CN102912766A - Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab - Google Patents

Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab Download PDF

Info

Publication number
CN102912766A
CN102912766A CN2012101333101A CN201210133310A CN102912766A CN 102912766 A CN102912766 A CN 102912766A CN 2012101333101 A CN2012101333101 A CN 2012101333101A CN 201210133310 A CN201210133310 A CN 201210133310A CN 102912766 A CN102912766 A CN 102912766A
Authority
CN
China
Prior art keywords
water
spray
dripping
concrete
spraying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101333101A
Other languages
Chinese (zh)
Inventor
罗伟林
李红燕
刘晓鹏
杰恩斯汗
牛尚峰
王从记
卿光辉
吕斌
金兴强
韩强
李耀东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG IRTYSH RIVER BASIN DEVELOPMENT ENGINEERING CONSTRUCTION ADMINISTRATION
Original Assignee
XINJIANG IRTYSH RIVER BASIN DEVELOPMENT ENGINEERING CONSTRUCTION ADMINISTRATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG IRTYSH RIVER BASIN DEVELOPMENT ENGINEERING CONSTRUCTION ADMINISTRATION filed Critical XINJIANG IRTYSH RIVER BASIN DEVELOPMENT ENGINEERING CONSTRUCTION ADMINISTRATION
Priority to CN2012101333101A priority Critical patent/CN102912766A/en
Publication of CN102912766A publication Critical patent/CN102912766A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a fully-enclosed spraying, dripping and irrigating maintenance device of a canal lining concrete slab, belonging to the field of hydraulic work. The fully-enclosed spraying, dripping and irrigating maintenance device comprises a spraying, dripping and irrigating pipeline, composite geomembranes, an adhesive tape and carpets, wherein the spraying, dripping and irrigating pipeline is arranged on an upper lining concrete slab of a canal roof; the composite geomembranes are covered on a canal slope lining concrete slab, a lower lining concrete slab and the spraying, dripping and irrigating pipeline; the adhesive tape is used for bonding the joints of the composite geomembranes; and the carpets are coated and covered on the upper and lower end parts of the composite geomembranes. The end part of every unit of the spraying, dripping and irrigating pipeline is separated by a valve or an end cap; and water outlet holes distributed at intervals are formed in the pipe body, and the spraying, dripping and irrigating pipeline is orderly communicated with a water inlet pipe, a water tank or a water-tank lorry. The positions of the spraying, dripping and irrigating pipeline, at both sides of the water inlet pipe, are provided with valves. By adopting the invention, an enclosed wet environment can be created within the maintenance period of the canal lining concrete slab, so that the desiccation crack of the concrete slab is effectively controlled, the increasing of the concrete intensity is guaranteed, and the maintenance quality is obviously improved. The device is simple and convenient to operate and manage, can save more than 80% of water, and lightens the labor intensity. The facility and materials are convenient and quick to dismount and transport, and can be recycled, therefore, the maintenance cost is reduced.

Description

The totally-enclosed spray drip irrigation of Concrete Lining of Canals plate curing means
Technical field
The totally-enclosed spray drip irrigation of Concrete Lining of Canals plate of the present invention curing means belongs to the water conservancy project field.
Background technology
Xeothermic windy, evaporation capacity is multiple times than the northern serious water shortage Gobi Desert Terrain area of amount of precipitation, long distance water transfer has that scale is large, circuit is long, water source point far and less, large, the slope maintenance of channel maintenance area can't water characteristics, the maintenance quality of Concrete Lining of Canals plate is determining the win or lose of water diversion project.
Following mode is mainly taked in the concrete maintenance of present domestic large channel:
Figure DEST_PATH_IMAGE002
Cover straw screen or mat, felt rug, the watering moisturizing: being traditional maintenance method, also is the major way that present domestic long distance water transfer adopts.Its strong point is that used straw screen or mat, felt rug material cost are relatively low, and defective is to sprinkle water at the inclination lining concrete plate face that covers straw screen or mat, felt rug, exists to be difficult for water conservation, maintenance effect is poor, concrete quality can't guarantee problem.Because long distance water transfer is implemented in the Gobi Desert Terrain area at northern serious water shortage, the channel of opening often dried up source point is far away.Because the overburden dehydration is very fast, for keeping the moistening continuously of concrete surface, just need to shorten the watering time interval, and the increase of water consumption, so that fortune water cost promotes greatly, the human and material resources of supporting input are showed increased also, and this method has been difficult to implement under the situation that current labor shortage labour cost increases.
2. curing film: two kinds of minute geomembrane or composite geo-membrane, water-saving moist keeping maintenance films.
Geomembrane or composite geo-membrane all are antiseepage functions of utilizing geomembrane, with concrete surface and air insulated with water-preserving curing.This maintenance method still needs regularly concrete surface watering moisturizing under the film, but to being laid on the maintenance geomembrane on thinner thickness, concrete canal lining plate surface that area is larger, the film end need to be used for holding one's breath during each watering and the windproof gland weight that blows afloat is removed and film is started, sprinkling water presses after complete again, has not only bothered the labour intensity but also large of taking a lot of work.The strong point of this mode is that the large geomembrane of used composite geo-membrane or thickness is reusable, and water retention property is better than straw screen or mat, felt rug.
Water-saving moist keeping maintenance film is that macromolecule water absorbent material take novel controlled 200 times of moisture that can absorb own wt is as core, take plastic sheeting as carrier, only need between curing time to water water one time when concrete surface is laid water-saving moist keeping maintenance film, concrete surface can remain moistening between curing time.But because material self thin thickness, very easily damaged and swept and ineffective by wind under xeothermic windy environment, this film can only disposablely use.
Figure DEST_PATH_IMAGE004
Curing agent: curing agent is to form the film that one deck seals at its external coating immediately after the concrete form removal or after the initial set, utilizing the moisture of inside concrete self to carry out maintenance, does not need watering between curing time.Curing agent is used for the inclined-plane or facade is more, do not have the building of disturbance after the brushing, and maintenance effect is relatively good.In the domestic market, the curing agent product is numerous, and quality is difficult to identify that its maintenance effect differs greatly.Curing agent will could form comparatively firm film after 24 ~ 36 hours in brushing at least according to temperature, and curing time also will be avoided contacting with sharp-pointed article with weight and destroys established closing membrane.And the lining canal concrete slab of long distance water transfer is finished by the big machinery laying, it is continuous large-area sheet bulk, produce the crack for preventing that plate from shrinking, build after finishing 10 ~ 36 hours according to temperature at concrete slab and must carry out the structural joint cutting, but should the time with the brushing curing agent after can carry out manual work time conflict mutually, cutting operation also is difficult to avoid the closing membrane that curing agent forms is caused local damage simultaneously, affects maintenance effect.Therefore, this method is not commonly used in long maintenance apart from water transfer large channel machinery lining cutting thin wall concrete plate.
In sum, these three kinds of maintenance patterns all are difficult to guarantee the maintenance quality of Concrete Lining of Canals plate.
Look into newly through retrieval, " Henan water conservancy and the south water to north " (4) periodical in 2011 has been sent out the paper " project of South-to-North water diversion Concrete Lining of Canals maintenance process pre-test " of Henan Province's water conservancy the second Li Liang of Engineering Bureau fine jade, Hu Xiang, it adopts 3 kinds of methods to carry out maintenance, be respectively: 1. natural curing method: namely cover geotextiles, the maintenance of then sprinkling water at concrete surface; 2. film covering curing method: namely after concrete surface spills one deck water, cover moisturizing with curing membrane immediately; 3. gunning concrete curing agent method of curing: namely carry out moisture-keeping maintaining at concrete surface spraying one deck curing agent.
Above-mentioned natural curing method is similar to felt rug, straw screen or mat tradition method of curing.Film covering curing method is same as the water-saving moist keeping maintenance film method of curing.Gunning concrete curing agent method of curing is same as the curing agent method of curing.
" planning for water resources development and design " (3) periodical in 2009 has been sent out the paper " application of drip irrigation zone in the maintenance of Bachu general main canal concrete slab " of the Kashi Area of Xingjiang Autonomous Region water conservancy and hydropower Han Xiu of surveying and designing institute, Liu Guoqiang, its method is: establish two of special water boxes 1., water tank can adopt waste and old oil truck repacking, and water tank places respectively on the canal dike of the left and right sides; 2. water tank upper is established one of inlet valve, directly connects water inlet pipe, or establishes a square aperture of 30cm at the top, conveniently adds water; 3. the water tank bottom sets out one of penstock, directly links to each other with plastic flexible pipe, beats Three-way pipe with snap fastener at plastic flexible pipe and links to each other with the drip irrigation zone, and according to temperature situation choose reasonable drip irrigation zone quantity, vertically lay along the canal dike drip irrigation zone; 4. after the drip irrigation zone installs, open water tank below flowing water Valve, the concrete curing water goes to the canal underflow with the drip irrigation zone.
The drip irrigation zone method of curing is the quantity of selecting the drip irrigation zone according to climatic condition, and vertically lay along channel the drip irrigation zone, thereby the maintenance water reaches the maintenance purpose at the bottom of flowing to canal along the drip irrigation zone.Its advantage is: the maintenance water consumption of more manually sprinkling water will lack, and water supply process is easy, has reduced labour intensity, can be evenly distributed on concrete surface when the maintenance of light section channel is supplied water, and maintenance effect is good.Shortcoming is: (1) does not form the long-term wet environment of supporting.Concrete surface is in the moist curing environment during cistern water supply, and the rear concrete surface of cutting off the water is in dry state very soon, without water curing.If curing time is wanted the concrete surface moisturizing, supply water and just can not be interrupted, so that water supply volume and quality monitoring workload are all larger.(2) be not suitable for the maintenance of large hydraulic engineering canal cross section.Owing to be furnished with longitudinal and transverse cutting seam on the liner plate, after maintenance was supplied water and run off along the cutting seam, the bottom concrete slab seldom or can not get the maintenance water; If such as artificial cast in place concrete plate, relatively poor because of planeness, the maintenance water is difficult to be evenly distributed on the concrete slab surface.(3) because cistern water supply will have certain head that pressure is just arranged, plastic flexible pipe adds the drip irrigation zone and supplies water apart from limited, and the water tank input amount is large.
Zhengzhou No.1 Construction Engineering Co., Ltd. is 201020184139.3 in the patent No. of 2010.5.10 application, denomination of invention is the utility model patent of " applying date concrete automatic drip-irrigation curing means ", is comprised of booster body, controlling organization, hydraulic pipeline, a certain number of mini sprinkler.The water inlet of booster body is communicated with the water source, the delivery port of booster body is communicated with the water inlet of hydraulic pipeline by water-main, the delivery port of hydraulic pipeline is communicated with a certain number of mini sprinkler, controlling organization contains controller, flow meter, pressure meter, controller contains microprocessor, digital to analog converter, analog-digital converter, booster body contains booster pump, the output of digital to analog converter is connected with booster pump, flow meter, pressure meter is installed on the water-main, flow meter, manometric output signal enters the input of analog-digital converter, and the output of analog-digital converter is connected with the input of microprocessor.
China Construction. Third Engineering Bureau Corp., Ltd.) is 201120012944.2 in the patent No. of 2011.1.17 application, denomination of invention is the utility model patent of " a kind of Novel concrete curing device ", this device sidewall is provided with some weep holes, weep hole is in the same level face, be positioned at the device lower sidewall, weep hole evenly distributes.The device top is provided with cover plate, and the bottom fixed connecting piece is fixed on by connector on the end face of concrete component, and angle iron connecting piece is bolted on the end face of concrete component.
Above-mentioned two patents all belong to the apparatus for concrete member curing device, maintenance is dripped in the spray of all adopting automation control to supply water, do not form with independently wetting of atmospheric isolation at concrete surface and support environment, be not suitable for the maintenance large channel machinery lining concrete plate of cast-in-site in the open air, only be adapted at the usefulness that maintenance is done in the concrete component field.
Summary of the invention
The object of the invention is to propose a kind of xeothermic windy, evaporation capacity is greater than the water shortage in north china Gobi Desert Terrain area of amount of precipitation, grow apart from water transfer, adopt large channel concrete placer cast lining concrete plate, the wet environment of supporting of sealing was provided for its curing time, the assurance concrete strength increases, it is simple and direct to supply water, and the water saving material-saving reduces maintenance cost, reduce labor intensity, obviously improve the totally-enclosed spray drip irrigation of the Concrete Lining of Canals plate curing means of maintenance quality.
The object of the present invention is achieved like this: the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate curing means forms by supplying water and covering two parts, water supply part by the spray droping irrigating pipe on the upper lining concrete plate that is laid in canal top place, with spray water inlet pipe, the mobile water tank that droping irrigating pipe sequentially is communicated with and form, the spray droping irrigating pipe is laid along the channel trend, each unit pipe end is separated by valve or plug, have the weep hole that is intervally arranged in canal on the body, be equiped with respectively valve on the spray droping irrigating pipe of water inlet pipe both sides.The cover part is by covering canal slope lining concrete plate, lower lining concrete plate and spray droping irrigating pipe OnThe adhesive tape, the felt rug that parcel covers the upper and lower end of composite geo-membrane of composite geo-membrane, bonding each piece composite geo-membrane seam form.
The applicant 112 kilometers long of approach channel road, In Altay, xinjiang west water east engineerings apart from large-sized water transfer project in, use this device and maintenance process, actual results of measuring is as follows: maintenance length is 300 m, area is 4200m 2The Concrete Lining of Canals plate, supplied water once water 10m in per two days 3Can keep 48 hours moistening continuously.Save the maintenance water and can reach more than 80%, water head site efficiency-cost ratio far away is higher.Composite geo-membrane 4 turnovers use 6 times cost just identical with felt rug, and turnover is used more than 6 times, and use cost will further reduce.
The cost contrast table
Figure DEST_PATH_IMAGE006
Because dripping, spraying alternately and feed water in Concrete Lining of Canals plate surface coverage composite geo-membrane and spray drip irrigation pipe, just guaranteed that maintenance water supply can be distributed to this plate surface very equably, and the impact of not cut seam, within curing time, built the wet environment of supporting of sealing, humidity under the film and test room's maintain humidity are basic identical, the random shrinkage crack that produces is effectively controlled so that the Concrete Lining of Canals plate early-age plastic stage scatters and disappears owing to moisture is too early, the concrete strength growth is guaranteed, and maintenance quality obviously improves.This device operational administrative is easy, and water saving reduces labor intensity more than 80%.Used facility, material dismounting and transporting are convenient, can reuse, and maintenance cost reduces, and are easy to promote.
Description of drawings: concrete structure of the present invention is provided by following drawings and Examples:
Fig. 1 is spray droping irrigating pipe, channel, lining concrete Board position schematic diagram;
Fig. 2 is the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate curing means structural representation;
Fig. 3 is spray droping irrigating pipe water supply block construction schematic diagram;
Fig. 4 is spray droping irrigating pipe water system structural representation.
Legend: 1, Qu Ding, 2, upper lining concrete plate, 3, the spray droping irrigating pipe, 4, canal slope lining concrete plate, 5, water inlet pipe, 6, valve, 7, weep hole, 8, the cutting seam, 9, at the bottom of the canal, 10, lower lining concrete plate, 11, felt rug, 12, adhesive tape, 13, composite geo-membrane, 14, plug.
The specific embodiment:
The present invention is not subjected to the restriction of following embodiment, can determine concrete embodiment according to technical scheme of the present invention and actual conditions.
Embodiment: shown in Fig. 1-4, the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate curing means forms by supplying water and covering two parts, water supply part is comprised of the spray droping irrigating pipe 3 on the upper lining concrete plate 2 that is laid in canal and pushes up 1 place, the water inlet pipe 5, the mobile water tank that are communicated with spray droping irrigating pipe 3 orders, spray droping irrigating pipe 3 is laid along the channel trend, each unit pipe end is separated by valve 6 or plug 14, have the weep hole that is intervally arranged 7 in canal on the body, be equiped with respectively valve 6 on the spray droping irrigating pipe 3 of water inlet pipe 5 both sides.The cover part is by covering canal slope lining concrete plate 4, lower lining concrete plate 10 and spray droping irrigating pipe 3 OnThe adhesive tape 12, the felt rug 11 that parcel covers composite geo-membrane 13 upper and lower ends of composite geo-membrane 13, bonding each piece composite geo-membrane 13 seam form.
Shown in Fig. 1-3, spray droping irrigating pipe 3 per 10-200m length are a water supply line unit, each unit pipe end is separated by valve 6 or plug 14, have the weep hole that is intervally arranged 7 in canal on the body, spray droping irrigating pipe 3 is communicated with water inlet pipe 5, is equiped with respectively valve 6 on the spray droping irrigating pipe 3 of water inlet pipe 5 both sides.
As shown in Figure 4, can two or more water supply lines unit is continuous, form the piped water supply system, only need two mouths of pipe valve 6 or plug 14 shutoff with spray droping irrigating pipe 3 outermost end, two spray droping irrigating pipe 3 joints link to each other with valve 6 and get final product.
Composite geo-membrane 13 is a cloth one film, and it is by 200g/m 2The knitting nonwoven of short fiber and the sealed polyethylene plastic heat of thick 0.2mm be composited.Per two adjacent composite geo-membrane 13 seam crossings are stained with adhesive tape 12, and composite geo-membrane 13 upper and lower end parcels are coated with felt rug 11.
Device enforcement order: operation channel concrete casting machine is poured into a mould, behind Qu Po and the lower lining concrete plate 2,4,10, on upper lining concrete plate, lay spray droping irrigating pipe 3 along the channel trend, Qu Po, lower lining concrete plate 2,4 and spray droping irrigating pipe 3 cover composite geo-membranes 13, one of sealed polyethylene plastic is faced down.The upper/lower terminal of composite geo-membrane 4 is laid in respectively 9 places at the bottom of canal top 1 and the canal, with behind felt rug 6 its two ends of parcel with weight glands such as stones.Per two adjacent composite geo-membrane 13 seam crossings are bonding with adhesive tape 12, scatter and disappear to prevent water vapour, prolong the water conservation time.When 20-38 ℃ of hot weathers, maintenance face supplied water once in per 1-2 days.Near canal top 1 mobile water tank is set, water tank is communicated with water inlet pipe 5.Also the water pot of water-tank lorry directly can be connected with water inlet pipe 5.Water from weep hole 7 ejections evenly is sprayed on the sealed polyethylene plastic of composite geo-membrane 13, because this film is close to, Qu Po and lower lining concrete plate 2,4,10, Gu Shui is along the concrete slab surface slowly flows to canal under film at the bottom of, for concrete slab provides sealing in its curing time
The wet environment of supporting has guaranteed the growth of concrete strength.The water yield of weep hole 7 can be regulated by the valve 6 of water inlet pipe 5 both sides, realizes spray, drips two kinds for water state.Produce behind the cutting seam 8 channel concrete casting machines cast lining concrete plate.Composite geo-membrane 13 is the commercially available prod.
Curing time, rolled composite geo-membrane 13 after finishing, and pulls down water inlet pipe 5, valve 6, plug 14, is transported to next canal section for the treatment of maintenance together with spray droping irrigating pipe 3, mobile water tank.
Above technical characterictic has consisted of most preferred embodiment of the present invention, and it has stronger compliance and best implementation result, can increase and decrease according to actual needs inessential technical characterictic, satisfies the needs of different situations.

Claims (4)

1. the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate curing means, form by supplying water and covering two parts, it is characterized in that: water supply part by the spray droping irrigating pipe on the upper lining concrete plate that is laid in canal top place, with spray water inlet pipe, the mobile water tank that droping irrigating pipe sequentially is communicated with and form, the spray droping irrigating pipe is laid along the channel trend, each unit pipe end is separated by valve or plug, have the weep hole that is intervally arranged in canal on the body, be equiped with respectively valve on the spray droping irrigating pipe of water inlet pipe both sides; The cover part is by covering canal slope lining concrete plate, lower lining concrete plate and spray droping irrigating pipe OnThe adhesive tape, the felt rug that parcel covers the upper and lower end of composite geo-membrane of composite geo-membrane, bonding each piece composite geo-membrane seam form.
2. the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate as claimed in claim 1 curing means is characterized in that: the per 10-200m length of spray droping irrigating pipe is a water supply line unit.
3. the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate as claimed in claim 1 curing means, it is characterized in that: the piped water supply system is connected to form by two or more water supply lines unit, that two spray droping irrigating pipe joints are linked to each other with valve, with two mouths of pipe of this pipeline outermost end with valve or plug shutoff.
4. the totally-enclosed spray drip irrigation of Concrete Lining of Canals plate as claimed in claim 1 curing means, it is characterized in that: the felt rug upper press cover has weight.
CN2012101333101A 2012-05-03 2012-05-03 Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab Pending CN102912766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101333101A CN102912766A (en) 2012-05-03 2012-05-03 Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101333101A CN102912766A (en) 2012-05-03 2012-05-03 Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab

Publications (1)

Publication Number Publication Date
CN102912766A true CN102912766A (en) 2013-02-06

Family

ID=47611316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101333101A Pending CN102912766A (en) 2012-05-03 2012-05-03 Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab

Country Status (1)

Country Link
CN (1) CN102912766A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887883A (en) * 2016-04-18 2016-08-24 新疆额尔齐斯河流域开发工程建设管理局 Large-plane thin-layer concrete mechanical construction method
CN107151954A (en) * 2017-06-24 2017-09-12 中铁十局集团第二工程有限公司 A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting
CN108999094A (en) * 2018-10-17 2018-12-14 中铁六局集团广州工程有限公司 Bridge pier conservation layer and bridge pier pier shaft insured's cloth conserve engineering method
CN110486035A (en) * 2019-07-30 2019-11-22 中交第一航务工程局有限公司 A kind of shield machine working shaft lining wall trickle irrigation maintenance process
CN114474435A (en) * 2021-12-24 2022-05-13 中国船舶重工集团应急预警与救援装备股份有限公司 Underwater cutting equipment
CN114718001A (en) * 2022-05-07 2022-07-08 张成海 Municipal administration frozen pavement cleaning device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090012296A (en) * 2008-12-30 2009-02-03 한민섭 Concrete structures and stone structures with ecological pathways to restore natural ecosystems
CN201669782U (en) * 2010-05-10 2010-12-15 郑州市第一建筑工程集团有限公司 Concrete automatic drip irrigation and maintenance device
CN202595705U (en) * 2012-05-03 2012-12-12 新疆额尔齐斯河流域开发工程建设管理局 Large-sized channel lining concrete enclosed curing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090012296A (en) * 2008-12-30 2009-02-03 한민섭 Concrete structures and stone structures with ecological pathways to restore natural ecosystems
CN201669782U (en) * 2010-05-10 2010-12-15 郑州市第一建筑工程集团有限公司 Concrete automatic drip irrigation and maintenance device
CN202595705U (en) * 2012-05-03 2012-12-12 新疆额尔齐斯河流域开发工程建设管理局 Large-sized channel lining concrete enclosed curing device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨晏: "赵湾灌区渠道防渗措施分析", 《河南水利与南水北调》 *
韩秀等: "滴灌带在巴楚总干渠混凝土板养护中的应用", 《水利规划与设计》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887883A (en) * 2016-04-18 2016-08-24 新疆额尔齐斯河流域开发工程建设管理局 Large-plane thin-layer concrete mechanical construction method
CN107151954A (en) * 2017-06-24 2017-09-12 中铁十局集团第二工程有限公司 A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting
CN108999094A (en) * 2018-10-17 2018-12-14 中铁六局集团广州工程有限公司 Bridge pier conservation layer and bridge pier pier shaft insured's cloth conserve engineering method
CN110486035A (en) * 2019-07-30 2019-11-22 中交第一航务工程局有限公司 A kind of shield machine working shaft lining wall trickle irrigation maintenance process
CN114474435A (en) * 2021-12-24 2022-05-13 中国船舶重工集团应急预警与救援装备股份有限公司 Underwater cutting equipment
CN114474435B (en) * 2021-12-24 2023-11-03 中国船舶重工集团应急预警与救援装备股份有限公司 Underwater cutting equipment
CN114718001A (en) * 2022-05-07 2022-07-08 张成海 Municipal administration frozen pavement cleaning device

Similar Documents

Publication Publication Date Title
CN102912766A (en) Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab
CN208981168U (en) A kind of bridge pier abutment body intelligent spray curing system
CN105104010B (en) Water and fertilizer automatic irrigation greening wall
CN203937012U (en) A kind of concrete wet curing device
CN107060226A (en) A kind of construction method of planted roof construction
CN205893924U (en) Full automatic spray maintenance system of pier concrete
CN204888240U (en) Gardens hydrologic cycle irrigation equipment
CN106677441A (en) Gardening plant module technology suitable for roof garden rainwater storage and supply
CN104831873B (en) Compound drainage intelligence inversion formula rigid roof that holds
CN204335474U (en) For the energy-saving environmental-protection roots infiltrating irrigation blanket of roof greening
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN207461064U (en) Arid area arbor integration irrigation system
CN108605819A (en) Green intelligent is without electric power storage subirrigation system
CN202595705U (en) Large-sized channel lining concrete enclosed curing device
CN102375421A (en) Solar energy and wind energy golf course automatic water-saving sprinkling irrigation control system
CN113186945A (en) Intelligent maintenance system and method for ecological slope protection
Xiaochu et al. Engineering quality control of solar-powered intelligent water-saving irrigation
CN206101172U (en) Solar energy type roof greening water -saving irrigation system
CN204168847U (en) Nano ceramics micro-seeping irrigation device
CN208965377U (en) A kind of high temperature and drought area road maintenance system
CN113605173B (en) Sponge football field integral solution method
CN206181995U (en) Embedded automatic irrigation system
CN212520286U (en) Water storage and saving structure for greenbelt lawn
CN212896695U (en) Artificial lawn water storage device for sponge city
CN210168641U (en) Full-automatic efficient irrigation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130206