CN101985882B - Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel - Google Patents

Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel Download PDF

Info

Publication number
CN101985882B
CN101985882B CN2010102512241A CN201010251224A CN101985882B CN 101985882 B CN101985882 B CN 101985882B CN 2010102512241 A CN2010102512241 A CN 2010102512241A CN 201010251224 A CN201010251224 A CN 201010251224A CN 101985882 B CN101985882 B CN 101985882B
Authority
CN
China
Prior art keywords
construction
concrete
tunnel
waterproof
preliminary bracing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102512241A
Other languages
Chinese (zh)
Other versions
CN101985882A (en
Inventor
郭朋超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN2010102512241A priority Critical patent/CN101985882B/en
Publication of CN101985882A publication Critical patent/CN101985882A/en
Application granted granted Critical
Publication of CN101985882B publication Critical patent/CN101985882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a construction method of a rigid primary support of mould-building concrete of a plateau permafrost tunnel. The method comprises the following steps: 1. measuring and paying off; 2. tunnel excavation and construction: excavating by utilizing a full face excavation method; 3. construction of the rigid primary support of the mould-building concrete: erecting a grille steel frame, applying an anchor rod, hanging a reinforced mesh and pouring concrete with an initial lining trolley, namely constructing the primary support of the tunnel by utilizing a bolt-mesh-shotcreting-grouting combined support method; 4. laying of a waterproof and thermal insulation layer: laying the waterproof and thermal insulation layer on the completely constructed rigid primary support of the mould-building concrete; and 5. secondary lining construction: carrying out secondary lining construction on the laid waterproof and thermal insulation layer. The construction method has the advantages of rational design, low cost, high engineering quality and fast construction speed, is convenient in construction, effectively ensures the construction safety and quality, and simultaneously ensuresthat the completely constructed plateau permafrost tunnel has excellent water resistance and drainage functions, excellent thermal insulation function, long service life, low maintenance cost and lowlater-stage rework cost.

Description

The job practices of plateau permafrost tunnel form concrete rigidity preliminary bracing
Technical field
The invention belongs to plateau permafrost tunnel construction technology field, especially relate to the job practices of a kind of plateau permafrost tunnel form concrete rigidity preliminary bracing.
Background technology
Tunnel, wind volcano is located in depopulated zone, Qinghai-Tibet HOh Xil, and this area is high and cold, low pressure and anoxic, and natural environment is very abominable.The height above sea level of institute's construction tunnel rail level is 4905 meters, is the present the highest tunnel of height above sea level in the world.Simultaneously, the extreme lowest temperature-41 of this area ℃, average temperature of the whole year-6.11 ℃, the coldest monthly mean temperature-17.8 ℃; Local average gas pressure is about 70% of interior ground average gas pressure; Minimum partial pressure of oxygen 11kPa, oxygen content is 159.71kPa (oxygen content on interior ground is about 299.3kPa).Owing to be limited to 1.2~1.8m on the ever-frozen ground of location; The lower limit degree of depth is greater than 110m; Thereby the barrel of institute's construction tunnel all is positioned at and freezes among the rock, grows the area comprising containing native ice sheet, full ice and ice-rich permafrost, in the practice of construction process for reducing the influence of temperature and stratum interchange of heat in the hole; And solve frozen soil heat and melt the concrete water-permeating problem that causes, must carry out adaptation to the existing tunnel job practices.
Existing nowadays plateau permafrost constructing tunnel referential experience is less, simultaneously because ever-frozen ground receives the spray plane temperature difference big; The rebound degree of sprayed mortar is high, thereby when adopting the benching tunnelling method excavation with the mould shotcrete construction, not only working procedure is many; And it is big disturbed by the external environment factor; Add high Etio. Ag and make that artificial work efficiency is low, speed of application is slow, then very easily causes ever-frozen ground to melt, drip, sink and cave in; The construction safety quality can not guarantee, thereby make in the work progress that constructing tunnel gets into a difficult position.
Summary of the invention
Technical problem to be solved by this invention is to above-mentioned deficiency of the prior art; The job practices of a kind of plateau permafrost tunnel form concrete rigidity preliminary bracing is provided; It is reasonable in design, easy construction, construction cost is low and workmanship is high, speed of application is fast, when effectively guaranteeing the construction safety quality, can guarantee that also the construct anti-drain function and the heat insulation function in plateau permafrost tunnel of completion of institute is good; Service life is long, and maintenance and later stage rework cost are very low.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the job practices of a kind of plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that this method may further comprise the steps:
Step 1, measurement unwrapping wire: carry out construction survey at the construction field (site) by design drawing, and survey center line and the peripheral sideline that sets out the plateau permafrost tunnel of to construct at the tunnel portal place in need construction plateau permafrost tunnel;
Step 2, tunnel excavation construction: adopt full face tunneling method that need construction plateau permafrost tunnel is excavated and excavate a plurality of sections of time-division and carry out; And in each sections digging process, on the inwall that excavates the completion tunnel trunk, evenly spray the concrete that the inner admixture of one deck has concrete early strength agent synchronously, and corresponding formation one layer thickness is the first pneumatically placed concrete layer of 3cm~5cm;
Step 3, form concrete rigidity preliminary bracing construction; In each sections digging process described in the step 2; Adopt the anchor net to annotate Support Method and carry out the preliminary bracing construction to excavating the tunnel trunk of accomplishing and be provided with said first pneumatically placed concrete layer immediately; And carry out preliminary bracing when construction, be divided into a plurality of construction sections and construct along the bearing of trend that the needs construction plateau permafrost tunnel plateau permafrost tunnel of need constructing;
For the preliminary bracing work progress of arbitrary construction sections, may further comprise the steps:
301, the steel bow member supports and lays: in the tunnel sections digging process described in the step 2; Along the bearing of trend that needs construction plateau permafrost tunnel, adopt a plurality of steel bow members to have the tunnel trunk of first pneumatically placed concrete layer to carry out bracing reinforcement to excavating to spray on completion and the inwall immediately;
302, anchor net preliminary bracing construction: in the bow member of steel described in the step 301 bracing reinforcement process, many anchor poles of anchoring on said tunnel trunk, many said anchor poles are quincunx laying; And in many said anchor poles of anchoring, outside the many said anchor poles that anchoring is accomplished, hang one deck steel mesh reinforcements, and corresponding formation anchor net preliminary bracing structure; Simultaneously, before hanging said steel mesh reinforcement, the pre-buried many madjack pipes in arch in need construction plateau permafrost tunnel;
303, concrete pouring construction: adopt punching block lining trolley one on the anchor net preliminary bracing structure described in the step 302, to carry out concrete pouring construction, and to form a layer thickness be that the concrete of 30cm ± 5cm just serves as a contrast; When carrying out concrete pouring construction, the concrete that is pumped into mould is the durable concrete of low-temperature high-early strength, adopt poker vibrator to carry out vibration compacting, and the molding temperature of institute's pumping of concrete is 0 ℃~5 ℃;
304, first backing grouting behind shaft or drift lining construction: after treating that institute's concreting solidifies in the step 303; Adopt slurry filling machine and just press cement injection between the lining at said pneumatically placed concrete layer just and said concrete through many pre-buried in the step 302 said madjack pipes; And form a pressure cement injection layer, and said pressure cement injection layer closely connects as one said pneumatically placed concrete layer just and the first lining of said concrete; After treating that said pressure cement injection lamination is annotated completion, just accomplish the preliminary bracing work progress of this construction sections, the form concrete rigidity preliminary bracing structure of corresponding this construction of acquisition sections;
305, continuous repeating step 301 to 304 is until accomplishing the preliminary bracing work progress that needs a plurality of construction sections of residue in the construction plateau permafrost tunnel;
Step 4, waterproof and insulating are laid: after the preliminary bracing construction of each construction sections described in the step 304 is accomplished; On the form concrete rigidity preliminary bracing structure of accomplishing of constructing, lay one deck waterproof and insulating immediately, and lay waterproof and a plurality of sections of insulating time-division are laid; Said waterproof and insulating comprise the compound water-proof one that is laid in the preliminary bracing of said form concrete rigidity, are laid in the insulating on the said compound water-proof one and are laid in the compound water-proof two on the said insulating;
Step 5, Second Lining Construction: described in the step 4 the waterproof of each sections and insulating lay accomplish after; Adopt punching block lining trolley two immediately and on waterproof of laying completion and insulating, carry out Second Lining Construction according to conventional Second Lining Construction method; And corresponding formation concrete secondary liner, and carry out a plurality of sections of Second Lining Construction time-division and construct;
Waterproof described in form concrete rigidity preliminary bracing structure described in the step 3, the step 4 and the concrete secondary liner described in insulating and the step 5 are the loopful formula structure that need construction plateau permafrost tunnel is carried out integral reinforcing and protection; In the Second Lining Construction process described in form concrete rigidity preliminary bracing construction described in tunnel excavation construction described in the step 2, the step 3, the waterproof described in the step 4 and insulating laying and the step 5; Dividing equally a plurality of sections constructs continuously; And the construction speed of the construction of tunnel excavation described in the step 2 is ahead of the construction speed of the rigidity of form concrete described in step 3 preliminary bracing construction; The construction speed of the rigidity of form concrete described in step 3 preliminary bracing construction is ahead of the construction speed of waterproof described in the step 4 and insulating laying, and the construction speed that waterproof described in the step 4 and insulating are laid is ahead of the construction speed of Second Lining Construction described in the step 5.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that: during Second Lining Construction described in the step 5, the concrete of being built is the durable concrete of low-temperature high-early strength.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that: the thickness of first pneumatically placed concrete layer is 5cm described in the step 2, and concrete described in the step 303 just thickness of lining is 30cm.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing; It is characterized in that: the concrete of being built in the step 303 is the C25 concrete; Correspondingly the intensity of treating institute's concreting in the step 303 described in the step 304 reaches 70% when above of design strength, adopts slurry filling machine again and between said pneumatically placed concrete layer just and said concrete just serve as a contrast, presses cement injection through many pre-buried in the step 302 said madjack pipes.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that: anchor pole described in the step 302 is that length is the hollow grouting anchor of 2.5m ± 0.2m, and the longitudinal pitch and the circumferential distance of said hollow grouting anchor are 1m ± 0.1m; The size of mesh opening of said steel mesh reinforcement is (20 ± 3) cm * (20 ± 3) cm.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that: the concrete early strength agent described in the step 2 is the durable early strength admixture of WQDZ low temperature.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing; It is characterized in that: the punching block lining trolley one described in the step 303 by shaping steel die one, that said shaping steel die one is carried out the braced system of fixed support is unified and be installed in that said braced system is unified to be gone up and drive the walking mechanism one that said braced system unification moves forward and backward and form, the longitudinal length of said shaping steel die one is 9m; Punching block lining trolley two described in the step 5 is by shaping steel die two, carry out the support system two of fixed support and be installed on the said support system two and drive the walking mechanism two that said support system two moves forward and backward forming to said shaping steel die two, and the longitudinal length of said shaping steel die two is 6m.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing; It is characterized in that: the water/binder ratio of cement paste described in the step 304 is 1: 1~1: 2; And when between said pneumatically placed concrete layer just and the first lining of said concrete, pressing cement injection through many pre-buried in the step 302 said madjack pipes, grouting pressure is controlled at 0.6MPa ± 0.05MPa.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that: the loopful formula waterproof construction of waterproofing protection is carried out in the corresponding formation of waterproof described in the step 4 and insulating to need construction plateau permafrost tunnel; And in said waterproof and insulating process of deployment, need that also existing constuction joint and deformation joint on the concrete rigidity preliminary bracing structure are carried out waterproof construction and handle;
Existing constuction joint and deformation joint on the concrete rigidity preliminary bracing structure are carried out waterproof construction when handling, and mainly are that the section to the structural horizontal construction joint of concrete rigidity preliminary bracing, hoop constuction joint and preset shrinkage joint or settlement joint carries out waterproofing work; When wherein said horizontal construction joint or hoop constuction joint being carried out waterproofing work; Even brushing one deck cement based interfacial agents overcoat in horizontal construction joint that is processed or hoop constuction joint is laid rubber fastening band at said horizontal construction joint or hoop constuction joint middle part more earlier; When the section of presetting shrinkage joint or settlement joint is carried out waterproofing work, lay rubber fastening band at the section middle part of preset shrinkage joint or settlement joint earlier, fill out the waterproof filler at the inner closely knit plug of the section of presetting shrinkage joint or settlement joint again; Also need lay rubber fastening band simultaneously, fill out the waterproof filler at the inner closely knit plug in slit in the first mat edge of the said concrete outside again along the first mat edge of the said concrete that construction in the step 303 is accomplished.
The job practices of above-mentioned plateau permafrost tunnel form concrete rigidity preliminary bracing; It is characterized in that: in the Second Lining Construction process described in the form concrete rigidity preliminary bracing construction described in the tunnel excavation construction described in the step 2, the step 3, the waterproof described in the step 4 and insulating laying and the step 5; All the temperature in the hole, tunnel is controlled at through being laid in the air-conditioning units that need in the construction plateau permafrost tunnel 4 ± 5 ℃ between, guaranteed that the frozen soil heat the hole, tunnel in is disturbed the stable concrete construction quality that reaches.
The present invention compared with prior art has the following advantages:
1, reasonable in design, easy construction and quality control on construction are easy, and input cost is lower.
2, speed of application is fast, and the construction period is short.
3, construction quality is good, and workmanship is good, has satisfied high-quality and efficient construction requirements, remarkable in economical benefits.The plateau permafrost tunnel water handling function and the heat insulation function of the completion of constructing are good, and service life is long, and maintenance and later stage rework cost are very low.
4, can effectively promote and be suitable for to the construction of plateau frozen soil tunnel, and can effectively solve the multiple actual defects that frozen soil tunnel adopts " New Austrian Tunneling Method " job practices to exist, wherein; For " New Austrian Tunneling Method " job practices; Because tunnel " New Austrian Tunneling Method " job practices requires behind tunnel excavation, utilize country rock to become the self-supporting ability of arching, adopt the sprayed mortar flexible support; And enforcement country rock monitoring measurement; According to the monitoring measurement data and treat to go after surrouding rock deformation tends towards stability secondary lining, but frozen soil geology is difficult to adapt to " New Austrian Tunneling Method " technology again, and the compressive strength of frozen soil is very high; Its ultimate compressive strength even suitable with concrete; But frozen soil melts back compressive strength and sharply reduces, and the sunken frost heave action with next dead season of formed hot thaw collapse usually causes the engineering works unstability and is difficult to be repaired, thereby tunnel " New Austrian Tunneling Method " job practices can not effectively be suitable for to the construction of plateau frozen soil tunnel.And employing the present invention; It specifically is engineering properties according to frozen soil; Former benching tunnelling method excavation plan is adjusted into full face excavation (to be excavated function and directly adopts ultrashort step in the location of excavation; Connect profile steel frame at twice) after, not only accelerated construction speed, and reduced disturbance number of times frozen soil; Helping follow-up heat preservation construction operations such as pneumatically placed concrete (just serving as a contrast concrete), laying waterproof, warming plate in time follows up; And it is very high and melt the engineering characteristic that back intensity sharply reduces that full face tunneling method can make full use of frozen soil excavation back real-time intensity, can reduce temperature as far as possible and raise to the influence of frozen soil, avoid frozen soil melt compression sink with next dead season formed frost-heave force cause construction disaster and operation hidden danger.
5, because after adopting full section method to excavate, the excavation degree of progress speed in tunnel, follow-up if when adopting the thick concrete of mould spray 30cm; Because sprayed mortar is restricted by the plateau execution conditions; Artificial, facility usefulness is low, is difficult to raising speed, its flow chart seriously lags behind; The concrete of direct injection simultaneously is difficult to provide circle suitable basal plane for laying water-proof heat-insulating slab on the one hand; Because the construction environment temperature is low excessively, the pneumatically placed concrete springback capacity is big, intensity is low, can not play the effect of supporting well on the other hand.When then adopting form concrete rigidity preliminary bracing of the present invention; Not only speed of application is accelerated; And can respond and solve the existing above-mentioned defective of construction of shotcrete; The basal plane of the form concrete rigidity preliminary bracing that forms circle is suitable, should be able to lay waterproof and insulating provides circle suitable basal plane for the later stage mutually, and can play effective support action.To sum up, adopt the preliminary bracing of form concrete rigidity to replace the concrete mould spraying scheme, thoroughly solved the technical barrier of hysteresis of mould pneumatically placed concrete progress and difficult quality guarantee.Find according to factual survey, when adopting benching tunnelling method excavation and mating die shotcrete support, single port excavation daily footage 0.5~1m; Average daily footage has surpassed 4m when adopting full section method excavation and mating die to build concrete support, the construction efficiency multiplication.
6, remarkable in economical benefits has successfully been dwindled frozen soil and has been melted circle, has reduced the engineering quantity of backbreaking that thaw-frozen landslide causes, and has avoided the landslide accident, and practicing thrift cost will be more than ten million yuan; Adopting the preliminary bracing of form concrete rigidity is that multiple waterproof thermal-insulated facility provides circle suitable basal plane; Temperature Change inside and outside the Tunnel Second Lining is isolated; Prevented frozen soil frost heave hidden danger preferably; Make the plateau permafrost tunnel rebuild new thermal balance system, the rejection and waste of being avoided loss is very big.
7, between form concrete rigidity preliminary bracing structure and concrete secondary liner, waterproof and insulating are set, and the waterproof of being laid and insulating full section laying of total length along the tunnel, the temperature Change inside and outside the Tunnel Second Lining is effectively isolated; And waterproof and insulating adopt " no nail method is laid " new technology, and the tunnel of accomplishing of guaranteeing to construct does not ooze, do not leak
In sum; The present invention is reasonable in design, easy construction, construction cost is low and workmanship is high, speed of application is fast; When effectively guaranteeing the construction safety quality; Anti-drain function and the heat insulation function that also can guarantee the plateau permafrost tunnel accomplished of constructing are good, and service life is long, keep in repair and the later stage rework cost very low.
Through accompanying drawing and embodiment, technical scheme of the present invention is done further detailed description below.
Description of drawings
Fig. 1 is a job practices flow chart of the present invention.
Fig. 2 is the structural representation in institute of the present invention construction molding tunnel.
Description of reference numerals:
The 1-form concrete rigidity initial stage is propped up 2-waterproof and heat-insulation and heat-preservation 3-concrete secondary liner; Protection structure; Layer;
The 4-plateau permafrost tunnel of need constructing.
The specific embodiment
The job practices of a kind of plateau permafrost tunnel form concrete rigidity preliminary bracing as shown in Figure 1 may further comprise the steps:
Step 1, measurement unwrapping wire: carry out construction survey at the construction field (site) by design drawing, and survey center line and the peripheral sideline that sets out the plateau permafrost tunnel 4 of to construct at the tunnel portal place in need construction plateau permafrost tunnel 4.
Step 2, tunnel excavation construction: adopt full face tunneling method that need construction plateau permafrost tunnel 4 is excavated and excavate a plurality of sections of time-division and carry out; And in each sections digging process, on the inwall that excavates the completion tunnel trunk, evenly spray the concrete that the inner admixture of one deck has concrete early strength agent synchronously, and corresponding formation one layer thickness is the first pneumatically placed concrete layer of 3cm~5cm.
In the present embodiment, the said thickness of pneumatically placed concrete layer just is 5cm, and said concrete early strength agent is the durable early strength admixture of WQDZ low temperature.In the actual mechanical process, should confirm the addition content of institute's admixture concrete early strength agent according to the kind of institute's admixture concrete early strength agent, admixture proportion and the actual concrete applied environment that manual is put down in writing.
In the practice of construction process; Behind tunnel excavation; Immediately after evenly injection one layer thickness is the concrete of 3cm~5cm and the durable early strength admixture of admixture WQDZ low temperature on the tunneling barrel; Can effectively stop excavate to form in the hole, tunnel air and freeze interchange of heat take place between the rock, prevent to freeze rock weathering and thawing.To sum up; On the basis of fully realizing and grasping frozen soil engineering character; It is very high to make full use of frozen soil excavation back real-time intensity; But the engineering characteristic that intensity sharply reduces after melting changes to full face tunneling method with benching tunnelling method excavation method, and full face tunneling method can make full use of the engineering characteristic that frozen soil excavation back real-time intensity is very high and thawing back intensity sharply reduces.
Step 3, form concrete rigidity preliminary bracing construction; In each sections digging process described in the step 2; Adopt the anchor net to annotate Support Method and carry out the preliminary bracing construction to excavating the tunnel trunk of accomplishing and be provided with said first pneumatically placed concrete layer immediately; And carry out preliminary bracing when construction, be divided into a plurality of construction sections and construct along the bearing of trend that the needs construction plateau permafrost tunnel 4 plateau permafrost tunnel 4 of need constructing.
For the preliminary bracing work progress of arbitrary construction sections, may further comprise the steps:
301, the steel bow member supports and lays: in the tunnel sections digging process described in the step 2; Along the bearing of trend that needs construction plateau permafrost tunnel, adopt a plurality of steel bow members to have the tunnel trunk of first pneumatically placed concrete layer to carry out bracing reinforcement to excavating to spray on completion and the inwall immediately.
In the present embodiment, said steel bow member is the grid steelframe.
302, anchor net preliminary bracing construction: in the bow member of steel described in the step 301 bracing reinforcement process, many anchor poles of anchoring on said tunnel trunk, many said anchor poles are quincunx laying; And in many said anchor poles of anchoring, outside the many said anchor poles that anchoring is accomplished, hang one deck steel mesh reinforcements, and corresponding formation anchor net preliminary bracing structure; Simultaneously, before hanging said steel mesh reinforcement, the pre-buried many madjack pipes in arch in need construction plateau permafrost tunnel.
In the present embodiment, said anchor pole is that length is the hollow grouting anchor of 2.5m ± 0.2m, and the longitudinal pitch and the circumferential distance of said hollow grouting anchor are 1m ± 0.1m; The size of mesh opening of said steel mesh reinforcement is (20 ± 3) cm * (20 ± 3) cm.
303, concrete pouring construction: adopt punching block lining trolley one on the anchor net preliminary bracing structure described in the step 302, to carry out concrete pouring construction, and to form a layer thickness be that the concrete of 30cm ± 5cm just serves as a contrast; When carrying out concrete pouring construction, the concrete that is pumped into mould is the durable concrete of low-temperature high-early strength, adopt poker vibrator to carry out vibration compacting, and the molding temperature of institute's pumping of concrete is 0 ℃~5 ℃.
In the present embodiment, the said concrete just thickness of lining is 30cm.Said punching block lining trolley one by shaping steel die one, that said shaping steel die one is carried out the braced system of fixed support is unified and be installed in that said braced system is unified to be gone up and drive the walking mechanism one that said braced system unification moves forward and backward and form, the longitudinal length of said shaping steel die one is 9m.
304, first backing grouting behind shaft or drift lining construction: after treating that institute's concreting solidifies in the step 303; Adopt slurry filling machine and just press cement injection between the lining at said pneumatically placed concrete layer just and said concrete through many pre-buried in the step 302 said madjack pipes; And the corresponding said concrete that builds up type at said pneumatically placed concrete layer just and mould just forms one and presses the cement injection layer between the lining, and said pressure cement injection layer closely connects as one said first pneumatically placed concrete layer and the first lining of said concrete; After treating that said pressure cement injection lamination is annotated completion, just accomplish the preliminary bracing work progress of this construction sections, the form concrete rigidity preliminary bracing structure 1 of corresponding this construction of acquisition sections.
When reality is pressed cement injection; The water/binder ratio of said cement paste is 1: 1~1: 2; In the present embodiment, the water/binder ratio of stating cement paste is 1: 1 and actual the pressure in the notes process, can adjust accordingly according to the water/binder ratio of the concrete needs of reality to the pressure cement injection; When between said pneumatically placed concrete layer just and the first lining of said concrete, pressing cement injection through many pre-buried in the step 302 said madjack pipes, grouting pressure is controlled at 0.6MPa ± 0.05MPa.
In the practice of construction process; The main effect of said pressure cement injection layer be can backfill form concrete rigidity preliminary bracing structure 1 and the lining cutting of said concrete country rock between the local hole that occurs; Prevent that ponding becomes ice and causes concrete destruction in the hole; Simply say to be exactly space, avoid freeze injury hidden danger between backfill form concrete rigidity preliminary bracing structure 1 and country rock.
305, continuous repeating step 301 to 304 is until accomplishing the preliminary bracing work progress that needs a plurality of construction sections of residue in the construction plateau permafrost tunnel 4.
In the present embodiment; The concrete of being built in the step 303 is the C25 concrete; Correspondingly the intensity of treating institute's concreting in the step 303 described in the step 304 reaches 70% when above of design strength, adopts slurry filling machine again and between the said concrete that said pneumatically placed concrete layer just and mould build up type just serves as a contrast, presses cement injection through many pre-buried in the step 302 said madjack pipes.
To sum up, in the practice of construction process, after entering needs the positive hole in construction plateau permafrost tunnel 4; Suitable for guaranteeing the basal plane circle; Adopting 1 pair of form concrete rigidity preliminary bracing to need construction plateau permafrost tunnel 4 to carry out preliminary bracing, specifically is to adopt said punching block lining trolley one to carry out concrete pouring construction, and in the concrete pouring construction process; Concrete molding temperature is controlled at 5 ℃, can weakens like this heat of frozen soil is melted influence.
Step 4, waterproof and insulating are laid: after the preliminary bracing construction of each construction sections described in the step 304 is accomplished; On the form concrete rigidity preliminary bracing structure of accomplishing 1 of constructing, lay one deck waterproof and insulating 2 immediately, and lay waterproof and a plurality of sections of 2 time-divisions of insulating are laid; Said waterproof and insulating 2 comprise the compound water-proof one that is laid in the preliminary bracing of said form concrete rigidity, are laid in the insulating on the said compound water-proof one and are laid in the compound water-proof two on the said insulating.
In the present embodiment, the loopful formula waterproof construction of waterproofing protection is carried out in waterproof described in the step 4 and insulating 2 corresponding formation to need construction plateau permafrost tunnel 4; And in said waterproof and insulating 2 process of deployment, need that also existing constuction joint and deformation joint on the concrete rigidity preliminary bracing structure 1 are carried out waterproof construction and handle.
Existing constuction joint and deformation joint on the concrete rigidity preliminary bracing structure 1 are carried out waterproof construction when handling, and mainly are that the section to horizontal construction joint, hoop constuction joint and preset shrinkage joint or settlement joint on the concrete rigidity preliminary bracing structure 1 carries out waterproofing work; When wherein said horizontal construction joint or hoop constuction joint being carried out waterproofing work; Even brushing one deck cement based interfacial agents overcoat in horizontal construction joint that is processed or hoop constuction joint is laid rubber fastening band at said horizontal construction joint or hoop constuction joint middle part more earlier; When the section of presetting shrinkage joint or settlement joint is carried out waterproofing work, lay rubber fastening band at the section middle part of preset shrinkage joint or settlement joint earlier, fill out the waterproof filler at the inner closely knit plug of the section of presetting shrinkage joint or settlement joint again; Also need lay rubber fastening band simultaneously, fill out the waterproof filler at the inner closely knit plug in slit in the first mat edge of the said concrete outside again along the first mat edge of the said concrete that construction in the step 303 is accomplished.
Simultaneously, said waterproof and insulating 2 comprise that also one deck is layed in the nonwoven on the fish tail and waterproof layer of spreading at the bottom of the arch that needs construction plateau permafrost tunnel 4 and the tunnel.
In the present embodiment, said fish tail and waterproof layer is a splash guard, and said compound water-proof is EVA compound water-proof or PVC compound water-proof, and said insulating is that polyurethane foam board and its thickness are 5cm ± 1cm.Said waterproof filler is residual oil hemp cut or immersion oil plank, and said nonwoven is that specification is greater than 300g/m 2Geotextiles.
Particularly: the performance indications of the PVC compound water-proof that adopts are: hot strength >=15MPa; Elongation at break >=300%; Low temperature flexibility, flawless under-35 ℃ of temperature condition; Impermeabilisation, puncture; Water-fast, low temperature resistant; Nontoxic, aseptic, corrosion-resistant; Require the tunnel french drain to have elasticity at cryogenic conditions, good water permeability can be born the pressure that is not less than 0.5MPa, not easy-to-rust.
Step 5, Second Lining Construction: described in the step 4 the waterproof of each sections and insulating 2 lay accomplish after; Adopt punching block lining trolley two immediately and on waterproof of laying completion and insulating 2, carry out Second Lining Construction according to conventional Second Lining Construction method; And corresponding formation concrete secondary liner 3; And carry out a plurality of sections of Second Lining Construction time-division and construct, the tunnel structure that final construction is accomplished is seen Fig. 2.
In the present embodiment; Said punching block lining trolley two is by shaping steel die two, carry out the support system two of fixed support and be installed on the said support system two and drive the walking mechanism two that said support system two moves forward and backward forming to said shaping steel die two, and the longitudinal length of said shaping steel die two is 6m.During actual Second Lining Construction, the concrete of being built is the durable concrete of low-temperature high-early strength.
Actual when carrying out Second Lining Construction, adopt 43kg/m rail girder formula trestle scheme excavation and construction lining cutting inverted arch, bent abutment wall reinforcing bar is together poured into a mould and preset to shop fixtures concrete and inverted arch.Arch wall lining cutting one-shot forming; Adopt the long all-hydraulic whole punching block lining trolley (being said punching block lining trolley two) of 6m; Concrete adopts automatic gauge to mix and stir; The capable concrete transport vehicle transportation of TST-6 type rail, the HBT60 concrete pump is pumped into mould, and immersion vibrator cooperates the chassis form vibrator to vibrate.
In the present embodiment, the impermeability of institute's concreting is the S8 grade in step 303 and the step 5.
In the practice of construction process, waterproof described in the form concrete rigidity preliminary bracing structure 1 described in the step 3, the step 4 and the concrete secondary liner 3 described in insulating 2 and the step 5 are the loopful formula structure that need construction plateau permafrost tunnel 4 is carried out integral reinforcing and protection; In the Second Lining Construction process described in form concrete rigidity preliminary bracing construction described in tunnel excavation construction described in the step 2, the step 3, the waterproof described in the step 4 and insulating laying and the step 5; Dividing equally a plurality of sections constructs continuously; And the construction speed of the construction of tunnel excavation described in the step 2 is ahead of the construction speed of the rigidity of form concrete described in step 3 preliminary bracing construction; The construction speed of the rigidity of form concrete described in step 3 preliminary bracing construction is ahead of the construction speed of waterproof described in the step 4 and insulating laying, and the construction speed that waterproof described in the step 4 and insulating are laid is ahead of the construction speed of Second Lining Construction described in the step 5.
In addition; In the Second Lining Construction process described in form concrete rigidity preliminary bracing construction described in tunnel excavation construction described in the step 2, the step 3, the waterproof described in the step 4 and insulating laying and the step 5; All the temperature in the hole, tunnel is controlled at through being laid in the air-conditioning units that need in the construction plateau permafrost tunnel 4 ± 5 ℃ between, guaranteed that the frozen soil heat the hole, tunnel in is disturbed the stable concrete construction quality that reaches.And practice of construction is crossed in the layer; When the work plane lowest temperature is lower than-3 ℃; Form concrete rigidity preliminary bracing structure 1 working concrete is handled by the winter construction measure, specifically is to adopt DZLZ-10-A type steam heating boiler steam to improve water temperature or set up heat preservation greenhouse and connect sand, the building stones that heating installation uses the mix concrete and be incubated heating.
The above; It only is preferred embodiment of the present invention; Be not that the present invention is done any restriction, every technical spirit changes any simple modification, change and the equivalent structure that above embodiment did according to the present invention, all still belongs in the protection domain of technical scheme of the present invention.

Claims (9)

1. the job practices of a plateau permafrost tunnel form concrete rigidity preliminary bracing is characterized in that this method may further comprise the steps:
Step 1, measurement unwrapping wire: carry out construction survey at the construction field (site) by design drawing, and survey center line and the peripheral sideline that sets out the plateau permafrost tunnel (4) of to construct at the tunnel portal place in need construction plateau permafrost tunnels (4);
Step 2, tunnel excavation construction: adopt full face tunneling method that need construction plateau permafrost tunnels (4) are excavated and excavate a plurality of sections of time-division and carry out; And in each sections digging process, on the inwall that excavates the completion tunnel trunk, evenly spray the concrete that the inner admixture of one deck has concrete early strength agent synchronously, and corresponding formation one layer thickness is the first pneumatically placed concrete layer of 3cm~5cm;
Step 3, form concrete rigidity preliminary bracing construction; In each sections digging process described in the step 2; Adopt the anchor net to annotate Support Method and carry out the preliminary bracing construction to excavating the tunnel trunk of accomplishing and be provided with said first pneumatically placed concrete layer immediately; And carry out preliminary bracing when construction, be divided into a plurality of construction sections and construct along the bearing of trend that needs construction plateau permafrost tunnels (4) the plateau permafrost tunnel (4) of need constructing;
For the preliminary bracing work progress of arbitrary construction sections, may further comprise the steps:
301, the steel bow member supports and lays: in the tunnel sections digging process described in the step 2; Along the bearing of trend that needs construction plateau permafrost tunnel, adopt a plurality of steel bow members to have the tunnel trunk of first pneumatically placed concrete layer to carry out bracing reinforcement to excavating to spray on completion and the inwall immediately;
302, anchor net preliminary bracing construction: in the bow member of steel described in the step 301 bracing reinforcement process, many anchor poles of anchoring on said tunnel trunk, many said anchor poles are quincunx laying; And in many said anchor poles of anchoring, outside the many said anchor poles that anchoring is accomplished, hang one deck steel mesh reinforcements, and corresponding formation anchor net preliminary bracing structure; Simultaneously, before hanging said steel mesh reinforcement, the pre-buried many madjack pipes in arch in need construction plateau permafrost tunnel;
303, concrete pouring construction: adopt punching block lining trolley one on the anchor net preliminary bracing structure described in the step 302, to carry out concrete pouring construction, and to form a layer thickness be that the concrete of 30cm ± 5cm just serves as a contrast; When carrying out concrete pouring construction, the concrete that is pumped into mould is the durable concrete of low-temperature high-early strength, adopt poker vibrator to carry out vibration compacting, and the molding temperature of institute's pumping of concrete is 0 ℃~5 ℃;
304, first backing grouting behind shaft or drift lining construction: after treating that institute's concreting solidifies in the step 303; Adopt slurry filling machine and just press cement injection between the lining at said pneumatically placed concrete layer just and said concrete through many pre-buried in the step 302 said madjack pipes; And form a pressure cement injection layer, and said pressure cement injection layer closely connects as one said pneumatically placed concrete layer just and the first lining of said concrete; After treating that said pressure cement injection lamination is annotated completion, just accomplish the preliminary bracing work progress of this construction sections, the form concrete rigidity preliminary bracing structure (1) of corresponding this construction of acquisition sections;
305, continuous repeating step 301 to 304 is until accomplishing the preliminary bracing work progress that needs a plurality of construction sections of residue in the construction plateau permafrost tunnel (4);
Step 4, waterproof and insulating are laid: after the preliminary bracing construction of each construction sections described in the step 304 is accomplished; Go up in the form concrete rigidity preliminary bracing structure (1) accomplished of constructing immediately and lay one deck waterproof and insulating (2), and lay waterproof and a plurality of sections of insulating (2) time-division are laid; Said waterproof and insulating (2) comprise the compound water-proof one that is laid in the preliminary bracing of said form concrete rigidity, are laid in the insulating on the said compound water-proof one and are laid in the compound water-proof two on the said insulating;
Step 5, Second Lining Construction: described in the step 4 the waterproof of each sections and insulating (2) lay accomplish after; Adopt punching block lining trolley two immediately and on waterproof of laying completion and insulating (2), carry out Second Lining Construction according to conventional Second Lining Construction method; And corresponding formation concrete secondary liner (3), and carry out a plurality of sections of Second Lining Construction time-division and construct;
Concrete secondary liner (3) described in waterproof described in form concrete rigidity preliminary bracing structure (1) described in the step 3, the step 4 and insulating (2) and the step 5 is the loopful formula structure that need construction plateau permafrost tunnels (4) are carried out integral reinforcing and protection; In the Second Lining Construction process described in form concrete rigidity preliminary bracing construction described in tunnel excavation construction described in the step 2, the step 3, the waterproof described in the step 4 and insulating laying and the step 5; Dividing equally a plurality of sections constructs continuously; And the construction speed of the construction of tunnel excavation described in the step 2 is ahead of the construction speed of the rigidity of form concrete described in step 3 preliminary bracing construction; The construction speed of the rigidity of form concrete described in step 3 preliminary bracing construction is ahead of the construction speed of waterproof described in the step 4 and insulating laying, and the construction speed that waterproof described in the step 4 and insulating are laid is ahead of the construction speed of Second Lining Construction described in the step 5.
2. according to the job practices of the described plateau permafrost of claim 1 tunnel form concrete rigidity preliminary bracing, it is characterized in that: during Second Lining Construction described in the step 5, the concrete of being built is the durable concrete of low-temperature high-early strength.
3. according to the job practices of claim 1 or 2 described plateau permafrost tunnel form concrete rigidity preliminary bracings, it is characterized in that: the thickness of first pneumatically placed concrete layer is 5cm described in the step 2, and concrete described in the step 303 just thickness of lining is 30cm.
4. according to the job practices of claim 1 or 2 described plateau permafrost tunnel form concrete rigidity preliminary bracings; It is characterized in that: the concrete of being built in the step 303 is the C25 concrete; Correspondingly the intensity of treating institute's concreting in the step 303 described in the step 304 reaches 70% when above of design strength, adopts slurry filling machine again and between said pneumatically placed concrete layer just and said concrete just serve as a contrast, presses cement injection through many pre-buried in the step 302 said madjack pipes.
5. according to the job practices of claim 1 or 2 described plateau permafrost tunnel form concrete rigidity preliminary bracings; It is characterized in that: anchor pole described in the step 302 is that length is the hollow grouting anchor of 2.5m ± 0.2m, and the longitudinal pitch and the circumferential distance of said hollow grouting anchor are 1m ± 0.1m; The size of mesh opening of said steel mesh reinforcement is (20 ± 3) cm * (20 ± 3) cm.
6. according to the job practices of claim 1 or 2 described plateau permafrost tunnel form concrete rigidity preliminary bracings; It is characterized in that: the punching block lining trolley one described in the step 303 by shaping steel die one, that said shaping steel die one is carried out the braced system of fixed support is unified and be installed in that said braced system is unified to be gone up and drive the walking mechanism one that said braced system unification moves forward and backward and form, the longitudinal length of said shaping steel die one is 9m; Punching block lining trolley two described in the step 5 is by shaping steel die two, carry out the support system two of fixed support and be installed on the said support system two and drive the walking mechanism two that said support system two moves forward and backward forming to said shaping steel die two, and the longitudinal length of said shaping steel die two is 6m.
7. according to the job practices of the described plateau permafrost of claim 4 tunnel form concrete rigidity preliminary bracing; It is characterized in that: the water/binder ratio of cement paste described in the step 304 is 1: 1~1: 2; And when between said pneumatically placed concrete layer just and the first lining of said concrete, pressing cement injection through many pre-buried in the step 302 said madjack pipes, grouting pressure is controlled at 0.6MPa ± 0.05MPa.
8. according to the job practices of claim 1 or 2 described plateau permafrost tunnel form concrete rigidity preliminary bracings, it is characterized in that: the loopful formula waterproof construction of waterproofing protection is carried out in the corresponding formation of waterproof described in the step 4 and insulating (2) to need construction plateau permafrost tunnels (4); And in said waterproof and insulating (2) process of deployment, also need carry out the waterproof construction processing to last existing constuction joint of concrete rigidity preliminary bracing structure (1) and deformation joint;
When concrete rigidity preliminary bracing structure (1) is gone up existing constuction joint and carries out the waterproof construction processing with deformation joint, mainly be that the section to the horizontal construction joint on the concrete rigidity preliminary bracing structure (1), hoop constuction joint and preset shrinkage joint or settlement joint carries out waterproofing work; When wherein said horizontal construction joint or hoop constuction joint being carried out waterproofing work; Even brushing one deck cement based interfacial agents overcoat in horizontal construction joint that is processed or hoop constuction joint is laid rubber fastening band at said horizontal construction joint or hoop constuction joint middle part more earlier; When the section of presetting shrinkage joint or settlement joint is carried out waterproofing work, lay rubber fastening band at the section middle part of preset shrinkage joint or settlement joint earlier, fill out the waterproof filler at the inner closely knit plug of the section of presetting shrinkage joint or settlement joint again; Also need lay rubber fastening band simultaneously, fill out the waterproof filler at the inner closely knit plug in slit in the first mat edge of the said concrete outside again along the first mat edge of the said concrete that construction in the step 303 is accomplished.
9. according to the job practices of claim 1 or 2 described plateau permafrost tunnel form concrete rigidity preliminary bracings; It is characterized in that: in the Second Lining Construction process described in the form concrete rigidity preliminary bracing construction described in the tunnel excavation construction described in the step 2, the step 3, the waterproof described in the step 4 and insulating laying and the step 5; All the temperature in the hole, tunnel is controlled at through being laid in the air-conditioning unit that needs in the construction plateau permafrost tunnel (4) ± 5 ℃ between, guaranteed that the frozen soil heat the hole, tunnel in is disturbed the stable concrete construction quality that reaches.
CN2010102512241A 2010-08-10 2010-08-10 Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel Active CN101985882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102512241A CN101985882B (en) 2010-08-10 2010-08-10 Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102512241A CN101985882B (en) 2010-08-10 2010-08-10 Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel

Publications (2)

Publication Number Publication Date
CN101985882A CN101985882A (en) 2011-03-16
CN101985882B true CN101985882B (en) 2012-07-04

Family

ID=43710272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102512241A Active CN101985882B (en) 2010-08-10 2010-08-10 Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel

Country Status (1)

Country Link
CN (1) CN101985882B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251783B (en) * 2011-05-10 2014-05-28 北京城建亚泰建设集团有限公司 Tunnel two-lining structure back grouting device, and grouting method thereof
CN102287208B (en) * 2011-07-12 2013-04-24 中铁四局集团第一工程有限公司 Method for installing and erecting tunnel arch frame
CN102562091A (en) * 2012-01-30 2012-07-11 中铁七局集团有限公司 Foam concrete shock absorbing structure of tunnel and construction method of foam concrete shock absorbing structure
CN102808649A (en) * 2012-08-28 2012-12-05 煤炭工业合肥设计研究院 Supporting insulation structure for refuge chamber of deep well under high-temperature geological conditions
CN102864759B (en) * 2012-10-22 2015-07-01 安蓉建设总公司 Method for constructing sheet concrete lining
CN104179513B (en) * 2014-08-13 2016-08-17 中铁隧道集团二处有限公司 A kind of construction method of tunnel in cold area hole external thermal insulation outlet
CN104533449B (en) * 2014-11-07 2016-09-14 成龙建设集团有限公司 A kind of tunnel excavation stand and apply the adit construction method of this stand
CN105697033B (en) * 2016-04-01 2017-11-24 长安大学 A kind of construction method of Tunnel Engineering without template punishment rock mass cavity
CN106759521B (en) * 2017-01-11 2018-09-21 北京建工土木工程有限公司 A kind of underground project waterproof processing structure
CN107587881A (en) * 2017-10-30 2018-01-16 中铁五局集团第五工程有限责任公司 A kind of composite lining structure and construction technology for permafrost tunnel
CN108222970A (en) * 2018-02-09 2018-06-29 中国人民解放军陆军工程大学 A kind of extremely frigid zones people occupies underground engineering insulation construction
CN109707398B (en) * 2019-01-08 2020-05-05 西南交通大学 Freezing-resistant assembled tunnel primary support structure and construction method
CN110005435B (en) * 2019-05-05 2020-07-07 中交第三航务工程局有限公司 Construction process for primary support of tunnel body
CN110319622B (en) * 2019-05-15 2021-03-16 宁波工程学院 High-heat-conductivity ground temperature energy heat exchange tunnel system and construction method thereof
CN110206563A (en) * 2019-06-25 2019-09-06 深圳市综合交通设计研究院有限公司 A kind of full packet waterproof composite lining structure resistant to pressure and its construction method
CN110486052A (en) * 2019-09-04 2019-11-22 中交天和机械设备制造有限公司 A kind of press injecting type concrete support method and the supporting mechanism for implementing it
CN111075485B (en) * 2019-12-30 2021-10-08 湖南尚上市政建设开发有限公司 Water-rich fault zone tunnel structure and construction method
CN111173543A (en) * 2020-02-27 2020-05-19 石河子大学 Heat-insulation high-temperature-resistant structure of high-ground-temperature diversion tunnel and construction method thereof
CN111753360B (en) * 2020-06-22 2023-04-28 河北交通职业技术学院 Tunnel local water storage frost heaving force calculation method, calculation system, storage medium and season frost region tunnel lining frost heaving design method
CN114320359A (en) * 2021-12-10 2022-04-12 中国一冶集团有限公司 Method for processing large and deep non-filler karst cave above tunnel arch

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3140672A1 (en) * 1981-10-13 1983-04-28 Linde Ag, 6200 Wiesbaden METHOD FOR CREATING A TUNNEL
JP2000234493A (en) * 1999-02-16 2000-08-29 Taisei Corp Method for constructing face part earth retaining wall of shield starting shaft
CN1594836A (en) * 2004-06-24 2005-03-16 西南交通大学 Device for keeping plateau tunnel thermal stability
CN101074562A (en) * 2006-05-19 2007-11-21 佟国栋 Building-block railway and highway and submarine tunnel
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN101619656A (en) * 2007-10-23 2010-01-06 中铁第一勘察设计院集团有限公司 Permafrost tunnel supporting method of railway

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3140672A1 (en) * 1981-10-13 1983-04-28 Linde Ag, 6200 Wiesbaden METHOD FOR CREATING A TUNNEL
JP2000234493A (en) * 1999-02-16 2000-08-29 Taisei Corp Method for constructing face part earth retaining wall of shield starting shaft
CN1594836A (en) * 2004-06-24 2005-03-16 西南交通大学 Device for keeping plateau tunnel thermal stability
CN101074562A (en) * 2006-05-19 2007-11-21 佟国栋 Building-block railway and highway and submarine tunnel
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN101619656A (en) * 2007-10-23 2010-01-06 中铁第一勘察设计院集团有限公司 Permafrost tunnel supporting method of railway

Also Published As

Publication number Publication date
CN101985882A (en) 2011-03-16

Similar Documents

Publication Publication Date Title
CN101985882B (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
CN105464686B (en) Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility
CN104675403A (en) Underground space construction method and supporting structure
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN102619522A (en) Construction method for subway contact passage
CN107201908A (en) A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107587881A (en) A kind of composite lining structure and construction technology for permafrost tunnel
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN103670446B (en) Circular diversion tunnel 2/3 circle concrete-liner construction method
CN201943086U (en) Underground building wall body
CN105256810A (en) Construction method for round underground continuous wall two-in-one structure
CN109162298A (en) A kind of construction method of hydrous fluids pipe gallery
CN106049538A (en) Reverse-building-method underground engineering building envelope crown beam anti-floating node
CN109838240A (en) Cross the river tunnel ledge cover and cut construction method
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN212837843U (en) IV-class and V-class surrounding rock tunnel concrete lining anti-cracking structure
CN212272234U (en) High-strength combined template for open groove section of large-section inclined shaft
CN206513380U (en) A kind of tunnel double-lining vault with rubber seal reserves Grouting Pipe
US11821316B1 (en) System and construction method of single-layer lining tunnel structure based on mine-tunnelling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant