CN102261051A - Gantry for casting breast wall and construction process thereof - Google Patents

Gantry for casting breast wall and construction process thereof Download PDF

Info

Publication number
CN102261051A
CN102261051A CN 201110149489 CN201110149489A CN102261051A CN 102261051 A CN102261051 A CN 102261051A CN 201110149489 CN201110149489 CN 201110149489 CN 201110149489 A CN201110149489 A CN 201110149489A CN 102261051 A CN102261051 A CN 102261051A
Authority
CN
China
Prior art keywords
door frame
breastwork
gantry
bearing
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110149489
Other languages
Chinese (zh)
Inventor
罗柳
唐如蜜
刘霄
徐汉俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN 201110149489 priority Critical patent/CN102261051A/en
Publication of CN102261051A publication Critical patent/CN102261051A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a gantry for casting a breast wall. The gantry comprises a gantry body and a travelling system. The gantry body comprises a bearing truss which is a retaining ring beam structure. A support leg is arranged under the bearing truss. A pulley is arranged at the lower end of the support leg. The travelling system comprises a driving system and a track. The gantry body is glidingly supported on the track through the pulley. A control circuit of the pulley is connected with the driving system. A lifting point for installing a chain block is arranged under the bearing truss. By means of the movable gantry, a template is lifted by utilizing the chain block installed on the gantry body; the problem of being difficult to lift and install the template is solved; furthermore, problems, such as low construction efficiency, high cost, large equipment occupation area and the like, are also solved; meanwhile, an H beam arranged on the gantry provides a construction platform for lifting block stones; the construction efficiency is further increased; the cost is further reduced; the equipment occupation area is further reduced; and the gantry is applicable to casting the breast wall.

Description

Be used for door frame and construction technology thereof that breastwork is built
Technical field
The invention belongs to breastwork and build the field, be specifically related to door frame and construction technology thereof that a kind of breastwork that is used for sloping breakwater is built.
Background technology
At present, on engineerings such as sloping breakwater, breastwork is built through regular meeting and is run into following problem:
1, because the breastwork size of sloping breakwater is bigger, so it is also bigger to be used to build the template size and the tonnage of breastwork, will cause like this template installation, dismounting, move the large-scale crane gear of needs, transport a template but also once can only lift by crane;
2, because the construction channel width of engineerings such as sloping breakwater is less, if so adopt crane gears such as portable tower crane, straddle truck, mobile crane, can take limited construction passage, cause the operation of other working procedures to carry out (as the transportation of specification stone, the installation of armour etc.), if and the employing crane ship carries out installation, the dismounting, mobile of template, cost height then, work efficiency is low, can't satisfy the construction speed requirement;
3, because the breastwork of sloping breakwater is the large volume plain concrete, in order to reduce the heat of hydration, need in concrete, add 20% piece stone according to designing requirement, the lifting of these piece stones also needs crane gear, can take limited construction passage equally, influence the operation of other working procedures.
4, since engineering such as sloping breakwater all in the coastal region, all will experience the typhoon phase in every year, in order to guarantee in work progress, can it's the typhoon phase to past degree of safety, need before arriving, finish typhoon building of lower floor's breastwork (because the breastwork sectional dimension is big, one-time-concreting is difficult, so divide two-layer building), so just require to improve efficiency of construction.
Summary of the invention
The object of the present invention is to provide a kind of simple in structure, easy to use and efficiency of construction is high and the construction area area is little is used for door frame and the construction technology thereof that breastwork is built, to address the above problem.
Technical scheme of the present invention is: a kind ofly be used for the door frame that breastwork is built, comprise door frame main body and running gear, described door frame main body comprises the load-bearing of the waling structure frame that spreads out, and the load-bearing frame below of spreading out is provided with supporting leg, and the supporting leg lower end is provided with pulley; Described running gear comprises drive system and track, and described door frame main body is passed through the pulley sliding support in orbit, and the control circuit of described pulley links to each other with drive system; The spread out below of frame of described load-bearing is provided with the suspension centre that is used to install Chain block.
In such scheme, described suspension centre is arranged in described load-bearing and spreads out around the frame, and the load-bearing every limit of frame of spreading out is respectively equipped with 3 suspension centres---and two ends are 1 main suspension centre respectively, and middle 1 leveling suspension centre has guaranteed to lift by crane the polylith template simultaneously like this, has improved efficiency of construction.
In such scheme, spread out frame below of described load-bearing is provided with the H shaped steel that is used to install electric block, and this H shaped steel is positioned at the load-bearing beam middle part of spreading out, and this H shaped steel provides operation platform for the handling of piece stone.
In such scheme, described H shaped steel is vertically arranged along door frame main body direction of travel, like this, helps the carrying of piece stone.
A kind of construction technology that is used for the door frame that breastwork builds may further comprise the steps:
(1) lay track according to the job site, and with this door frame installation in position;
(2) template is hung on the Chain block, and utilize Chain block to carry out handling, installation and the reinforcing of template;
(3) utilize electric block to carry out the lifting of piece stone and move, be put into the position that needs jackstone, manually put, put and carry out concreting after finishing;
(4) after concrete strength reaches more than the 5MPa, stripping utilizes the Chain block climbing shuttering, makes template exceed bottom breastwork height, and utilizes described running gear moving door frame body to next section breastwork to build a little;
(5) utilize Chain block to carry out the installation and the reinforcing of template once more, and carry out building of breastwork as stated above, so circulation.
The present invention is by the packaged type door frame, utilizes to be installed in and draws cucurbit handling template on the door frame main body, solved the template handling and the problem of difficulty is installed; But also solved that efficiency of construction is low, cost is high and problem such as occupation area of equipment is big; The H shaped steel that this door frame of while is provided with has further improved efficiency of construction for the handling of piece stone provides operation platform, has reduced cost, has reduced occupation area of equipment.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present invention.
Fig. 2 is the side-looking structural representation of Fig. 1.
Fig. 3 is the plan structure schematic diagram of Fig. 1.
Fig. 4 is a user mode structural representation of the present invention.
1-door frame main body among the figure, the 1a-load-bearing frame that spreads out, 1b-supporting leg, 1c-pulley, 2-running gear, 2a-drive system, 2b-track, 3-Chain block, 4-suspension centre, 5-template, 6-electric block, 7-H shaped steel.
The specific embodiment
As shown in Figure 1, a kind ofly be used for the door frame that breastwork is built, comprise door frame main body 1 and running gear 2, described door frame main body 1 comprises the load-bearing of the waling structure frame 1a that spreads out, spread out frame 1a below of load-bearing is provided with 4 supporting leg 1b, each supporting leg 1b lower end is provided with pulley 1c, certainly also can be according to the quantity of practice of construction operating mode design supporting leg 1b; Described running gear 2 comprises drive system 2a and track 2b, and described door frame main body 1a is slidably supported on the track 2b by pulley 1c, and the control circuit of described pulley 1c links to each other with drive system 2a; The spread out below of frame 1a of described load-bearing is provided with the suspension centre 4 (referring to Fig. 2 and Fig. 3) that is used to install Chain block 3.
As shown in Figure 1, described suspension centre 4 is arranged in described load-bearing and spreads out around the frame 1a, load-bearing is spread out and is respectively equipped with 3 suspension centres on the four edges of frame 1a---and two ends are 1 main suspension centre that is used for template 5 is carried out descending operation respectively, middle 1 leveling suspension centre that is used for template 5 is carried out the leveling operation, guaranteed like this to lift by crane the polylith template simultaneously, improved efficiency of construction.Certainly, also can be according to number and position (referring to Fig. 2 and Fig. 3) of practice of construction operating mode design suspension centre.
As shown in Figure 2, spread out frame 1a below of described load-bearing is provided with two H shaped steel 7 that are used to install electric block 6, and this H shaped steel 7 is positioned at the load-bearing beam 1a middle part of spreading out, and this H shaped steel 7 provides operation platform for the handling of piece stone.Described H shaped steel 7 arranges vertically that along door frame main body 1 direction of travel described electric block 6 is installed on this H shaped steel 7.Certainly, also can the piece stone handling apparatus (referring to Fig. 3) of other structures of design on the tame main body 1.
As shown in Figure 4, the construction technology of this door frame may further comprise the steps:
(1) lay track 2b according to the job site, and with this door frame installation in position;
(2) template 5 is hung on the Chain block 3, and utilize Chain block 3 to carry out handling, installation and the reinforcing of template 5;
(3) utilize electric block 6 to carry out the lifting of piece stone and move, be put into the position that needs jackstone, manually put, put and carry out concreting after finishing;
(4) after concrete strength reaches more than the 5MPa, stripping 5 utilizes Chain block 3 climbing shutterings 5, makes template 5 exceed bottom breastwork height, and utilizes described running gear 2 moving door frame bodies 1 to next section breastwork to build a little;
(5) utilize Chain block 3 to carry out the installation and the reinforcing of template 5 once more, and carry out building of breastwork as stated above, so circulation (referring to Fig. 1, Fig. 2 and Fig. 3).

Claims (5)

1. one kind is used for the door frame that breastwork is built, and comprises door frame main body and running gear, it is characterized in that, described door frame main body comprises the load-bearing of the waling structure frame that spreads out, and the load-bearing frame below of spreading out is provided with supporting leg, and the supporting leg lower end is provided with pulley; Described running gear comprises drive system and track, and described door frame main body is passed through the pulley sliding support in orbit, and the control circuit of described pulley links to each other with drive system; The spread out below of frame of described load-bearing is provided with the suspension centre that is used to install Chain block.
2. as claimed in claim 1ly be used for the door frame that breastwork is built, it is characterized in that, described suspension centre is arranged in described load-bearing and spreads out around the frame.
3. as claimed in claim 1 or 2ly be used for the door frame that breastwork is built, it is characterized in that, the described load-bearing frame below of spreading out is provided with the H shaped steel that is used to install electric block, and this H shaped steel is positioned at the load-bearing beam middle part of spreading out.
4. as claimed in claim 3ly be used for the door frame that breastwork is built, it is characterized in that described H shaped steel is vertically arranged along door frame main body direction of travel.
5. the construction technology that is used for the door frame that breastwork builds as claimed in claim 1 is characterized in that, may further comprise the steps:
(1) lay track according to the job site, and with this door frame installation in position;
(2) template is hung on the Chain block, and utilize Chain block to carry out handling, installation and the reinforcing of template;
(3) utilize electric block to carry out the lifting of piece stone and move, be put into the position that needs jackstone, manually put, put and carry out concreting after finishing;
(4) after concrete strength reaches more than the 5MPa, stripping utilizes the Chain block climbing shuttering, makes template exceed bottom breastwork height, and utilizes described running gear moving door frame body to next section breastwork to build a little;
(5) utilize Chain block to carry out the installation and the reinforcing of template once more, and carry out building of breastwork as stated above, so circulation.
CN 201110149489 2011-06-03 2011-06-03 Gantry for casting breast wall and construction process thereof Pending CN102261051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110149489 CN102261051A (en) 2011-06-03 2011-06-03 Gantry for casting breast wall and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110149489 CN102261051A (en) 2011-06-03 2011-06-03 Gantry for casting breast wall and construction process thereof

Publications (1)

Publication Number Publication Date
CN102261051A true CN102261051A (en) 2011-11-30

Family

ID=45007869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110149489 Pending CN102261051A (en) 2011-06-03 2011-06-03 Gantry for casting breast wall and construction process thereof

Country Status (1)

Country Link
CN (1) CN102261051A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776865A (en) * 2012-07-12 2012-11-14 江苏省交通工程集团有限公司 Revetment wall construction movable mould frame and revetment wall construction method
CN108798714A (en) * 2018-05-28 2018-11-13 广西路建工程集团有限公司 A kind of working portable shifting formwork trolley of channel wall body and its construction method
CN113336104A (en) * 2021-06-18 2021-09-03 中交第二航务工程局有限公司 Comprehensive pipe gallery integrated light movable portal frame system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070095777A1 (en) * 2005-10-31 2007-05-03 Wierzba Jerry J Powered auxiliary hoist mechanism for a gantry crane
CN2937068Y (en) * 2006-07-21 2007-08-22 山东丰汇设备技术有限公司 Portal crane of round pipe truss structure
CN202148514U (en) * 2011-06-03 2012-02-22 中交第二航务工程局有限公司 Portal frame for breast wall pouring

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070095777A1 (en) * 2005-10-31 2007-05-03 Wierzba Jerry J Powered auxiliary hoist mechanism for a gantry crane
CN2937068Y (en) * 2006-07-21 2007-08-22 山东丰汇设备技术有限公司 Portal crane of round pipe truss structure
CN202148514U (en) * 2011-06-03 2012-02-22 中交第二航务工程局有限公司 Portal frame for breast wall pouring

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《葫芦式起重机》 20090831 宫本智 葫芦式起重机 , *
《黑龙江科技信息》 20100331 黄涛 钢模台车在海堤防浪胸墙砼施工中的应用 , 第8期 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776865A (en) * 2012-07-12 2012-11-14 江苏省交通工程集团有限公司 Revetment wall construction movable mould frame and revetment wall construction method
CN108798714A (en) * 2018-05-28 2018-11-13 广西路建工程集团有限公司 A kind of working portable shifting formwork trolley of channel wall body and its construction method
CN113336104A (en) * 2021-06-18 2021-09-03 中交第二航务工程局有限公司 Comprehensive pipe gallery integrated light movable portal frame system
CN113336104B (en) * 2021-06-18 2023-06-06 中交第二航务工程局有限公司 Integrated light movable door frame system of comprehensive pipe rack

Similar Documents

Publication Publication Date Title
CN104895584B (en) A kind of modularization steel form carrier and construction technology thereof
CN106638687B (en) A kind of accurate quick-assembling technique of precast assembly pipe gallery
CN204609906U (en) A kind of modularization steel form carrier
CN101787678B (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN105293315B (en) A kind of hanging device of assembled architecture prefabricated components
CN102146799A (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN102720432A (en) Self-propelled underground boring jumbo
CN105544546B (en) Discarded object for underground engineering clears up conveying arrangement and method
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
JP5890060B1 (en) Bridge dismantling method using erection girder
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN202064281U (en) Slip form frame
CN102261051A (en) Gantry for casting breast wall and construction process thereof
CN203247031U (en) Hoisting device for curtain board transporting
CN104895336A (en) Method for installing stiff mixed-structure steel girders in place
CN108661328A (en) A kind of shaped steel girder transferring installation method
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN102815606A (en) Device for realizing operation of mobile tower crane on structural floor and construction method
CN211141313U (en) Portal crane suitable for hoisting low-height underground continuous wall reinforcement cage
CN202148514U (en) Portal frame for breast wall pouring
CN207957611U (en) A kind of small members are mobile and install equipment
CN205711780U (en) Wave forms steel web SCC engineering method movable hanging basket
CN212335771U (en) Descending movable formwork demolishs auxiliary device based on it is convenient
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111130