CN107151954A - A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting - Google Patents
A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting Download PDFInfo
- Publication number
- CN107151954A CN107151954A CN201710489725.5A CN201710489725A CN107151954A CN 107151954 A CN107151954 A CN 107151954A CN 201710489725 A CN201710489725 A CN 201710489725A CN 107151954 A CN107151954 A CN 107151954A
- Authority
- CN
- China
- Prior art keywords
- track bed
- crts iii
- geotextiles
- bed plates
- unballasted track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 28
- 239000004746 geotextile Substances 0.000 claims abstract description 26
- 238000012423 maintenance Methods 0.000 claims abstract description 23
- 239000012528 membrane Substances 0.000 claims abstract description 23
- 238000004078 waterproofing Methods 0.000 claims abstract description 23
- 239000004567 concrete Substances 0.000 claims abstract description 17
- 230000003020 moisturizing effect Effects 0.000 claims abstract description 9
- 239000012634 fragment Substances 0.000 claims description 8
- 239000003245 coal Substances 0.000 claims description 4
- 239000011148 porous material Substances 0.000 claims description 4
- 239000004575 stone Substances 0.000 claims description 4
- 238000001723 curing Methods 0.000 abstract description 12
- 238000012407 engineering method Methods 0.000 abstract description 2
- 238000003973 irrigation Methods 0.000 abstract description 2
- 230000002262 irrigation Effects 0.000 abstract description 2
- 230000007774 longterm Effects 0.000 abstract description 2
- 239000010410 layer Substances 0.000 description 9
- 238000010276 construction Methods 0.000 description 6
- 239000010426 asphalt Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 230000018044 dehydration Effects 0.000 description 2
- 238000006297 dehydration reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/005—Making of concrete parts of the track in situ
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B40/00—Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
- C04B40/02—Selection of the hardening environment
- C04B40/0277—Hardening promoted by using additional water, e.g. by spraying water on the green concrete element
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/09—Ballastless systems
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/10—Making longitudinal or transverse sleepers or slabs in situ or embedding them
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Health & Medical Sciences (AREA)
- Toxicology (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The present invention fills curing means for a kind of drop supercharging of type unballasted track bed plates of CRTS III and fills the method for supporting, covered with one layer of geotextiles on the type unballasted track bed plates of CRTS III, one layer of waterproofing membrane is laid in geotextiles again, the water storage wherein on the waterproofing membrane above groove, a plurality of branch's dropper pipeline is provided between waterproofing membrane and geotextiles, a plurality of branch's dropper pipeline extends to the both sides of the type unballasted track bed plates of CRTS III, and is connected to water tank by main line;Booster pump, and passage time Control are additionally provided with main line;Pressurization is carried out to branch's dropper pipeline and send water, water is flowed out, penetrated into maintenance geotextiles;Wherein mean temperature is between 30 degrees Celsius of daytime, and watering is typically needed 3 ~ 4 times;Night typically needs that the moisturizing state of full maintenance processes can be met 1 ~ 2 time.Drip irrigation maintenance engineering method is pressurized on the basis of original concrete curing method is combined, by improving water system and Water-retaining Measure, to realize the long-term moisturizing state of concrete.
Description
Technical field
The present invention relates to the maintenance of unballasted track bed plate, the specifically a kind of type unballasted track bed plates of CRTS III drop supercharging
Fill curing means and fill the method for supporting.
Background technology
The plate-type non-fragment orbits of CRTS II are to be laid on precast track plate now by cement emulsified asphalt mortar adjustment layer
In the concrete support layer or the reinforced concrete footing of cast-in-place post that field paves, and adapt to the vertical of ZPW-2000 track circuit requirements
Linking-board type ballastless track structure form.
Its main technical requirements:
1. track plates width is 2550mm, thickness is 200mm, and standard gauge guidance tape length is the 6450mm, (compensation of heterotypic rail guidance tape
Plate) length is according to specific laying paragraph reasonable disposition.Track plates should be met using C55 grades of concrete《Passenger dedicated railway line
CRTS II plate-type non-fragment orbit concrete railway board (having shoulder block) provisional technical conditions》(scientific and technological base [2008] 173) will
Ask.
2. mortar adjustment layer design thickness is 30mm, and should be met《The plate-type non-fragment orbits of passenger dedicated railway line CRTS II
The provisional technical conditions of cement emulsified asphalt mortar》(scientific and technological base [2008] 74) requirement.
3. supporting course top surface width is 2950mm, bottom width is 3250mm, and thickness is 300mm, and should be met《Passenger traffic
The provisional technical conditions of special line railway ballastless track supporting course》(scientific and technological base [2008] 74) requirement.
4. for the concrete structure in rail system, in terms of the selected of material, construction technology and durability measure
According to《Railway concrete durability design of structure temporary provisions》(iron construction [2005] 157) and " on issue《Railway is mixed
Xtah Crude Clay structure durability Design temporary provisions》Deng the notice of two Environment in Railway Engineering Construction standard partial revision provisions " etc. specification hold
OK.
5. superrelation on curve is set on subgrade bed top layer.
6. rail system should set waterproof and water drainage system of good performance.Straight line location is adopted using two row drainings, 3 in Curve Segment
With three row drainings.
Left and right line bearing interlayer fills mineral compound, and its top surface uses C25 Concrete Filleds.Along fill concrete
Expansion joint laterally is respectively provided with every 5m between road longitudinal direction and track plates and along circuit, using fill asphalt method.Supporting course on the outside of track
Surface and road bed are surface-treated using emulsified asphalt.
Above-mentioned technical requirements need to set up on the basis of relatively good maintenance, wherein in traditional concrete curing, typically
Using geotextiles covering watering maintenance, or using film covering watering maintenance.But, conventional concrete curing method, which exists, to be permitted
Many shortcomings, it is difficult to reach the high standards that construction unit conserves on the plate-type unballasted track bed plates of CRTS III, display is such as
Under:
(1)Technique is outmoded, and standard is relatively low
Routine, which covers cloth maintenance or peritonaeum maintenance, needs someone's whole process to carry out spray water curing, because artificial treatment occupies leading, supports
The level of shield is uneven, and efficiency of construction is very low, it is necessary to take a substantial amount of time.In practical operation, occur unavoidably
Maintenance speed does not catch up with situations such as moisture evaporation speed, workman are slacked off, and dehydration is ftractureed during causing bedplate concrete curing,
It is difficult in adapt to the maintenance construction requirement of existing high standard.
(2)Water resource waste is more serious
In work progress, due to needing bedplate being chronically at moisturizing state, it is necessary to supplement water before dehydration inside covering.
And plastic sheeting water-holding capacity is poor, it is difficult to realize and continue moisturizing, it is necessary to continuously water;Geotextiles water-holding capacity is slightly strong, and summer waves
Hair speed is exceedingly fast, it is also desirable to substantial amounts of water resource;The two is combined in time, is manually needed when being sprinkled water by film and geotextiles
Separate, cause to conserve inefficiency.
(3)Automaticity is low
Whole process maintenance is required to artificial progress, and labor intensive is huge, it is impossible to the requirement of high-volume factory operation is met, while night
Between maintenance be very difficult to monitoring.
The content of the invention
The present invention by the type unballasted track bed plates of CRTS III in order to reach technical requirements, and spy proposes a kind of types of CRTS III without the tiny fragments of stone, coal, etc.
The drop supercharging of rail bed plate fills curing means and fills the method for supporting.
For this technical scheme is that, a kind of drop supercharging of type unballasted track bed plates of CRTS III fills curing means, bag
The type unballasted track bed plates of CRTS III are included, the type unballasted track bed plates of CRTS III are provided with groove, it is characterised in that:The types of CRTS III
Covered with one layer of geotextiles on unballasted track bed plate, one layer of waterproofing membrane is laid again in geotextiles, wherein on groove
Water storage on waterproofing membrane, and it is provided with sandbag in the waterproofing membrane both sides pressure of the type unballasted track bed plates of CRTS III;
A plurality of branch's dropper pipeline is provided between waterproofing membrane and geotextiles, a plurality of branch's dropper pipeline is to the types of CRTS III without the tiny fragments of stone, coal, etc.
The both sides extension of rail bed plate, and water tank is connected to by main line.
Further improve is:Booster pump, and passage time Control are additionally provided with main line.
Further improve is:The main line is made of φ 40mm PCV pipes, and a plurality of branch's dropper pipeline is used
φ 25mm PCV pipes are made.
Further improve is:The PCV pipelines of the φ 25mm, provided with a φ 3mm hole, are formed and divided at interval of 500mm
Branch dropper pore.
A kind of type unballasted track bed plates of CRTS III drop supercharging fills foster method, it is characterised in that:In the types of CRTS III without the tiny fragments of stone, coal, etc.
The concreting of rail bed plate completes and after final set, adds waterproofing membrane to cover using geotextiles concrete surface first
Lid;
Secondth, the pvc pipe of φ 25mm branches dropper pipeline is arranged in parallel between geotextiles and waterproofing membrane according to four roads, point
Branch dropper pipe ends are led to main line and are connected with booster pump, the time relay;
3rd, after the time relay starts, main line two ends booster pump starts simultaneously, and carrying out pressurization to branch's dropper pipeline send
Water, flows out water, penetrates into maintenance geotextiles;Wherein mean temperature is between 30 degrees Celsius of daytime, and watering is typically needed 3 ~ 4 times;Night
Between typically need to meet the moisturizing state of full maintenance processes 1 ~ 2 time.
Beneficial effect:
Due to carrying out supercharging dropper maintenance to the type unballasted track bed plates of CRTS III using a plurality of branch's dropper pipeline in the present invention,
Drip irrigation maintenance engineering method is pressurized on the basis of original concrete curing method is combined, by improving water system and Water-retaining Measure,
To realize the long-term moisturizing state of concrete.
Booster pump and passage time Control, without ensure that pressure can also safely may be used by the monitoring of intelligence
Lean on.
Main line is made of φ 40mm PCV pipes, and a plurality of branch's dropper pipeline is made of φ 25mm PCV pipes, is taken
Material is convenient, while the setting of pore, it is ensured that the uniformity of pressure and flowing water.
The present invention is due to waterproofing membrane covering, while the moisture loss in geotextiles is slower, can be effectively aqueous, by setting
Set the interval time of the time relay, automatic start is supplemented the moisture in conservation layer, automatic maintenance can be reached
Effect.
Found by test data, mean temperature is between 30 degrees Celsius of daytime, and watering is typically needed 3 ~ 4 times;Night typically needs 1
The moisturizing state of full maintenance processes can be met ~ 2 times.
Brief description of the drawings
Fig. 1 is the front view structure sectional view of the present invention.
Fig. 2 is the schematic top plan view of the present invention.
Fig. 3 is the schematic flow sheet of the present invention.
1 is the type unballasted track bed plates of CRTS III in figure, and 2 be groove, and 3 be geotextiles, and 4 be waterproofing membrane, and 5 be water storage, 6
It is dropper pipeline, 7 be main line, and 8 be water tank, and 9 be booster pump, and 10 be the time relay, and 11 be sandbag.
Embodiment
The present invention is as shown in Fig. 1/2/3.
A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means, including the type unballasted track bed plates of CRTS III
1, CRTS III type unballasted track bed plate 1 is provided with groove 2, the type unballasted track bed plates 1 of CRTS III covered with one layer of geotechnique
One layer of waterproofing membrane 4 is laid in cloth 3, geotextiles 3 again, wherein water storage 5 on the waterproofing membrane 4 on groove 2, and in CRTS III
The both sides of waterproofing membrane 4 pressure of type unballasted track bed plate 1 is provided with sandbag 11;
A plurality of branch's dropper pipeline 6 is provided between waterproofing membrane 4 and geotextiles 3, a plurality of branch's dropper pipeline 6 is to the types of CRTS III
The both sides extension of unballasted track bed plate 1, and water tank 8 is connected to by main line 7.
Booster pump 9 is additionally provided with main line 7, and passage time relay 10 is controlled.
Main line 7 is made of φ 40mm PCV pipes, and a plurality of branch's dropper pipeline 6 is made of φ 25mm PCV pipes.
The PCV pipelines of the φ 25mm, provided with a φ 3mm hole, form branch's dropper pore at interval of 500mm.
A kind of type unballasted track bed plates of CRTS III drop supercharging fills foster method, in the type unballasted track bed plates 1 of CRTS III
Concreting complete and after final set, concrete surface is covered using geotextiles 3 plus waterproofing membrane first;
Secondth, by the pvc pipe of φ 25mm branches dropper pipeline 6 according to four roads be arranged in parallel in geotextiles 3 and waterproofing membrane 4 it
Between, the two ends of branch's dropper pipeline 6 lead to main line 7 and are connected with booster pump 9, the time relay 10;
3rd, after the time relay 10 starts, the two ends booster pump 9 of main line 7 starts simultaneously, and branch's dropper pipeline 6 is carried out
Water is sent in pressurization, flows out water, is penetrated into maintenance geotextiles 3;Wherein mean temperature between 30 degrees Celsius of daytime, watering typically need 3 ~
4 times;Night typically needs that the moisturizing state of full maintenance processes can be met 1 ~ 2 time.
Claims (5)
1. a kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means, including the type unballasted track bed plates of CRTS III,
The type unballasted track bed plates of CRTS III are provided with groove, it is characterised in that:Covered with one on the type unballasted track bed plates of CRTS III
One layer of waterproofing membrane is laid again in layer geotextiles, geotextiles, wherein the water storage on the waterproofing membrane above groove, and in CRTS III
The waterproofing membrane both sides pressure of type unballasted track bed plate is provided with sandbag;
A plurality of branch's dropper pipeline is provided between waterproofing membrane and geotextiles, a plurality of branch's dropper pipeline is to the types of CRTS III without the tiny fragments of stone, coal, etc.
The both sides extension of rail bed plate, and water tank is connected to by main line.
2. the type unballasted track bed plates of a kind of CRTS III drop supercharging according to claim 1 fills curing means, its feature exists
In:Booster pump, and passage time Control are additionally provided with main line.
3. the type unballasted track bed plates of a kind of CRTS III drop supercharging according to claim 1 or 2 fills curing means, its feature
It is:The main line is made of φ 40mm PCV pipes, and a plurality of branch's dropper pipeline is made of φ 25mm PCV pipes.
4. the type unballasted track bed plates of a kind of CRTS III drop supercharging according to claim 3 fills curing means, its feature exists
In:The PCV pipelines of the φ 25mm, provided with a φ 3mm hole, form branch's dropper pore at interval of 500mm.
5. a kind of type unballasted track bed plates of CRTS III drop supercharging fills the method for supporting, it is characterised in that:In the type non-fragment orbits of CRTS III
The concreting of bedplate completes and after final set, adds waterproofing membrane to cover using geotextiles concrete surface first;
Secondth, the pvc pipe of φ 25mm branches dropper pipeline is arranged in parallel between geotextiles and waterproofing membrane according to four roads, point
Branch dropper pipe ends are led to main line and are connected with booster pump, the time relay;
3rd, after the time relay starts, main line two ends booster pump starts simultaneously, and carrying out pressurization to branch's dropper pipeline send
Water, flows out water, penetrates into maintenance geotextiles;Wherein mean temperature is between 30 degrees Celsius of daytime, and watering is typically needed 3 ~ 4 times;Night
Between typically need to meet the moisturizing state of full maintenance processes 1 ~ 2 time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710489725.5A CN107151954A (en) | 2017-06-24 | 2017-06-24 | A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710489725.5A CN107151954A (en) | 2017-06-24 | 2017-06-24 | A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107151954A true CN107151954A (en) | 2017-09-12 |
Family
ID=59796407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710489725.5A Pending CN107151954A (en) | 2017-06-24 | 2017-06-24 | A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107151954A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371767A (en) * | 2018-11-10 | 2019-02-22 | 中铁五局集团有限公司 | A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS- |
CN109930848A (en) * | 2019-03-19 | 2019-06-25 | 中铁十八局集团有限公司 | A kind of Self-watering curing means and its application |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201669782U (en) * | 2010-05-10 | 2010-12-15 | 郑州市第一建筑工程集团有限公司 | Concrete automatic drip irrigation and maintenance device |
CN102912766A (en) * | 2012-05-03 | 2013-02-06 | 新疆额尔齐斯河流域开发工程建设管理局 | Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab |
CN104369262A (en) * | 2013-08-12 | 2015-02-25 | 中铁二局股份有限公司 | Concrete curing method for Gobi environments |
-
2017
- 2017-06-24 CN CN201710489725.5A patent/CN107151954A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201669782U (en) * | 2010-05-10 | 2010-12-15 | 郑州市第一建筑工程集团有限公司 | Concrete automatic drip irrigation and maintenance device |
CN102912766A (en) * | 2012-05-03 | 2013-02-06 | 新疆额尔齐斯河流域开发工程建设管理局 | Fully-enclosed spraying, dripping and irrigating maintenance device of canal lining concrete slab |
CN104369262A (en) * | 2013-08-12 | 2015-02-25 | 中铁二局股份有限公司 | Concrete curing method for Gobi environments |
Non-Patent Citations (1)
Title |
---|
许彦辉: ""风沙干燥地区无砟道床纤维混凝土抗裂性能研究",许彦辉,《科技创新导报》,第33期,第42页-第43页", 《科技创新导报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371767A (en) * | 2018-11-10 | 2019-02-22 | 中铁五局集团有限公司 | A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS- |
CN109930848A (en) * | 2019-03-19 | 2019-06-25 | 中铁十八局集团有限公司 | A kind of Self-watering curing means and its application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108194136B (en) | Lining construction method | |
CN106013259B (en) | Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather | |
CN101906768B (en) | Panel construction method of concrete faced rock-fill dam | |
CN101985882B (en) | Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel | |
CN204357484U (en) | The drainage system of anti-tunnel invert constuction joint infiltration | |
CN106988164A (en) | Platy ballastless track structure and its construction method | |
CN110080530B (en) | Anchoring construction method for glazed tile slope roof in severe cold region | |
CN104775833A (en) | Cold region tunnel anti-freezing insulation system and anti-freezing insulation construction method | |
CN202560320U (en) | Frost-damage preventing drainage system for tunnels | |
CN110878700A (en) | Tunnel waterproof structure and construction method thereof | |
CN203049610U (en) | Road cutting pile-plank trough type retaining wall structure for railway rich water area | |
CN102808418A (en) | Firm structure for preventing and controlling freeze-thaw collapse of side slope in cold region and construction method for firm structure | |
CN102776897A (en) | Wash apron anti-settling anti-cracking construction method and structure | |
CN103061230A (en) | Construction method of technology utilizing ground source heat pump to cool and melt frozen road surfaces and drain boards for construction | |
CN107151954A (en) | A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting | |
CN206204901U (en) | A kind of accurate heating and anti-freezing anti-seepage channel | |
CN202706060U (en) | Waterproof structure for base plate deformation joint with width of 50 mm | |
CN111270566A (en) | Railway roadbed drainage device, repair structure and slurry-turning mud-pumping remediation method | |
CN203161256U (en) | Large-span swelling rock tunnel system in severe cold area | |
CN202627166U (en) | Novel water-discharging ecological zone for town road | |
CN203821189U (en) | Through cut sewer drainage antifreezing system based on existing railway operation condition | |
CN206521696U (en) | A kind of bridge drainage system | |
CN203487418U (en) | Subgrade surface reinforcement waterproof structure of ballastless track high speed railway | |
CN102367735A (en) | Back-to-back waterstop installation equipment for tunnel construction joint | |
CN206815113U (en) | A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170912 |