CN103061370A - Novel engineering machinery cement counterweight - Google Patents

Novel engineering machinery cement counterweight Download PDF

Info

Publication number
CN103061370A
CN103061370A CN2013100482993A CN201310048299A CN103061370A CN 103061370 A CN103061370 A CN 103061370A CN 2013100482993 A CN2013100482993 A CN 2013100482993A CN 201310048299 A CN201310048299 A CN 201310048299A CN 103061370 A CN103061370 A CN 103061370A
Authority
CN
China
Prior art keywords
balance weight
counterweight
hole
engineering machinery
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100482993A
Other languages
Chinese (zh)
Inventor
徐德荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SFAM Science and Technology Jiangsu Co Ltd
Original Assignee
SFAM Science and Technology Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SFAM Science and Technology Jiangsu Co Ltd filed Critical SFAM Science and Technology Jiangsu Co Ltd
Priority to CN2013100482993A priority Critical patent/CN103061370A/en
Publication of CN103061370A publication Critical patent/CN103061370A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)
  • Jib Cranes (AREA)

Abstract

The invention belongs to the field of engineering machinery and particularly relates to a novel engineering machinery cement counterweight which comprises a cement counterweight main body and an iron skin outer layer which wraps the cement counterweight main body. The novel engineering machinery cement counterweight is characterized by also comprising an installation hole which is formed in the bottom of the counterweight and extends inwards, wherein the counterweight is fixed at the supporting part by the installation hole. According to the novel engineering machinery cement counterweight disclosed by the invention, the counterweight is stably connected with the supporting part of an excavator main body by inserting the same stud into the installation hole and a supporting hole; through the connection between a hoisting hole and a plug, when the counterweight is not hoisted, the hoisting hole is not corroded by rainwater, and in addition, the rainwater is ensured not to be accumulated near the hoisting hole by a salient; and when cement is poured to carry out counterbalancing, if the condition of inhomogeneity of pouring density occurs, a balancing weight is adopted to regulate counterbalancing, thus ensuring stable running of an excavator.

Description

New engineering machinery cement balance weight
Technical field
The invention belongs to engineering machinery field, be specifically related to a kind of New engineering machinery cement balance weight for counter weight of excavator.
 
Background technology
Counterweight is one of vitals of excavator, and the stability during to machine works plays an important role.Counterweight need to be in some way connected on the excavator base machine main body.In addition, counterweight is moved to the excavator base machine main body, then need lifting, lifting realizes by hole for hoist usually, when running into the ectocine such as rainwater, and the hole for hoist corrosion that gets rusty easily, the realization that impact lifts.In addition, to the counterweight casting cement time, as run into the inhomogenous situation of pouring density, then affect the stability of whole machine.
 
Summary of the invention
The object of the invention is to overcome the problems referred to above, a kind of New engineering machinery cement balance weight that guarantees that hole for hoist non-corrosive burn into makes the excavator steady operation, is connected with the excavator base machine Soil stability is provided.
To achieve these goals, the technical solution adopted in the present invention is: New engineering machinery cement balance weight, the iron sheet that comprises cement balance weight main body, coating cement balance weight main body is outer, it is characterized in that: also comprise the installing hole that is positioned at the balance weight bottom and extends internally and form, described installing hole is fixed in support with balance weight.
Aforesaid New engineering machinery cement balance weight, described support is provided with the support holes corresponding with installing hole, and double-screw bolt successively passes installing hole and support holes and then makes balance weight be fixed in support.
Aforesaid New engineering machinery cement balance weight is provided with some balancing weights in the described balance weight.
Aforesaid New engineering machinery cement balance weight, described balance weight is provided with projection, and hole for hoist is set in the projection.
Aforesaid New engineering machinery cement balance weight, described hole for hoist is screwed hole, hole for hoist is threaded with screw plug.
The present invention makes balance weight stablize with the support of excavator base machine main body to be connected by insert same double-screw bolt in installing hole and support holes; By being connected of hole for hoist and screw plug, when balance weight was not lifted, hole for hoist was not corroded by rainwater, and projection has guaranteed that rainwater does not accumulate near hole for hoist; To the counterweight casting cement time, as run into the inhomogenous situation of pouring density, adopt balancing weight to regulate counterweight, guarantee excavator stable operation.
 
Description of drawings
Fig. 1 is structure chart of the present invention;
Wherein, 1 iron sheet is outer, 2 projections, 3 holes for hoist, 4 balancing weights, 5 installing holes, 6 cement balance weight main bodys.
 
The specific embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments.
According to Fig. 1, New engineering machinery cement balance weight, comprise that cement balance weight main body 6(is made of cement), coat the iron sheet skin 1 of cement balance weight main body 6, it is characterized in that: also comprise the installing hole 5 that is positioned at balance weight bottom and extends internally and form, described installing hole 5 is fixed in support with balance weight.Support is provided with the support holes corresponding with installing hole 5, and double-screw bolt successively passes installing hole 5 and support holes and then makes balance weight be fixed in support.Be provided with some balancing weights 4 in the balance weight.Balance weight is provided with projection 2, the projection 2 interior holes for hoist 3 that arrange.Hole for hoist 3 is screwed hole, and hole for hoist 3 is threaded with screw plug (also being a double-screw bolt).
The present invention makes balance weight stablize with the support of excavator base machine main body to be connected by insert same double-screw bolt in installing hole 5 and support holes; By being connected of hole for hoist 3 and screw plug, when balance weight was not lifted, hole for hoist 3 was not corroded by rainwater, and projection 2 has guaranteed that rainwater does not accumulate near hole for hoist 3; To the counterweight casting cement time, as run into the inhomogenous situation of pouring density, adopt balancing weight 4 to regulate counterweight, guarantee excavator stable operation.
Above-described embodiment does not limit the present invention in any form, and all employings are equal to replaces or technical scheme that the mode of equivalent transformation obtains, all drops on protection scope of the present invention.

Claims (5)

1. New engineering machinery cement balance weight, the iron sheet that comprises cement balance weight main body, coating cement balance weight main body is outer, it is characterized in that: also comprise the installing hole that is positioned at the balance weight bottom and extends internally and form, described installing hole is fixed in support with balance weight.
2. New engineering machinery cement balance weight according to claim 1, it is characterized in that: described support is provided with the support holes corresponding with installing hole, and double-screw bolt successively passes installing hole and support holes and then makes balance weight be fixed in support.
3. New engineering machinery cement balance weight according to claim 1 is characterized in that: be provided with some balancing weights in the described balance weight.
4. New engineering machinery cement balance weight according to claim 1, it is characterized in that: described balance weight is provided with projection, and hole for hoist is set in the projection.
5. New engineering machinery cement balance weight according to claim 4, it is characterized in that: described hole for hoist is screwed hole, and hole for hoist is threaded with screw plug.
CN2013100482993A 2013-02-07 2013-02-07 Novel engineering machinery cement counterweight Pending CN103061370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100482993A CN103061370A (en) 2013-02-07 2013-02-07 Novel engineering machinery cement counterweight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100482993A CN103061370A (en) 2013-02-07 2013-02-07 Novel engineering machinery cement counterweight

Publications (1)

Publication Number Publication Date
CN103061370A true CN103061370A (en) 2013-04-24

Family

ID=48104236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100482993A Pending CN103061370A (en) 2013-02-07 2013-02-07 Novel engineering machinery cement counterweight

Country Status (1)

Country Link
CN (1) CN103061370A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180683A (en) * 1997-12-24 1999-07-06 Hitachi Constr Mach Co Ltd Counter weight fastening device of construction machine
CN1718945A (en) * 2005-04-29 2006-01-11 夏咸仁 Engineering machinery counter weight
JP2010090533A (en) * 2008-10-03 2010-04-22 Hitachi Constr Mach Co Ltd Counterweight of construction machine
CN202689075U (en) * 2012-07-11 2013-01-23 徐州徐工挖掘机械有限公司 Drainage mechanism for counter weight of excavator
CN203129231U (en) * 2013-02-07 2013-08-14 江苏南铸科技股份有限公司 Novel engineering machinery cement balancing weight

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11180683A (en) * 1997-12-24 1999-07-06 Hitachi Constr Mach Co Ltd Counter weight fastening device of construction machine
CN1718945A (en) * 2005-04-29 2006-01-11 夏咸仁 Engineering machinery counter weight
JP2010090533A (en) * 2008-10-03 2010-04-22 Hitachi Constr Mach Co Ltd Counterweight of construction machine
CN202689075U (en) * 2012-07-11 2013-01-23 徐州徐工挖掘机械有限公司 Drainage mechanism for counter weight of excavator
CN203129231U (en) * 2013-02-07 2013-08-14 江苏南铸科技股份有限公司 Novel engineering machinery cement balancing weight

Similar Documents

Publication Publication Date Title
CN204455829U (en) Bridge-collision-avoidance wall construction equipment
CN204324684U (en) For the lifting tooling of nuclear power plant's fuel screen work
CN203877801U (en) Adjustable type counterweight device of crane
CN203129231U (en) Novel engineering machinery cement balancing weight
CN103061370A (en) Novel engineering machinery cement counterweight
CN204281117U (en) Secondary elevator Self-loading-unloading hoisting crane
CN207363080U (en) A kind of bilayer plaster tablet suspended ceiling structure
CN101942923A (en) Auxiliary pole fixing base
CN202689671U (en) Lifting type holding rod
CN202379594U (en) Lifting device capable of automatically adjusting lifting center
CN103101843B (en) A kind of lifting appliance
CN203782725U (en) Large steel suspension box
CN205816796U (en) A kind of high intensity tundish
CN104495645A (en) Structure capable of mounting and dismounting balancing weight automatically by tower crane
CN202924635U (en) Tower crane jib and tower crane comprising same
CN207375632U (en) Thermal power generation unit tower boiler lifting machine arrangement
CN204434124U (en) Tower machine is from the structure installing and certainly dismantle counterbalanced weight
CN205616454U (en) Bridge crane girder assembly welding device
CN203667852U (en) Variable cross-section crane suitable for assembly of transmission tower
CN103407869A (en) Counterbalancing weight
CN104803276A (en) Hoisting apparatus for engineering equipment and hoisting method
CN202880685U (en) Tubular balance beam without bending moment
CN204588441U (en) For the hanging apparatus of engineering equipment
CN204419128U (en) A kind of balance weight slidably counter weight of beam unit crossbeam
CN204662953U (en) One hangs mould supporting member

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130424