CN102992238A - Hanging scaffold for mounting and building furnace cooling wall in blast furnace - Google Patents

Hanging scaffold for mounting and building furnace cooling wall in blast furnace Download PDF

Info

Publication number
CN102992238A
CN102992238A CN2012105310880A CN201210531088A CN102992238A CN 102992238 A CN102992238 A CN 102992238A CN 2012105310880 A CN2012105310880 A CN 2012105310880A CN 201210531088 A CN201210531088 A CN 201210531088A CN 102992238 A CN102992238 A CN 102992238A
Authority
CN
China
Prior art keywords
hanging scaffold
blast furnace
turret
cooling wall
rotating mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105310880A
Other languages
Chinese (zh)
Other versions
CN102992238B (en
Inventor
章锐
晋杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Masteel Metallurgical Construction Engineering Co ltd
Magang Group Holding Co Ltd
Anhui Masteel Engineering and Technology Group Co Ltd
Original Assignee
Maanshan Iron & Steel Equipment Installation Engineering Co Ltd
Magang Group Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron & Steel Equipment Installation Engineering Co Ltd, Magang Group Holding Co Ltd filed Critical Maanshan Iron & Steel Equipment Installation Engineering Co Ltd
Priority to CN201210531088.0A priority Critical patent/CN102992238B/en
Publication of CN102992238A publication Critical patent/CN102992238A/en
Application granted granted Critical
Publication of CN102992238B publication Critical patent/CN102992238B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

The invention discloses a hanging scaffold for mounting and building a furnace cooling wall in a blast furnace, and relates to an operation platform for furnace construction in the blast furnace. The hanging scaffold is a round plate body comprising a girder, a ring beam, spokes, a platform plates and a central handrail which are connected, and is characterized in that an annular support rail and a brace are arranged on the plate body; a rotation mechanism is mounted on the support rail; a moving mechanism provided with an operation platform is movably mounted on the rotation mechanism to drive the operation platform to approach or leave the original position; and the moving mechanism is locked with the rotation mechanism after arriving at a mounting position and is supported by the rotation mechanism and the brace. The hanging scaffold provided by the invention has the advantages of novel conception, reasonable and simple structure, high strength, high stability, and easiness for manufacture; the operation platform is reduced in area so as to reduce the material consumption and reduce the weight of the hanging scaffold; the hanging scaffold is convenient and quick to adjust position and angle, and obviates the assembly/disassembly of planks, thereby saving labor force, improving work efficiency, shortening construction period and facilitating iron-making production; the materials of the planks and the machine-team cost of a hoisting tool are saved so as to reduce the construction cost; and the construction site is clean and safe.

Description

Be used for the interior cooling wall of State of Blast Furnace and install and build by laying bricks or stones the hanging scaffold of operation
Technical field
The invention belongs in the building or the liftable bearing set that cooperates with building, relate in particular to the service platform for construction operation in the State of Blast Furnace.
Background technology
More than the Modern Large Blast Furnaces diameter 10m, up to tens of rice, need to install hundreds of piece cooling wall in the stove.From bottom to top successively construction of cooling wall is installed, and amount of high-altitude operation and construction intensity are all very large, set up scaffold and cooling wall is installed without possibility in burner hearth.Adopt the annular hanging scaffold that is provided with service platform during current installation blast furnace cooling stave, hanging scaffold is hung on the haulage cable, is elevated to suitable height by winch, successively installs.The annular hanging scaffold of current use is connected and composed by girder, collar tie beam, spoke, landing slab and center railing, and landing slab is fixed on the spoke, and spoke is fixed on the collar tie beam, and collar tie beam is fixed on the girder, and girder is hung on the haulage cable.The hanging scaffold diameter is convenient to hanging scaffold vertical lift and smoothly turnover in blast furnace less than the minimum diameter of blast furnace inwall.But when being installed to the larger position of cupola well or the such diameter of bosh band, it is large that hanging scaffold and blast furnace inwall spacing become, and must extend and bed board could satisfy the construction demand hanging scaffold.Adopt at present device to be: to insert steel pipe or shaped steel in the tubular spoke of hanging scaffold (pipe or square tube), when hanging scaffold rises to the position of blast furnace different inner diameters, the length that can regulate spoke by steel pipe or shaped steel in the flexible spoke, and then colligation or remove interim bed board on spoke, regulate the needs that the hanging scaffold diameter satisfies construction operation thereby reach.Its defective is: because the installation diameter of each layer cooling wall is not quite similar, when each layer cooling wall is installed, all will again extends or dismantle hanging scaffold, repeated disassembled and assembled hanging scaffold work capacity be large, is seriously restricting the duration of cooling wall installation, affects ironmaking production; The dismounting of hanging scaffold needs a large amount of artificial, and the consumption of material is also larger, and construction cost is high; Carry out disassemble and assemble work at the hanging scaffold edge and belong to aloft work, exist great potential safety hazard.
Summary of the invention
The defective that exists in order to overcome prior art the purpose of this invention is to provide a kind of hanging scaffold of installing and build by laying bricks or stones operation for cooling wall in the State of Blast Furnace, avoids delaying because of demolition, installation hanging scaffold service platform repeatedly, increase work efficiency, reduce labor intensity, the reduction of erection time, blast furnace puts into production in advance; Cutting down the consumption of raw materials eliminates safe hidden trouble.
Be used for the interior cooling wall of State of Blast Furnace and install and build by laying bricks or stones the hanging scaffold of operation, connect and compose circular disk body by girder, collar tie beam, spoke, landing slab and center railing, landing slab is fixed on the spoke, spoke is fixed on the collar tie beam, collar tie beam is fixed on the girder, girder is hung on the winding plant that blast furnace establishes by haulage cable, is characterized in arranging on the described disk body supporting track and support with the body concentric annular arrangement of dish; Rotating mechanism is loaded on the supporting track, and rotating mechanism rotates along supporting track, turns to construction location and is fixed by fixed mechanism; Travel mechanism establishes service platform in the front portion, travel mechanism's rear portion removable mounting is on rotating mechanism, travel mechanism moves as radial expansion along rotating mechanism, drive service platform and be toward or away from original position, arrive desired location, travel mechanism and rotating mechanism locking are by rotating mechanism and support supporting, before service platform just firmly is fixed on position to be installed.Improve the strength and stability of service platform, reduced or avoided the generation of safety misadventure.
The present invention further improves, and described rotating mechanism presses rail to consist of the rectangular box framework by turret, turret; Establish the lattice plate between on the turret, prop up the rear end of movable stand, both improved the intensity of turret, increase again the stability of movable stand; Turret is divided into rotor wheel, places on the supporting track, and turret rotates along supporting track, and turret is also established sliding roller and pin-and-hole; Described rotor wheel is the universal caster wheel with service brake, and pin is stepped on just and can be braked or unclamp, and is easy to operate.
The present invention further improves, and establishes 3-5 rotating mechanism on the described disk body, and each rotating mechanism rotates 80 °-120 ° along supporting track, can cover one week of blast furnace inwall, satisfies the needs that one deck cooling wall is installed.
The present invention advances a bit to improve, and described travel mechanism consists of rectangular frame by movable stand, service platform, oblique pull steel rope and lap plate, and the travel mechanism rear portion places on the sliding roller that arranges in the turret; The oblique pull steel rope is connected the oblique pull movable stand with the calabash that pulls on being located at the last furnace shell bolt; Movable stand moves as radial expansion along the sliding roller of turret, and behind the arrival construction location, lap plate rides on the mounted lower floor cooling wall, gains in strength and stability; Pin-and-hole also is set on the movable stand, corresponding with the pin-and-hole that rotation is set up, pin movable stand and turret by bearing pin or pin.
Last improvement of the present invention, operated platform is made of walkway board, arc-plane plate and gusset bar, and walkway board and arc-plane plate are fixed on the movable stand rib plate; Movable rail is established in walkway board and arc-plane plate both sides, is plugged in the mobile assembly opening that sets up, and guarantees construction safety, the conveniently detachable and increase and decrease of guardrail; The wide 550-750mm of described arc-plane plate, long 1500-1800mm can be for many people simultaneously at the cambered plate construction operation.
During work, by winding plant hanging scaffold of the present invention is promoted to operating altitude first, then forward turret to certain angle along the lower support track by rotor wheel, sliding moving frame forward or backward again, until the lap plate on the movable stand props up lower floor's cooling wall, service platform places the installation site, utilize stop mechanism that service platform is fixed, put on steel rope from the hold-down bolt hole of furnace shell upper strata cooling wall, establish the chain block traction at movable stand and live the oblique pull steel rope, to improve stability and the intensity of service platform.After service platform is adjusted, movable rail is inserted in the assembly opening of service platform and both sides, aisle establishing, the workmen enters service platform by walkway board, carries out installation exercise.
Compared with prior art, advantage is: novel, rational in infrastructure, simple, intensity is large, and stability is high, easily makes; The service platform area reduces, and cutting down the consumption of raw materials alleviates the weight of hanging scaffold; Hanging scaffold position and angular adjustment are convenient, fast, exempt the disassemble and assemble work of hanging scaffold bed board, save the labour, increase work efficiency reduction of erection time, favourable ironmaking production; The material of platen consumption and the machine-team expense of lifting device are paved in saving, are conducive to reduce executive cost; The camp site is clean and tidy, construction safety.
Description of drawings
The invention will be further described for the contrast accompanying drawing.
Fig. 1 is the hanging scaffold structural representation of installing and build by laying bricks or stones operation for cooling wall in the State of Blast Furnace.
Fig. 2 is the A-A section-drawing of Fig. 1.
Fig. 3 is the B-B section-drawing of Fig. 2.
Fig. 4 is hanging scaffold control position schematic diagram of the present invention.
Among the figure: 1 disk body, 2 landing slabs, 3 center railings 4 support 5 supporting tracks, 6 rotating mechanism 6-1 turret 6-2 turrets and press sliding roller 7 7-1 of the travel mechanism movable stand 7-2 gusset bar 7-3 oblique pull steel rope 7-4 lap plate 7-5 bearing pins of rail 6-3 rotor wheel 6-4 lattice plate 6-5 8 service platform 8-1 walkway board 8-2 arc-plane plates 9 movable rails 10 blast furnaces 11 main haulage cables.
The specific embodiment
Can be found out by Fig. 1, Fig. 2, be used for the interior cooling wall of State of Blast Furnace and install and build by laying bricks or stones the hanging scaffold of operation, connect and compose circular disk body 1 by girder, collar tie beam, spoke, landing slab 2 and center railing 3.Landing slab is fixed on the spoke, and spoke is fixed on the collar tie beam, and collar tie beam is fixed on the girder, and girder is hung on the winding plant that blast furnace 10 establishes by haulage cable 11, establishes on the disk body and the supporting track 5 that coils body concentric annular and support 4.Rotating mechanism 6 is loaded on the supporting track, and rotating mechanism rotates along supporting track, turns to construction location and is fixed by fixed mechanism.Travel mechanism establishes 7 front portions service platform 8, oblique pull steel rope 7-3, and travel mechanism's front end also is provided with lap plate 7-4, and travel mechanism's rear portion removable mounting is on rotating mechanism.Travel mechanism moves as radial expansion along rotating mechanism, drive service platform and be toward or away from original position, arrive desired location, travel mechanism and rotating mechanism locking, travel mechanism is by rotating mechanism and support supporting, lap plate rides on the mounted lower floor cooling wall, and the tension of oblique pull steel rope is before service platform just firmly is fixed on position to be installed.Improved operation translation actuation mechanism will with the strength and stability of platform.
Can be found out by Fig. 2, Fig. 3, rotating mechanism presses rail 6-2 to consist of the rectangular box framework by turret 6-1, turret.Establish lattice plate 6-4 between on the turret, prop up the movable stand rear end, improve the intensity of turret, increase the stability of movable stand; Turret is divided into rotor wheel 6-3, places on the supporting track, and turret rotates along supporting track, and turret is also established sliding roller 6-5 and pin-and-hole; Described rotor wheel is the universal caster wheel with service brake, and pin is stepped on just and can be braked or unclamp, and is easy to operate.
As seen from Figure 1, establish 4 rotating mechanisms on the disk body of hanging scaffold, each rotating mechanism rotates 80 °-120 ° along supporting track, can cover one week of blast furnace inwall, satisfies the needs that one deck cooling wall is installed.
Can be found out by Fig. 2, Fig. 3, travel mechanism 7 consists of framework by movable stand 7-1, service platform 8, gusset bar 7-2, oblique pull steel rope 7-3 and lap plate 7-4, and the travel mechanism rear portion places on the sliding roller 6-5 that arranges in the turret; The oblique pull steel rope 7-3 of movable stand front portion is connected (among the figure mark) with the calabash that pulls on being located at the last furnace shell bolt, and the oblique pull movable stand increases the fulcrum of movable stand; Movable stand moves as radial expansion along the sliding roller of turret, and behind the arrival construction location, lap plate rides on the mounted lower floor cooling wall, gains in strength and stability; Pin-and-hole also is set on the movable stand, corresponding with the pin-and-hole that rotation is set up, pin movable stand and turret by bearing pin or pin 7-5.
As seen from Figure 1, service platform 8 is connected and composed by walkway board 8-1, arc-plane plate 8-2 and gusset bar 7-2, walkway board and arc-plane plate are fixed on the movable stand gusset bar, gusset is fixed on the movable stand, movable rail 9 is established in walkway board and arc-plane plate both sides, be plugged in the mobile assembly opening that sets up, guarantee construction safety, the conveniently detachable and increase and decrease of guardrail; The wide 550-750mm of described arc-plane plate, long 1500-1800mm can be for many people simultaneously at the cambered plate construction operation.
During construction operation, first by winding plant master haulage cable 11 hanging scaffold of the present invention is promoted to operating altitude, then forward turret to certain angle along the lower support track by rotor wheel, sliding moving frame forward or backward again, until the lap plate on the movable stand props up lower floor's cooling wall, service platform moves on to the installation site, utilize stop mechanism that service platform is fixed, put on the oblique pull steel rope from the hold-down bolt hole of furnace shell upper strata cooling wall, establish the chain block traction at movable stand and live the oblique pull steel rope, to improve stability and the intensity of service platform.After service platform is adjusted, movable rail is inserted in the assembly opening of service platform and both sides, aisle establishing, the workmen enters service platform by walkway board, carries out cooling wall and installs or build by laying bricks or stones operation.

Claims (5)

1. be used for the interior cooling wall of State of Blast Furnace and install and build by laying bricks or stones the hanging scaffold of operation, connect and compose circular disk body (1) by girder, collar tie beam, spoke, landing slab (2) and center railing (3), landing slab is fixed on the spoke, spoke is fixed on the collar tie beam, collar tie beam is fixed on the girder, girder is hung on the winding plant that blast furnace (10) establishes by haulage cable (11), it is characterized in that establishing on the disk body and the supporting track that coils body concentric annular arrangement (5) and support (4); Rotating mechanism (6) is loaded on the supporting track, and rotating mechanism rotates along supporting track, turns to construction location and is fixed by fixed mechanism; Travel mechanism (7) is fixed on the rotating mechanism, travel mechanism establishes the front portion service platform (8), travel mechanism's rear portion removable mounting is on rotating mechanism, travel mechanism moves as radial expansion along rotating mechanism, drive service platform and be toward or away from original position, arrive desired location, travel mechanism and rotating mechanism locking, by rotating mechanism and support supporting, before service platform just firmly is fixed on position to be installed.
2. the hanging scaffold of installing and build by laying bricks or stones operation for cooling wall in the State of Blast Furnace according to claim 1 is characterized in that described rotating mechanism consists of the rectangular box framework by turret (6-1), turret pressure rail (6-2); Layout plate (6-4) on the turret props up the rear end of movable stand; Turret is divided into rotor wheel (6-3) and is placed on the supporting track, and turret rotates along supporting track; Turret is also established sliding roller (6-5) and pin-and-hole; Described rotor wheel is the universal caster wheel with service brake, and pin is stepped on just and can be braked or unclamp.
3. the hanging scaffold of installing and build by laying bricks or stones operation for cooling wall in the State of Blast Furnace according to claim 1, it is characterized in that establishing on the described disk body 3-5 rotating mechanism, each rotating mechanism rotates 80 °-120 ° along supporting track, can cover one week of blast furnace inwall, satisfy the needs that one deck cooling wall is installed.
4. the hanging scaffold of installing and build by laying bricks or stones operation for cooling wall in the State of Blast Furnace according to claim 1, it is characterized in that described travel mechanism (7) consists of rectangular frame by movable stand (7-1), service platform (8), gusset bar (7-2), oblique pull steel rope (7-3) and lap plate (7-4), the movable stand rear portion places on the sliding roller (6-5) that arranges in the turret; Oblique pull steel rope (7-3) is connected the oblique pull movable stand with the calabash that pulls on being located at blast furnace (10) furnace shell bolt; Movable stand moves as radial expansion along the sliding roller of turret, and behind the arrival construction location, lap plate rides on the mounted lower floor cooling wall; Pin-and-hole also is set on the movable stand, corresponding with the pin-and-hole that rotation is set up, pin movable stand and turret by bearing pin or pin (7-5).
5. the hanging scaffold of installing and build by laying bricks or stones operation for cooling wall in the State of Blast Furnace according to claim 1, it is characterized in that described service platform (8) is connected and composed by walkway board (8-1), arc-plane plate (8-2) and gusset bar (7-2), walkway board and arc-plane plate are fixed on the movable stand gusset bar; Movable rail (9) is established in walkway board and arc-plane plate both sides, is plugged in the mobile assembly opening that sets up; The wide 550-750mm of described arc-plane plate, long 1500-1800mm.
CN201210531088.0A 2012-12-11 2012-12-11 Hanging scaffold for mounting and building furnace cooling wall in blast furnace Expired - Fee Related CN102992238B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210531088.0A CN102992238B (en) 2012-12-11 2012-12-11 Hanging scaffold for mounting and building furnace cooling wall in blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210531088.0A CN102992238B (en) 2012-12-11 2012-12-11 Hanging scaffold for mounting and building furnace cooling wall in blast furnace

Publications (2)

Publication Number Publication Date
CN102992238A true CN102992238A (en) 2013-03-27
CN102992238B CN102992238B (en) 2015-07-22

Family

ID=47921450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210531088.0A Expired - Fee Related CN102992238B (en) 2012-12-11 2012-12-11 Hanging scaffold for mounting and building furnace cooling wall in blast furnace

Country Status (1)

Country Link
CN (1) CN102992238B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107570904A (en) * 2016-07-04 2018-01-12 五冶集团上海有限公司 Preparation method for cooling wall maintenance hanging scaffold in lateritic nickel ore State of Blast Furnace
CN113428813A (en) * 2021-08-02 2021-09-24 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201214594Y (en) * 2008-04-11 2009-04-01 中冶成工上海五冶建设有限公司 Loop crane hoisting disk device for blast furnace inner lining construction
CN201560575U (en) * 2009-11-11 2010-08-25 鞍钢建设集团有限公司 Operation platform device
CN102212630A (en) * 2011-05-23 2011-10-12 北京首钢建设集团有限公司 Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold
CN203006873U (en) * 2012-12-11 2013-06-19 马鞍山马钢设备安装工程有限公司 Hanging scaffold used for installation and construction operation of cooling walls in blast furnace

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201214594Y (en) * 2008-04-11 2009-04-01 中冶成工上海五冶建设有限公司 Loop crane hoisting disk device for blast furnace inner lining construction
CN201560575U (en) * 2009-11-11 2010-08-25 鞍钢建设集团有限公司 Operation platform device
CN102212630A (en) * 2011-05-23 2011-10-12 北京首钢建设集团有限公司 Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold
CN203006873U (en) * 2012-12-11 2013-06-19 马鞍山马钢设备安装工程有限公司 Hanging scaffold used for installation and construction operation of cooling walls in blast furnace

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107570904A (en) * 2016-07-04 2018-01-12 五冶集团上海有限公司 Preparation method for cooling wall maintenance hanging scaffold in lateritic nickel ore State of Blast Furnace
CN113428813A (en) * 2021-08-02 2021-09-24 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc
CN113428813B (en) * 2021-08-02 2024-02-13 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc

Also Published As

Publication number Publication date
CN102992238B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN201458596U (en) Crane with self-dismounting device
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN203006873U (en) Hanging scaffold used for installation and construction operation of cooling walls in blast furnace
CN102992238B (en) Hanging scaffold for mounting and building furnace cooling wall in blast furnace
CN201647834U (en) Device for mounting tower equipment in narrow spaces
CN202358850U (en) Light lift-type cantilever crane
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN109778713A (en) A kind of steel truss girder bridge scene suspension and slipping assembly device and method
WO2024087901A1 (en) Cantilever casting and locomotion all-in-one machine
CN203959689U (en) A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car
CN110747307B (en) Large steam drum hoisting method in converter energy-saving and environment-friendly reconstruction
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN206091283U (en) Hydraulic pressure is from climbing formula elevartor shaft regularization operation platform
CN103884184B (en) The resistance to material of a kind of vertical continuous annealing furnace, liner installation method and movable mounting platform
CN109607384B (en) Turning-over method for cutter head of super-large-diameter shield tunneling machine
JP2001159249A (en) Demolishing method and demolishing device for steel tower type highrise chimney
CN201512364U (en) Telescopic hoisting gantry crane used for paving unballasted tracks
CN103184878B (en) Method for improving second lining construction efficiency in tunnel widening section
CN202208696U (en) Construction platform used for dry quenching furnace
CN209958220U (en) Movable trolley for mounting and dismounting railing
CN108059091A (en) A kind of Feeding System of Urban Rail Transit disk cabinet installs crane boom
CN201770429U (en) Portal type framework used for hoisting and slipping
CN210767897U (en) Unit type curtain wall plate construction machine
CN210421859U (en) A portable lift truck for furred ceiling installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 1889 Taibai Road 243000 in Anhui province Ma'anshan City Economic and Technological Development Zone

Co-patentee after: MAGANG (Group) HOLDING Co.,Ltd.

Patentee after: Anhui Masteel Metallurgical Construction Engineering Co.,Ltd.

Address before: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone Avenue West Road No. 259 layer

Co-patentee before: MAGANG (Group) HOLDING Co.,Ltd.

Patentee before: Maanshan Magang Equipment Installation Engineering Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20190712

Address after: No. 1889 Taibai Road 243000 in Anhui province Ma'anshan City Economic and Technological Development Zone

Patentee after: ANHUI MASTEEL ENGINEERING & TECHNOLOGY GROUP Co.,Ltd.

Address before: No. 1889 Taibai Road 243000 in Anhui province Ma'anshan City Economic and Technological Development Zone

Co-patentee before: MAGANG (Group) HOLDING Co.,Ltd.

Patentee before: ANHUI MASTEEL ENGINEERING & TECHNOLOGY GROUP Co.,Ltd.

Effective date of registration: 20190712

Address after: No. 1889 Taibai Road 243000 in Anhui province Ma'anshan City Economic and Technological Development Zone

Co-patentee after: MAGANG (Group) HOLDING Co.,Ltd.

Patentee after: ANHUI MASTEEL ENGINEERING & TECHNOLOGY GROUP Co.,Ltd.

Address before: No. 1889 Taibai Road 243000 in Anhui province Ma'anshan City Economic and Technological Development Zone

Co-patentee before: MAGANG (Group) HOLDING Co.,Ltd.

Patentee before: Anhui Masteel Metallurgical Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

CF01 Termination of patent right due to non-payment of annual fee