CN103084797A CN2012105116715A CN201210511671A CN103084797A CN 103084797 A CN103084797 A CN 103084797A CN 2012105116715 A CN2012105116715 A CN 2012105116715A CN 201210511671 A CN201210511671 A CN 201210511671A CN 103084797 A CN103084797 A CN 103084797A
Authority
CN
China
Prior art keywords
bolt
percent
temperature
forging
controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105116715A
Other languages
Chinese (zh)
Other versions
CN103084797B (en
Inventor
王立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quanzhou Huangshengda Auto Accessories Industry &trade Co ltd
Original Assignee
Anhui Liufang Zhonglian Mechanical Share Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Liufang Zhonglian Mechanical Share Co Ltd filed Critical Anhui Liufang Zhonglian Mechanical Share Co Ltd
Priority to CN201210511671.5A priority Critical patent/CN103084797B/en
Publication of CN103084797A publication Critical patent/CN103084797A/en
Application granted granted Critical
Publication of CN103084797B publication Critical patent/CN103084797B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The invention discloses a method for forging a bolt for a caterpillar track of an excavator. The method comprises the step of: manufacturing a rod blank, wherein the rod blank comprises the following chemical ingredients in percentage by weight: 0.28 to 0.35 percent of C, 0.15 to 0.25 percent of Mn, 0.15 to 0.35 percent of Si, 0.01 to 0.04 percent of W, less than or equal to 0.025 and more than or equal to 0.015 percent of P, less than or equal to 0.035 and more than or equal to 0.015 percent of S, 0.15 to 0.20 percent of Ni, 0.025 to 0.045 percent of Co, 0.02 to 0.03 percent of Sn, less than or equal to 0.02 percent of Al and the balance of Fe. According to the method for forging the bolt for the caterpillar track of the excavator, the bolt is machined by using a cold extrusion process, so that the strength of the bolt is enhanced, a hardness value and a strength value which are required by the high-strength bolt of which the strength is 12.9 are reached, and the delayed breakage and fatigue breakage of the bolt are avoided under high strength; and the bolt is reliable in connection and difficult to break in the using process, so that the service life of the bolt is prolonged, and the using demand of each industry in society on the high-strength bolt is met.

Description

Crawler of excavator bolt forging method
Technical field
The present invention relates to the processing method of bolt, especially a kind of crawler of excavator bolt forging method.
Background technology
The crawler of excavator bolt is securing member commonly used in machinery industry, and present processing mode is generally the moulding of turning, and intensity often is difficult to guarantee, sometimes in use produce turn around, the dangerous phenomenon such as bar section fracture, endanger very large to industrial production.Therefore the high-strength bolt production method is studied and improved, guaranteed the quality stability of high-strength bolt, technology and expanding economy are had important function.In addition, when bolt was in relatively moist environment, the corrosion that gets rusty easily finally caused fracture or crackle, forms potential accident source.
Given this, be necessary to provide the processing method of a kind of crawler of excavator with bolt, produce more corrosion resistant high-strength bolt.
Summary of the invention
The object of the invention is to avoid weak point of the prior art, and a kind of crawler of excavator bolt forging method is provided.
Purpose of the present invention is as follows by the following technical programs:
Crawler of excavator bolt forging method, procedure of processing comprises:
A, casting bar material blank, the percentage by weight of each chemical composition of control lever material blank should satisfy following requirement: C 0.28~0.35, Mn 0.15~0.25, Si 0.15~0.35, W 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni 0.15~0.20, Co 0.025~0.045, Sn 0.02~0.03, Al≤0.02, and surplus is iron;
B, the bar material after casting is carried out forging and molding processing, forge temperature and be controlled to be 630-680 ℃, forging covering thin layer graphite powder on the impression inwall of mould, the granularity of graphite powder is controlled to be the 200-300 order, forge number of times no more than 25 times, utilize fine turning lathe turning to go out the bolt external screw thread after forging moulding;
C, heat treatment, that the bolt external screw thread after turning was heated 8-9 hour under 460-550 ℃ for the first time, be warming up to 1080-1120 ℃ in 20-30 minute again, keep 20 minutes heat time heating times, quench with quenching oil, bolt after quenching again carries out tempering and kept 30 minutes under 500 ℃, then take out from tempering furnace put into 250-270 ℃ No. 200 solvent naphthas with oily slow cooling; Be for the second time the body of rod with bolt under 800 ℃ ± 20 ℃, the use quenching liquid quenches, then the bolt after quenching carries out tempering, 60 minutes duration under 600 ℃;
D, phosphatization are processed, and at first carry out ungrease treatment with 17% ammonia scrubbing, and temperature is controlled between 45-60 ℃, and the time is 6-7 minute, then washing; Carry out pickling processes with 25% hydrochloric acid solution washing again, temperature is controlled at 18-20 ℃, and the time is 1-2 minute, then washing; In 40 ℃ of situations of temperature, immerse in neopelex solution at last, temperature is controlled at 45-57 ℃, and the immersion time is 3-5 minute, cleans up afterwards;
E, blackening process, be under the condition of 120~130 ℃ in temperature, bolt is placed in to process in the 5-8% sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from liquid, and spontaneous curing 15~20min, more fully clean, obtain the finished product bolt after air-dry with water.
Crawler of excavator of the present invention bolt forging method, adopt the processing of cold-extrusion technology bolt, improved the intensity of bolt, reached required hardness number, the intensity level of 12.9 high-strength bolts, solved delayed fracture and the fatigue fracture of bolt under high strength, in use connected reliably, not frangibility, improve bolt life, satisfied social upper every profession and trade to the user demand of high-strength bolt.
Beneficial effect of the present invention is:
1, refinement of the present invention the shaping processing technology of material, make wire rod hardness moderate, the surface has good phosphatization epithelium, greasy property is good, wire rod is without hydrogen embrittlement, plasticity is good;
2, bolt of the present invention has carried out repeatedly cold-forge forming, has improved the high-strength bolt bulk strength, and the bolt precision is high, and quality is good, and production efficiency is high, and without waste material, unit cost descends greatly without cutting.Obtain bulk metal and flowed to the consistent bolt of direction, greatly improved its tensile strength;
3, the invention of Technology for Heating Processing has broken through the limit of the alloy steel products of bolt prior heat treatment, the leading domestic Investment in fastener industry level of the characteristic of its super-strong and super-toughened property.
The specific embodiment
The invention will be further described with the following Examples:
Crawler of excavator bolt forging method, procedure of processing comprises:
A, casting bar material blank, the percentage by weight of each chemical composition of control lever material blank should satisfy following requirement: C 0.28~0.35, Mn 0.15~0.25, Si 0.15~0.35, W 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni 0.15~0.20, Co 0.025~0.045, Sn 0.02~0.03, Al≤0.02, and surplus is iron;
B, the bar material after casting is carried out forging and molding processing, forge temperature and be controlled to be 630-680 ℃, forging covering thin layer graphite powder on the impression inwall of mould, the granularity of graphite powder is controlled to be the 200-300 order, forge number of times no more than 25 times, utilize fine turning lathe turning to go out the bolt external screw thread after forging moulding;
C, heat treatment, that the bolt external screw thread after turning was heated 8-9 hour under 460-550 ℃ for the first time, be warming up to 1080-1120 ℃ in 20-30 minute again, keep 20 minutes heat time heating times, quench with quenching oil, bolt after quenching again carries out tempering and kept 30 minutes under 500 ℃, then take out from tempering furnace put into 250-270 ℃ No. 200 solvent naphthas with oily slow cooling; Be for the second time the body of rod with bolt under 800 ℃ ± 20 ℃, the use quenching liquid quenches, then the bolt after quenching carries out tempering, 60 minutes duration under 600 ℃;
D, phosphatization are processed, and at first carry out ungrease treatment with 17% ammonia scrubbing, and temperature is controlled between 45-60 ℃, and the time is 6-7 minute, then washing; Carry out pickling processes with 25% hydrochloric acid solution washing again, temperature is controlled at 18-20 ℃, and the time is 1-2 minute, then washing; In 40 ℃ of situations of temperature, immerse in neopelex solution at last, temperature is controlled at 45-57 ℃, and the immersion time is 3-5 minute, cleans up afterwards;
E, blackening process are under temperature is the condition of 125 ℃, bolt is placed in to process in the 5-8% sodium nitrite solution is grey black or all black to the surface, then bolt is taken out from liquid, and spontaneous curing 18min, more fully clean, obtain the finished product bolt after air-dry with water.
The bolt of producing according to the preparation method of bolt of the present invention, as follows through detecting its mechanical performance numerical value of test, the bolt centre hardness reaches 50-52HRC, bolt thread section hardness reaches 46-50HRC, tensile strength reaches 1260Mpa, yield strength reaches 1270Mpa, percentage elongation is greater than 12%, and the contraction percentage of area is greater than 35%, and impact flexibility is greater than 50J/cm 2, the high 10-12% of bolt that comprehensive mechanical performance produces than existing technique.
Should be noted that at last; above embodiment only is used for technical scheme of the present invention being described but not limiting the scope of the invention; although with reference to preferred embodiment, the present invention has been done detailed description; those of ordinary skill in the art is to be understood that; can modify or be equal to replacement technical scheme of the present invention, and not break away from essence and the scope of technical solution of the present invention.

Claims (1)

1. crawler of excavator bolt forging method, is characterized in that, procedure of processing comprises:
A, casting bar material blank, the percentage by weight of each chemical composition of control lever material blank should satisfy following requirement: C 0.28~0.35, Mn 0.15~0.25, Si 0.15~0.35, W 0.01-0.04,0.015≤P≤0.025,0.015≤S≤0.035, Ni 0.15~0.20, Co 0.025~0.045, Sn 0.02~0.03, Al≤0.02, and surplus is iron;
B, the bar material after casting is carried out forging and molding processing, forge temperature and be controlled to be 630-680 ℃, forging covering thin layer graphite powder on the impression inwall of mould, the granularity of graphite powder is controlled to be the 200-300 order, forge number of times no more than 25 times, utilize fine turning lathe turning to go out the bolt external screw thread after forging moulding;
C, heat treatment, that the bolt external screw thread after turning was heated 8-9 hour under 460-550 ℃ for the first time, be warming up to 1080-1120 ℃ in 20-30 minute again, keep 20 minutes heat time heating times, quench with quenching oil, bolt after quenching again carries out tempering and kept 30 minutes under 500 ℃, then take out from tempering furnace put into 250-270 ℃ No. 200 solvent naphthas with oily slow cooling; Be for the second time the body of rod with bolt under 800 ℃ ± 20 ℃, the use quenching liquid quenches, then the bolt after quenching carries out tempering, 60 minutes duration under 600 ℃;
D, phosphatization are processed, and at first carry out ungrease treatment with 17% ammonia scrubbing, and temperature is controlled between 45-60 ℃, and the time is 6-7 minute, then washing; Carry out pickling processes with 25% hydrochloric acid solution washing again, temperature is controlled at 18-20 ℃, and the time is 1-2 minute, then washing; In 40 ℃ of situations of temperature, immerse in neopelex solution at last, temperature is controlled at 45-57 ℃, and the immersion time is 3-5 minute, cleans up afterwards;
E, blackening process, be under the condition of 120~130 ℃ in temperature, bolt is placed in to process in the 5-8% sodium nitrite solution is grey black or all black to the surface, then bolt is therefrom taken out, and spontaneous curing 15~20min, more fully clean, obtain the finished product bolt after air-dry with water.
CN201210511671.5A 2012-12-04 2012-12-04 Crawler of excavator bolt forging method Expired - Fee Related CN103084797B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210511671.5A CN103084797B (en) 2012-12-04 2012-12-04 Crawler of excavator bolt forging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210511671.5A CN103084797B (en) 2012-12-04 2012-12-04 Crawler of excavator bolt forging method

Publications (2)

Publication Number Publication Date
CN103084797A true CN103084797A (en) 2013-05-08
CN103084797B CN103084797B (en) 2016-12-14

Family

ID=48198194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210511671.5A Expired - Fee Related CN103084797B (en) 2012-12-04 2012-12-04 Crawler of excavator bolt forging method

Country Status (1)

Country Link
CN (1) CN103084797B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105296850A (en) * 2015-11-03 2016-02-03 合肥海源机械有限公司 Preparation method of high-temperature-resistant engine crankshaft bearing bush
CN105401078A (en) * 2015-11-03 2016-03-16 合肥海源机械有限公司 Method for producing automobile engine rocker shaft
CN106381449A (en) * 2016-09-23 2017-02-08 安徽丰磊制冷工程有限公司 Preparation method of low-alloy air purifier filter screen

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0565540A (en) * 1991-09-10 1993-03-19 Nissan Motor Co Ltd Manufacture of high strength bolt
CN101169150A (en) * 2007-11-29 2008-04-30 贵州航天新力铸锻有限责任公司 Million - kilowatts class nuclear power station reactor main bolt production process
CN101549449A (en) * 2008-03-31 2009-10-07 江都狮鹤高强度螺栓有限公司 Processing technology of high-strength large hexagon head bolt for steel structure
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN101934466A (en) * 2009-06-30 2011-01-05 江都狮鹤高强度螺栓有限公司 Technology for processing high strength large hexagon-headed bolt used for steel structure
CN102072234A (en) * 2010-11-19 2011-05-25 浙江高强度紧固件有限公司 Production process of nuclear bolt
CN102319990A (en) * 2011-09-30 2012-01-18 山推工程机械股份有限公司 Manufacturing process of low-carbon high-strength bolt for track

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0565540A (en) * 1991-09-10 1993-03-19 Nissan Motor Co Ltd Manufacture of high strength bolt
CN101169150A (en) * 2007-11-29 2008-04-30 贵州航天新力铸锻有限责任公司 Million - kilowatts class nuclear power station reactor main bolt production process
CN101549449A (en) * 2008-03-31 2009-10-07 江都狮鹤高强度螺栓有限公司 Processing technology of high-strength large hexagon head bolt for steel structure
CN101934466A (en) * 2009-06-30 2011-01-05 江都狮鹤高强度螺栓有限公司 Technology for processing high strength large hexagon-headed bolt used for steel structure
CN101890618A (en) * 2010-06-17 2010-11-24 鹏驰五金制品有限公司 Processing method of high-strength bolts
CN102072234A (en) * 2010-11-19 2011-05-25 浙江高强度紧固件有限公司 Production process of nuclear bolt
CN102319990A (en) * 2011-09-30 2012-01-18 山推工程机械股份有限公司 Manufacturing process of low-carbon high-strength bolt for track

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105296850A (en) * 2015-11-03 2016-02-03 合肥海源机械有限公司 Preparation method of high-temperature-resistant engine crankshaft bearing bush
CN105401078A (en) * 2015-11-03 2016-03-16 合肥海源机械有限公司 Method for producing automobile engine rocker shaft
CN106381449A (en) * 2016-09-23 2017-02-08 安徽丰磊制冷工程有限公司 Preparation method of low-alloy air purifier filter screen

Also Published As

Publication number Publication date
CN103084797B (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN103088268B (en) The preparation method of fastening bolt used for automobile wheels
CN103128506B (en) The anti-preparation method of foot bolt yieldly
CN103088266B (en) The forging method of foundation bolt
CN103089781B (en) Method for machining high-strength double end bolt
CN103084532B (en) Method for machining T-shaped bolt
CN101890618A (en) Processing method of high-strength bolts
CN104400344A (en) Bolt manufacturing technology
CN103205641A (en) Preparation method for high-strength foundation bolt
CN103084798B (en) high-strength bolt forging method
CN103205642A (en) Preparation method for wear-resistant check bolt
CN103084523A (en) Method for machining high-strength U-shaped bolt
CN103131948A (en) Preparation method of high-strength T-shaped bolt
CN104400359A (en) Method for preparing foundation bolts
CN103088267B (en) The preparation method of Lengthened bolt
CN103128505B (en) The preparation method of high-strength steel cable bolt
CN103028685B (en) The processing method of high-grade bolt
CN103084797A (en) Method for forging bolt for caterpillar track of excavator
CN103084525B (en) The connecting-rod bolts processing method of diesel engine
CN103131949A (en) Preparation method of high-strength aluminum alloy flange bolt
CN103131954A (en) Preparation method of fracture-resistant steel rope bolt
CN103084524B (en) Flange bolt forging method
CN103084533B (en) Method for forging torsional shear type high-strength bolt
CN103088271B (en) The preparation method of high-strength corrosion-resisting bolt
CN103133481B (en) The preparation method of abrasion-resistant foundation bolt
CN103133485B (en) The preparation method of wear-resistant U bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160920

Address after: 241200 Anhui Province, Wuhu City asan cypress Fanchang County Town Village Industrial Park

Applicant after: WUHU CHUANGYUAN NEW MATERIALS Co.,Ltd.

Address before: 241000 Anhui Province, Wuhu Yongchang City Jiujiang Road Development Zone No. 69

Applicant before: Anhui Liufang Zhonglian Mechanical Share Co.,Ltd.

C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zeng Shanghuai

Inventor before: Wang Lixin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161101

Address after: 401320 Chongqing District of Banan City Jinzhu Industrial Park

Applicant after: Chongqing Jiewei Mold Manufacturing Co.,Ltd.

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20161101

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: 241200 Anhui Province, Wuhu City asan cypress Fanchang County Town Village Industrial Park

Applicant before: WUHU CHUANGYUAN NEW MATERIALS Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180613

Address after: 362302 Fujian Nanan city of Xia Mei Binjiang auto distribution base

Patentee after: QUANZHOU HUANGSHENGDA AUTO ACCESSORIES INDUSTRY &TRADE Co.,Ltd.

Address before: 401320 Jin Zhu Industrial Park, Banan District, Chongqing

Patentee before: Chongqing Jiewei Mold Manufacturing Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214