CN103008849A - 壳法兰l型坡口埋弧堆焊焊接方法 - Google Patents

壳法兰l型坡口埋弧堆焊焊接方法 Download PDF

Info

Publication number
CN103008849A
CN103008849A CN2012105276930A CN201210527693A CN103008849A CN 103008849 A CN103008849 A CN 103008849A CN 2012105276930 A CN2012105276930 A CN 2012105276930A CN 201210527693 A CN201210527693 A CN 201210527693A CN 103008849 A CN103008849 A CN 103008849A
Authority
CN
China
Prior art keywords
welding
shell flange
type groove
adopt
barrier part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105276930A
Other languages
English (en)
Other versions
CN103008849B (zh
Inventor
李雅范
宋丹
刘大为
李梦启
张韵曾
李永剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Electric Power Equipment Co Ltd
Original Assignee
Harbin Electric Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Electric Power Equipment Co Ltd filed Critical Harbin Electric Power Equipment Co Ltd
Priority to CN201210527693.0A priority Critical patent/CN103008849B/zh
Publication of CN103008849A publication Critical patent/CN103008849A/zh
Application granted granted Critical
Publication of CN103008849B publication Critical patent/CN103008849B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

本发明涉及到一种壳法兰L形坡口埋堆焊焊接方法,旨在确立一种用于主泵电机关键部件壳法兰焊接的新焊接工艺方法,并通过采用新的焊接顺序,排道方法以及机械摆动驻留时间,可有效克服壳法兰产品件由于局部特殊结构形式导致磁场分布不均,影响电弧稳定性,引起堆焊焊道表面易形成气孔状缺陷的问题,从而提高焊缝质量,满足结构设计要求。该成果在工程上具有很高的应用价值,并具有深远的社会意义。

Description

壳法兰L型坡口埋弧堆焊焊接方法
技术领域:本发明涉及一种壳法兰L型坡口埋弧堆焊焊接方法。
背景技术:屏蔽电机是核电站核岛极其关键的设备,屏蔽电机主泵制造成功与否直接关系到一回路主设备的国产化率及第三代AP1000非能动先进压水堆核电站技术引进的成败。主泵电机的完整性对一回路的安全运行有着重要的影响,其中机座壳法兰堆焊技术成为主泵电机制造环节中的一道技术难题。原有的焊接方法采用的是手工焊,焊接质量受人为因素的影响,焊接质量不稳定,返修率较高,对于焊接质量要求极高的核电站来讲,受原有的焊接方法限制,充分保证产品质量具有一定的难度。
发明内容:本发明的目的是提供一种壳法兰L型坡口埋弧堆焊焊接方法,避免由于L型坡口内壁的特殊结构形式导致磁场分布不均,影响电弧稳定性,引起堆焊焊道表面形成凹坑状缺陷的问题。
本发明的技术方案为:
(1)采用埋弧堆焊焊接方法在壳法兰筒件L形坡口内壁进行环缝堆焊;
(2)焊接顺序:先采用多层多道环缝焊接,即壳法兰L型坡口上每层先焊接与筒体心轴距离最远的焊道,由外至内逐道焊接,待L形坡口底面焊缝满足加工余量,再采用多层单道焊,即在上述多层多道焊缝基础上,沿壳法兰L型坡口侧壁每层堆焊一道,至焊缝高度满足尺寸要求;
(3)焊接工艺:采用机械摆动焊,摆动频率30~40次/分钟,摆动宽度不大于32mm,摆动驻留时间0.2s,在焊接壳法兰L型坡口首层与第二层最后一道焊缝时,靠近壳法兰筒件圆心端驻留时间0.1s,远离壳法兰筒件圆心端驻留时间0.2s,以此消除由于特殊局部结构形式导致磁场分布不均,引起气孔状缺陷的产生;
(4)焊接方法:1)采用埋弧焊;2)焊接顺序:在壳法兰筒件L型坡口上,先采用多层多道环缝,由外至内逐道焊接,待底面焊缝满足加工余量,再采用多层单道焊,即在上述多层多道焊缝基础上,沿壳法兰L型坡口侧壁每层堆焊一道,至焊缝高度满足尺寸要求;3)焊接规范:焊接电流280~300A,焊接电压35~37V,焊接速度在140~178mm/min,最小预热温度66℃,最大层间温度176℃,机械摆动焊,摆动频率30~40次/分钟,摆动宽度不大于32mm,摆动驻留时间0.2s,在焊接壳法兰L型坡口首层与第二层最后一道焊缝时,靠近壳法兰筒件圆心端驻留时间0.1s,远离壳法兰筒件圆心端驻留时间0.2s;4)焊后热处理:567.5~582℃保持30小时;5)探伤:壳法兰筒件L型坡口堆焊结束,去除焊缝加工余量后进行超声波探伤检测。
本发明通过改变原有的焊接方法,焊接顺序及工艺参数,在满足壳法兰堆焊坡口的特殊结构设计条件下,以机动埋弧焊代替传统手工焊的焊接方法,可降低由于人为因素的影响,导致焊接质量不稳定、返修率较高的现象。新的焊接工艺方法,一方面通过大量反复试验,摸索确定新的焊接顺序,焊道排布及工艺参数,另一方面,根据产品结构形式,制作模拟件,在理论联系实际的基础上,分析L型坡口底层根部焊缝表面易出现气孔缺陷原因,并通过调整不同焊道间的机械摆动驻留时间,成功的克服由于局部特殊结构形式导致磁场分布不均,电弧不稳引起堆焊焊道表面形成气孔状缺陷的问题。新的工艺方法在与产品件同材质同尺寸的模拟件上获得验证,并已在多台产品中得到应用,焊缝表面成型良好,100%通过无损探伤检查,达到了预期效果。
附图说明:
图1为壳法兰筒件L形坡口结构简图
图2为本发明的焊接顺序及焊道排布示意图
图3为调整机械摆动驻留时间示意图
具体实施方式:
壳法兰L型坡口埋弧堆焊焊接方法为:
(1)采用埋弧堆焊焊接方法在图1所示的壳法兰筒件L形坡口内壁进行环缝堆焊;
(2)焊接顺序:如图2所示,先采用多层多道环缝焊接,即壳法兰L型坡口上每层先焊接与筒体心轴距离最远的焊道,由外至内逐道焊接,待L形坡口底面焊缝满足加工余量,再采用多层单道焊,即在上述多层多道焊缝基础上,沿壳法兰L型坡口侧壁每层堆焊一道,至焊缝高度满足尺寸要求;
(3)焊接工艺:采用机械摆动焊,摆动频率30~40次/分钟,摆动宽度不大于32mm,摆动驻留时间0.2s,在焊接壳法兰L型坡口首层与第二层最后一道焊缝时,如图3所示,靠近壳法兰筒件圆心端2驻留时间0.1s,远离壳法兰筒件圆心端1驻留时间0.2s,以此消除由于特殊局部结构形式导致磁场分布不均,引起气孔状缺陷的产生;
(4)焊接方法:1)采用埋弧焊;2)焊接顺序:在壳法兰筒件L型坡口上,先采用多层多道环缝,由外至内逐道焊接,待底面焊缝满足加工余量,再采用多层单道焊,即在上述多层多道焊缝基础上,沿壳法兰L型坡口侧壁每层堆焊一道,至焊缝高度满足尺寸要求;3)焊接规范:焊接电流280~300A,焊接电压35~37V,焊接速度在140~178mm/min,最小预热温度66℃,最大层间温度176℃,机械摆动焊,摆动频率30~40次/分钟,摆动宽度不大于32mm,摆动驻留时间0.2s,在焊接壳法兰L型坡口首层与第二层最后一道焊缝时,靠近壳法兰筒件圆心端驻留时间0.1s,远离壳法兰筒件圆心端驻留时间0.2s;4)焊后热处理:567.5~582℃保持30小时;5)探伤:壳法兰筒件L型坡口堆焊结束,去除焊缝加工余量后进行超声波探伤检测。

Claims (1)

1.一种壳法兰L型坡口埋弧堆焊焊接方法,其特征是:
(1)采用埋弧堆焊焊接方法在壳法兰筒件L形坡口内壁进行环缝堆焊;
(2)焊接顺序:先采用多层多道环缝焊接,即壳法兰L型坡口上每层先焊接与筒体心轴距离最远的焊道,由外至内逐道焊接,待L形坡口底面焊缝满足加工余量,再采用多层单道焊,即在上述多层多道焊缝基础上,沿壳法兰L型坡口侧壁每层堆焊一道,至焊缝高度满足尺寸要求;
(3)焊接工艺:采用机械摆动焊,摆动频率30~40次/分钟,摆动宽度不大于32mm,摆动驻留时间0.2s,在焊接壳法兰L型坡口首层与第二层最后一道焊缝时,靠近壳法兰筒件圆心端驻留时间0.1s,远离壳法兰筒件圆心端驻留时间0.2s,以此消除由于特殊局部结构形式导致磁场分布不均,引起气孔状缺陷的产生;
(4)焊接方法:1)采用埋弧焊;2)焊接顺序:在壳法兰筒件L型坡口上,先采用多层多道环缝,由外至内逐道焊接,待底面焊缝满足加工余量,再采用多层单道焊,即在上述多层多道焊缝基础上,沿壳法兰L型坡口侧壁每层堆焊一道,至焊缝高度满足尺寸要求;3)焊接规范:焊接电流280~300A,焊接电压35~37V,焊接速度在140~178mm/min,最小预热温度66℃,最大层间温度176℃,机械摆动焊,摆动频率30~40次/分钟,摆动宽度不大于32mm,摆动驻留时间0.2s,在焊接壳法兰L型坡口首层与第二层最后一道焊缝时,靠近壳法兰筒件圆心端驻留时间0.1s,远离壳法兰筒件圆心端驻留时间0.2s;4)焊后热处理:567.5~582℃保持30小时;5)探伤:壳法兰筒件L型坡口堆焊结束,去除焊缝加工余量后进行超声波探伤检测。
CN201210527693.0A 2012-12-10 2012-12-10 壳法兰l型坡口埋弧堆焊焊接方法 Active CN103008849B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210527693.0A CN103008849B (zh) 2012-12-10 2012-12-10 壳法兰l型坡口埋弧堆焊焊接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210527693.0A CN103008849B (zh) 2012-12-10 2012-12-10 壳法兰l型坡口埋弧堆焊焊接方法

Publications (2)

Publication Number Publication Date
CN103008849A true CN103008849A (zh) 2013-04-03
CN103008849B CN103008849B (zh) 2014-09-24

Family

ID=47958256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210527693.0A Active CN103008849B (zh) 2012-12-10 2012-12-10 壳法兰l型坡口埋弧堆焊焊接方法

Country Status (1)

Country Link
CN (1) CN103008849B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106312251A (zh) * 2016-10-13 2017-01-11 广西大学 一种法兰的堆焊焊接方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0557448A (ja) * 1991-08-30 1993-03-09 Kawasaki Steel Corp 厚鋼板の高能率すみ肉溶接方法
CN101433999A (zh) * 2008-12-15 2009-05-20 中国水利水电第三工程局有限公司 一种控制法兰焊接变形的方法
CN101491855A (zh) * 2008-05-16 2009-07-29 中冶天工上海十三冶建设有限公司 T、l型厚板接头熔透焊接的方法
CN102632326A (zh) * 2012-03-23 2012-08-15 天津大学 提高小支管承插焊疲劳寿命的焊接工艺
CN102717199A (zh) * 2012-07-03 2012-10-10 苏州张扬能源科技有限公司 一种节能电机底座法兰盘的焊接技术

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0557448A (ja) * 1991-08-30 1993-03-09 Kawasaki Steel Corp 厚鋼板の高能率すみ肉溶接方法
CN101491855A (zh) * 2008-05-16 2009-07-29 中冶天工上海十三冶建设有限公司 T、l型厚板接头熔透焊接的方法
CN101433999A (zh) * 2008-12-15 2009-05-20 中国水利水电第三工程局有限公司 一种控制法兰焊接变形的方法
CN102632326A (zh) * 2012-03-23 2012-08-15 天津大学 提高小支管承插焊疲劳寿命的焊接工艺
CN102717199A (zh) * 2012-07-03 2012-10-10 苏州张扬能源科技有限公司 一种节能电机底座法兰盘的焊接技术

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106312251A (zh) * 2016-10-13 2017-01-11 广西大学 一种法兰的堆焊焊接方法

Also Published As

Publication number Publication date
CN103008849B (zh) 2014-09-24

Similar Documents

Publication Publication Date Title
CN107150175A (zh) 损伤齿轮激光实时动态熔覆修复及应力调控系统及方法
CN106077901A (zh) 基于热作模具失效部位的电弧增材制造方法
CN103231169B (zh) 堆心围筒的激光焊接方法
CN105414878A (zh) 一种高耐热合金钢铸件缺陷的返修方法
CN102941403B (zh) 壳法兰窄间隙埋弧焊焊接工艺
CN104959703A (zh) 一种海工高强钢板的焊接方法及应用
CN103008849B (zh) 壳法兰l型坡口埋弧堆焊焊接方法
CN103962808A (zh) 用于高炉炉壳的制作安装方法
CN102500993A (zh) 马氏体不锈钢特大深孔的焊接修复方法
CN103567710B (zh) 不锈钢水箱的制备工艺
CN102284772B (zh) 第三代核电汽轮机低压给水加热器壳体氩弧封底焊接方法
CN105171332A (zh) 贯流式水轮发电机转子支架焊缝裂纹的处理方法
CN104014978A (zh) 一种镁合金零件的堆焊成形再制造方法
CN105057854A (zh) 一种控制熔深的不锈钢铸件表面堆焊方法
CN112570876B (zh) 一种gh4141镍基高温合金真空电子束焊接方法
CN104227217B (zh) 一种专用于不锈钢水槽焊接的电焊机
CN110303227B (zh) 一种核电大型贯穿件焊接及焊后处理方法及其应用
CN105945437A (zh) 一种低合金铸钢件精加工后缺陷返修方法
CN107186316A (zh) 一种用于大型汽轮机低压缸接凝汽器焊接防变形的焊接工艺
WO2021120873A1 (zh) 可提高加工效率和产品质量的钩爪制造用材料及制造方法
CN103212938A (zh) 大型机械的履带板修复方法
CN105364276A (zh) 一种高强钢钢管塔焊接加工工艺
CN110961857B (zh) 一种控制棒驱动机构密封焊缝唇边坡口再制方法及系统
WO2021121139A1 (zh) 一种用于控制棒驱动机构上钩爪制造的板材及制造方法
CN106239030A (zh) 一种火力发电厂汽包下降管焊缝裂纹修补方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant