CN103015462A CN2013100190868A CN201310019086A CN103015462A CN 103015462 A CN103015462 A CN 103015462A CN 2013100190868 A CN2013100190868 A CN 2013100190868A CN 201310019086 A CN201310019086 A CN 201310019086A CN 103015462 A CN103015462 A CN 103015462A
Authority
CN
China
Prior art keywords
cloth bag
stone
poured
piecing devices
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100190868A
Other languages
Chinese (zh)
Other versions
CN103015462B (en
Inventor
张永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lim Kum Kee Foodstuff Co Ltd
Original Assignee
张永忠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张永忠 filed Critical 张永忠
Priority to CN201310019086.8A priority Critical patent/CN103015462B/en
Publication of CN103015462A publication Critical patent/CN103015462A/en
Application granted granted Critical
Publication of CN103015462B publication Critical patent/CN103015462B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

A cloth bag stone piecing device divides a continuous groove segment into a to-be-poured groove segment and a non-poured groove segment and comprises a cloth bag, an injection pipe is arranged in the middle of the cloth bag, the lower end of the injection pipe is inserted to the groove bottom, and the cloth bag is filled with stones. The cloth bag is filled with the stones, and frictional resistance of the solid stones and groove walls is high, so that after the cloth bag is filled to the full, a single groove segment can be poured immediately without waiting, and a series of problems of slot collapse, overlarge sediment thickness and the like caused by overlong dead time are avoided. Besides, filling the stones into the cloth bag is simpler than embedding a guide tube into the cloth bag prior to pouring of underwater concrete.

Description

Cloth bag stone piecing devices
Technical field
The present invention relates to a kind of concrete joint head unit, particularly a kind of concrete cloth bag stone piecing devices of building diaphragm wall.
Background technology
When the succeeding vat section that continuous groover becomes is built underwater concrete, need the succeeding vat section is divided into sectional single groove segment with piecing devices, then respectively each single groove segment is carried out building of underwater concrete, at present, its piecing devices are mostly made with cloth bag filling underwater concrete, because the underwater concrete flowability is very strong, the frictional resistance of cloth bag concrete and cell wall is very little, need the long setting time of cloth bag concrete, just can build single groove segment that the cloth bag concrete is isolated, and need when in cloth bag, carrying out the building of underwater concrete and will be full of mud in the cloth bag, then place conduit and carry out building of underwater concrete, very difficult.
Summary of the invention
The present invention has remedied above shortcoming, and a kind of cloth bag stone piecing devices are provided.
The present invention is achieved through the following technical solutions:
A kind of cloth bag stone piecing devices, its piecing devices are divided into the succeeding vat section groove section to be poured and do not water the groove section, and piecing devices comprise a cloth bag, are provided with Grouting Pipe in the middle of cloth bag is interior, and the lower end of Grouting Pipe is inserted into bottom land, fills stone in the cloth bag.
The present invention has following beneficial effect:
These piecing devices are by filling stone to cloth bag, because stone is solid-state large with frictional resistance cell wall, after filling up cloth bag, need not to wait for, can build single groove segment at once, the series of problems such as the slotted eye of avoiding bringing because dead time is long caves in, sediment thickness is excessive, and the filling stone is more simply too much than the perfusion that then implantation catheter in cloth bag carries out underwater concrete in the cloth bag.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing;
Accompanying drawing is structural representation of the present invention;
Among the figure: 1, watered the groove section, 2, groove section to be poured, 3, do not water the groove section, 4, ground, 5, the soil body to be excavated, 6, bottom land, 7, Grouting Pipe, 8, slip casting stone, 9, cloth bag, 10, slip casting stone not.
The specific embodiment
Accompanying drawing is a kind of specific embodiment of the present invention, the piecing devices of this embodiment are divided into the succeeding vat section groove section 2 to be poured and do not water groove section 3, and piecing devices comprise a cloth bag 9, the middle Grouting Pipe 7 that is provided with in the cloth bag, the lower end of Grouting Pipe is inserted into bottom land, fills stone in the cloth bag.
Determining of cloth bag width: according to the width of the Depth determination cloth bag of groove, 10 meters of general groove depths, the width of selecting cloth bag is 1 meter, groove depth increases, and increases the width of cloth bag according to ratio.
Determining of cloth bag material: cloth bag should the first-selected knit nylon cloth bag of strengthening.
Determining of Grouting Pipe number: determine the number of Grouting Pipe according to the width of cloth bag, 1 meter of general width, the number of selecting Grouting Pipe is 1, greater than 1 meter less than 2 meters, the number of Grouting Pipe is 2, increases according to ratio thereafter.
Selecting of injecting paste material: the first-selected cement paste of injecting paste material.
When the present invention works, length according to groove section to be poured, determine the position of piecing devices, at the bottom of one cloth bag is equipped with a small amount of stone and Grouting Pipe and together sinks to this location groove, to the in-built son that rockfills of cloth bag, after filling, can build the underwater concrete of groove section to be poured, after not watering groove section concreting, can carry out slip casting to Grouting Pipe.

Claims (2)

1. cloth bag stone piecing devices, its piecing devices are divided into the succeeding vat section groove section to be poured (2) and do not water groove section (3), and piecing devices comprise a cloth bag (9), it is characterized in that: be provided with Grouting Pipe (7) in the middle of in the cloth bag, the lower end of Grouting Pipe is inserted into bottom land, fills stone in the cloth bag.
2. the using method of cloth bag stone piecing devices as claimed in claim 1, it is characterized in that: when the present invention works, length according to groove section to be poured, determine the position of piecing devices, at the bottom of a cloth bag is equipped with a small amount of stone and Grouting Pipe and together sinks to this location groove, to the in-built son that rockfills of cloth bag, after filling, can build the underwater concrete of groove section to be poured (2), after not watering groove section (3) concreting, namely available Grouting Pipe is carried out slip casting to the stone space in the cloth bag.
CN201310019086.8A 2013-01-20 2013-01-20 Cloth bag stone piecing device and its using method Expired - Fee Related CN103015462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310019086.8A CN103015462B (en) 2013-01-20 2013-01-20 Cloth bag stone piecing device and its using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310019086.8A CN103015462B (en) 2013-01-20 2013-01-20 Cloth bag stone piecing device and its using method

Publications (2)

Publication Number Publication Date
CN103015462A true CN103015462A (en) 2013-04-03
CN103015462B CN103015462B (en) 2015-01-21

Family

ID=47964524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310019086.8A Expired - Fee Related CN103015462B (en) 2013-01-20 2013-01-20 Cloth bag stone piecing device and its using method

Country Status (1)

Country Link
CN (1) CN103015462B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08253927A (en) * 1995-03-16 1996-10-01 Ohbayashi Corp Joint structure in underground continuous wall
JPH11269870A (en) * 1998-03-26 1999-10-05 Kajima Corp Execution method of joint for underground continuous wall
CN2429564Y (en) * 2000-05-12 2001-05-09 彭德钊 Apparatus for casting concrete in long trough of underground thin bulkhead
CN201180268Y (en) * 2008-02-03 2009-01-14 王平 Flexible apparatus for preventing concrete circumferential motion of underground continuous wall
CN101806067A (en) * 2009-02-16 2010-08-18 上海市机械施工有限公司 Construction method of underground continuous wall joints by using air bag
CN101858090A (en) * 2010-06-23 2010-10-13 天津深基工程有限公司 Construction method for soft connection of diaphram wall rigid joints
CN102168427A (en) * 2010-11-12 2011-08-31 张永忠 Bag concrete isolator
CN202577362U (en) * 2012-03-12 2012-12-05 张立丽 Flexible underground continuous wall connector
CN203022031U (en) * 2013-01-20 2013-06-26 张永忠 Cloth bag stone joint device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08253927A (en) * 1995-03-16 1996-10-01 Ohbayashi Corp Joint structure in underground continuous wall
JPH11269870A (en) * 1998-03-26 1999-10-05 Kajima Corp Execution method of joint for underground continuous wall
CN2429564Y (en) * 2000-05-12 2001-05-09 彭德钊 Apparatus for casting concrete in long trough of underground thin bulkhead
CN201180268Y (en) * 2008-02-03 2009-01-14 王平 Flexible apparatus for preventing concrete circumferential motion of underground continuous wall
CN101806067A (en) * 2009-02-16 2010-08-18 上海市机械施工有限公司 Construction method of underground continuous wall joints by using air bag
CN101858090A (en) * 2010-06-23 2010-10-13 天津深基工程有限公司 Construction method for soft connection of diaphram wall rigid joints
CN102168427A (en) * 2010-11-12 2011-08-31 张永忠 Bag concrete isolator
CN202577362U (en) * 2012-03-12 2012-12-05 张立丽 Flexible underground continuous wall connector
CN203022031U (en) * 2013-01-20 2013-06-26 张永忠 Cloth bag stone joint device

Also Published As

Publication number Publication date
CN103015462B (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN103866780B (en) A kind of construction method of carrying out quick seepage preventing curtain grouting in karst blowby area
CN107130633A (en) A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN107905218A (en) A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain
CN207245722U (en) A kind of built-in dual-fluid synchronous slip casting pipe-line system of shield machine shield tail
CN201770981U (en) Tube-side injection grouting apparatus for simultaneous drilling pipe pile
CN103669349B (en) A kind of reducing stirring type anchor pole and construction method thereof
CN107060821A (en) A kind of many lithology method for protecting support of face
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN105332511A (en) Huge concrete filled steel tubular column core grouting pouring and tamping device and method
CN204780990U (en) Combined type retaining wall structure
CN104196488B (en) Underwater exploration hole hole-sealing technology
CN102304915A (en) New method for controlling top quality of drilled pile
CN103343534A (en) Closed precipitation method for foundation pit construction
CN203022031U (en) Cloth bag stone joint device
CN102477743A (en) Construction method for concrete bagged pouring in small-diameter pile hole
CN103015462B (en) Cloth bag stone piecing device and its using method
CN202007401U (en) Device for reinforcing earthen sites by means of PS (polystyrene) dripping permeation
CN103267464A (en) Tool for measuring concrete pouring height
CN206448273U (en) A kind of continuous steel frame aqueduct GG2# pier foundation grouting systems
CN205329674U (en) Underground continuous wall structure under fluid bowl or channelling geological conditions
CN108487229A (en) Artificial pore-forming method after strong rock-soluble foundation pre-grouting treatment
CN205712144U (en) A kind of karst talus anchor pole reinforcement retaining structure
CN108999198A (en) A kind of New-type mould bag soil nailing pile constructing process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ANHUI LIM KUM KEE FOODSTUFF CO., LTD.

Free format text: FORMER OWNER: ZHANG YONGZHONG

Effective date: 20141218

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lin Mingchuan

Inventor before: Zhang Yongzhong

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 276807 RIZHAO, SHANDONG PROVINCE TO: 241000 WUHU, ANHUI PROVINCE

Free format text: CORRECT: INVENTOR; FROM: ZHANG YONGZHONG TO: LIN MINGCHUAN

TA01 Transfer of patent application right

Effective date of registration: 20141218

Address after: The green food of Wuhu Economic Development Zone in Anhui province Wuhu City Sanshan District 241000

Applicant after: Lim Kum Kee Foodstuff Co., Ltd. Anhui

Address before: 276807 car hill area, Arashiyama District, Shandong, Rizhao City

Applicant before: Zhang Yongzhong

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150121

Termination date: 20210120

CF01 Termination of patent right due to non-payment of annual fee