CN103128505B - The preparation method of high-strength steel cable bolt - Google Patents

The preparation method of high-strength steel cable bolt Download PDF

Info

Publication number
CN103128505B
CN103128505B CN201310042135.XA CN201310042135A CN103128505B CN 103128505 B CN103128505 B CN 103128505B CN 201310042135 A CN201310042135 A CN 201310042135A CN 103128505 B CN103128505 B CN 103128505B
Authority
CN
China
Prior art keywords
bolt
parts
bar material
strength
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310042135.XA
Other languages
Chinese (zh)
Other versions
CN103128505A (en
Inventor
赵光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinglong Shipping Engineering Nantong Co ltd
Original Assignee
FANCHANG COUNTY QILIN CASTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANCHANG COUNTY QILIN CASTING Co Ltd filed Critical FANCHANG COUNTY QILIN CASTING Co Ltd
Priority to CN201310042135.XA priority Critical patent/CN103128505B/en
Publication of CN103128505A publication Critical patent/CN103128505A/en
Application granted granted Critical
Publication of CN103128505B publication Critical patent/CN103128505B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Forging (AREA)

Abstract

The invention discloses a kind of preparation method of high-strength steel cable bolt, procedure of processing comprises: a, casting bar material, by weight, first the steel scrap of 10-14 part is dropped in middle frequency furnace and be fused into molten steel, add again and add carbon agent, when temperature in middle frequency furnace rises to 1120 ~ 1220 DEG C, drop into the steel ingot of 30-35 part, the pig iron of 30-35 part and the foundry returns of 12-16 part again, then deslagging, when coming out of the stove when the temperature in middle frequency furnace rises to 1450 DEG C, the copper of 0.4-0.6 part is added ladle with molten iron, pours into a mould; The preparation method of high-strength steel cable bolt of the present invention, adopt the processing of cold-extrusion technology bolt, improve the intensity of bolt, reach the hardness number needed for 12.9 high-strength bolts, intensity level, solve delayed fracture and the fatigue fracture of bolt under high strength, in use connect reliable, not frangibility, improve bolt life, meet the upper every profession and trade of society to the user demand of high-strength bolt.

Description

The preparation method of high-strength steel cable bolt
Technical field
The present invention relates to the processing method of bolt, especially a kind of preparation method of high-strength steel cable bolt.
Background technology
Wire bolt is securing member conventional in machinery industry, and current processing mode is generally the shaping of turning, and intensity is often difficult to ensure, the dangerous phenomenons such as in use generation is sometimes turned around, the fracture of bar portion, very large to industrial production harm.Therefore high-strength bolt production method is studied and improved, guaranteed the quality stability of high-strength bolt, to technology and expanding economy, be there is important function.In addition, when bolt is in the environment of relative humidity, get rusty easily corrosion, finally causes fracture or crackle, form potential accident source.
Given this, be necessary to provide a kind of wire bolt preparation method, produce more corrosion-resistant, more anti abrasive high-strength bolt.
Summary of the invention
The object of the invention is to avoid weak point of the prior art, and a kind of preparation method of high-strength steel cable bolt is provided.
Object of the present invention is as follows by the following technical programs:
The preparation method of high-strength steel cable bolt, procedure of processing comprises:
A, casting bar material, by weight, first the steel scrap of 10-14 part is dropped in middle frequency furnace and be fused into molten steel, add again and add carbon agent, when temperature in middle frequency furnace rises to 1120 ~ 1220 DEG C, drop into the steel ingot of 30-35 part again, the pig iron of 30-35 part and the foundry returns of 12-16 part, fusing, then deslagging, ferromanganese is added after deslagging, the alloys such as ferrosilicon, when coming out of the stove when the temperature in middle frequency furnace rises to 1450 DEG C, pour into a mould, the percentage by weight of each chemical composition of control lever material blank should meet following requirement: C0.28 ~ 0.35, Mn0.25 ~ 0.35, V0.05-0.15, Si0.25 ~ 0.35, W0.01-0.04, P≤0.025, S≤0.035, Ni0.45 ~ 0.60, Sn0.20 ~ 0.30, Cu0.25 ~ 0.35, surplus is iron,
B, bar material after casting do pickling processes; According to the wire diameter requirement of bolt, line is taken out to it, be retracted to wire diameter needed for bolt to make described bar material; Being cut to length needed for bolt by shrinking the bar material after wire diameter, at normal temperatures the bar material after cutting off being put into the mold cavity being coated with plant ash, make bar material form head needed for bolt and bar portion size with upset force; Utilize the outer peripheral face turning of fine turning lathe in bar material bar portion to form screw thread, the cutter on lathe is Sintox, and workpiece velocity of rotation ensures at 3350-3550r.P.M, and feed by one end that disc head portions is relative, cutting fluid adopts water-base cutting fluid;
C, heat treatment
By bolt external screw thread shaping for fine turning lathe turning at 740 DEG C ± 10 DEG C, quench with quenching oil, again the bolt after quenching is carried out tempering at 500 DEG C, duration 80-100 minute, by the polished rod section of bolt at 800 DEG C ± 20 DEG C, use quenching liquid quenches, again the bolt after quenching is carried out tempering at 550 DEG C, duration 60-70 minute, finally carry out Carburization Treatment, carburizer is sent in tempering furnace, Carburization Treatment 80 ~ 120min in 1100 ~ 1150 DEG C of temperature ranges, described carburizer is by fine silica 35 ~ 50Wt%, granular graphite 15 ~ 30Wt% and carbonate are or/and bicarbonate 35 ~ 50Wt% obtains after being uniformly mixed,
D, Passivation Treatment, it is process 4-5min in the inactivating treatment liquid of 100-120 DEG C that bolt after heat treatment is immersed temperature, described inactivating treatment liquid is mixed with by the material of following weight proportioning to form: 4 ~ 6 parts of water-soluble molybdenum hydrochlorates, 8 ~ 12 parts of diethanol amine, 70 ~ 100 parts of alkaline silica sols, 80 ~ 100 parts of water soluble acrylic resins, 80-100 part water;
E, chromising process, the ferrochrome powder bolt after Passivation Treatment being put into hydrochloric acid solution wetting heats, and is heated to 700-900 DEG C, keeps 60-70min, then carry out cleaning, air-dry, get product bolt.
Described Passivation Treatment, it is process 4.5min in the inactivating treatment liquid of 110 DEG C that bolt after heat treatment is immersed temperature, inactivating treatment liquid is prepared from by the material of following weight proportioning: 5 parts of water-soluble molybdenum hydrochlorates, 10 parts of diethanol amine, 85 parts of alkaline silica sols, 90 parts of water soluble acrylic resins, 90 parts of water.
The preparation method of high-strength steel cable bolt of the present invention, adopt the processing of cold-extrusion technology bolt, improve the intensity of bolt, reach the hardness number needed for high-strength bolt, intensity level, solve delayed fracture and the fatigue fracture of bolt under high strength, in use connect reliable, not frangibility, improve bolt life, meet the upper every profession and trade of society to the user demand of high-strength bolt.
Beneficial effect of the present invention is:
1, the refinement of the present invention shaping processing technology of material, make wire rod hardness moderate, surface has good phosphatization epithelium, and greasy property is good, wire rod is without hydrogen embrittlement, and plasticity is good;
2, bolt of the present invention has carried out that repeatedly cold-heading is extruded, and improve high-strength bolt bulk strength, bolt precision is high, and quality is good, and production efficiency is high, and without cutting no waste mine, unit cost declines greatly.Obtain bulk metal and flow to the consistent bolt in direction, substantially increase its tensile strength;
3, the invention of Technology for Heating Processing breaches the limit of the alloy steel products of bolt prior heat treatment, the leading domestic Investment in fastener industry level of characteristic of its super-strong and super-toughened property.
Detailed description of the invention
The invention will be further described with the following Examples:
The preparation method of high-strength steel cable bolt, procedure of processing comprises:
A, casting bar material, by weight, first the steel scrap of 10-14 part is dropped in middle frequency furnace and be fused into molten steel, add again and add carbon agent, when temperature in middle frequency furnace rises to 1120 ~ 1220 DEG C, drop into the steel ingot of 30-35 part again, the pig iron of 30-35 part and the foundry returns of 12-16 part, fusing, then deslagging, ferromanganese is added after deslagging, the alloys such as ferrosilicon, when coming out of the stove when the temperature in middle frequency furnace rises to 1450 DEG C, pour into a mould, the percentage by weight of each chemical composition of control lever material blank should meet following requirement: C0.28 ~ 0.35, Mn0.25 ~ 0.35, V0.05-0.15, Si0.25 ~ 0.35, W0.01-0.04, P≤0.025, S≤0.035, Ni0.45 ~ 0.60, Sn0.20 ~ 0.30, Cu0.25 ~ 0.35, surplus is iron,
B, bar material after casting do pickling processes; According to the wire diameter requirement of bolt, line is taken out to it, be retracted to wire diameter needed for bolt to make described bar material; Being cut to length needed for bolt by shrinking the bar material after wire diameter, at normal temperatures the bar material after cutting off being put into the mold cavity being coated with plant ash, make bar material form head needed for bolt and bar portion size with upset force; Utilize the outer peripheral face turning of fine turning lathe in bar material bar portion to form screw thread, the cutter on lathe is Sintox, and workpiece velocity of rotation ensures at 3350-3550r.P.M, and feed by one end that disc head portions is relative, cutting fluid adopts water-base cutting fluid;
C, heat treatment
By bolt external screw thread shaping for fine turning lathe turning at 740 DEG C ± 10 DEG C, quench with quenching oil, again the bolt after quenching is carried out tempering at 500 DEG C, duration 80-100 minute, by the polished rod section of bolt at 800 DEG C ± 20 DEG C, use quenching liquid quenches, again the bolt after quenching is carried out tempering at 550 DEG C, duration 60-70 minute, finally carry out Carburization Treatment, carburizer is sent in tempering furnace, Carburization Treatment 80 ~ 120min in 1100 ~ 1150 DEG C of temperature ranges, described carburizer is by fine silica 35 ~ 50Wt%, granular graphite 15 ~ 30Wt% and carbonate are or/and bicarbonate 35 ~ 50Wt% obtains after being uniformly mixed,
D, Passivation Treatment, it is process 4.5min in the inactivating treatment liquid of 110 DEG C that bolt after heat treatment is immersed temperature, inactivating treatment liquid is mixed with by the material of following weight proportioning to form: 5 parts of water-soluble molybdenum hydrochlorates, 10 parts of diethanol amine, 85 parts of alkaline silica sols, 90 parts of water soluble acrylic resins, 90 parts of water;
E, chromising process, the ferrochrome powder bolt after Passivation Treatment being put into 20% hydrochloric acid solution wetting heats, and is heated to 700-900 DEG C, keeps 60-70min, then carry out cleaning, air-dry, get product bolt.
According to the bolt that the preparation method of high-strength steel cable bolt of the present invention produces, as follows through its mechanical performance numerical value of detection experiment, bolt centre hardness reaches 42-45HRC, tensile strength reaches 1220Mpa, yield strength reaches 1250Mpa, percentage elongation is greater than 10%, the contraction percentage of area is greater than 32%, and impact flexibility is greater than 60J/cm 2, the bolt height 10-12% that comprehensive mechanical performance goes out than existing manufacture technics.
Finally should be noted that; above embodiment is only for illustration of technical scheme of the present invention but not limiting the scope of the invention; although be explained in detail the present invention with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to technical scheme of the present invention or equivalent replacement, and not depart from essence and the scope of technical solution of the present invention.

Claims (2)

1. the preparation method of high-strength steel cable bolt, is characterized in that, procedure of processing comprises:
A, casting bar material, by weight, first the steel scrap of 10-14 part is dropped in middle frequency furnace and be fused into molten steel, add again and add carbon agent, when temperature in middle frequency furnace rises to 1120 ~ 1220 DEG C, drop into the steel ingot of 30-35 part again, the pig iron of 30-35 part and the foundry returns of 12-16 part, fusing, then deslagging, ferromanganese is added after deslagging, Antaciron, when coming out of the stove when the temperature in middle frequency furnace rises to 1450 DEG C, pour into a mould, the percentage by weight of each chemical composition of control lever material blank should meet following requirement: C0.28 ~ 0.35, Mn0.25 ~ 0.35, V0.05-0.15, Si0.25 ~ 0.35, W0.01-0.04, P≤0.025, S≤0.035, Ni0.45 ~ 0.60, Sn0.20 ~ 0.30, Cu0.25 ~ 0.35, surplus is iron,
B, bar material after casting do pickling processes; According to the wire diameter requirement of bolt, line is taken out to it, be retracted to wire diameter needed for bolt to make described bar material; Being cut to length needed for bolt by shrinking the bar material after wire diameter, at normal temperatures the bar material after cutting off being put into the mold cavity being coated with plant ash, make bar material form head needed for bolt and bar portion size with upset force; Utilize the outer peripheral face turning of fine turning lathe in bar material bar portion to form screw thread, the cutter on lathe is Sintox, and workpiece velocity of rotation ensures at 3350-3550r.P.M, and feed by one end that disc head portions is relative, cutting fluid adopts water-base cutting fluid;
C, heat treatment
By bolt external screw thread shaping for fine turning lathe turning at 740 DEG C ± 10 DEG C, quench with quenching oil, again the bolt after quenching is carried out tempering at 500 DEG C, duration 80-100 minute, by the polished rod section of bolt at 800 DEG C ± 20 DEG C, use quenching liquid quenches, again the bolt after quenching is carried out tempering at 550 DEG C, duration 60-70 minute, finally carry out Carburization Treatment, carburizer is sent in tempering furnace, Carburization Treatment 80 ~ 120min in 1100 ~ 1150 DEG C of temperature ranges, described carburizer is by fine silica 35 ~ 50Wt%, granular graphite 15 ~ 30Wt% and carbonate are or/and bicarbonate 35 ~ 50Wt% obtains after being uniformly mixed,
D, Passivation Treatment, it is process 4-5min in the inactivating treatment liquid of 100-120 DEG C that bolt after heat treatment is immersed temperature, described inactivating treatment liquid is mixed with by the material of following weight proportioning to form: 4 ~ 6 parts of water-soluble molybdenum hydrochlorates, 8 ~ 12 parts of diethanol amine, 70 ~ 100 parts of alkaline silica sols, 80 ~ 100 parts of water soluble acrylic resins, 80-100 part water;
E, chromising process, the ferrochrome powder bolt after Passivation Treatment being put into hydrochloric acid solution wetting heats, and is heated to 700-900 DEG C, keeps 60-70min, then carry out cleaning, air-dry, get product bolt.
2. the preparation method of high-strength steel cable bolt according to claim 1, it is characterized in that: described Passivation Treatment, it is process 4.5min in the inactivating treatment liquid of 110 DEG C that bolt after heat treatment is immersed temperature, inactivating treatment liquid is prepared from by the material of following weight proportioning: 5 parts of water-soluble molybdenum hydrochlorates, 10 parts of diethanol amine, 85 parts of alkaline silica sols, 90 parts of water soluble acrylic resins, 90 parts of water.
CN201310042135.XA 2013-02-04 2013-02-04 The preparation method of high-strength steel cable bolt Expired - Fee Related CN103128505B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310042135.XA CN103128505B (en) 2013-02-04 2013-02-04 The preparation method of high-strength steel cable bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310042135.XA CN103128505B (en) 2013-02-04 2013-02-04 The preparation method of high-strength steel cable bolt

Publications (2)

Publication Number Publication Date
CN103128505A CN103128505A (en) 2013-06-05
CN103128505B true CN103128505B (en) 2016-01-20

Family

ID=48489299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310042135.XA Expired - Fee Related CN103128505B (en) 2013-02-04 2013-02-04 The preparation method of high-strength steel cable bolt

Country Status (1)

Country Link
CN (1) CN103128505B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104825219A (en) * 2015-05-03 2015-08-12 刘乐 Bone plate for minimally invasive surgery
CN105154785B (en) * 2015-07-16 2017-12-22 江苏永昊高强度螺栓有限公司 High-strength bolt and its manufacture method
CN105014320A (en) * 2015-07-20 2015-11-04 中山市祥丰瓦斯器材制品有限公司 Valve body manufacturing method
CN106917045B (en) * 2017-03-07 2019-03-05 广西大学行健文理学院 Cast the manufacturing method of cold upsetting die of car
CN111001981A (en) * 2019-11-01 2020-04-14 江苏振光电力设备制造有限公司 Preparation method of weather-resistant bolt for iron tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4442562A (en) * 1982-05-07 1984-04-17 Russo Peter J Method of forming anchor bolts
CN101486087A (en) * 2009-02-11 2009-07-22 江苏大学 Casting and forging combined technique of aluminum alloy linkage rod
CN101549448A (en) * 2008-03-31 2009-10-07 江都狮鹤高强度螺栓有限公司 Processing technology for high-strength bolt used for steel net frame bolt ball node
CN101797685A (en) * 2010-04-08 2010-08-11 浙江裕泰紧固件制造有限公司 Process for manufacturing high-strength bolt
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102152078A (en) * 2011-03-30 2011-08-17 浙江迪特高强度螺栓有限公司 Processing technique for high-strength bolt adopted by bulldozer or excavator pedrail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4442562A (en) * 1982-05-07 1984-04-17 Russo Peter J Method of forming anchor bolts
CN101549448A (en) * 2008-03-31 2009-10-07 江都狮鹤高强度螺栓有限公司 Processing technology for high-strength bolt used for steel net frame bolt ball node
CN101486087A (en) * 2009-02-11 2009-07-22 江苏大学 Casting and forging combined technique of aluminum alloy linkage rod
CN101797685A (en) * 2010-04-08 2010-08-11 浙江裕泰紧固件制造有限公司 Process for manufacturing high-strength bolt
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102152078A (en) * 2011-03-30 2011-08-17 浙江迪特高强度螺栓有限公司 Processing technique for high-strength bolt adopted by bulldozer or excavator pedrail

Also Published As

Publication number Publication date
CN103128505A (en) 2013-06-05

Similar Documents

Publication Publication Date Title
CN103128506B (en) The anti-preparation method of foot bolt yieldly
CN103088268B (en) The preparation method of fastening bolt used for automobile wheels
CN103205641A (en) Preparation method for high-strength foundation bolt
CN103128505B (en) The preparation method of high-strength steel cable bolt
CN103131948A (en) Preparation method of high-strength T-shaped bolt
CN103205642A (en) Preparation method for wear-resistant check bolt
CN103089781B (en) Method for machining high-strength double end bolt
CN104400359A (en) Method for preparing foundation bolts
CN103088266A (en) Forging method for foundation bolt
CN103133481B (en) The preparation method of abrasion-resistant foundation bolt
CN103088267B (en) The preparation method of Lengthened bolt
CN103084798B (en) high-strength bolt forging method
CN103084523B (en) High intensity U bolt processing method
CN103131954A (en) Preparation method of fracture-resistant steel rope bolt
CN103131949A (en) Preparation method of high-strength aluminum alloy flange bolt
CN103133485B (en) The preparation method of wear-resistant U bolt
CN102974771A (en) Casting forming preparation method of pressure reducing valve body
CN103084797B (en) Crawler of excavator bolt forging method
CN103203593B (en) The preparation method of high strength excavator bolt
CN103028685A (en) Processing method for high-class bolt
CN103088271B (en) The preparation method of high-strength corrosion-resisting bolt
CN103084525B (en) The connecting-rod bolts processing method of diesel engine
CN103084524B (en) Flange bolt forging method
CN103084533B (en) Method for forging torsional shear type high-strength bolt
CN102994861B (en) A kind of castmethod of spherical check valve rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190726

Address after: 226121 Room 6, No. 32 Daqing Road, Sanchang Town, Haimen City, Nantong City, Jiangsu Province

Patentee after: Haimen Qinglong Shipping Engineering Co.,Ltd.

Address before: 241200 Xindong Village, Xingang Town, Fanchang County, Wuhu City, Anhui Province

Patentee before: FANCHANG QIXIN CASTING CO.,LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 6, No.32 Daqing Road, Sanchang Town, Haimen City, Nantong City, Jiangsu Province

Patentee after: Qinglong Shipping Engineering (Nantong) Co.,Ltd.

Address before: Room 6, No.32 Daqing Road, Sanchang Town, Haimen City, Nantong City, Jiangsu Province

Patentee before: Haimen Qinglong Shipping Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120