CN210068193U - Gantry-type double-template alternate trolley for cable groove of tunnel ditch - Google Patents
Gantry-type double-template alternate trolley for cable groove of tunnel ditch Download PDFInfo
- Publication number
- CN210068193U CN210068193U CN201920912011.5U CN201920912011U CN210068193U CN 210068193 U CN210068193 U CN 210068193U CN 201920912011 U CN201920912011 U CN 201920912011U CN 210068193 U CN210068193 U CN 210068193U
- Authority
- CN
- China
- Prior art keywords
- gantry crane
- cable trough
- pair
- ditch cable
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
A gantry crane type double-template alternating trolley for a tunnel ditch cable trough is characterized in that a gantry crane is arranged in a tunnel ditch cable trough construction section, two pairs of ditch cable trough templates are arranged on two sides of the ground of the tunnel ditch cable trough construction section in a concrete lining construction mode, and the two pairs of ditch cable trough templates are respectively arranged in a segmented and alternating construction mode; a pair of electric hoists are symmetrically arranged at two ends below the gantry crane beam, motors are arranged on the inner sides of the pair of electric hoists respectively, and reels are arranged on the outer sides of the motors respectively; a double-control operation table is arranged at the lower part of the herringbone frame body on one side of the gantry crane, and a manual control system and a wireless signal control system are respectively arranged in the double-control operation table; a lifting hook is arranged between the balance angle rope and the lifting rope on the longitudinal balance beam of the template group; the utility model discloses a gantry crane formula is template platform truck in turn and is established to the gantry crane of a, and the gantry crane is the walking, and the electric block is installed respectively at the crossbeam both ends of gantry crane, and a gantry crane both sides are equipped with two sets of ditch cable tray templates and are under construction, improve equipment's production and rate of utilization in turn.
Description
Technical Field
The utility model relates to a template platform truck of tunnel ditch cable duct, especially a gantry crane formula bimodulus board of tunnel ditch cable duct is platform truck in turn.
Background
At present, a ditch cable trough lining concrete construction in a tunnel generally uses a ditch cable trough trolley formed by welding steel plates, the weight of the steel plate welding trolley is large, the installation of a construction site is complex, the transportation is difficult, and the specification of the trolley is customized according to the diameter of one tunnel; in addition, the shapes of the ditch cable trough trolleys produced and designed by enterprises are different, so that the production cost is high, and the capital waste of the ditch cable trough trolleys is large; after the tunnel construction is finished, the cable trough trolley of the ditch can not be repeatedly used, so that the waste of construction equipment is caused; in view of the above, a gantry type dual-template alternating trolley for a cable trough of a tunnel ditch is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the construction of the lining concrete of the ditch cable channel in the tunnel, the ditch cable channel trolley formed by welding steel plates is generally used, the weight of the steel plate welded trolley is heavy, the installation of a construction site is complex, the transportation is difficult, and the specification of the trolley is customized according to the diameter of one tunnel; in addition, the shapes of the ditch cable trough trolleys produced and designed by enterprises are different, so that the production cost is high, and the capital waste of the ditch cable trough trolleys is large; after the tunnel construction is finished, the ditch cable trough trolley can not be used repeatedly, so that the waste of construction equipment is caused, and through reasonable design, the utility model provides a gantry crane type double-template alternating trolley of a tunnel ditch cable trough, the gantry crane type alternating template trolley is designed into a gantry crane of one machine, the gantry crane is of a walking type, electric hoists are respectively arranged at two ends of a beam of the gantry crane, two sides of the gantry crane are provided with two sets of ditch cable trough templates for alternate construction, so that the construction progress can be accelerated; the walking type gantry crane is controlled by a manual control system and a wireless signal control system respectively, and is small in size, light in weight, light and flexible in operation, simple and light in installation and disassembly, light in production and transportation, capable of being used repeatedly, capable of greatly reducing production cost, energy-saving, environment-friendly and capable of improving production and utilization rate of equipment.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme: a gantry double-template alternating trolley for a tunnel ditch cable trough is composed of: the device comprises a gantry crane, a gantry crane beam, an electric hoist, a scroll, a template group longitudinal balance beam, a small beam frame, a vertical beam frame, a ditch cable groove, a vertical wall of a vertical wall, a track, a traveling device, a balance angle rope, a lifting lug, lining concrete, a double-control operating platform and a paying-off device; the construction method comprises the following steps that a gantry crane is arranged in a ditch cable trough construction section of a tunnel, two pairs of ditch cable trough templates are arranged on two sides of the ground of the ditch cable trough construction section in a lining concrete construction mode, and the two pairs of ditch cable trough templates are respectively arranged in a segmented and alternate construction mode; a pair of herringbone frame bodies are symmetrically arranged on two sides of the gantry crane, a gantry crane cross beam is arranged between the pair of herringbone frame bodies, a pair of electric hoists are symmetrically arranged at two ends below the gantry crane cross beam, a runway is arranged between the lower surface of the gantry crane cross beam and the electric hoists, motors are arranged on the inner sides of the pair of electric hoists respectively, and reels are arranged on the outer sides of the motors respectively; a double-control operating platform is arranged at the lower part of the herringbone frame body on one side of the gantry crane, the double-control operating platform is electrically connected with the pair of electric hoists, and a manual control system and a wireless signal control system are respectively arranged in the double-control operating platform; a pair of walking devices are symmetrically arranged at the lower ends of a pair of herringbone frame bodies at two sides of the gantry crane, and pay-off devices are arranged on the walking devices corresponding to the double-control operating platform; two parallel tracks are arranged between the pair of walking devices and the ground;
the two sides of the gantry crane are symmetrically provided with a pair of ditch cable trough templates, the middle parts of the upper ends of the pair of ditch cable trough templates are symmetrically provided with a template group longitudinal balance beam respectively, two ends of the upper surface of the template group longitudinal balance beam are symmetrically provided with a pair of lifting lugs, a balance angle rope is arranged between the pair of lifting lugs, the center of the balance angle rope is provided with a folded rope ring, the outer side of the scroll is wound with a lifting rope, and a lifting hook is arranged between the lower end of the lifting rope and the rope ring of the balance angle rope;
at least two small beam frames are uniformly distributed below longitudinal balance beams of a paired template group, vertical beam frames are arranged below the inner side ends of the small beam frames, the small beam frames and the vertical beam frames are inverted L-shaped frame bodies, vertical walls are arranged on the inner side below the small beam frames, a ditch cable groove is arranged on the outer side of each vertical wall, and adjusting screw rods are arranged between the upper ends of the vertical walls and the small beam frames respectively.
Has the advantages that: the gantry crane type alternate template trolley is a gantry crane, the gantry crane is of a walking type, electric hoists are respectively installed at two ends of a beam of the gantry crane, two sides of the gantry crane are provided with two sets of ditch cable trough templates for alternate construction, and the construction progress can be accelerated; the walking type gantry crane is controlled by a manual control system and a wireless signal control system respectively, and is small in size, light in weight, light and flexible in operation, simple and light in installation and disassembly, light in production and transportation, capable of being used repeatedly, capable of greatly reducing production cost, energy-saving, environment-friendly and capable of improving production and utilization rate of equipment.
Drawings
The present invention will be further explained with reference to the accompanying drawings:
FIG. 1 is a schematic view of the assembly structure;
FIG. 2 is a schematic side view of the structure of FIG. 1;
FIG. 3 is a schematic view of a portion of the structure of FIG. 2;
in fig. 1, 2, 3: the device comprises a gantry crane 1, a gantry crane crossbeam 2, an electric hoist 3, a reel 4, a template group longitudinal balance beam 5, a small beam frame 5-1, a vertical beam frame 5-2, a ditch cable groove 5-3, a vertical wall 5-4, a track 6, a walking device 7, a balance angle rope 8, a lifting rope 9, a lifting lug 10, lining concrete 11, a double-control operating platform 12 and a paying-off device 13.
Detailed Description
The present invention will be described in further detail with reference to the following detailed description and accompanying drawings:
the gantry crane 1 is arranged in a ditch cable trough construction section of a tunnel, two sides of the ground of the ditch cable trough construction section are provided with two pairs of ditch cable trough templates in a lining concrete 11 construction mode, and the two pairs of ditch cable trough templates are respectively arranged in a segmented and alternate construction mode; a pair of herringbone frame bodies are symmetrically arranged on two sides of the gantry crane 1, a gantry crane cross beam 2 is arranged between the herringbone frame bodies, a pair of electric hoists 3 are symmetrically arranged at two ends below the gantry crane cross beam 2, a runway is arranged between the lower surface of the gantry crane cross beam 2 and the electric hoists 3, motors are respectively arranged on the inner sides of the electric hoists 3, and reels 4 are respectively arranged on the outer sides of the motors; a double-control operating platform 12 is arranged at the lower part of the herringbone frame body on one side of the gantry crane 1, the double-control operating platform 12 is electrically connected with the pair of electric hoists 3, and a manual control system and a wireless signal control system are respectively arranged in the double-control operating platform 12; a pair of walking devices 7 are symmetrically arranged at the lower ends of a pair of herringbone frame bodies at two sides of the gantry crane 1, and pay-off devices 13 are arranged on the walking devices 7 corresponding to the double-control operating platform 12; two parallel tracks 6 are arranged between the pair of walking devices 7 and the ground;
the two sides of the gantry crane 1 are symmetrically provided with a pair of ditch cable trough templates, the middle parts of the upper ends of the pair of ditch cable trough templates are symmetrically provided with a template group longitudinal balance beam 5 respectively, the two ends of the upper surface of the template group longitudinal balance beam 5 are symmetrically provided with a pair of lifting lugs 10, a balance angle rope 8 is arranged between the pair of lifting lugs 10, the center of the balance angle rope 8 is provided with a folded rope ring, the outer side of the scroll 4 is wound with a lifting rope 9, and a lifting hook is arranged between the lower end of the lifting rope 9 and the rope ring of the balance angle rope 8;
at least two small beam frames 5-1 are uniformly distributed below a longitudinal balance beam 5 of a paired template group respectively, vertical beam frames 5-2 are arranged below the inner side ends of the small beam frames 5-1, the small beam frames 5-1 and the vertical beam frames 5-2 are arranged into inverted L-shaped frame bodies, vertical walls 5-4 are arranged on the inner side below the small beam frames 5-1, ditch cable grooves 5-3 are arranged on the outer sides of the vertical walls 5-4, and adjusting screw rods are arranged between the upper ends of the vertical walls 5-4 and the ditch cable grooves 5-3 and the small beam frames 5-1 respectively.
Claims (3)
1. A gantry double-template alternating trolley for a tunnel ditch cable trough is composed of: the device comprises a gantry crane (1), gantry crane cross beams (2), electric hoists (3), reels (4), template group longitudinal balance beams (5), small beam frames (5-1), vertical beam frames (5-2), ditch cable grooves (5-3), vertical walls (5-4), rails (6), a traveling device (7), balance angle ropes (8), lifting ropes (9), lifting lugs (10), lining concrete (11), a double-control operating platform (12) and a pay-off device (13); the method is characterized in that: a gantry crane (1) is arranged in a ditch cable trough construction section of a tunnel, two pairs of ditch cable trough templates are arranged on two sides of the ground of the ditch cable trough construction section in a lining concrete (11) construction mode, and the two pairs of ditch cable trough templates are respectively arranged in a segmented and alternate construction mode; a pair of herringbone frame bodies are symmetrically arranged on two sides of the gantry crane (1), a gantry crane cross beam (2) is arranged between the herringbone frame bodies, a pair of electric hoists (3) are symmetrically arranged at two ends below the gantry crane cross beam (2), a runway is arranged between the lower surface of the gantry crane cross beam (2) and the electric hoists (3), motors are respectively arranged on the inner sides of the pair of electric hoists (3), and reels (4) are respectively arranged on the outer sides of the motors; a double-control operating platform (12) is arranged at the lower part of a herringbone frame body on one side of the gantry crane (1), the double-control operating platform (12) is electrically connected with the pair of electric hoists (3), and a manual control system and a wireless signal control system are respectively arranged in the double-control operating platform (12); a pair of walking devices (7) are symmetrically arranged at the lower ends of a pair of herringbone frame bodies at the two sides of the gantry crane (1), and pay-off devices (13) are arranged on the walking devices (7) corresponding to the double-control operating platform (12); two parallel tracks (6) are arranged between the pair of running gear (7) and the ground.
2. The gantry crane type double-template alternating trolley for the cable trough of the tunnel ditch as claimed in claim 1, characterized in that: the two sides of the gantry crane (1) are symmetrically arranged to form a pair of ditch cable trough templates, the middle of the upper end of each ditch cable trough template is symmetrically provided with a longitudinal balance beam (5) of the template set, two ends of the upper surface of the longitudinal balance beam (5) of the template set are symmetrically provided with a pair of lifting lugs (10), a balance angle rope (8) is arranged between each pair of lifting lugs (10), the center of each balance angle rope (8) is arranged to be a rope ring folded in half, the outer side of the scroll (4) is wound with a lifting rope (9), and a lifting hook is arranged between the lower end of the lifting rope (9) and the rope ring of the balance angle rope.
3. The gantry crane type double-template alternating trolley for the cable trough of the tunnel ditch as claimed in claim 1, characterized in that: at least two small beam frames (5-1) are uniformly distributed below a longitudinal balance beam (5) of a paired template group, vertical beam frames (5-2) are arranged below the inner side ends of the small beam frames (5-1), the small beam frames (5-1) and the vertical beam frames (5-2) are arranged into inverted L-shaped frame bodies, vertical wall vertical walls (5-4) are arranged on the inner side below the small beam frames (5-1), ditch cable grooves (5-3) are arranged on the outer sides of the vertical walls (5-4), and adjusting screw rods are arranged between the upper ends of the vertical wall vertical walls (5-4) and the ditch cable grooves (5-3) and the small beam frames (5-1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920912011.5U CN210068193U (en) | 2019-06-17 | 2019-06-17 | Gantry-type double-template alternate trolley for cable groove of tunnel ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920912011.5U CN210068193U (en) | 2019-06-17 | 2019-06-17 | Gantry-type double-template alternate trolley for cable groove of tunnel ditch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210068193U true CN210068193U (en) | 2020-02-14 |
Family
ID=69427834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920912011.5U Active CN210068193U (en) | 2019-06-17 | 2019-06-17 | Gantry-type double-template alternate trolley for cable groove of tunnel ditch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210068193U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113446027A (en) * | 2021-07-10 | 2021-09-28 | 中铁一局集团(广州)建设工程有限公司 | Subway station structure side wall trackless hydraulic formwork trolley construction method |
WO2022139576A1 (en) * | 2020-12-22 | 2022-06-30 | De Bruin Cornelis Christiaan | Assembly comprising a rail vehicle and provided with a track section of a railway track for allowing the rail vehicle to drive along it |
-
2019
- 2019-06-17 CN CN201920912011.5U patent/CN210068193U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022139576A1 (en) * | 2020-12-22 | 2022-06-30 | De Bruin Cornelis Christiaan | Assembly comprising a rail vehicle and provided with a track section of a railway track for allowing the rail vehicle to drive along it |
CN113446027A (en) * | 2021-07-10 | 2021-09-28 | 中铁一局集团(广州)建设工程有限公司 | Subway station structure side wall trackless hydraulic formwork trolley construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106348188B (en) | The manufacture method of planer-type building-construction lifting device | |
CN201474704U (en) | Needle beam type hydraulic steel mould carrier | |
CN105421249A (en) | Novel dragging- hoisting combined type hanging basket structure and construction method | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN210068193U (en) | Gantry-type double-template alternate trolley for cable groove of tunnel ditch | |
CN203021883U (en) | Wheel-track railway track laying unit | |
CN108639968A (en) | Whole lateral moving formula cable crane | |
CN111502293B (en) | Method and system for hoisting single peripheral component of assembly type building | |
CN201882783U (en) | Crane for hoisting concrete finished blank body | |
CN202391104U (en) | Portable rail slip form | |
CN207891733U (en) | The mobile operation platform of steel truss arched bridge coating project | |
CN204778464U (en) | Shield constructs gantry crane for subway | |
CN203334186U (en) | A wheel type device for cable-stayed bridge floor press anchoring | |
CN205369040U (en) | Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device | |
CN209853595U (en) | Novel lower trolley system | |
CN212687392U (en) | Cable crane hoisting device for bridge erection | |
CN201512364U (en) | Telescopic hoisting gantry crane used for paving unballasted tracks | |
CN111661768B (en) | Method and system for hoisting multiple peripheral components of assembly type building | |
CN211521390U (en) | Bridge sidewalk accessory facility hoisting equipment | |
CN210150618U (en) | Track panel hoisting gantry crane device | |
CN203428766U (en) | Electric hoist | |
CN102261051A (en) | Gantry for casting breast wall and construction process thereof | |
CN201554467U (en) | Overhead needle beam hydraulic steel mould trolley | |
CN207499886U (en) | A kind of large cross-section tunnel moves adjustable waterproof construction trolley | |
CN201665821U (en) | Crown block used for bridge erecting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 471000 No. 16, Longteng North Road, Xiagou Village, Hongshan Township, Xigong District, Luoyang City, Henan Province Patentee after: Luoyang Gaofei Bridges and Tunnels Machinery Co.,Ltd. Address before: 471000 No. 16, Longteng North Road, Xiagou Village, Hongshan Township, Xigong District, Luoyang City, Henan Province Patentee before: LUOYANG GAOFEI BRIDGE AND TUNNEL MACHINERY Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |