CN103088266B - The forging method of foundation bolt - Google Patents

The forging method of foundation bolt Download PDF

Info

Publication number
CN103088266B
CN103088266B CN201210511820.8A CN201210511820A CN103088266B CN 103088266 B CN103088266 B CN 103088266B CN 201210511820 A CN201210511820 A CN 201210511820A CN 103088266 B CN103088266 B CN 103088266B
Authority
CN
China
Prior art keywords
bolt
stove
temperature
warming
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210511820.8A
Other languages
Chinese (zh)
Other versions
CN103088266A (en
Inventor
王立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Qianqianhui Need Chemical Co ltd
Original Assignee
Hefei Hongjie New Material Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Hongjie New Material Science And Technology Co Ltd filed Critical Hefei Hongjie New Material Science And Technology Co Ltd
Priority to CN201210511820.8A priority Critical patent/CN103088266B/en
Publication of CN103088266A publication Critical patent/CN103088266A/en
Application granted granted Critical
Publication of CN103088266B publication Critical patent/CN103088266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses the forging method of foundation bolt, procedure of processing comprises: a, make bar material blank by casting technique, should the percentage by weight of each chemical composition of control lever material blank meet following requirement: C? 0.25~0.35, Mn? 0.15~0.25, Si? 0.15~0.35, W? 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni? 0.15~0.20, Zn? 0.025~0.045, Sn? 0.02~0.03, Cr≤0.02, surplus is iron. The forging method of foundation bolt of the present invention, adopt the processing of cold-extrusion technology bolt, improve the intensity of bolt, reach required hardness number, the intensity level of 12.9 high-strength bolts, solve delayed fracture and the fatigue fracture of bolt under high strength, in use connected reliably not frangibility, improve bolt life, met the user demand of social upper every profession and trade to high-strength bolt.

Description

The forging method of foundation bolt
Technical field
The present invention relates to the processing method of bolt, especially a kind of forging method of foundation bolt.
Background technology
Foundation bolt is securing member conventional in machinery industry, and current processing mode is generally the moulding of turning, and intensity is often difficult to ensure, the dangerous phenomenons such as in use generation is sometimes turned around, the fracture of bar portion are very large to industrial production harm. Therefore foundation bolt production method is studied and improved, guaranteed the quality stability of high-strength bolt, technology and expanding economy are had to important function. In addition, bolt is in relatively moist environment time, and the corrosion that gets rusty easily, finally causes rupturing or crackle, forms potential accident source.
Given this, be necessary to provide a kind of processing method of foundation bolt, produce the foundation bolt more corrosion-resistant, intensity is higher.
Summary of the invention
The object of the invention is to avoid weak point of the prior art, and a kind of forging method of foundation bolt is provided.
Object of the present invention is as follows by the following technical programs:
The forging method of foundation bolt, procedure of processing comprises:
A, make bar material blank by casting technique, the percentage by weight of each chemical composition of control lever material blank should meet following requirement: C0.25~0.35, Mn0.15~0.25, Si0.15~0.35, W0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni0.15~0.20, Zn0.025~0.045, Sn0.02~0.03, Cr≤0.02, and surplus is iron;
B, the bar material after casting is carried out to forging and molding processing, forging temperature control is 600-650 DEG C, on the impression inwall that forges mould, cover thin layer plant ash, the granularity control of plant ash is 200-300 order, forge number of times no more than 25 times, after forging moulding, by two dental laminas of reciprocating tooth roller, bar material is pushed, by reciprocal action, screw thread is rolled over to the type of making, form the external screw thread of bolt;
C, heat treatment, bolt is put into vacuum heat treatment furnace, while being warming up to 450 ± 10 DEG C with stove, insulation 1-2 hour, while being warming up to 700 ± 10 DEG C with stove, insulation 40-50 minute, while being warming up to 800-900 DEG C with stove, insulation 4-5 hour, then the quenching of coming out of the stove, puts into stove again after quenching, while being warming up to 550-650 ± 10 DEG C with stove, insulation 6-8 hour, the use of coming out of the stove again quenching liquid is cooling, after cooling, put into again stove, while being warming up to 550-650 DEG C with stove, insulation 5-6 hour, then the water-cooled of coming out of the stove;
D, the bolt after heat treatment is carried out to subzero treatment, liquid nitrogen temperature is-125~-150 DEG C, and the time of subzero treatment is 2-5 hour, and the isothermal time in liquid nitrogen is: the cross-sectional area of bolt be multiplied by 2~3min/mm2, the bolt that after subzero treatment, temperature has been gone back up to room temperature is put into the boiling water of 100 DEG C and is heated 60-80 minute;
E, phosphatization processing, first carry out ungrease treatment with 14% sodium hydroxide solution washing, and temperature is controlled between 55-60 DEG C, and the time is 5-6 minute, then washing; Use again 55%KHSO4Solution washing carries out pickling processes, and temperature is controlled at 18-20 DEG C, and the time is 1-2 minute, then washing; Finally, in 40 DEG C of situations of temperature, immerse in neopelex solution, temperature is controlled at 45-57 DEG C, and the immersion time is 3 minutes, cleans up afterwards;
F, blackening process, be under the condition of 120~130 DEG C in temperature, bolt is placed in sodium nitrite solution and processes and be grey black or all black to surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 15~20min, more fully clean, obtain finished product bolt after air-dry with water.
Described blackening process is under temperature is the condition of 125 DEG C, bolt is placed in sodium nitrite solution and processes and be grey black or all black to surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 18min, more fully clean, obtain finished product bolt after air-dry with water.
The forging method of foundation bolt of the present invention, adopt the processing of cold-extrusion technology bolt, improve the intensity of bolt, delayed fracture and the fatigue fracture of foundation bolt are solved, in use connect reliable, not frangibility, has improved bolt life, has met the user demand of social upper every profession and trade to foundation bolt.
Beneficial effect of the present invention is:
1, refinement of the present invention the shaping processing technology of material, make wire rod hardness moderate, surface has good phosphatization epithelium, greasy property is good, wire rod is without hydrogen embrittlement, plasticity is good;
2, bolt of the present invention has carried out repeatedly heat treatment, has improved foundation bolt bulk strength, and bolt precision is high, quality is good, and production efficiency is high, without cutting without waste material, unit cost declines greatly, has obtained bulk metal and has flowed to the bolt that direction is consistent, has greatly improved its tensile strength;
3, the invention of Technology for Heating Processing has broken through the limit of the alloy steel products of bolt prior heat treatment, the leading domestic Investment in fastener industry level of the characteristic of its super-strong and super-toughened property.
Detailed description of the invention
The invention will be further described with the following Examples:
The forging method of foundation bolt, procedure of processing comprises:
A, make bar material blank by casting technique, the percentage by weight of each chemical composition of control lever material blank should meet following requirement: C0.25~0.35, Mn0.15~0.25, Si0.15~0.35, W0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni0.15~0.20, Zn0.025~0.045, Sn0.02~0.03, Cr≤0.02, and surplus is iron;
B, the bar material after casting is carried out to forging and molding processing, forging temperature control is 600-650 DEG C, on the impression inwall that forges mould, cover thin layer plant ash, the granularity control of plant ash is 200-300 order, forge number of times no more than 25 times, after forging moulding, by two dental laminas of reciprocating tooth roller, bar material is pushed, by reciprocal action, screw thread is rolled over to the type of making, form the external screw thread of bolt;
C, heat treatment, bolt is put into vacuum heat treatment furnace, while being warming up to 450 ± 10 DEG C with stove, insulation 1-2 hour, while being warming up to 700 ± 10 DEG C with stove, insulation 40-50 minute, while being warming up to 800-900 DEG C with stove, insulation 4-5 hour, then the quenching of coming out of the stove, puts into stove again after quenching, while being warming up to 550-650 ± 10 DEG C with stove, insulation 6-8 hour, the use of coming out of the stove again quenching liquid is cooling, after cooling, put into again stove, while being warming up to 550-650 DEG C with stove, insulation 5-6 hour, then the water-cooled of coming out of the stove;
D, the bolt after heat treatment is carried out to subzero treatment, liquid nitrogen temperature is-125~-150 DEG C, and the time of subzero treatment is 2-5 hour, and the isothermal time in liquid nitrogen is: the cross-sectional area of bolt be multiplied by 2~3min/mm2, the bolt that after subzero treatment, temperature has been gone back up to room temperature is put into the boiling water of 100 DEG C and is heated 60-80 minute;
E, phosphatization processing, first carry out ungrease treatment with 14% sodium hydroxide solution washing, and temperature is controlled between 55-60 DEG C, and the time is 5-6 minute, then washing; Use again 55%KHSO4Solution washing carries out pickling processes, and temperature is controlled at 18-20 DEG C, and the time is 1-2 minute, then washing; Finally, in 40 DEG C of situations of temperature, immerse in neopelex solution, temperature is controlled at 45-57 DEG C, and the immersion time is 3 minutes, cleans up afterwards;
F, blackening process are under temperature is the condition of 125 DEG C, bolt is placed in sodium nitrite solution and processes and be grey black or all black to surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 18min, more fully clean, obtain finished product bolt after air-dry with water.
The bolt of producing according to the preparation method of foundation bolt of the present invention, as follows through detecting its mechanical performance numerical value of test, bolt centre hardness reaches 40-42HRC, bolt thread section hardness reaches 36-40HRC, tensile strength reaches 1240Mpa, yield strength reaches 1250Mpa, percentage elongation is greater than 11%, and the contraction percentage of area is greater than 35%, and impact flexibility is greater than 50J/cm2, the high 10-12% of bolt that comprehensive mechanical performance produces than existing technique.
Finally should be noted that; above embodiment is only for illustrating technical scheme of the present invention but not limiting the scope of the invention; although the present invention is explained in detail with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify or be equal to replacement technical scheme of the present invention, and not depart from essence and the scope of technical solution of the present invention.

Claims (2)

1. the forging method of foundation bolt, is characterized in that, procedure of processing comprises:
A, make bar material blank by casting technique, the percentage by weight of each chemical composition of control lever material blank should meet following requirement: C0.25~0.35, Mn0.15~0.25, Si0.15~0.35, W0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni0.15~0.20, Zn0.025~0.045, Sn0.02~0.03, Cr≤0.02, and surplus is iron;
B, the bar material after casting is carried out to forging and molding processing, forging temperature control is 600-650 DEG C, on the impression inwall that forges mould, cover thin layer plant ash, the granularity control of plant ash is 200-300 order, forge number of times no more than 25 times, after forging moulding, by two dental laminas of reciprocating tooth roller, bar material is pushed, by reciprocal action, screw thread is rolled over to the type of making, form the external screw thread of bolt;
C, heat treatment, bolt is put into vacuum heat treatment furnace, while being warming up to 450 ± 10 DEG C with stove, insulation 1-2 hour, while being warming up to 700 ± 10 DEG C with stove, insulation 40-50 minute, while being warming up to 800-900 DEG C with stove, insulation 4-5 hour, then the quenching of coming out of the stove, puts into stove again after quenching, while being warming up to 550-650 DEG C with stove, insulation 6-8 hour, the use of coming out of the stove again quenching liquid is cooling, after cooling, put into again stove, while being warming up to 550-650 DEG C with stove, insulation 5-6 hour, then the water-cooled of coming out of the stove;
D, the bolt after heat treatment is carried out to subzero treatment, liquid nitrogen temperature is-125~-150 DEG C, and the time of subzero treatment is 2-5 hour, and the isothermal time in liquid nitrogen is: the cross-sectional area of bolt is multiplied by 2~3min/mm2, the bolt that after subzero treatment, temperature has been gone back up to room temperature is put into the boiling water of 100 DEG C and is heated 60-80 minute;
E, first carry out ungrease treatment with 14% sodium hydroxide solution washing, temperature is controlled between 55-60 DEG C, and the time is 5-6 minute, then washing; Use again 55%KHSO4Solution washing carries out pickling processes, and temperature is controlled at 18-20 DEG C, and the time is 1-2 minute, then washing; Finally, in 40 DEG C of situations of temperature, immerse in neopelex solution, temperature is controlled at 45-57 DEG C, and the immersion time is 3 minutes, cleans up afterwards;
F, blackening process, be under the condition of 120~130 DEG C in temperature, bolt is placed in sodium nitrite solution and processes and be grey black or all black to surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 15~20min, more fully clean, obtain finished product bolt after air-dry with water.
2. the forging method of foundation bolt according to claim 1, it is characterized in that: described blackening process is under temperature is the condition of 125 DEG C, bolt is placed in sodium nitrite solution and processes and be grey black or all black to surface, then bolt is taken out from sodium nitrite solution, and spontaneous curing 18min, more fully clean, obtain finished product bolt after air-dry with water.
CN201210511820.8A 2012-12-04 2012-12-04 The forging method of foundation bolt Active CN103088266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210511820.8A CN103088266B (en) 2012-12-04 2012-12-04 The forging method of foundation bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210511820.8A CN103088266B (en) 2012-12-04 2012-12-04 The forging method of foundation bolt

Publications (2)

Publication Number Publication Date
CN103088266A CN103088266A (en) 2013-05-08
CN103088266B true CN103088266B (en) 2016-05-11

Family

ID=48201390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210511820.8A Active CN103088266B (en) 2012-12-04 2012-12-04 The forging method of foundation bolt

Country Status (1)

Country Link
CN (1) CN103088266B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104400359A (en) * 2014-11-28 2015-03-11 杨帆 Method for preparing foundation bolts
CN104694845B (en) * 2015-04-04 2016-11-30 胡贤晨 The heat treatment method of a kind of bumper and this bumper
CN107641701A (en) * 2017-10-17 2018-01-30 苏州华丰不锈钢紧固件有限公司 A kind of deep cooling Technology for Heating Processing of steel alloy screw
CN109112410A (en) * 2018-09-30 2019-01-01 宁波市镇海甬鼎紧固件制造有限公司 A kind of low temperature resistant high-strength bolt and its production method
CN112111697A (en) * 2020-08-19 2020-12-22 张清苗 Preparation method of heavy anti-corrosion alloy connecting bolt
CN112226675A (en) * 2020-08-19 2021-01-15 张清苗 Heavy-duty anticorrosive high-strength foundation bolt and preparation method thereof
CN112899578A (en) * 2021-01-21 2021-06-04 牟昶宇 Bolt preparation process

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102260831A (en) * 2011-07-08 2011-11-30 曾美霞 Fastener, such as screw bolt, screw nut and the like made from high-strength steel

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4142853B2 (en) * 2001-03-22 2008-09-03 新日本製鐵株式会社 High strength bolt with excellent delayed fracture resistance
JP5167616B2 (en) * 2005-10-31 2013-03-21 Jfeスチール株式会社 Metal bolts with excellent delayed fracture resistance

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102260831A (en) * 2011-07-08 2011-11-30 曾美霞 Fastener, such as screw bolt, screw nut and the like made from high-strength steel

Also Published As

Publication number Publication date
CN103088266A (en) 2013-05-08

Similar Documents

Publication Publication Date Title
CN103088266B (en) The forging method of foundation bolt
CN103088268B (en) The preparation method of fastening bolt used for automobile wheels
CN103128506B (en) The anti-preparation method of foot bolt yieldly
CN103089781B (en) Method for machining high-strength double end bolt
CN103084532B (en) Method for machining T-shaped bolt
CN103643146B (en) A kind of manufacture method of chrome molybdenum low-alloy prestressed aluminium coated steel wire
CN103205641A (en) Preparation method for high-strength foundation bolt
CN103088267B (en) The preparation method of Lengthened bolt
CN103084798B (en) high-strength bolt forging method
CN103205642A (en) Preparation method for wear-resistant check bolt
CN103084523A (en) Method for machining high-strength U-shaped bolt
CN105603258B (en) A kind of high intensity zircaloy and preparation method
CN103028685B (en) The processing method of high-grade bolt
CN104400359A (en) Method for preparing foundation bolts
CN103556029A (en) Manufacturing method of anti-corrosion high-pressure-resistant sealing gasket
CN105328095A (en) Low-carbon high-alloy steel forging technology
CN103128505B (en) The preparation method of high-strength steel cable bolt
CN103084525B (en) The connecting-rod bolts processing method of diesel engine
CN103084797B (en) Crawler of excavator bolt forging method
CN103084524B (en) Flange bolt forging method
CN103131949A (en) Preparation method of high-strength aluminum alloy flange bolt
CN103084533B (en) Method for forging torsional shear type high-strength bolt
CN103088271B (en) The preparation method of high-strength corrosion-resisting bolt
CN103131954A (en) Preparation method of fracture-resistant steel rope bolt
CN103320596A (en) Manufacturing process of tin-phosphor bronze stretching rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160406

Address after: 230031 Hefei high tech Zone, Zhejiang Province, venture building, room A-914

Applicant after: Hefei Hongjie New Material Science and Technology Co.,Ltd.

Address before: 241000 Anhui Province, Wuhu Yongchang City Jiujiang Road Development Zone No. 69

Applicant before: Anhui Liufang Zhonglian Mechanical Share Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181114

Address after: 226403 No. 11 Xinjian Road, Chahe Town, Rudong County, Nantong City, Jiangsu Province

Patentee after: Rudong County Yan Chuan Water Service Co.,Ltd.

Address before: 230031 A-914 room, Zhejiang business and business building, Hefei hi tech Zone, Anhui

Patentee before: Hefei Hongjie New Material Science and Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200407

Address after: The new road Chahe town of Rudong County in Jiangsu province Nantong City, No. 11, 226400

Patentee after: Rudong Yanchuan Property Management Co.,Ltd.

Address before: The new road Chahe town of Rudong County in Jiangsu province Nantong City, No. 11, 226403

Patentee before: Rudong County Yan Chuan Water Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230106

Address after: No. 1, Zone 7, Nantong Galaxy Industrial Park, Rudong County, Nantong, Jiangsu 226400

Patentee after: NANTONG QIANQIANHUI NEED CHEMICAL CO.,LTD.

Address before: 226400 No.11, Xinjian Road, Chahe Town, Rudong County, Nantong City, Jiangsu Province

Patentee before: Rudong Yanchuan Property Management Co.,Ltd.

TR01 Transfer of patent right