CN104179513B - A kind of construction method of tunnel in cold area hole external thermal insulation outlet - Google Patents

A kind of construction method of tunnel in cold area hole external thermal insulation outlet Download PDF

Info

Publication number
CN104179513B
CN104179513B CN201410395898.7A CN201410395898A CN104179513B CN 104179513 B CN104179513 B CN 104179513B CN 201410395898 A CN201410395898 A CN 201410395898A CN 104179513 B CN104179513 B CN 104179513B
Authority
CN
China
Prior art keywords
outlet
water pipe
tunnel
row water
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410395898.7A
Other languages
Chinese (zh)
Other versions
CN104179513A (en
Inventor
陈军
刘俊成
秦岭
张震
汤旭
乐晟
杨春勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201410395898.7A priority Critical patent/CN104179513B/en
Publication of CN104179513A publication Critical patent/CN104179513A/en
Application granted granted Critical
Publication of CN104179513B publication Critical patent/CN104179513B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to Construction Technology field, particularly relate to a kind of tunnel in cold area hole external thermal insulation outlet construction method.nullThe present invention is when tunnel in cold area hole external thermal insulation outlet is constructed,Use the mode of drain pipe outlet layering draining,After first row hose nozzle ground floor freezes,Water level is raised by water by the slabstone water storehouse at rear,Discharged by upper strata second row water pipe again,After the upper strata mouth of pipe freezes,Water itself has certain temperature slowly the first row hose nozzle of bottom will be melted dredging,Water is in the case of constant flow,Will not be frozen to ice,And use such as asbestos at drain pipe outlet、The auxiliary Insulation such as cinder,Water in the range of slope protection not easy freezing,Drain pipe outlet is crop out in the least scope,It is enough to ensure that effluent pipe mouth is the most frozen by the temperature of water self,Below first row water pipe, electric heater unit is set,Once run into extreme climate,Take electrical heat tracing measure,Guarantee the normal drainage effect of outlet.

Description

A kind of construction method of tunnel in cold area hole external thermal insulation outlet
Technical field
The present invention relates to Construction Technology field, particularly relate to the construction method of a kind of tunnel in cold area hole external thermal insulation outlet.
Background technology
In prior art, tunnel in cold area hole external thermal insulation outlet is the important component part of tunnel drainage, is also to ensure that construction quality The important measures of " project of vital and lasting importance ", outside hole, the quality of the construction quality of drainage system is directly connected to tunnel internal drainage and to tunnel Impact after operation, hole internal water accumulation can not be discharged smoothly and will be directly affected the frost heave in tunnel simultaneously, direct relation constructing tunnel quality And operation security.The common practice of existing tunnel in cold area heat-insulating water outlet design is the mode taking nature to flow out, and requires water outlet The position of mouthful design should be at leeward area without shade, but heat-insulating water outlet does not takes into full account heating and the thermometric measure of outlet, the most not Contemplate the mouth of a river to take to fall the method such as slope draining and the insulation material of application auxiliary simultaneously.
Summary of the invention
In order to overcome defect of the prior art, the construction method of a kind of tunnel in cold area hole external thermal insulation outlet that the present invention provides, First contemplating the mode of mouth of a river layering draining, after drain pipe port ground floor freezes, water passes through the slabstone water storehouse at rear by water Position is raised, then is discharged by upper strata drain pipe, and after the upper strata mouth of pipe freezes, water body self has certain temperature will be slowly by The drain pipe port of lower section melts dredging, and water, will not be frozen in the case of constant flow, and various such as in outlet employing The auxiliary Insulation such as asbestos, cinder, the water in slope protection scope should not freeze, crop out in the least scope of an outlet, Being enough to ensure that the mouth of pipe is the most frozen by the temperature of water body self, separately the lower section at drain pipe arranges heat tape, once runs into pole End weather, can take electrically heated Insulation, so that it is guaranteed that the heat insulation effect of outlet.
The present invention is achieved through the following technical solutions: the construction method of a kind of tunnel in cold area hole external thermal insulation outlet, including with Lower step:
Step 1: determine position, the mouth of a river, excavates outlet foundation trench in described outlet position, and described foundation trench first uses sand Gravel bed course, then casting concrete;
Step 2: apply outlet headwall, described headwall uses mortar flag stone to apply, buries armored concrete underground in the middle part of described headwall Pipe culvert is connected as reserved second drain tube holes and buried with outside hole section and causes at described outlet headwall;
Step 3: apply described outlet domatic with the draining of described headwall location, and splayed aileron is set in both sides does gear and protect, It is domatic, based on the domatic lower section of described slabstone uses mortar flag stone also that described draining domatic lower section backfill ragstone layer forms slabstone Make barricade, above described slabstone is domatic, first lays one layer of geotextiles re-lays one layer of rock wool and do overcoat;
Step 4: arrange horizontal wall inscription at described domatic barricade water outlet end, described horizontal wall inscription is provided with the gradient, and goes out at described domatic barricade Mouth of a river end arranges and buries two-layer first row water pipe at horizontal wall inscription underground, and the interlamellar spacing of described first row water pipe and tube pitch are according to a determining deviation cloth If arranging two electrothermal tubes outside first row water pipe every described, above described electrothermal tube, install temperature transducer, described electric heating Pipe is arranged in below described first row water pipe both sides closely connected with described first row water pipe, and described electrothermal tube is always domatic along lower section to be prolonged Extend drainage culvert and stretch out certain distance;
Step 5: in described step 4, described first row water pipe surrounding uses concrete filling fixing, on described first row water pipe Side lays one layer of geotextiles and re-lays one layer of rock wool, backfills cinder extremely described end wall surface, above described rock wool above described cinder Applying mortar rubble masonry pavement, described first row water pipe passes described bank protection face, it is ensured that water can flow naturally from described first row water pipe Going out, described first row water pipe water outlet is provided with weathering;
Step 6: apply bituminous coating on described mortar rubble masonry pavement surface.
Further, the Base with Sand Gravel Cushion in described step 1 is 15cm, and described concreting thickness is 10cm, and model is C15.
Further, second row water pipe external diameter described in described step 2 is φ 40cm, and the internal diameter of described armored concrete pipe culvert is φ 40cm, wall thickness is 8cm.
Further, the domatic ratio of slope of draining described in described step 3 is 1:1.5.
Further, described in described step 4, the horizontal wall inscription ratio of slope of domatic barricade water side is 8%.
Further, the 20cm of a diameter of φ of first row water pipe described in described step 4, material is UPVC.
Further, in described step 4, the scheme of burying underground of described first row water pipe is lower floor 7,6, upper strata, is spaced cloth And if interlamellar spacing and tube pitch are 60cm.
Further, the pvc pipe of a diameter of 2cm of electrothermal tube described in described step 4 or the steel pipe of a diameter of φ 32cm.
Further, the bank protection ratio of slope described in described step 5 is 1:1.5, and described mortar flag stone thickness is 30cm, described Draining ratio of slope outside first row water pipe outlet is 10%.
Further, at described first row water pipe outlet to one section of cable buried outside hole in described step 4, described cable buries It is provided with temperature transducer.
Compared with prior art, superior effect is: the present invention is when tunnel in cold area hole external thermal insulation outlet is constructed, owing to using The mode of outlet layering draining, after drain pipe port ground floor freezes, water level is raised by water by the slabstone water storehouse at rear, Being discharged by upper strata drain pipe, after the upper strata mouth of pipe freezes, water body self has certain temperature will be slowly by the row of bottom again Hose nozzle melts dredging, and water, will not be frozen in the case of constant flow, and uses various such as asbestos, coal at outlet The auxiliary Insulation such as slag, the water in slope protection scope should not freeze, and water is passed through in crop out in the least scope of an outlet The temperature of body self is enough to ensure that the mouth of pipe is the most frozen, and separately the lower section at drain pipe arranges heat tape, runs into extreme climate, can Take electrically heated Insulation, so that it is guaranteed that the proper drainage effect of outlet.
Accompanying drawing explanation
Fig. 1 is flow chart of the present invention;
Fig. 2 is present configuration plane graph;
Fig. 3 is present configuration elevation;
Fig. 4 is present configuration I-I profile;
Fig. 5 is second row water pipe scheme of installation in the present invention;
Fig. 6 is first row water pipe scheme of installation in the present invention.
Reference is as follows:
1-headwall, 2-eight word aileron, 3-bank protection, 4-aileron termination, 5-mortar flag stone, 6-first row water pipe, 7-draining is domatic, 8-dry chip stone, 9-second row water pipe pedestal, 10-second row water pipe, 11-backfills covering, 12-electrothermal tube, 13-temperature transducers Device, 14-test cable, 15-heat tape, 16-inspection shaft, 17-insulation material, 18-sensor wire post, 19-cat ladder.
Detailed description of the invention
Below in conjunction with the accompanying drawings the specific embodiment of the invention is described in further detail.
Below in conjunction with Figure of description 1-6, illustrate the present invention, the invention provides a kind of tunnel in cold area hole external thermal insulation water outlet The construction method of mouth, as it is shown in figure 1, the most so apply, first apply out outlet, hole inspection shaft 16, inspection shaft 16 Inside setting cat ladder 19, bury outlet armored concrete pipe culvert underground, pipe culvert pedestal uses No. 15 cement concretes to pour, and determines water outlet Mouth position, excavation applies outlet foundation trench, and described outlet foundation trench first applies 15cm Base with Sand Gravel Cushion, then pours 10cm15 Number cement concrete;Then applying outlet headwall 1, headwall 1 uses mortar flag stone 5 to apply, and reserves and bury underground in the middle part of headwall 1 As the armored concrete pipe culvert of the second drain tube holes 10, buried with outside hole section of outlet inspection shaft 16 pipe culvert connects, and pipe culvert goes out Outside the mouth of a river to hole, buried one section of test cable 14, test cable 14 is embedded with temperature transducer 13;As it is shown on figure 3, headwall 1 apply during pre-buried centre be provided with penetration pipe and the sensor wire post 18 of heat tape 15, described sensor wire post 18 It is connected with power supply and temperature transducer 13, for the later stage, electric device is installed and prepares;Outlet connects headwall location and arranges weathering Face 7, draining domatic 7 uses and grouts, and both sides use eight word ailerons 2 to do gear and protect, and described eight word ailerons 2 use mortar flag stone to execute Making, aileron termination uses retaining wall closure, and aileron termination 4 barricade is the UPVC of pre-buried two-layer internal diameter 20cm during applying Pipe is laid, and interlamellar spacing and tube pitch are 60cm, use dry-laid rubble 8 to backfill, the domatic upper elder generation of slabstone in described eight word ailerons 2 Lay one layer of geotextiles to re-lay one layer of rock wool and make mask, apply and apply water outlet horizontal wall inscription outside eight word aileron terminations 4, two buried underground Layer internal diameter is that the UPVC pipe of 20cm uses as first row water pipe, and ratio of slope of burying underground therein is 8%, the row reserved with aileron termination Water pipe is connected, and as shown in Figure 6, every UPVC first row water pipe 6 is outside equipped with two electrothermal tubes 12, sets in electrothermal tube 12 There is heat tape 15, above described every UPVC first row water pipe 6, install temperature transducer 13 and test cable 14, described electricity Heat pipe 12 is arranged in below first row water pipe 6 both sides closely connected with described first row water pipe 6, and described electrothermal tube 12 is always from going out Dew opening's edge below domatic extend in drainage culvert stretch out certain distance;As it is shown in figure 5, described second row water pipe 10 surrounding is adopted Fixing with concrete filling, the external diameter of described second drain tube holes 10 being provided with is φ 40cm, described concrete reinforced pipe The internal diameter contained is φ 40cm, and wall thickness is 8cm;Re-lay as it is shown on figure 3, lay one layer of geotextiles above first row water pipe 6 One layer of rock wool protection, above rock wool, backfill covering cinder is to headwall plane, carries out mortar rubble masonry pavement 3, institute above cinder State first row water pipe 6 and pass domatic, it is ensured that water flows out naturally from the outlet of described first row water pipe 6, described outlet peripheral hardware The concrete weathering 7 having wide 1m thickness 25cm ratio of slope to be 10%;Mortar flag stone domatic brushing bituminous coating, prevents Exposure to Sunlight and rainwater Soak, cause domatic weathering damage, the pipe that the described second preferred internal diameter of drain tube holes 10 is φ 40cm being provided with, described The internal diameter of armored concrete pipe culvert is φ 40cm, and wall thickness is 8cm;Wherein it is additionally provided with power-line terminal as reserved wiring for current potential Put, nearby build supplying electricity and power distribution facility, power distribution cabinet etc. is set, when needing according to the later stage, be powered heating, wherein said row Domatic 7 ratios of slope of water are 1:1.5, and the horizontal wall inscription ratio of slope of described domatic barricade water side is 8%, and described first row water pipe 6 is the most straight Footpath is φ 20cm, and material is the specification of UPVC, and burying the described first row water pipe 6 of two-layer underground and burying scheme underground is lower floor 7, upper strata 6, interval is laid, and interlamellar spacing is 60cm;Described electrothermal tube 12 is preferably the pvc pipe of a diameter of 20cm or a diameter of φ 32cm Steel pipe, described mortar flag stone thickness is 30cm, and the drainage grade outside described first row water pipe 6 outlet is 10%, at Han Qu During the construction of Tunnel external thermal insulation outlet, owing to using the mode of outlet layering draining, after drain pipe port ground floor freezes, Water level is raised by water by the slabstone water storehouse at rear, then is discharged by upper strata second row water pipe 10, after the upper strata mouth of pipe freezes, Water body self has certain temperature slowly first row water pipe 6 outlet of bottom will be melted dredging, and water is at constant flow In the case of, will not be frozen, and outlet have employed various as asbestos, cinder etc. assist Insulation, at slope protection The water of scope should not freeze, crop out in the least scope of an outlet, by the temperature of water body self be enough to ensure that the mouth of pipe not by Freezing, separately the lower section at drain pipe arranges heat tape, runs into extreme climate, can take electrically heated Insulation, thus really Protect the heat insulation effect of outlet.
The present invention is not limited to above-mentioned embodiment, in the case of without departing substantially from the flesh and blood of the present invention, those skilled in the art It is contemplated that any deformation, improve, replace and each fall within the scope of the present invention.

Claims (10)

1. the construction method of a tunnel in cold area hole external thermal insulation outlet, it is characterised in that comprise the following steps:
Step 1: determine position, the mouth of a river, excavates outlet foundation trench in described outlet position, and described foundation trench first uses sand Gravel bed course, then casting concrete;
Step 2: apply outlet headwall, described headwall uses mortar flag stone to apply, buries armored concrete underground in the middle part of described headwall Pipe culvert is connected as reserved second drain tube holes and buried with outside hole section and causes at described outlet headwall;
Step 3: apply described outlet domatic with the draining of described headwall location, and splayed aileron is set in both sides does gear and protect, It is domatic, based on the domatic lower section of described slabstone uses mortar flag stone also that described draining domatic lower section backfill ragstone layer forms slabstone Make barricade, above described slabstone is domatic, first lays one layer of geotextiles re-lays one layer of rock wool and do overcoat;
Step 4: arrange horizontal wall inscription at domatic barricade water outlet end, described horizontal wall inscription is provided with the gradient, and sets at domatic barricade water outlet end Putting and bury two-layer first row water pipe at horizontal wall inscription underground, interlamellar spacing and the tube pitch of described first row water pipe are laid according to a determining deviation, often Arranging two electrothermal tubes outside first row water pipe described in root, install temperature transducer above described electrothermal tube, described electrothermal tube is arranged in Both sides closely connected with described first row water pipe below described first row water pipe, described electrothermal tube is always domatic along lower section extends to draining Culvert pipe and stretch out certain distance;
Step 5: in described step 4, described first row water pipe surrounding uses concrete filling fixing, on described first row water pipe Side lays one layer of geotextiles and re-lays one layer of rock wool, and above described rock wool, backfill cinder is to end wall surface, applies above described cinder Mortar rubble masonry pavement, described first row water pipe passes bank protection face, it is ensured that water can flow out naturally from described first row water pipe, described First row water pipe water outlet is provided with weathering;
Step 6: apply bituminous coating on the surface of described mortar rubble masonry pavement.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that in described step 1 The thickness of Base with Sand Gravel Cushion be 15cm, described concreting thickness is 10cm, and model is C15.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 2 Described in second row water pipe external diameter be φ 40cm, the internal diameter of described armored concrete pipe culvert is φ 40cm, and wall thickness is 8cm.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 3 Described in the domatic ratio of slope of draining be 1:1.5.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 4 In the horizontal wall inscription ratio of slope of domatic barricade water outlet end be 8%.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 4 Described in first row water pipe a diameter of φ 20cm, material is UPVC.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 4 In, the scheme of burying underground of described first row water pipe is lower floor 7,6, upper strata, and interval laying and interlamellar spacing and tube pitch are 60cm.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 4 Described in the pvc pipe of a diameter of 20cm of electrothermal tube or the steel pipe of a diameter of φ 32cm.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step 5 Described in the bank protection ratio of slope be 1:1.5, described mortar flag stone thickness is 30cm, the weathering outside described first row water pipe outlet Ratio of slope is 10%.
The construction method of tunnel in cold area hole external thermal insulation outlet the most according to claim 1, it is characterised in that described step At described first row water pipe outlet to one section of cable buried outside hole in 4, described cable is embedded with temperature transducer.
CN201410395898.7A 2014-08-13 2014-08-13 A kind of construction method of tunnel in cold area hole external thermal insulation outlet Expired - Fee Related CN104179513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410395898.7A CN104179513B (en) 2014-08-13 2014-08-13 A kind of construction method of tunnel in cold area hole external thermal insulation outlet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410395898.7A CN104179513B (en) 2014-08-13 2014-08-13 A kind of construction method of tunnel in cold area hole external thermal insulation outlet

Publications (2)

Publication Number Publication Date
CN104179513A CN104179513A (en) 2014-12-03
CN104179513B true CN104179513B (en) 2016-08-17

Family

ID=51960826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410395898.7A Expired - Fee Related CN104179513B (en) 2014-08-13 2014-08-13 A kind of construction method of tunnel in cold area hole external thermal insulation outlet

Country Status (1)

Country Link
CN (1) CN104179513B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948832B (en) * 2017-03-14 2019-03-29 中铁隧道集团二处有限公司 A kind of tunnel in cold regions heat-insulating water outlet construction method
CN109404011A (en) * 2018-09-10 2019-03-01 北京隧盾市政建设有限公司 A kind of heat insulating construction method of pipe curtain slip casting tunnel water outlet

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100443819B1 (en) * 2003-10-14 2004-08-11 건양씨앤이 주식회사 Underway Tunneling Methods of arch typed Triangle Elementary pipe-roof
JP5163424B2 (en) * 2008-10-23 2013-03-13 株式会社大林組 Groundwater drainage structure and tunnel construction method having the drainage structure
CN101614129B (en) * 2009-08-10 2011-07-27 招商局重庆交通科研设计院有限公司 Construction method of tunnel waterproof and water drainage system
CN101985882B (en) * 2010-08-10 2012-07-04 中铁二十局集团有限公司 Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel

Also Published As

Publication number Publication date
CN104179513A (en) 2014-12-03

Similar Documents

Publication Publication Date Title
Lai et al. Freeze-proof method and test verification of a cold region tunnel employing electric heat tracing
CN104074525B (en) Full-face pouring, rectangular horizontal are freezed and pipe canopy joint reinforcement structure and method
CN102926304B (en) Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
CN102996178B (en) A kind of drainage system of tunnel in cold regions
CN103774699B (en) Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN103883328B (en) The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel
CN108316952A (en) Extremely frigid zones tunnel insulation waterproof and water drainage system
CN109026064A (en) A kind of construction method that large span multiple-arch tunnel is hazy
CN105887606B (en) Alpine meadow region heavy cut insulation infiltration combined type underdrain and its construction method
CN103362254A (en) Building roof construction process
CN109707117A (en) A kind of construction technology of siphon type rainwater discharging system
CN103032096B (en) Cold-proof construction method of tunnel central ditch of severe cold area
CN104179513B (en) A kind of construction method of tunnel in cold area hole external thermal insulation outlet
CN205348697U (en) Prevent aproll that ftractures
CN102877538A (en) Construction method for fixing HDPE (high-density polypropylene) pipe by embedding iron wires
CN205444201U (en) Reinforced concrete waist rail structure
CN208534539U (en) One kind can maintenance type drainage heating system for seasonal Layers In Cold-area Tunnels
CN208702024U (en) Inverted roof light and shade combination dual-drainage structure
CN110924435A (en) Transverse pipeline fixing device under transverse structure and construction method thereof
CN107034900B (en) Structure is administered to frozen soil side slope disease of slumping of hot melt
CN208380578U (en) Precast construction in a kind of roads and tunnels
CN206376897U (en) A kind of anti-tunnel frost discharge structure of extremely frigid zones
CN106351310B (en) A kind of installation method that greening structure soil is used as to rainwater accumulator
CN205474898U (en) A water nail drainage system for railway roadbed side slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Jun

Inventor after: Liu Juncheng

Inventor after: Qin Ling

Inventor after: Zhang Zhen

Inventor after: Tang Xu

Inventor after: Yue Cheng

Inventor after: Yang Chunbo

Inventor after: Lai Jinxing

Inventor before: Chen Jun

Inventor before: Liu Juncheng

Inventor before: Qin Ling

Inventor before: Zhang Zhen

Inventor before: Tang Xu

Inventor before: Yue Cheng

Inventor before: Yang Chunbo

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20210813

CF01 Termination of patent right due to non-payment of annual fee