of the present invention, as follows through detecting its mechanical property numerical value of test, the bolt centre hardness reaches 40-42HRC, bolt thread section hardness reaches 36-40HRC, tensile strength reaches 1240Mpa, yield strength reaches 1250Mpa, unit elongation is greater than 11%, and relative reduction in area is greater than 35%, and impelling strength is greater than 50J/cm 2, the high 10-12% of bolt that comprehensive mechanical performance produces than existing technique.
Should be noted that at last; above embodiment only is used for technical scheme of the present invention being described but not limiting the scope of the invention; although with reference to preferred embodiment, the present invention has been done detailed description; those of ordinary skill in the art is to be understood that; can modify or be equal to replacement technical scheme of the present invention, and not break away from essence and the scope of technical solution of the present invention.

Claims (2)

1. the forging method of wall screw, is characterized in that, procedure of processing comprises:
A, make bar material blank by casting technique, the weight percent of each chemical composition of control lever material blank should satisfy following requirement: C 0.25~0.35, Mn 0.15~0.25, Si 0.15~0.35, W 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni 0.15~0.20, Zn 0.025~0.045, Sn 0.02~0.03, Cr≤0.02, and surplus is iron;
B, the bar material after casting is carried out forging and molding processing, forge temperature and be controlled to be 600-650 ℃, forging covering thin layer plant ash on the impression inwall of mould, the granularity of plant ash is controlled to be the 200-300 order, forge number of times no more than 25 times, forge that two dental laminas by reciprocating type tooth roller push the bar material after moulding, by reciprocal action, screw thread is rolled over the type of making, form the outside screw of bolt;
C, thermal treatment, bolt is put into vacuum heat treatment furnace, when being warming up to 450 ± 10 ℃ with stove, the insulation 1-2 hour, when being warming up to 700 ± 10 ℃ with stove, the insulation 40-50 minute, when being warming up to 800-900 ℃ with stove, the insulation 4-5 hour, then the quenching of coming out of the stove, put into again stove after quenching, when being warming up to 550-650 ± 10 ℃ with stove, insulation 6-8 hour, the use of coming out of the stove again hardening liquid is cooling, put into again stove after cooling, when being warming up to 550-650 ℃ with stove, insulation 5-6 hour, then the water-cooled of coming out of the stove;
D, the bolt after thermal treatment is carried out sub-zero treatment, liquid nitrogen temperature is-125~-150 ℃, and the time of sub-zero treatment is 2-5 hour, and the isothermal time in liquid nitrogen is: the cross-sectional area of bolt multiply by 2~3min/mm 2, the bolt that after sub-zero treatment, temperature has been gone back up to room temperature is put into boiling water heating 60-80 minute of 100 ℃;
At first e, bonderizing carry out skimming treatment with 14% sodium hydroxide solution washing, and temperature is controlled between 55-60 ℃, and the time is 5-6 minute, then washing; Use again 55%KHSO 4Solution washing carries out cleanup acid treatment, and temperature is controlled at 18-20 ℃, and the time is 1-2 minute, then washing; In 40 ℃ of situations of temperature, immerse in Sodium dodecylbenzene sulfonate solution at last, temperature is controlled at 45-57 ℃, and the immersion time is 3 minutes, cleans up afterwards;
F, blackening process, be under the condition of 120~130 ℃ in temperature, bolt is placed in to process in sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 15~20min, more fully clean, obtain the finished product bolt after air-dry with water.
2. the forging method of wall screw according to claim 1, it is characterized in that: described blackening process is under temperature is the condition of 125 ℃, bolt is placed in to process in sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from oxidation solution, and spontaneous curing 18min, more fully clean, obtain the finished product bolt after air-dry with water.
CN201210511820.8A 2012-12-04 2012-12-04 The forging method of foundation bolt Active CN103088266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210511820.8A CN103088266B (en) 2012-12-04 2012-12-04 The forging method of foundation bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210511820.8A CN103088266B (en) 2012-12-04 2012-12-04 The forging method of foundation bolt

Publications (2)

Publication Number Publication Date
CN103088266A true CN103088266A (en) 2013-05-08
CN103088266B CN103088266B (en) 2016-05-11

Family

ID=48201390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210511820.8A Active CN103088266B (en) 2012-12-04 2012-12-04 The forging method of foundation bolt

Country Status (1)

Country Link
CN (1) CN103088266B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104400359A (en) * 2014-11-28 2015-03-11 杨帆 Method for preparing foundation bolts
CN104694845A (en) * 2015-04-04 2015-06-10 王文姣 Heat treatment method for vehicle bumper and vehicle bumper
CN107641701A (en) * 2017-10-17 2018-01-30 苏州华丰不锈钢紧固件有限公司 A kind of deep cooling Technology for Heating Processing of steel alloy screw
CN109112410A (en) * 2018-09-30 2019-01-01 宁波市镇海甬鼎紧固件制造有限公司 A kind of low temperature resistant high-strength bolt and its production method
CN112111697A (en) * 2020-08-19 2020-12-22 张清苗 Preparation method of heavy anti-corrosion alloy connecting bolt
CN112226675A (en) * 2020-08-19 2021-01-15 张清苗 Heavy-duty anticorrosive high-strength foundation bolt and preparation method thereof
CN112899578A (en) * 2021-01-21 2021-06-04 牟昶宇 Bolt preparation process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030150529A1 (en) * 2001-03-22 2003-08-14 Nobuyoshi Uno High-strength bolt excellent in delayed fracture resistance characteristic and its steel product
JP2007146284A (en) * 2005-10-31 2007-06-14 Jfe Steel Kk High-strength steel excellent in delayed fracture resistance characteristic and metal bolt
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102260831A (en) * 2011-07-08 2011-11-30 曾美霞 Fastener, such as screw bolt, screw nut and the like made from high-strength steel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030150529A1 (en) * 2001-03-22 2003-08-14 Nobuyoshi Uno High-strength bolt excellent in delayed fracture resistance characteristic and its steel product
JP2007146284A (en) * 2005-10-31 2007-06-14 Jfe Steel Kk High-strength steel excellent in delayed fracture resistance characteristic and metal bolt
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102260831A (en) * 2011-07-08 2011-11-30 曾美霞 Fastener, such as screw bolt, screw nut and the like made from high-strength steel

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104400359A (en) * 2014-11-28 2015-03-11 杨帆 Method for preparing foundation bolts
CN104694845A (en) * 2015-04-04 2015-06-10 王文姣 Heat treatment method for vehicle bumper and vehicle bumper
CN107641701A (en) * 2017-10-17 2018-01-30 苏州华丰不锈钢紧固件有限公司 A kind of deep cooling Technology for Heating Processing of steel alloy screw
CN109112410A (en) * 2018-09-30 2019-01-01 宁波市镇海甬鼎紧固件制造有限公司 A kind of low temperature resistant high-strength bolt and its production method
CN112111697A (en) * 2020-08-19 2020-12-22 张清苗 Preparation method of heavy anti-corrosion alloy connecting bolt
CN112226675A (en) * 2020-08-19 2021-01-15 张清苗 Heavy-duty anticorrosive high-strength foundation bolt and preparation method thereof
CN112899578A (en) * 2021-01-21 2021-06-04 牟昶宇 Bolt preparation process

Also Published As

Publication number Publication date
CN103088266B (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN103088266B (en) The forging method of foundation bolt
CN103088268B (en) The preparation method of fastening bolt used for automobile wheels
CN103089781B (en) Method for machining high-strength double end bolt
CN104439219B (en) A kind of casting technique of steel loop base based on casting and rolling composite forming
CN103084532B (en) Method for machining T-shaped bolt
CN101890618A (en) Processing method of high-strength bolts
CN103205641A (en) Preparation method for high-strength foundation bolt
CN103205642A (en) Preparation method for wear-resistant check bolt
CN103084523A (en) Method for machining high-strength U-shaped bolt
CN103084798A (en) Method for forging high-strength bolt
CN103131948A (en) Preparation method of high-strength T-shaped bolt
CN103088267B (en) The preparation method of Lengthened bolt
CN105328095A (en) Low-carbon high-alloy steel forging technology
CN103028685B (en) The processing method of high-grade bolt
CN103128505B (en) The preparation method of high-strength steel cable bolt
CN103131949A (en) Preparation method of high-strength aluminum alloy flange bolt
CN103084797A (en) Method for forging bolt for caterpillar track of excavator
CN103084525B (en) The connecting-rod bolts processing method of diesel engine
CN103084533B (en) Method for forging torsional shear type high-strength bolt
CN103131954A (en) Preparation method of fracture-resistant steel rope bolt
CN103084524B (en) Flange bolt forging method
CN103088271B (en) The preparation method of high-strength corrosion-resisting bolt
CN103320596A (en) Manufacturing process of tin-phosphor bronze stretching rod
CN103133485B (en) The preparation method of wear-resistant U bolt
CN105821300A (en) Heat treatment process of low-alloy large mold steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160406

Address after: 230031 Hefei high tech Zone, Zhejiang Province, venture building, room A-914

Applicant after: Hefei Hongjie New Material Science and Technology Co.,Ltd.

Address before: 241000 Anhui Province, Wuhu Yongchang City Jiujiang Road Development Zone No. 69

Applicant before: Anhui Liufang Zhonglian Mechanical Share Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181114

Address after: 226403 No. 11 Xinjian Road, Chahe Town, Rudong County, Nantong City, Jiangsu Province

Patentee after: Rudong County Yan Chuan Water Service Co.,Ltd.

Address before: 230031 A-914 room, Zhejiang business and business building, Hefei hi tech Zone, Anhui

Patentee before: Hefei Hongjie New Material Science and Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200407

Address after: The new road Chahe town of Rudong County in Jiangsu province Nantong City, No. 11, 226400

Patentee after: Rudong Yanchuan Property Management Co.,Ltd.

Address before: The new road Chahe town of Rudong County in Jiangsu province Nantong City, No. 11, 226403

Patentee before: Rudong County Yan Chuan Water Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230106

Address after: No. 1, Zone 7, Nantong Galaxy Industrial Park, Rudong County, Nantong, Jiangsu 226400

Patentee after: NANTONG QIANQIANHUI NEED CHEMICAL CO.,LTD.

Address before: 226400 No.11, Xinjian Road, Chahe Town, Rudong County, Nantong City, Jiangsu Province

Patentee before: Rudong Yanchuan Property Management Co.,Ltd.