CN201512364U - Telescopic hoisting gantry crane used for paving unballasted tracks - Google Patents

Telescopic hoisting gantry crane used for paving unballasted tracks Download PDF

Info

Publication number
CN201512364U
CN201512364U CN2009201686145U CN200920168614U CN201512364U CN 201512364 U CN201512364 U CN 201512364U CN 2009201686145 U CN2009201686145 U CN 2009201686145U CN 200920168614 U CN200920168614 U CN 200920168614U CN 201512364 U CN201512364 U CN 201512364U
Authority
CN
China
Prior art keywords
gantry crane
winch
mother
sub
child
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201686145U
Other languages
Chinese (zh)
Inventor
冯扶民
周春江
孙玉桥
苑喜斌
曹静蕾
黄春霞
尤秀亮
魏超
杨杰
陈志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Original Assignee
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Tianye Tolian Heavy Industry Co Ltd filed Critical Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority to CN2009201686145U priority Critical patent/CN201512364U/en
Application granted granted Critical
Publication of CN201512364U publication Critical patent/CN201512364U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a telescopic hoisting gantry crane used for paving unballasted tracks. The gantry crane mainly comprises a mother beam, a gantry crane supporting leg, a child beam, a winch, a hanger plate trolley, a wire rope, guide pulleys, an upper PTFE (polytetrafluoroethylene) sheet, and a lower PTFE sheet, wherein, the gantry crane supporting leg is arranged at the lower end of the mother beam; the child beam is arranged in the mother beam; the upper and the lower PTFE sheets are respectively arranged between the upper end and the lower end of the child beam contact with the mother beam; the winch is arranged at the central part of the upper end of the mother beam; the hanger plate trolley is arranged on the child beam; the wire rope bypassing the winch is connected and fixed with the child beam through the two guide pulleys; and when the winch rotates after being started, the child beam can be driven to slide in the mother beam through the wire rope. Therefore, the motion range of the hanger plate trolley can be greatly increased, and the gantry crane can conveniently conduct hoisting construction within restricted construction areas.

Description

The telescoping hoisting door-hanging of non-fragment orbit is used to mat formation
Technical field
The utility model relates to a kind of telescoping hoisting door-hanging of the non-fragment orbit that is used to mat formation, and belongs to the railway construction machine apparatus field.
Background technology
At present, at home in the work progress of railway line for passenger traffic and high speed railway, employing be fragment-free track slab.About about 8 tons of this track plate weight need be processed in specific making sheet field.In concrete construction and installation process, if carrying the plate machine with cross-line installs to this track plate on the desired location from carrying to bridge under the bridge, repaving, must guarantee that then the road surface of both sides under the bridge keeps smooth, this engineering is expensive bigger.If directly the track plate is winched on the bridge under bridge with hanging device, hanging device is by construction restricted areass such as tunnel or electric poles the time so, must carry out dismounting to hanging device, after moving to suitable position, carry out lifting construction again, so not only can have a strong impact on the efficient of construction of railways, also increased simultaneously working strength of workers, so existing hanging device uses very inconvenient, brings many worries to unit in charge of construction.
The utility model content
The purpose of this utility model is to design the telescoping hoisting door-hanging that a kind of non-fragment orbit that is used to mat formation is provided at the problems referred to above, this hoisting door-hanging is by the extension function of the inner sub-beam of its female beam, can directly under bridge, lift the track plate, and when by construction restricted areass such as tunnel or electric poles the time, need not dismantle gantry crane equipment, as long as the inner extended sub-beam of female beam is partly regained in female beam, promptly is movable to predetermined appropriate position and carries out lifting construction work.This gantry crane equipment can reduce working strength of workers, reduces the waste of manpower, material and fund, improves construction speed and efficient.
In order to achieve the above object, the utility model is realized by following technological means.
The telescoping hoisting door-hanging of non-fragment orbit is used to mat formation, it mainly is made of female beam, gantry crane supporting leg, Zi Liang, winch, boatswain chair dolly, steel rope, leading sheave, upper strata tetrafluoro plate, lower floor's tetrafluoro board main portion, wherein: be provided with the gantry crane supporting leg in the installation of the lower end of female beam, in female beam, be provided with sub-beam, between sub-beam and the contacted top and bottom of female beam, be respectively arranged with upper strata tetrafluoro plate and lower floor's tetrafluoro plate, mainly play the effect that reduces to rub; Upper center at female beam is provided with winch, and Zi Liang is provided with the boatswain chair dolly; After steel rope is walked around winch, be connected and fixed by two leading sheaves and Zi Liang; When winch starts the back rotation, can in female beam, slide by rope belt mover beam, like this, the action radius of boatswain chair dolly can increase a lot, can carry out lifting construction very easily at the construction area that is restricted.
Described winch is the friction-type winch.
When hoisting door-hanging need carry out whole when mobile at construction restricted areass such as tunnel, electric poles, as long as sub-beam is retracted in female beam by the control winch, like this, can dwindle the length of whole gantry crane equipment, make gantry crane equipment pass through restricted areas smoothly, move to predetermined place easily and carry out construction operation.
The utility model mainly has following beneficial effect:
This hoisting door-hanging is by the extension function of the inner sub-beam of its female beam, can directly under bridge, lift the track plate, and when by construction restricted areass such as tunnel or electric poles the time, need not dismantle gantry crane equipment, as long as the inner extended sub-beam of female beam is partly regained in female beam, promptly is movable to predetermined appropriate position and carries out lifting construction work.This gantry crane equipment can reduce working strength of workers, reduces the waste of manpower, material and fund, improves construction speed and efficient.
Description of drawings
Accompanying drawing 1 is the planar structure scheme drawing of the utility model telescoping hoisting door-hanging equipment;
Accompanying drawing 2 is the vertical section structure scheme drawings after the sub-beam 2 of the utility model telescoping hoisting door-hanging equipment inserts in female beam 3.
As shown in the figure, each structure division of above-mentioned telescoping hoisting door-hanging equipment is represented by following Arabic number:
1. boatswain chair dolly, 2. sub-beam, 3. female beam, 4. winch, 5. gantry crane supporting leg, 6. steel rope, 7. leading sheave, 8. upper strata tetrafluoro plate, 9. lower floor's tetrafluoro plate.
The utility model is described in further detail below in conjunction with embodiment and Figure of description:
The specific embodiment
Embodiment
As shown in Figure 1, the telescoping hoisting door-hanging of the non-fragment orbit that is used to mat formation, it mainly is made of female beam 3, gantry crane supporting leg 5, sub-beam 2, winch 4, boatswain chair dolly 1, steel rope 6, leading sheave 7, upper strata tetrafluoro plate 8, lower floor's tetrafluoro plate 9 main portions.
As shown in Figure 1, be provided with gantry crane supporting leg 5, in female beam 3, be provided with sub-beam 2 in the installation of the lower end of female beam 3.
As shown in Figure 2, between sub-beam 2 and female beam 3 contacted top and bottom, be respectively arranged with upper strata tetrafluoro plate 8 and lower floor's tetrafluoro plate 9, mainly play the effect that reduces to rub.
As shown in Figure 1 and Figure 2, be provided with winch 4 in the upper center of female beam 3, sub-beam 2 is provided with boatswain chair dolly 1; After steel rope 6 is walked around winch 4, be connected and fixed by two leading sheaves 7 and sub-beam 2; When winch 4 starts the back rotation, can drive sub-beam 2 by steel rope 6 and in female beam 3, slide, like this, the action radius of boatswain chair dolly 1 can increase a lot, can carry out lifting construction very easily at the construction area that is restricted.
As shown in Figure 2, described winch 4 is the friction-type winch.
As shown in Figure 1, when hoisting door-hanging need carry out whole when mobile at construction restricted areass such as tunnel, electric poles, as long as sub-beam 2 is retracted in female beam 3 by control winch 4, like this, can dwindle the length of whole gantry crane equipment, make gantry crane equipment pass through restricted areas smoothly, move to predetermined place easily and carry out construction operation.

Claims (1)

1. the telescoping hoisting door-hanging of non-fragment orbit is used to mat formation, it is mainly by female beam (3), gantry crane supporting leg (5), sub-beam (2), winch (4), boatswain chair dolly (1), steel rope (6), leading sheave (7), upper strata tetrafluoro plate (8), lower floor's tetrafluoro plate (9) main portion constitutes, it is characterized in that: install in the lower end of female beam (3) and be provided with gantry crane supporting leg (5), in female beam (3), be provided with sub-beam (2), between Zi Liang (2) and the contacted top and bottom of female beam (3), be respectively arranged with upper strata tetrafluoro plate (8) and lower floor's tetrafluoro plate (9), upper center at female beam (3) is provided with winch (4), and Zi Liang (2) is provided with boatswain chair dolly (1); After steel rope (6) is walked around winch (4), be connected and fixed by two leading sheaves (7) and sub-beam (2).
CN2009201686145U 2009-07-26 2009-07-26 Telescopic hoisting gantry crane used for paving unballasted tracks Expired - Fee Related CN201512364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201686145U CN201512364U (en) 2009-07-26 2009-07-26 Telescopic hoisting gantry crane used for paving unballasted tracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201686145U CN201512364U (en) 2009-07-26 2009-07-26 Telescopic hoisting gantry crane used for paving unballasted tracks

Publications (1)

Publication Number Publication Date
CN201512364U true CN201512364U (en) 2010-06-23

Family

ID=42483770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201686145U Expired - Fee Related CN201512364U (en) 2009-07-26 2009-07-26 Telescopic hoisting gantry crane used for paving unballasted tracks

Country Status (1)

Country Link
CN (1) CN201512364U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785998A (en) * 2012-08-06 2012-11-21 河南起重机器有限公司 Variable-span manual hoist gantry crane
CN109355984A (en) * 2018-12-11 2019-02-19 中铁五局集团第六工程有限责任公司 A kind of prefabricated switching turnout plate rotating plate translating device of subway and its application method
CN113526361A (en) * 2021-08-11 2021-10-22 上海振华重工(集团)股份有限公司 Telescopic shore bridge girder telescopic control method and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785998A (en) * 2012-08-06 2012-11-21 河南起重机器有限公司 Variable-span manual hoist gantry crane
CN109355984A (en) * 2018-12-11 2019-02-19 中铁五局集团第六工程有限责任公司 A kind of prefabricated switching turnout plate rotating plate translating device of subway and its application method
CN109355984B (en) * 2018-12-11 2023-10-20 中铁五局集团第六工程有限责任公司 Subway prefabricated turnout plate rotating plate translation device and application method thereof
CN113526361A (en) * 2021-08-11 2021-10-22 上海振华重工(集团)股份有限公司 Telescopic shore bridge girder telescopic control method and device

Similar Documents

Publication Publication Date Title
CN105000482B (en) Tower crane with walking mechanism
CN110655015B (en) Trackless self-propelled platform car for subway tunnel maintenance
CN103726421B (en) Height and span adjustable track paver for metro construction
CN105293315B (en) A kind of hanging device of assembled architecture prefabricated components
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN201512364U (en) Telescopic hoisting gantry crane used for paving unballasted tracks
CN203486784U (en) Trolley for installing and disassembling steel moulding plate for construction of anti-colliding wall of bridge
CN103182733A (en) Trowelling machine
CN205204688U (en) Assembly type structure prefabricated component's lifting device
CN201850076U (en) Gate-shaped stand rod hoist of contact network
CN201507112U (en) Sliding template system
CN210068193U (en) Gantry-type double-template alternate trolley for cable groove of tunnel ditch
CN109607384B (en) Turning-over method for cutter head of super-large-diameter shield tunneling machine
CN202449763U (en) Simple pneumatic crane
CN202390106U (en) Lifting hook portal crane easy to maintain
CN212687392U (en) Cable crane hoisting device for bridge erection
CN202465121U (en) Suspension arm of crane
CN202465109U (en) Motor-driven double-beam grab bucket gantry crane
CN203125678U (en) Troweling machine
CN202449760U (en) Container portal crane with rails
CN202429913U (en) Movable crane
CN202913360U (en) Bridge floor rotary hoisting device
CN202465110U (en) Shipbuilding portal crane with rail clamping device
CN202429915U (en) Large-tonnage lifting hook overhead crane
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100623

Termination date: 20130726