CN102995569A - 挂篮过接触网支柱基础及其施工方法 - Google Patents
挂篮过接触网支柱基础及其施工方法 Download PDFInfo
- Publication number
- CN102995569A CN102995569A CN2012105359261A CN201210535926A CN102995569A CN 102995569 A CN102995569 A CN 102995569A CN 2012105359261 A CN2012105359261 A CN 2012105359261A CN 201210535926 A CN201210535926 A CN 201210535926A CN 102995569 A CN102995569 A CN 102995569A
- Authority
- CN
- China
- Prior art keywords
- casing
- setting
- hanging basket
- sleeve pipe
- crab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Abstract
本发明公开了一种挂篮过接触网支柱基础及其施工方法,其特征是在接触网支柱基础的预埋钢板的底部焊接下套管,在下套管的底部焊接底板以使下套管的底部封闭,相邻下套管之间在下套管的底部以横管相连通,在下套管的上部焊接压浆管;在预埋钢板的上部焊接上套管;上套管与下套管竖向贯通;锚栓置于由上套管和下套管贯通形成的套管中,并能在套管中上下移动。本发明可以实现挂篮顺利通过有接触网的梁段,其施工方法简单、不损坏梁体结构,没有安全风险,成本较小,极大地减少挂篮通过前移时间,保证工程质量及工期。
Description
技术领域
本发明涉及一种挂篮过接触网支柱基础及其施工方法。
背景技术
已有技术中,对于有接触网梁段的施工方法是将挂篮提升至接触网锚栓高度以上,或者在混凝土浇筑前预留接触网基础位置,待挂篮前移通过后再安装接触网支柱基础,进行混凝土浇筑。
我国国内大西铁路客运专线站前施工11标主桥2×108m单T刚构采用挂篮悬臂浇筑施工,接触网支柱基础位于腹板范围内,与挂篮位置冲突,挂篮在遇到有接触网的位置无法通过,如采取将挂篮提升,施工难度较大,挂篮稳定性不足,如采取预留孔洞的方式,预留孔洞处接茬面处理复杂,影响钢筋混凝土结构的整体性能。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种挂篮过接触网支柱基础及其施工方法,以简单有效的方式实现挂篮顺利通过有接触网的梁段。
本发明解决技术问题采用如下技术方案:
本发明挂篮过接触网支柱基础,其特点是在接触网支柱基础的预埋钢板的底部焊接下套管,在所述下套管的底部焊接底板以使下套管的底端封闭,相邻下套管之间在下套管的底部以横管相连通,在所述下套管的上部焊接压浆管并引至混凝土顶面之上;在预埋钢板的上部焊接以上盖封顶的上套管;所述上套管与下套管竖向贯通;锚栓置于由所述上套管和下套管贯通形成的套管中,并能在所述套管中上下移动,设置下套管的深度为:在锚栓下移至套管底部时,锚栓的顶端面处在挂篮走道梁顶部高度之下。
本发明挂篮过接触网支柱基础的施工方法,其特点是按如下步骤进行:
步骤1、在接触网支柱基础的预埋钢板的底部焊接下套管,在下套管的底部焊接底板以使下套管在底端封闭,相邻下套管之间在下套管的底部以横管相连通;在所述下套管的上部焊接压浆管并引至混凝土顶面之上;
步骤2、在预埋钢板的上部焊接上套管,使所述上套管与下套管竖向贯通;
步骤3、在挂篮走形前,将锚栓下降至下套管的底部,并在上套管的顶端以上盖封顶;
步骤4、在挂篮前移通过接触网后,将锚栓提升至设计高度,并定位牢固,向压浆管内注浆直至下套管内注满浆液,并向上套管中注浆,直至浆液注满上套管。
与已有技术相比,本发明有益效果体现在:
本发明使挂篮能顺利通过有接触网的梁段,不损坏梁体结构、操作简单、成本较小,不存在没有安全风险,极大地减少挂篮通过前移时间,保证工程质量及工期。
附图说明
图1为本发明挂篮移动前结构示意图;
图2为本发明挂篮移动后结构示意图;
图中标号:1预埋钢板;2上套管;3底板;4横管;5压浆管;6上套管;7挂篮;8锚栓;9挂篮走道梁;10上盖;11混凝土顶面。
具体实施方式
参见图1和图2,本实施例中挂篮过接触网支柱基础是在接触网支柱基础的预埋钢板1的底部焊接下套管2,在下套管2的底部焊接底板3以使下套管2的底端封闭,相邻下套管2之间在下套管2的底部以横管4相连通,在下套管2的上部焊接压浆管5并引至混凝土顶面11之上;在预埋钢板1的上部焊接上套管6,并以上盖10封顶;上套管6与下套管2通过预埋钢板1竖向贯通;锚栓8置于由上套管6和下套管2贯通形成的套管中,并能在套管中上下移动。
具体实施中,设置下套管2的深度为:在锚栓8下移至套管底部时,锚栓8的顶端面处在挂篮走道梁9顶部高度之下;上套管6的高度为:在螺栓8落至底部时,能焊接上盖10,将螺栓8封住,防止在混凝土浇筑过程中,混凝土进入上套管6内。
本实施例中挂篮过接触网支柱基础的施工方法是按如下步骤进行:
步骤1、在接触网支柱基础的预埋钢板1的底部焊接下套管2,在下套管2的底部焊接底板3以使下套管2在底端封闭,相邻下套管2之间在下套管2的底部以横管4相连通;在下套管2的上部焊接压浆管5并引至混凝土面之上;
步骤2、在预埋钢板1的上部焊接上套管6,使上套管6与下套管2竖向贯通;
步骤3、在挂篮7走形前,将锚栓8下降至下套管2的底部,并在上套管6的顶部上以上盖10封顶;
步骤4、在挂篮7前移通过接触网后,将锚栓8提升至设计高度,并定位牢固,向压浆管5内注浆直至下套2内注满浆液,并向上套管6中注浆,直至浆液注满上套管6。
图1和图2中所示的挂篮走道梁9是直接用钢材焊接而成的整体,在浇筑完混凝土后,将挂篮走道梁9铺设在混凝土面上,以便作为挂篮7的走道实现挂篮的移动,在挂篮7完成移动之后,拆除挂篮走道梁9。
Claims (2)
1.一种挂篮过接触网支柱基础,其特征是在接触网支柱基础的预埋钢板(1)的底部焊接下套管(2),在所述下套管(2)的底部焊接底板(3)以使下套管(2)的底端封闭,相邻下套管(2)之间在下套管(2)的底部以横管(4)相连通,在所述下套管(2)的上部焊接压浆管(5)并引至混凝土顶面(11)之上;在预埋钢板(1)的上部焊接以上盖(10)封顶的上套管(6);所述上套管(6)与下套管(2)竖向贯通;锚栓(8)置于由所述上套管(6)和下套管(2)贯通形成的套管中,并能在所述套管中上下移动,设置下套管(2)的深度为:在锚栓(8)下移至套管底部时,锚栓(8)的顶端面处在挂篮走道梁(9)顶部高度之下。
2.一种权利要求1所述挂篮过接触网支柱基础的施工方法,其特征是按如下步骤进行:
步骤1、在接触网支柱基础的预埋钢板(1)的底部焊接下套管(2),在下套管(2)的底部焊接底板(3)以使下套管(2)在底端封闭,相邻下套管(2)之间在下套管(2)的底部以横管(4)相连通;在所述下套管(2)的上部焊接压浆管(5)并引至混凝土顶面(11)之上;
步骤2、在预埋钢板(1)的上部焊接上套管(6),使所述上套管(6)与下套管(2)竖向贯通;
步骤3、在挂篮(7)走形前,将锚栓(8)下降至下套管(2)的底部,并在上套管(6)的顶端以上盖(10)封顶;
步骤4、在挂篮(7)前移通过接触网后,将锚栓(8)提升至设计高度,并定位牢固,向压浆管(5)内注浆直至下套管(2)内注满浆液,并向上套管(6)中注浆,直至浆液注满上套管(6)。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410607991.XA CN104294768B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础的施工方法 |
CN201210535926.1A CN102995569B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210535926.1A CN102995569B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410607991.XA Division CN104294768B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102995569A true CN102995569A (zh) | 2013-03-27 |
CN102995569B CN102995569B (zh) | 2014-12-10 |
Family
ID=47924626
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410607991.XA Expired - Fee Related CN104294768B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础的施工方法 |
CN201210535926.1A Expired - Fee Related CN102995569B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410607991.XA Expired - Fee Related CN104294768B (zh) | 2012-12-12 | 2012-12-12 | 挂篮过接触网支柱基础的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104294768B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11256521A (ja) * | 1998-03-09 | 1999-09-21 | Sumitomo Constr Co Ltd | 橋梁架設装置 |
CN201047063Y (zh) * | 2007-03-19 | 2008-04-16 | 曹辉 | 立交桥悬臂挂篮底部防水防电装置 |
CN201071487Y (zh) * | 2007-07-13 | 2008-06-11 | 中铁十七局集团第二工程有限公司 | 桥梁施工中的挂篮安全防护系统装置 |
CN201648980U (zh) * | 2010-04-22 | 2010-11-24 | 中建四局第六建筑工程有限公司 | 具有绝缘防护板的连续梁挂篮 |
CN202925562U (zh) * | 2012-12-12 | 2013-05-08 | 中铁上海工程局有限公司 | 挂篮过接触网支柱基础 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102330414B (zh) * | 2011-08-09 | 2013-04-03 | 中铁十二局集团第二工程有限公司 | 大跨连续刚构梁边跨现浇梁段的挂篮悬浇施工方法 |
-
2012
- 2012-12-12 CN CN201410607991.XA patent/CN104294768B/zh not_active Expired - Fee Related
- 2012-12-12 CN CN201210535926.1A patent/CN102995569B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11256521A (ja) * | 1998-03-09 | 1999-09-21 | Sumitomo Constr Co Ltd | 橋梁架設装置 |
CN201047063Y (zh) * | 2007-03-19 | 2008-04-16 | 曹辉 | 立交桥悬臂挂篮底部防水防电装置 |
CN201071487Y (zh) * | 2007-07-13 | 2008-06-11 | 中铁十七局集团第二工程有限公司 | 桥梁施工中的挂篮安全防护系统装置 |
CN201648980U (zh) * | 2010-04-22 | 2010-11-24 | 中建四局第六建筑工程有限公司 | 具有绝缘防护板的连续梁挂篮 |
CN202925562U (zh) * | 2012-12-12 | 2013-05-08 | 中铁上海工程局有限公司 | 挂篮过接触网支柱基础 |
Also Published As
Publication number | Publication date |
---|---|
CN102995569B (zh) | 2014-12-10 |
CN104294768A (zh) | 2015-01-21 |
CN104294768B (zh) | 2016-01-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106245674A (zh) | 空芯墙板混合预制装配式综合管廊及其施工方法 | |
CN101775844B (zh) | 一种用于逆作法基坑工程的钢管混凝土柱环梁连接节点 | |
CN102535738A (zh) | 一种预制房屋墙板及应用该墙板的全预制房屋及安装方法 | |
CN201128881Y (zh) | 盖梁施工中的预留式支撑结构 | |
CN108867391A (zh) | 一种钢管拱施工与铺架平行作业施工方法 | |
CN108166525A (zh) | 一种用现浇暗梁拼接的半预制装配式综合管廊及其施工方法 | |
CN109812620A (zh) | 一次性浇筑大口径钢管混凝土包封方法 | |
CN103669720A (zh) | 一种预制梁及具有榫锚体系的钢筋混凝土结构 | |
CN202925562U (zh) | 挂篮过接触网支柱基础 | |
CN105088961B (zh) | 一种边跨合拢段与现浇段合并的施工方法 | |
CN205063056U (zh) | 装配式建筑外墙干挂节点的防腐结构 | |
CN103790160A (zh) | 一种smw工法型钢拔除注浆方法 | |
CN103726613A (zh) | 一种新型装配式混凝土柱 | |
CN210858740U (zh) | 一种大盾构施工预留洞无支撑快速封堵结构 | |
CN102995569B (zh) | 挂篮过接触网支柱基础 | |
CN204311457U (zh) | 一种地铁车站基坑开挖施工用组合式支护体系 | |
CN203891256U (zh) | 钢管束组合结构剪力墙现场拼接节点 | |
CN106284097A (zh) | 一种钢管拱桥拱上墩k撑的安装方法 | |
CN215289655U (zh) | 机动车桥梁钢筋混凝土墩柱与上部钢箱梁固接的连接构造 | |
CN202298467U (zh) | 横跨既有铁路线的转换平台架梁装置 | |
CN201598734U (zh) | 一种用于逆作法基坑工程的钢管混凝土柱环梁连接节点 | |
CN203924484U (zh) | 一种预制梁及具有榫锚体系的钢筋混凝土结构 | |
CN210201445U (zh) | 一种地下管线群组合工具式支托保护体系 | |
CN209082953U (zh) | 一种悬挑结构支撑系统 | |
CN203684528U (zh) | 一种新型装配式混凝土柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20201212 |
|