CN103017709A - 一种利用降雨量测定地质滑坡位移的方法 - Google Patents

一种利用降雨量测定地质滑坡位移的方法 Download PDF

Info

Publication number
CN103017709A
CN103017709A CN2012105596341A CN201210559634A CN103017709A CN 103017709 A CN103017709 A CN 103017709A CN 2012105596341 A CN2012105596341 A CN 2012105596341A CN 201210559634 A CN201210559634 A CN 201210559634A CN 103017709 A CN103017709 A CN 103017709A
Authority
CN
China
Prior art keywords
landslide
displacement
monitoring
rainfall amount
rainfall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105596341A
Other languages
English (en)
Other versions
CN103017709B (zh
Inventor
贺可强
罗会来
孙林娜
赵民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201210559634.1A priority Critical patent/CN103017709B/zh
Publication of CN103017709A publication Critical patent/CN103017709A/zh
Application granted granted Critical
Publication of CN103017709B publication Critical patent/CN103017709B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本发明属于地质滑坡测定技术领域,涉及一种利用降雨量测定地质滑坡位移的方法,具体包括滑坡区降雨量及滑坡位移数据的监测、降雨量及滑坡位移监测数据的预处理、滑坡位移与降雨量关联性分析计算、滑坡位移与降雨量滞后性分析计算和评价预测五个步骤,其中滑坡位移与降雨量关联性分析计算具体包括:①建立降雨量母序列与滑坡位移子序列;②将各序列进行无量纲归一化处理;③求取矩阵的差异信息;④求解表示母序列和子序列相关性的关联系数;⑤求出所有关联系数的平均值即最终的关联度;其实现方法简单,设计原理可靠,计算分析准确,利用计算机系统进行运算,速度快、准确性高,成本低,监控预警效果好,效益明显,监控效率高。

Description

一种利用降雨量测定地质滑坡位移的方法
技术领域:
本发明属于地质滑坡测定技术领域,涉及一种确定滑坡位移与降雨量关联性及其滞后性关系的定量评价方法,特别是一种利用降雨量测定地质滑坡位移的方法,通过测定降雨量来定量分析和评价地质滑坡位移,实现地质滑坡位移的监控预警。
背景技术:
据不完全统计,降雨型滑坡约占滑坡总数的70%,而95%的地质滑坡发生于雨季,降雨与滑坡之间的作用规律与机理是复杂且多方面的,且是滑坡位移加速和失稳的一个关键诱发因素。传统相关研究大都以监测到的降雨及滑坡位移数据为基础,对两者的散点图进行回归拟合分析,建立拟合曲线的方程研究两者之间相关规律,并进一步运用数理统计方法进行预测预报,这种方法的不足主要体现在以下两点:一是在进行拟合分析时需事先人为假定函数关系,对于复杂的非线性相关关系很难准确确定其函数关系,所以容易造成测定误差;二是离散图为不包含时间因素的一种静态相关关系,不能很好地反映和评价包含时间因素的动态过程关系;这种方法受人为因素影响较大,且对滑坡位移与降雨的滞后关系仅停留在对规律总结的定性描述,具体实施中尚未有定量测定方法。贺可强的论文“新滩斜坡差异滑移规律的灰色系统分析”(河北地质学院学报,1991年)中提出运用“关联度”分析方法对新滩斜坡差异滑移规律进行时空分析,但未涉及降雨序列研究与应用,更没有对滑坡位移与降雨序列的关系进行任何分析与评价。因此,寻求设计一种利用降雨量测定地质滑坡位移的方法,建立和确定地质滑坡与降雨之间的关联性与滞后性定量评价参数与方法,实现对该类滑坡的监控预警与防治,具有良好的社会效益和经济价值。
发明内容:
本发明的目的在于克服现有技术存在的缺点,寻求设计提供一种利用降雨量测定地质滑坡位移的方法,通过定量评价地质滑坡与降雨之间的关联性与滞后性,实现地质滑坡位移的监控预警,防止地质滑坡等灾害的发生。
为了实现上述目的,本发明涉及的利用降雨量测定地质滑坡位移的方法具体包括滑坡区降雨量及滑坡位移数据的监测、降雨量及滑坡位移监测数据的预处理、滑坡位移与降雨量关联性分析计算、滑坡位移与降雨量滞后性分析计算和评价预测五个步骤:
(1)滑坡区降雨量及滑坡位移数据的监测:先在待测目标滑坡处的后缘引张拉裂区、前缘剪出区或中部变形较大区选定监测点并设立监测基桩,在距离监测点500-2000m处的周边稳定区域设置基准点,然后安装降雨监测系统和位移监测系统,在基准点处利用位移监测系统定期监测并记录监测基桩的滑坡位移数据或位移速率;利用降雨监测系统等时等周期在选定的待测目标滑坡处的区域开展降雨量的监测并记录监测的降雨量数据;
(2)降雨量及滑坡位移监测数据的预处理:将监测的降雨量数据和滑坡位移数据,按照监测周期分类预处理,录入Excel表格,并分别绘制降雨量-时间曲线和滑坡位移-时间曲线;
(3)滑坡位移与降雨量关联性分析计算:具体包括五个分步骤:①、利用步骤(2)中的降雨量数据和滑坡位移数据建立降雨量母序列与滑坡位移子序列;②、将各序列进行无量纲归一化处理;③、求取矩阵的差异信息;④、求解表示母序列和子序列相关性的关联系数;⑤、求出所有关联系数的平均值即最终的关联度;
(4)滑坡位移与降雨量滞后性分析计算:保持降雨时间序列不变,以定量的时间间隔逐一后移位移时间序列,并依次计算后移后的降雨量与滑坡位移时间序列关联度值,关联度极大值出现所对应的时间即为滑坡位移滞后时间;
(5)评价预测:根据步骤(3)中所得的关联度数值判断降雨量对滑坡位移的影响程度和关联性,关联度数值越大说明滑坡位移与降雨量关联性越大;根据步骤(4)中所得滞后时间判断滑坡位移与降雨量的滞后关系,确定滑坡滞后降雨发生的时间,并打印或显示,实现地质滑坡的监控预警。
本实施例涉及的降雨监测系统选择市售的全自动水文监测系统,位移监测系统选择市售的滑坡位移无线监测系统;步骤(3)中涉及的滑坡位移与降雨量关联性分析计算具体包括以下步骤:
①建立降雨量母序列与滑坡位移子序列,以月为监测时间单位,将滑坡某年n=1~12个月份的降雨量监测数据作为母序列
Figure BDA00002623744800021
将不同滑坡i上的不同监测点j的位移量监测数据作为子序列
Figure BDA00002623744800031
进行关联分析,若共计k个滑坡,则i=1,2,3…k;若滑坡i上共布设了pi个测点,则j=1,2,3,…pi
{ X 0 ( 0 ) ( n ) } = { X 0 ( 0 ) ( 1 ) , X 0 ( 0 ) ( 2 ) , · · · X 0 ( 0 ) ( 12 ) } - - - ( a )
{ X ij ( 0 ) ( n ) } = { X ij ( 0 ) ( 1 ) , X ij ( 0 ) ( 2 ) , · · · X ij ( 0 ) ( 12 ) } - - - ( b )
②将各序列进行无量纲归一化处理,由于不同序列数学单位不一致,数值差异的大小没有可比性,因此必须对其进行无量纲处理之后进行比较分析;常用区间相对值化的方法:
X 0 ( 0 ) ( n ) ′ = X 0 ( 0 ) ( n ) - min X 0 ( 0 ) ( n ) max X 0 ( 0 ) ( n ) - min X 0 ( 0 ) ( n ) - - - ( c )
得到无量纲后的结果:
{ X 0 ( 0 ) ( n ) ′ } = { X 0 ( 0 ) ( 1 ) ′ , X 0 ( 0 ) ( 2 ) ′ , · · · X 0 ( 0 ) ( 12 ) ′ } - - - ( d )
{ X ij ( 0 ) ( n ) ′ } = { X ij ( 0 ) ( 1 ) ′ , X ij ( 0 ) ( 2 ) ′ , · · · X ij ( 0 ) ( 12 ) ′ } - - - ( e )
③求取矩阵的差异信息
Δ i = [ | X 0 ( 0 ) ( n ) ′ - X ij ( 0 ) ( n ) ′ | ] - - - ( f )
分别提取12个差异序列中的最大值Δmax及最小值Δmin
④求解表示母序列和子序列相关性的关联系数,关联系数用来表示母序列和子序列的相关性,用下式求出:
η = Δ min + ζ Δ max Δ i + ζ Δ max - - - ( g )
ζ为分辨系数,取值为0.5,以提高关联系数的差异性;
⑤求出所有关联系数的平均值即最终的关联度,最终关联度取所有关联系数的平均值如下:
γ OK = 1 12 Σ 1 12 η n - - - ( h )
关联度越大说明降雨量对滑坡位移影响程度和关联性越大,即γok=1,表示滑坡位移与降雨量完全相关;γok=0,表示滑坡位移与降雨量完全无关;关联度数值越大表示滑坡位移与降雨量关联性越大,表明降雨量对滑坡位移的动力作用越明显,关联度取值0-1的区间划分为四个评价段,即0-0.25、0.25-0.5、0.50-0.75和0.75-1.0,分别表示待测目标滑坡处的关联性小、中等、较大和大。
本发明根据待测目标滑坡处的位置的不同能对同一滑坡不同区域进行关联性分区评价;也能对某地区不同滑坡的位移与降雨量的关联度进行分析与评价,对不同滑坡进行分类监测与治理。
本发明的步骤(4)中涉及的滑坡位移与降雨量滞后性分析计算,设定滞后时间间隔为一个月,当滞后一个月时,将滑坡某年12个月份的降雨量监测数据作为母序列
Figure BDA00002623744800041
固定不变,与各月份降雨量对应的子序列位移量序列依次推移一个月份,因此子序列中第一个月滑坡位移为原位移序列的第二个数据,第12个月滑坡位移为下一年的首月滑坡位移数据,则当滞后M个月时,同理将位移序列依次推移M个月(M=1~12),关联序列如下:
{ X 0 ( 0 ) ( n ) } = { X 0 ( 0 ) ( 1 ) , X 0 ( 0 ) ( 2 ) , · · · X 0 ( 0 ) ( 10 ) , X 0 ( 0 ) ( 11 ) , X 0 ( 0 ) ( 12 ) } - - - ( k )
{ X ij ( 0 ) ( n ) } = { X ij ( 0 ) ( 1 + M ) , X ij ( 0 ) ( 2 + M ) , · · · X ij ( 0 ) ( 11 + M ) , X ij ( 0 ) ( 12 + M ) } - - - ( m )
然后按照式(c)~(h)计算关联度;通过滞后性的分析计算,能确定滑坡滞后降雨发生的时间,并确定滑坡位移发生的高风险时间点,有效实现地质滑坡的监控预警。
本发明与现有技术相比,对滑坡位移与降雨的滞后关系不再仅停留在对规律总结的定性描述,而是采用定量评价方法,无需假设函数关系,避免人为因素干扰,能够定量分析和评价滑坡位移与降雨量不同时间序列的关联性和滞后性关系,并给出不同滑坡的分类治理依据,实现地质滑坡状态监控预警;其实现方法简单,设计原理可靠,计算分析准确,利用计算机系统进行运算,速度快、准确性高,成本低,监控预警效果好,效益明显,监控效率高。
附图说明:
图1为本发明的方法流程示意图。
图2为本发明涉及的滑坡Ⅰ坡体A~D系列监测点位置示意图。
图3为本发明涉及的滑坡Ⅱ坡体监测点A3、B3位置示意图。
图4为本发明涉及的滑坡ⅡA3、B3点位移与时间关系曲线图。
图5为本发明涉及的滑坡Ⅱ降雨量与时间关系曲线图。
具体实施方式:
下面结合附图并通过实施例对本发明作出详细说明。
实施例:
该实施例依据两个滑坡的具体应用实例进行测定,其具体步骤为:
(1)滑坡区降雨量及滑坡位移数据的监测:滑坡实例Ⅰ(附图2)监测的是1990年5月至2003年5月期间A~D系列监测点降雨量及滑坡位移数据,是由不同的滑坡共同形成的滑坡群;滑坡实例Ⅱ(附图3)监测的是1978年1月1至1985年6月期间A3、B3监测点(设在坡体480~600m高程上,见图3)的降雨量及位移量监测数据;
(2)降雨量及滑坡位移监测数据的预处理:将监测到的降雨量数据及滑坡位移数据见表1、表2、表3、表4、表5按照监测周期分类预处理,录入Excel表格,并分别绘制降雨量-时间曲线及滑坡位移-时间曲线见图4、图5;
表1滑坡Ⅰ监测1990年5月-2003年5月降雨量统计表  单位:mm
Figure BDA00002623744800051
表2滑坡Ⅰ监测1990年5月-2003年5月滑坡位移统计表  单位:mm
Figure BDA00002623744800052
Figure BDA00002623744800061
表3滑坡ⅡA3点累计位移数据(单位:mm)
Figure BDA00002623744800062
表4滑坡ⅡB3点累计位移数据(单位:mm)
Figure BDA00002623744800063
表5滑坡Ⅱ降雨数据(单位:mm)
Figure BDA00002623744800064
Figure BDA00002623744800071
(3)滑坡位移与降雨量关联性分析计算:具体包括五个分步骤:①、利用步骤(2)中的数据建立降雨量母序列与滑坡位移子序列;②、将各序列进行无量纲归一化处理;③、求取矩阵的差异信息;④、求解表示母序列和子序列相关性的关联系数;⑤、求出所有关联系数的平均值即最终的关联度;
①建立降雨母序列与滑坡位移子序列
因滑坡Ⅰ位移监测是以年周期,因此降雨量也采用同样的周期(如表1、表2),此处以D1为例,将滑坡1990年~2001年的降雨量监测数据作为母序列
Figure BDA00002623744800072
将D1点的位移量监测数据作为子序列
Figure BDA00002623744800073
进行关联分析:
{ X 0 ( 0 ) ( n ) } = 453.6 894.0 785.6 713.3 892.4 871.9 1221.2 705.9 1279.5 897.7 1002.4 693.9
{ X ij ( 0 ) ( n ) } = 4 8 10 12 15 15 15 15 15 19 29 29
②各序列无量纲归一化
由于不同序列数学单位不一致,数值差异的大小没有可比性,因此必须对其进行无量纲处理之后进行比较分析;常用区间相对值化的方法:
X 0 ( 0 ) ( n ) ′ = X 0 ( 0 ) ( n ) - min X 0 ( 0 ) ( n ) max X 0 ( 0 ) ( n ) - min X 0 ( 0 ) ( n )
得到无量纲后的结果:
{ X 0 ( 0 ) ( n ) ′ } = 0 0.533 0.402 0.314 0.531 0.506 0.929 0.305 1 0.538 0.664 0.291
{ X ij ( 0 ) ( n ) ′ } = 0 0.16 0.24 0.32 0.44 0.44 0.44 0.44 0.44 0.6 1 1
③求取矩阵的差异信息
Δ i = [ | X 0 ( 0 ) ( n ) ′ - X ij ( 0 ) ( n ) ′ | ]
得到:
Δi=[0 0.373 0.162 0.006 0.091 0.066 0.489 0.135 0.56 0.062 0.336 0.709]
分别提取12个差异序列中的最大值Δmax=0.709及最小值Δmin=0;
④求解表示母序列和子序列相关性的关联系数
关联系数用来表示母序列和子序列的相关性,用下式求出:
η = 0 + 0.5 × 0.709 Δ i + 0.5 × 0.709
ζ为分辨系数,一般取0.5,目的是提高关联系数的差异性;
⑤求出所有关联系数的平均值即最终的关联度
最终关联度取12个关联系数的平均值如下:
γ OK = 1 12 Σ 1 12 η n = 0.6887
将各点位移量与降雨量的关联度值计算如下,见表6;
表6滑坡Ⅰ年降雨量与各变形点年位移量关联度分析结果
Figure BDA00002623744800084
从关联度分析结果可以看出,同一滑坡的不同观测点降雨及滑坡位移的关联度值不一样,如滑坡⑤,从上部至底部逐渐增大,说明滑坡下部比上部受降雨的不利影响显著,应重点对滑坡下部进行排水治理,而滑坡②则呈现出相反的规律;同时对于此滑坡群内不同滑坡①③来说,滑坡③的关联度值比滑坡①要大,说明滑坡③受降雨不利影响大于滑坡①,因此相比而言,应对滑坡③采取较强的排水治理措施。上述该滑坡群区域关联性评价结果与实际滑坡位移与降雨量监测结果相吻合,总体评价:关联度不小于0.75时应以排水为重点治理措施,当在0.5~0.75之间时应以排水为主要治理措施。
(4)滑坡位移与降雨量滞后性分析计算:
以滑坡Ⅱ为例,采用表3、表4、表5监测数据,以A3点任一年1980年为例,当滞后时间间隔为一个月时,将滑坡12个月份的降雨量监测数据作为母序列
Figure BDA00002623744800091
固定不变,与各月份降雨量对应的子序列位移量序列依次推移一个月份,因此子序列中第一个月位移为原位移序列的第二个数据,第12个月位移为1981年的首月位移数据,,关联序列如下:
{ X 0 ( 0 ) ( n ) } = 18.2 20.5 76.3 38.7 99.1 292.5 250.9 281.3 85.7 67.3 21.3 0.3
{ X ij ( 0 ) ( n ) } = 694.8 702.6 706.8 716.5 726.2 807.0 856.5 916.0 936.7 946.1 964.8 987.7
然后按照式(c)~(h)计算关联度γOK=0.873;则当滞后M个月时,同理将位移序列依次推移M个月(M=1~12)通过滞后性的分析计算,能确定滑坡滞后降雨发生的时间,从而及时准确地确定滑坡发生的高风险时间点,有效实现地质滑坡的监控预警,A3,B3点滞后性关联度计算结果见表7;
表7滑坡降雨量与A3、B3点月位移量关联度滞后关系分析结果
Figure BDA00002623744800094
(5)评价预测:
滞后关联度分析结果表明,A3和B3点月位移量与月降雨量的关联度值在后移两个月后分别达到最大值,分别为0.881和0.879,该结果表明该滑坡关键部位的位移响应滞后其降雨量近两个月,这与该滑坡位移与降雨量实际监测结果与变化规律相吻合。

Claims (3)

1.一种利用降雨量测定地质滑坡位移的方法,其特征在于具体包括滑坡区降雨量及滑坡位移数据的监测、降雨量及滑坡位移监测数据的预处理、滑坡位移与降雨量关联性分析计算、滑坡位移与降雨量滞后性分析计算和评价预测五个步骤:
(1)滑坡区降雨量及滑坡位移数据的监测:先在待测目标滑坡处的后缘引张拉裂区、前缘剪出区或中部变形较大区选定监测点并设立监测基桩,在距离监测点500-2000m处的周边稳定区域设置基准点,然后安装降雨监测系统和位移监测系统,在基准点处利用位移监测系统定期监测并记录监测基桩的滑坡位移数据或位移速率;利用降雨监测系统等时等周期在选定的待测目标滑坡处的区域开展降雨量的监测并记录监测的降雨量数据;
(2)降雨量及滑坡位移监测数据的预处理:将监测的降雨量数据和滑坡位移数据,按照监测周期分类预处理,录入Excel表格,并分别绘制降雨量-时间曲线和滑坡位移-时间曲线;
(3)滑坡位移与降雨量关联性分析计算:具体包括五个分步骤:①、利用步骤(2)中的降雨量数据和滑坡位移数据建立降雨量母序列与滑坡位移子序列;②、将各序列进行无量纲归一化处理;③、求取矩阵的差异信息;④、求解表示母序列和子序列相关性的关联系数;⑤、求出所有关联系数的平均值即最终的关联度;
(4)滑坡位移与降雨量滞后性分析计算:保持降雨时间序列不变,以定量的时间间隔逐一后移位移时间序列,并依次计算后移后的降雨量与滑坡位移时间序列关联度值,关联度极大值出现所对应的时间即为滑坡位移滞后时间;
(5)评价预测:根据步骤(3)中所得的关联度数值判断降雨量对滑坡位移的影响程度和关联性,关联度数值越大说明滑坡位移与降雨量关联性越大;根据步骤(4)中所得滞后时间判断滑坡位移与降雨量的滞后关系,确定滑坡滞后降雨发生的时间,并打印或显示,实现地质滑坡的监控预警。
2.根据权利要求1所述的利用降雨量测定地质滑坡位移的方法,其特征在于所述降雨监测系统选择市售的全自动水文监测系统,位移监测系统选择市售的滑坡位移无线监测系统;步骤(3)中涉及的滑坡位移与降雨量关联性分析计算具体包括以下步骤:
①建立降雨量母序列与滑坡位移子序列,以月为监测时间单位,将滑坡某年n=1~12个月份的降雨量监测数据作为母序列,将不同滑坡i上的不同监测点j的位移量监测数据作为子序列
Figure FDA00002623744700022
进行关联分析,若共计k个滑坡,则i=1,2,3…k;若滑坡i上共布设了pi个测点,则j=1,2,3,…pi
{ X 0 ( 0 ) ( n ) } = { X 0 ( 0 ) ( 1 ) , X 0 ( 0 ) ( 2 ) , · · · X 0 ( 0 ) ( 12 ) } - - - ( a )
{ X ij ( 0 ) ( n ) } = { X ij ( 0 ) ( 1 ) , X ij ( 0 ) ( 2 ) , · · · X ij ( 0 ) ( 12 ) } - - - ( b )
②将各序列进行无量纲归一化处理,由于不同序列数学单位不一致,数值差异的大小没有可比性,因此必须对其进行无量纲处理之后进行比较分析;常用区间相对值化的方法:
X 0 ( 0 ) ( n ) ′ = X 0 ( 0 ) ( n ) - min X 0 ( 0 ) ( n ) max X 0 ( 0 ) ( n ) - min X 0 ( 0 ) ( n ) - - - ( c )
得到无量纲后的结果:
{ X 0 ( 0 ) ( n ) ′ } = { X 0 ( 0 ) ( 1 ) ′ , X 0 ( 0 ) ( 2 ) ′ , · · · X 0 ( 0 ) ( 12 ) ′ } - - - ( d )
{ X ij ( 0 ) ( n ) ′ } = { X ij ( 0 ) ( 1 ) ′ , X ij ( 0 ) ( 2 ) ′ , · · · X ij ( 0 ) ( 12 ) ′ } - - - ( e )
③求取矩阵的差异信息
Δ i = [ | X 0 ( 0 ) ( n ) ′ - X ij ( 0 ) ( n ) ′ | ] - - - ( f )
分别提取12个差异序列中的最大值Δmax及最小值Δmin
④求解表示母序列和子序列相关性的关联系数,关联系数用来表示母序列和子序列的相关性,用下式求出:
η = Δ min + ζ Δ max Δ i + ζ Δ max - - - ( g )
ζ为分辨系数,取值为0.5,以提高关联系数的差异性;
⑤求出所有关联系数的平均值即最终的关联度,最终关联度取所有关联系数的平均值如下:
γ OK = 1 12 Σ 1 12 η n - - - ( h )
关联度越大说明降雨量对滑坡位移影响程度和关联性越大,即γok=1,表示滑坡位移与降雨量完全相关;γok=0,表示滑坡位移与降雨量完全无关;关联度数值越大表示滑坡位移与降雨量关联性越大,表明降雨量对滑坡位移的动力作用越明显,关联度取值0-1的区间划分为四个评价段,即0-0.25、0.25-0.5、0.50-0.75和0.75-1.0,分别表示待测目标滑坡处的关联性小、中等、较大和大。
3.根据权利要求1所述的利用降雨量测定地质滑坡位移的方法,其特征在于所述步骤(4)中涉及的滑坡位移与降雨量滞后性分析计算,设定滞后时间间隔为一个月,当滞后一个月时,将滑坡某年12个月份的降雨量监测数据作为母序列
Figure FDA00002623744700031
固定不变,与各月份降雨量对应的子序列位移量序列依次推移一个月份,因此子序列中第一个月滑坡位移为原位移序列的第二个数据,第12个月滑坡位移为下一年的首月滑坡位移数据,则当滞后M个月时,同理将位移序列依次推移M个月(M=1~12),关联序列如下:
{ X 0 ( 0 ) ( n ) } = { X 0 ( 0 ) ( 1 ) , X 0 ( 0 ) ( 2 ) , · · · X 0 ( 0 ) ( 10 ) , X 0 ( 0 ) ( 11 ) , X 0 ( 0 ) ( 12 ) } - - - ( k )
{ X ij ( 0 ) ( n ) } = { X ij ( 0 ) ( 1 + M ) , X ij ( 0 ) ( 2 + M ) , · · · X ij ( 0 ) ( 11 + M ) , X ij ( 0 ) ( 12 + M ) } - - - ( m )
然后按照式(c)~(h)计算关联度;通过滞后性的分析计算,能确定滑坡滞后降雨发生的时间,并确定滑坡位移发生的高风险时间点,有效实现地质滑坡的监控预警。
CN201210559634.1A 2012-12-20 2012-12-20 一种利用降雨量测定地质滑坡位移的方法 Expired - Fee Related CN103017709B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210559634.1A CN103017709B (zh) 2012-12-20 2012-12-20 一种利用降雨量测定地质滑坡位移的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210559634.1A CN103017709B (zh) 2012-12-20 2012-12-20 一种利用降雨量测定地质滑坡位移的方法

Publications (2)

Publication Number Publication Date
CN103017709A true CN103017709A (zh) 2013-04-03
CN103017709B CN103017709B (zh) 2015-02-18

Family

ID=47966588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210559634.1A Expired - Fee Related CN103017709B (zh) 2012-12-20 2012-12-20 一种利用降雨量测定地质滑坡位移的方法

Country Status (1)

Country Link
CN (1) CN103017709B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266588A (zh) * 2013-04-28 2013-08-28 青岛理工大学 利用位移监测测定边坡非圆弧滑移面的方法
CN103714661A (zh) * 2013-11-14 2014-04-09 浙江省国土资源厅信息中心 降雨阈值自适应的滑坡实时预警方法
CN106198922A (zh) * 2016-06-23 2016-12-07 青岛理工大学 降雨型滑坡临界启动降雨量及失稳预警时间的确定方法
CN106781291A (zh) * 2016-12-29 2017-05-31 哈尔滨工业大学深圳研究生院 一种基于位移量的降雨型滑坡预警方法及装置
CN107067021A (zh) * 2016-12-30 2017-08-18 中国地质大学(武汉) 基于运动角差的滑坡形变相似性评价方法
CN107516402A (zh) * 2017-10-01 2017-12-26 中国科学院、水利部成都山地灾害与环境研究所 区域滑坡灾害雨量预警方法、预警系统
CN107610421A (zh) * 2017-09-19 2018-01-19 合肥英泽信息科技有限公司 一种地质灾害预警分析系统及方法
CN109740108A (zh) * 2019-01-25 2019-05-10 北京科技大学 一种考虑阶梯沉降的平推式滑坡稳定性评价方法
CN110749944A (zh) * 2019-10-16 2020-02-04 西北大学 一种滑坡预报的滞后非线性时间预报模型
CN112699572A (zh) * 2021-01-18 2021-04-23 长安大学 一种基于时滞相关性分析预测滑坡变形的方法
CN115587434A (zh) * 2022-09-28 2023-01-10 重庆市二零八地质环境研究院有限公司 一种定量评价降雨引起滑坡变形的滞后效应的评价方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477206A (zh) * 2009-01-20 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 一种地质灾害应急监测预报分析方法
CN101598721A (zh) * 2009-05-27 2009-12-09 云南省电力设计院 一种在降雨条件下土边坡稳定性预测预报方法
KR101103697B1 (ko) * 2011-09-30 2012-01-11 주식회사 디케이이앤씨 강우강도와 토양함수율을 이용한 경사지 경보시스템
CN101872533B (zh) * 2010-06-25 2012-02-01 中国科学院水利部成都山地灾害与环境研究所 一种泥石流预警方法及预警系统
KR101149916B1 (ko) * 2011-08-16 2012-05-30 (주)인펙비전 산사태 경보시스템

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477206A (zh) * 2009-01-20 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 一种地质灾害应急监测预报分析方法
CN101598721A (zh) * 2009-05-27 2009-12-09 云南省电力设计院 一种在降雨条件下土边坡稳定性预测预报方法
CN101872533B (zh) * 2010-06-25 2012-02-01 中国科学院水利部成都山地灾害与环境研究所 一种泥石流预警方法及预警系统
KR101149916B1 (ko) * 2011-08-16 2012-05-30 (주)인펙비전 산사태 경보시스템
KR101103697B1 (ko) * 2011-09-30 2012-01-11 주식회사 디케이이앤씨 강우강도와 토양함수율을 이용한 경사지 경보시스템

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
许建聪等: "松散土质滑坡位移与降雨量的相关性研究", 《岩土力学与工程学报》 *
龙悦等: "数据预处理在滑坡位移相关分析中的应用", 《地质科技情报》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266588B (zh) * 2013-04-28 2015-12-09 青岛理工大学 利用位移监测测定边坡非圆弧滑移面的方法
CN103266588A (zh) * 2013-04-28 2013-08-28 青岛理工大学 利用位移监测测定边坡非圆弧滑移面的方法
CN103714661A (zh) * 2013-11-14 2014-04-09 浙江省国土资源厅信息中心 降雨阈值自适应的滑坡实时预警方法
CN103714661B (zh) * 2013-11-14 2016-06-08 浙江省国土资源厅信息中心 降雨阈值自适应的滑坡实时预警方法
CN106198922A (zh) * 2016-06-23 2016-12-07 青岛理工大学 降雨型滑坡临界启动降雨量及失稳预警时间的确定方法
CN106198922B (zh) * 2016-06-23 2018-07-06 青岛理工大学 降雨型滑坡临界启动降雨量及失稳预警时间的确定方法
CN106781291B (zh) * 2016-12-29 2019-03-26 哈尔滨工业大学深圳研究生院 一种基于位移量的降雨型滑坡预警方法及装置
CN106781291A (zh) * 2016-12-29 2017-05-31 哈尔滨工业大学深圳研究生院 一种基于位移量的降雨型滑坡预警方法及装置
CN107067021A (zh) * 2016-12-30 2017-08-18 中国地质大学(武汉) 基于运动角差的滑坡形变相似性评价方法
CN107067021B (zh) * 2016-12-30 2023-10-31 中国地质大学(武汉) 基于运动角差的滑坡形变相似性评价方法
CN107610421A (zh) * 2017-09-19 2018-01-19 合肥英泽信息科技有限公司 一种地质灾害预警分析系统及方法
CN107516402B (zh) * 2017-10-01 2019-03-26 中国科学院、水利部成都山地灾害与环境研究所 区域滑坡灾害雨量预警方法、预警系统
CN107516402A (zh) * 2017-10-01 2017-12-26 中国科学院、水利部成都山地灾害与环境研究所 区域滑坡灾害雨量预警方法、预警系统
CN109740108A (zh) * 2019-01-25 2019-05-10 北京科技大学 一种考虑阶梯沉降的平推式滑坡稳定性评价方法
CN110749944A (zh) * 2019-10-16 2020-02-04 西北大学 一种滑坡预报的滞后非线性时间预报模型
CN112699572A (zh) * 2021-01-18 2021-04-23 长安大学 一种基于时滞相关性分析预测滑坡变形的方法
CN115587434A (zh) * 2022-09-28 2023-01-10 重庆市二零八地质环境研究院有限公司 一种定量评价降雨引起滑坡变形的滞后效应的评价方法

Also Published As

Publication number Publication date
CN103017709B (zh) 2015-02-18

Similar Documents

Publication Publication Date Title
CN103017709B (zh) 一种利用降雨量测定地质滑坡位移的方法
Plouffe et al. Comparing interpolation techniques for monthly rainfall mapping using multiple evaluation criteria and auxiliary data sources: A case study of Sri Lanka
Abbaszadeh et al. The quest for model uncertainty quantification: A hybrid ensemble and variational data assimilation framework
Villarini et al. On the frequency of heavy rainfall for the Midwest of the United States
Borges et al. Comparison of spatial interpolation methods for the estimation of precipitation distribution in Distrito Federal, Brazil
Magalhães et al. Online automatic identification of the modal parameters of a long span arch bridge
Wang et al. Isolating the impacts of climate change and land use change on decadal streamflow variation: Assessing three complementary approaches
Ho et al. The Southern Annular Mode: a comparison of indices
Antoniou et al. Relating traffic fatalities to GDP in Europe on the long term
Kempes et al. Comparing response of Pinus edulis tree-ring growth to five alternate moisture indices using historic meteorological data
Stanev et al. German Bight estuaries: An inter-comparison on the basis of numerical modeling
Duvert et al. Correlation and spectral analyses to assess the response of a shallow aquifer to low and high frequency rainfall fluctuations
Shi et al. Temporal and spatial variations of potential evaporation and the driving mechanism over Tibet during 1961–2001
Lee et al. The prospects of a monetary union in East Asia
CN103455702A (zh) 一种确定区域电离层延迟的方法
Kotwicki et al. Improving area swept estimates from bottom trawl surveys
Panthou et al. From pointwise testing to a regional vision: An integrated statistical approach to detect nonstationarity in extreme daily rainfall. Application to the Sahelian region
Yang Correlogram, predictability error growth, and bounds of mean square error of solar irradiance forecasts
Choi et al. Bayesian inference of structural error in inverse models of thermal response tests
Engeland et al. Probabilistic postprocessing models for flow forecasts for a system of catchments and several lead times
Yu et al. Automated detection of unusual soil moisture probe response patterns with association rule learning
Dutta et al. Value of information analysis for subsurface energy resources applications
CN103134433B (zh) 一种利用位移监测鉴别边坡失稳致滑因子的方法
Bárdossy et al. Process-driven direction-dependent asymmetry: identification and quantification of directional dependence in spatial fields
CN103353295A (zh) 一种精确预测大坝坝体垂直变形量的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20151220

EXPY Termination of patent right or utility model