CN102879549B - Three-way load large-scale three-dimensional analog simulation test system - Google Patents

Three-way load large-scale three-dimensional analog simulation test system Download PDF

Info

Publication number
CN102879549B
CN102879549B CN201210376520.3A CN201210376520A CN102879549B CN 102879549 B CN102879549 B CN 102879549B CN 201210376520 A CN201210376520 A CN 201210376520A CN 102879549 B CN102879549 B CN 102879549B
Authority
CN
China
Prior art keywords
seat
counter
force
dimensional
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210376520.3A
Other languages
Chinese (zh)
Other versions
CN102879549A (en
Inventor
尹光志
许江
蒋长宝
黄滚
王维忠
彭守建
李文璞
李铭辉
姚俊伟
李生舟
刘�东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201210376520.3A priority Critical patent/CN102879549B/en
Publication of CN102879549A publication Critical patent/CN102879549A/en
Application granted granted Critical
Publication of CN102879549B publication Critical patent/CN102879549B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明公开了一种三向加载大型三维相似模拟试验系统,包括试件箱和反力系统,其关键在于试件箱通过螺孔带的灵活设置,从而使试件箱可变化不同的体积,满足不同的试验要求,反力系统包括位于地面下的混凝土反力池以及与反力池固定的反力架。本发明可模拟井下采掘过程中不同顶板活动阶段时的煤层应力的复杂分布现象,制作大倾角矿层试件更方便、效果更好,可以保证在整个开采过程中,岩体都存于三向应力条件下,可以研究更多工况下的地下空间开挖,降低了整个系统地表上的高度,并且造价更低,系统更稳定。

The invention discloses a three-dimensional loading large-scale three-dimensional similar simulation test system, which includes a test piece box and a reaction force system. The key lies in the flexible setting of the test piece box through the screw hole belt, so that the test piece box can be changed in different volumes, To meet different test requirements, the reaction system includes a concrete reaction pool located under the ground and a reaction frame fixed to the reaction pool. The present invention can simulate the complex distribution phenomenon of coal seam stress at different roof activity stages in the process of underground mining, and it is more convenient and effective to make test pieces of large dip angle mine seam, which can ensure that the rock mass exists in the three-dimensional stress during the whole mining process. Under the same conditions, the excavation of underground space under more working conditions can be studied, which reduces the height of the entire system above the surface, and the cost is lower and the system is more stable.

Description

三向加载大型三维相似模拟试验系统Three-dimensional loading large-scale three-dimensional similar simulation test system

技术领域 technical field

本发明涉及一种模拟试验系统,特别是涉及一种用于研究矿体岩体应力分布的相似模拟试验系统。 The invention relates to a simulation test system, in particular to a similar simulation test system for studying stress distribution of ore mass and rock mass.

背景技术 Background technique

相似材料模拟试验是以相似理论、因次分析作为依据的实验室研究方法,广泛应用于水利、采矿、地质、铁路等部门。模拟试验的最大特点是可以人为地控制和改变试验条件,从而确定单因素或多因素对矿山压力影响的规律,试验效果清楚直观,而且试验周期短、见效快,在采矿科学的研究中发挥了巨大的作用。即使在岩石力学的数值模拟计算科学迅速发展的今天,相似材料模拟试验仍是采矿科学研究中不可替代的研究手段,它和日益成熟的数值计算模拟相辅相成,为人类认识和客服采矿科学中的难题发挥着重要的作用。 Similar material simulation test is a laboratory research method based on similarity theory and dimensional analysis, and is widely used in water conservancy, mining, geology, railway and other departments. The biggest feature of the simulation test is that the test conditions can be controlled and changed artificially, so as to determine the law of the influence of single or multiple factors on the mine pressure. The test effect is clear and intuitive, and the test period is short and the effect is quick. It has played an important role in the research of mining science. Huge effect. Even with the rapid development of numerical simulation and computing science of rock mechanics, similar material simulation test is still an irreplaceable research method in mining science research. It complements the increasingly mature numerical simulation and simulation, and helps humans understand and solve problems in mining science. play an important role.

在矿体没有开采之前,岩体处于平衡状态。当矿体开采后,形成了地下空间,破坏了岩体的原始应力场,引起岩体应力重新分布,并一直延续到岩体内形成新的平衡为止。在应力重新分布过程中,使围岩产生变形、移动、破坏,从而对工作面、巷道及围岩产生压力。在矿山压力的作用下会产生的一系列力学现象——矿压显现,如顶板下沉、底板鼓起、煤壁片帮、支架变形、岩层移动、煤的压出等。开采后的上覆岩层可分为冒落带、断裂带和弯曲下沉带。 Before the ore body is mined, the rock mass is in a state of equilibrium. When the ore body is mined, an underground space is formed, which destroys the original stress field of the rock mass, causes the stress redistribution of the rock mass, and continues until a new balance is formed in the rock mass. In the process of stress redistribution, the surrounding rock is deformed, moved, and destroyed, thereby exerting pressure on the working face, roadway and surrounding rock. Under the action of mine pressure, there will be a series of mechanical phenomena—mine pressure appearance, such as roof sinking, floor bulging, coal wall slabs, support deformation, rock formation movement, coal extrusion, etc. The overlying strata after mining can be divided into caving zone, fault zone and curved subsidence zone.

现有技术中的三维相似模拟试验系统,虽在一定程度上加深了地下开挖工 程研究的进展,但存在以下不足:1)模型尺寸较小,做模拟试验时的几何比将会很小,在实践中发现做模型试验几何比过小将不能很好的反应开挖带来的影响;2)模型尺寸都是固定的不能调整,这会导致有时几何比太小,有时会导致空间太大浪费材料;3)加力方向单一,难以实现三向加载;4)岩体变形监测大都采用应变片,岩体变形数据采集不够精确;5)矿层开挖必须将试件箱打开后人工手动开挖,这将引起卸荷效应,与实际工况不符;6)装置上架过程基本上靠手工搬运,不方便操作;7)所应用的应力加载系统多为手动,因此,应力加载过程不能保持匀速,且其精度不能保证,此外,诸如循环荷载等加载形式不能实现。 Although the three-dimensional similar simulation test system in the prior art has deepened the progress of underground excavation engineering research to a certain extent, it has the following shortcomings: 1) The model size is small, and the geometric ratio when doing simulation tests will be very small In practice, it is found that the geometric ratio of the model test is too small to reflect the impact of excavation; 2) The size of the model is fixed and cannot be adjusted, which will cause sometimes the geometric ratio is too small, and sometimes the space will be too large Waste of material; 3) The force direction is single, and it is difficult to achieve three-way loading; 4) Most of the rock mass deformation monitoring uses strain gauges, and the rock mass deformation data collection is not accurate enough; 5) The test piece box must be opened manually after the mine excavation Digging, which will cause unloading effect, which is inconsistent with the actual working conditions; 6) The process of loading the device is basically carried by hand, which is inconvenient to operate; 7) Most of the applied stress loading systems are manual, so the stress loading process cannot maintain a uniform speed , and its accuracy cannot be guaranteed. In addition, loading forms such as cyclic loading cannot be realized.

因此本领域技术人员致力于开发一种模型尺寸可变、操作简单并且试验准确可靠的三向加载大型三维相似模拟试验系统,以及一种试验制样方法,一种三维相似模拟试验载荷模拟方法,以及一种三向加载大型三维相似模拟试验开采层模拟方法。 Therefore, those skilled in the art are committed to developing a large-scale three-dimensional similar simulation test system with variable model size, simple operation, and accurate and reliable three-way loading, as well as a test sample preparation method, a three-dimensional similar simulation test load simulation method, And a three-dimensional loading large-scale three-dimensional similar simulation test mining layer simulation method.

发明内容 Contents of the invention

有鉴于现有技术的上述缺陷,本发明所要解决的技术问题是提供一种模型尺寸可变、操作简单并且试验准确可靠的三向加载大型三维相似模拟试验系统,以及一种试验制样方法,一种三维相似模拟试验载荷模拟方法,以及一种三向加载大型三维相似模拟试验开采层模拟方法。 In view of the above-mentioned defects of the prior art, the technical problem to be solved by the present invention is to provide a three-dimensional loading large-scale three-dimensional similar simulation test system with variable model size, simple operation and accurate and reliable test, and a test sample preparation method, A three-dimensional similar simulation test load simulation method, and a three-dimensional loading large-scale three-dimensional similar simulation test production layer simulation method.

为实现上述第一层面的发明目的,本发明提供了一种三向加载大型三维相似模拟试验系统,包括试件箱和反力系统,所述试件箱包括底座;所述底座的边缘设置有构成正方形的左螺孔带、右螺孔带、前螺孔带和后螺孔带;所述底 座在所述左螺孔带处通过螺栓固定连接有左侧板,在所述前螺孔带处通过螺栓固定连接有前侧板; In order to achieve the above-mentioned first aspect of the invention, the present invention provides a three-dimensional loading large-scale three-dimensional similar simulation test system, including a test piece box and a reaction force system, the test piece box includes a base; the edge of the base is provided with The left screw hole band, the right screw hole band, the front screw hole band and the rear screw hole band constitute a square; the base is fixedly connected with a left side plate at the left screw hole band by bolts, The belt is fixedly connected to the front side plate by bolts;

所述右螺孔带与所述左螺孔带之间设置有至少一个第一中间螺孔带;所述后螺孔带与所述前螺孔带之间设置有与所述第一中间螺孔带数量对应、垂直相接的第二中间螺孔带;相接的第一中间螺孔带和第二中间螺孔带与所述左螺孔带和右螺孔带构成正方形;所述右螺孔带或任一所述第一中间螺孔带上通过螺栓固定连接有右侧板;与所述右侧板相接的所述后螺孔带或任一所述第二中间螺孔带上通过螺栓固定连接有后侧板;所述后侧板上设置有传感器接线孔;所述后侧板的外侧间隔固定有第一垫板; At least one first middle screw hole band is arranged between the right screw hole band and the left screw hole band; between the rear screw hole band and the front screw hole band is provided with the first middle screw hole band. The number of hole belts corresponds to the second middle screw hole belt that is vertically connected; the connected first middle screw hole belt and the second middle screw hole belt form a square with the left screw hole belt and the right screw hole belt; the right screw hole belt The screw hole belt or any one of the first middle screw hole belts is fixedly connected with the right side plate by bolts; the rear screw hole belt connected to the right side plate or any one of the second middle screw hole belts The rear side plate is fixedly connected with bolts; the rear side plate is provided with sensor wiring holes; the outer side of the rear side plate is fixed with a first backing plate at intervals;

所述左侧板的内侧通过螺栓固定连接有左压座;所述左侧板上按均分区域设置有左压套;所述左压座上固定有数量和位置与所述左压套相对应的左压杆;所述左压杆穿出所述左压套; The inner side of the left plate is fixedly connected with a left pressure seat by bolts; the left plate is provided with a left pressure sleeve according to the equally divided area; The corresponding left pressure rod; the left pressure rod passes through the left pressure sleeve;

所述前侧板的内侧通过螺栓固定连接有前压座;所述前侧板上按均分区域设置有前压套;所述前压座上固定有数量和位置与所述前压套相对应的前压杆;所述前压杆穿出所述前压套; The inner side of the front side plate is fixedly connected with a front pressure seat by bolts; the front side plate is provided with a front pressure sleeve according to an evenly divided area; The corresponding front compression rod; the front compression rod passes through the front compression sleeve;

所述左压座与所述前压座间隔设置; The left press seat is spaced apart from the front press seat;

所述反力系统包括位于地面下的混凝土反力池;所述反力池的底部设置有与所述反力池固定连接的第一反力座;所述第一反力座的右侧设置有第二反力座;所述第二反力座与所述反力池的池底固定,并同时与所述第一反力座通过螺栓固定连接; The reaction force system includes a concrete reaction force pool located under the ground; the bottom of the reaction force pool is provided with a first reaction force seat fixedly connected to the reaction force pool; the right side of the first reaction force seat is provided with There is a second reaction force seat; the second reaction force seat is fixed to the bottom of the reaction force pool, and at the same time is fixedly connected to the first reaction force seat by bolts;

所述反力池在所述试件箱的左侧设置有与所述第一反力座固定连接,并且 紧靠混凝土墙面的侧承力架;所述侧承力架上固定有数量和位置与所述左压杆相对应的左液压缸;所述反力池在所述试件箱的右侧设置有与所述第二反力座螺栓连接的反力架;所述反力架可与所述试件箱通过螺栓固定连接; The reaction force pool is provided with a side bearing frame fixedly connected with the first reaction force seat on the left side of the test piece box, and close to the concrete wall surface; The left hydraulic cylinder whose position corresponds to the left pressure rod; the reaction force pool is provided with a reaction force frame connected with the second reaction force seat bolts on the right side of the test piece box; the reaction force frame It can be fixedly connected with the test piece box by bolts;

所述第一反力座的前部固定有前立柱;所述前立柱的一端面紧靠所述反力池的混凝土墙面,另一端面固定有数量和位置与所述前压杆相对应的前液压缸; The front part of the first reaction seat is fixed with a front column; one end of the front column is close to the concrete wall of the reaction pool, and the other end is fixed with a number and position corresponding to the front pressure bar. front hydraulic cylinder;

所述第一反力座的后部固定有后立柱;所述后立柱的一端面紧靠所述反力池的混凝土墙面,另一端面固定有数量和位置与所述第一垫板相对应、并可紧贴所述第一垫板的第二垫板; The rear part of the first reaction seat is fixed with a rear column; one end of the rear column is close to the concrete wall of the reaction pool, and the other end is fixed with a number and position corresponding to the first backing plate. a second backing plate corresponding to and close to the first backing plate;

所述前立柱和后立柱通过上方固定的横梁连接为一体结构;所述横梁上均布设置有与所述试件箱相对的上液压缸; The front column and the rear column are connected as an integrated structure through the fixed beam above; the upper hydraulic cylinder opposite to the specimen box is evenly distributed on the beam;

所述模拟试验系统还包括压座;进行相似模拟试验时,所述压座将所述上液压缸的加载力传递至所述试件箱内的相似材料上。 The simulation test system also includes a pressure seat; when performing a similar simulation test, the pressure seat transmits the loading force of the upper hydraulic cylinder to similar materials in the test piece box.

为防止加载过程中三向力发生干涉,在高度方向上,所述前压座与所述左压座的转角处放置有与所述前压座和左压座接触的第一防干涉座;所述左压座的内侧放置有第二防干涉座;所述第一防干涉座和第二防干涉座间隔设置。 In order to prevent the three-way force from interfering during the loading process, in the height direction, a first anti-interference seat in contact with the front press seat and the left press seat is placed at the corner of the front press seat and the left press seat; A second anti-interference seat is placed inside the left pressure seat; the first anti-interference seat and the second anti-interference seat are arranged at intervals.

较佳的,所述第一防干涉座远离所述左压座一端为楔形结构;所述第一防干涉座的顶端为楔形结构;所述第二防干涉板靠近所述前压座一端为楔形结构。 Preferably, the end of the first anti-interference seat away from the left press seat has a wedge-shaped structure; the top end of the first anti-interference seat has a wedge-shaped structure; the end of the second anti-interference plate close to the front press seat is wedge-shaped structure.

为便于移动试件箱,所述第一反力座上设置有滚动导轨;所述试件箱可放置在所述滚动导轨上;所述底座的左右两侧均设置有拉座;在所述试件箱的左右两侧设置有与所述拉座相对应的牵引机构。 In order to facilitate the movement of the test piece box, a rolling guide rail is provided on the first reaction force seat; the test piece box can be placed on the rolling guide rail; pull seats are provided on the left and right sides of the base; The left and right sides of the test piece box are provided with traction mechanisms corresponding to the pull seats.

较佳的,所述底座的左右两侧均间隔设置有两个拉座;所述牵引机构包括 减速机;所述减速机通过第一联轴器与第一卷筒的第一端连接;所述第一卷筒的第二端通过第二联轴器、传动轴和第三联轴器与第二卷筒联接;所述第一卷筒和第二卷筒上缠绕有可与所述拉座连接的钢丝绳。 Preferably, two pull seats are arranged at intervals on the left and right sides of the base; the traction mechanism includes a reducer; the reducer is connected to the first end of the first reel through a first coupling; the The second end of the first reel is connected with the second reel through the second coupling, the transmission shaft and the third coupling; The wire rope connected by the seat.

为简化操作,所述第二反力座的前侧设置有可固定所述第一卷筒的钢丝绳的第一钢丝绳固定座;所述第二反力座的后侧设置有可固定所述第二卷筒的钢丝绳的第二钢丝绳固定座。 In order to simplify the operation, the front side of the second reaction force seat is provided with a first wire rope fixing seat that can fix the steel wire rope of the first reel; The second wire rope fixing seat of the wire rope of the second reel.

较佳的,所述压座包括上板和底板,所述上板和底板通过立板连接为一体结构;所述立板上设置有筋板。 Preferably, the press seat includes an upper plate and a bottom plate, and the upper plate and the bottom plate are connected into one structure through a vertical plate; ribs are provided on the vertical plate.

为便于制作具有倾角矿层的试件,所述第二反力座的右侧设置有第三反力座;所述第三反力座与所述反力池的池底固定,并同时与所述第二反力座通过螺栓固定连接; For the convenience of making a test piece with an inclination angle ore layer, a third reaction force seat is provided on the right side of the second reaction force seat; the third reaction force seat is fixed with the bottom of the reaction force pool, and simultaneously with the The second reaction seat is fixedly connected by bolts;

所述第三反力座的右端间隔设置有第一铰接座和第二铰接座;所述底座的右端设置可分别与所述第一铰接座和第二铰接座铰接的第三铰接座和第四铰接座; The right end of the third reaction seat is provided with a first hinged seat and a second hinged seat at intervals; the right end of the base is provided with a third hinged seat and a second hinged seat which can be hinged with the first hinged seat and the second hinged seat respectively. Four hinged seats;

所述反力池在所述第三反力座靠近所述第二反力座一侧的前后两端分别设置有油缸支座;所述油缸支座上铰接有油缸;所述油缸的活塞杆端部铰接有推力支座;所述推力支座可与所述试件箱的底座连接。 The reaction pool is provided with oil cylinder supports at the front and rear ends of the third reaction force seat close to the second reaction force seat; an oil cylinder is hinged on the oil cylinder support; the piston rod of the oil cylinder A thrust support is hinged at the end; the thrust support can be connected with the base of the test piece box.

为便于模拟开挖煤层,所述前侧板和后侧板上对应设置有至少一列油囊安装孔。 In order to facilitate the simulation of coal seam excavation, at least one row of oil bag installation holes is correspondingly provided on the front side plate and the rear side plate.

为实现本发明第二层面的发明目的,本发明提供了一种三向加载大型三维相似模拟试验制样方法,包括以下步骤: In order to realize the invention objective of the second aspect of the present invention, the present invention provides a method for preparing a sample for a three-dimensional loading large-scale three-dimensional similar simulation test, comprising the following steps:

(1)使试件箱倾斜,试件箱的倾角等于矿层倾角; (1) Tilt the test piece box, and the inclination angle of the test piece box is equal to the inclination angle of the ore seam;

(2)对岩层压力分布规律进行数值模拟,根据模拟结果,得出预制试件应力测点布置压力传感器的位置; (2) Carry out numerical simulation of the rock formation pressure distribution law, and obtain the position of the pressure sensor at the stress measuring point of the prefabricated test piece according to the simulation result;

(3)按照几何相似比、容重相似比、应力相似比以及强度相似比计算出模型岩石的容重、抗压强度、开挖速度等力学性质参数,通过河砂、石膏、碳酸钙以不同的比例与适量的水搅拌均匀,制作成多个标准试件并在自然状态下风干,对标准试件的单轴抗压强度进行测定,根据强度相似比计算出的抗压强度与不同配比的一系列单轴抗压强度对比,得出各层相似材料的最佳配比; (3) According to the geometric similarity ratio, bulk density similarity ratio, stress similarity ratio and strength similarity ratio, the mechanical property parameters such as bulk density, compressive strength, and excavation speed of the model rock are calculated, and the river sand, gypsum, and calcium carbonate are used in different proportions. Stir evenly with an appropriate amount of water, make a number of standard specimens and air-dry them in a natural state, measure the uniaxial compressive strength of the standard specimens, and compare the compressive strength calculated according to the strength similarity ratio with a different ratio Comparison of serial uniaxial compressive strengths to obtain the best ratio of similar materials in each layer;

(4)根据各分层的最佳配比和容重,计算出各分层材料所需质量,称出相应配料的质量,将各种配料搅拌均匀,再加入适量水,立即进行搅拌,防止凝结;搅拌均匀后,将配料送入试件箱内,并夯实;在模拟矿层分层之间的表面上均匀地铺一层云母粉作为分层弱面,用壁刀将表面抹平,同时在各分层的指定位置插上测标;依照次序将各分层装好,直到所有岩层都装到试件箱内; (4) According to the optimal ratio and bulk density of each layer, calculate the required mass of each layered material, weigh the mass of the corresponding ingredients, mix the ingredients evenly, then add an appropriate amount of water, and stir immediately to prevent condensation ; After stirring evenly, send the ingredients into the test piece box and tamp it; spread a layer of mica powder evenly on the surface between the layers of the simulated ore layer as the weak layer of the layer, and smooth the surface with a wall knife. Insert the measurement mark at the designated position of the layer; install each layer in order until all the rock layers are installed in the test piece box;

(5)步骤(4)中,根据步骤(2)的结果在试件内布置传感器,并在试件内设置油囊模拟煤层,通过充油量控制模拟煤层的厚度,通过泄油模拟煤层开挖; (5) In step (4), according to the results of step (2), sensors are arranged in the test piece, and an oil bag is set in the test piece to simulate the coal seam. dig;

(6)待相似材料干燥后,使试件箱回复到水平位置。 (6) After the similar materials are dried, return the specimen box to the horizontal position.

较佳的,为更好的观测岩层的变形,由于udec软件特别适合于模拟节理岩石系统或者不连续块体集合体系在静力或动力荷载条件下的响应,因此可利用udec软件对岩层的变形规律进行数值模拟,对数值模拟形成的裂隙场进行裂隙提取,得到裂隙分布,并根据提取的裂隙场在试件上布置钻孔位置进行钻孔。 Preferably, in order to better observe the deformation of the rock formation, since the udec software is especially suitable for simulating the response of the jointed rock system or the discontinuous block assembly system under static or dynamic load conditions, the deformation of the rock formation can be analyzed by using the udec software The numerical simulation is carried out regularly, and the cracks are extracted from the crack field formed by the numerical simulation to obtain the crack distribution, and the drilling positions are arranged on the test piece according to the extracted crack field for drilling.

为实现本发明第三层面的发明目的,本发明提供了一种三维相似模拟试验载荷模拟方法,包括以下步骤: In order to realize the invention object of the third aspect of the present invention, the present invention provides a kind of three-dimensional similar simulation test load simulation method, comprising the following steps:

(1)以上下方向为Z向,左右方向为X向,前后方向为Y向,采用力控制方式对X向水平加载压力、Y向水平加载压力、Z向垂直加载压力进行加载,加载顺序为: (1) The up and down direction is the Z direction, the left and right direction is the X direction, and the front and rear direction is the Y direction. The force control method is used to load the horizontal loading pressure in the X direction, the horizontal loading pressure in the Y direction, and the vertical loading pressure in the Z direction. The loading sequence is :

a)同时加载X向和Y向N(N为自然数)秒,然后加载Z向N秒; a) Simultaneously load X-direction and Y-direction N (N is a natural number) seconds, and then load Z-direction N seconds;

b)重复步骤a); b) repeat step a);

c)同时加载X向和Y向2N秒,然后加载Z向2N秒; c) Simultaneously load X-direction and Y-direction 2N seconds, and then load Z-direction 2N seconds;

d)重复步骤c)至三向加载压力达到预定值,该预定值为工况现场实测的地应力; d) Repeat step c) until the three-way loading pressure reaches the predetermined value, which is the actual measured in-situ stress of the working condition;

步骤a)~d)中,加载速率恒定; In steps a) to d), the loading rate is constant;

(2)保持载荷; (2) holding load;

(3)当Z向垂直加载压力≥5kN,Z向垂直加载压力瞬时下降力≥0.3kN时,三向加载切换为位移控制方式。 (3) When the vertical loading pressure in the Z direction is ≥5kN, and the instantaneous drop force of the vertical loading pressure in the Z direction is ≥0.3kN, the three-way loading is switched to the displacement control mode.

较佳的,步骤(1)中,力控制方式的力加载速度范围为0.01kN/s-100kN/s,一般优选为0.05kN/s。 Preferably, in step (1), the force loading speed range of the force control mode is 0.01kN/s-100kN/s, generally preferably 0.05kN/s.

步骤(3)中,位移控制方式的加载速度范围为0.1mm/min~100mm/min,一般优选为0.1mm/min。 In step (3), the loading speed range of the displacement control mode is 0.1mm/min-100mm/min, and generally preferably 0.1mm/min.

为实现本发明第四层面的发明目的,本发明提供了一种三向加载大型三维相似模拟试验开采层模拟方法,包括以下步骤: In order to realize the invention object of the fourth aspect of the present invention, the present invention provides a method for simulating the production layer of a three-dimensional loading large-scale three-dimensional similar simulation test, including the following steps:

(1)制作岩层试件,并在试件中设置若干油囊; (1) Make a rock formation test piece, and set a number of oil pockets in the test piece;

(2)通过微型真空泵抽取油囊中的油,从而形成开采层。油的抽取速度根据前述开挖速度确定。开采层的开挖通过抽取油囊中的油来实现,开挖速度通过油囊抽油速度来模拟。如某矿一煤层实际开挖速度为3.6m/d,根据几何相似比α1=100、时间相似比 计算出模型开挖速度为0.25mm/min,由于油囊大小不一样,抽油速度范围为:0.01L/min-0.5L/min。抽油速度一般为0.025L/min-0.03L/min。 (2) The oil in the oil bag is pumped out by a micro-vacuum pump to form a production layer. The oil extraction rate is determined according to the aforementioned excavation rate. The excavation of the production layer is realized by pumping the oil in the oil bag, and the excavation speed is simulated by the oil pumping speed of the oil bag. For example, the actual excavation speed of a coal seam in a certain mine is 3.6m/d, according to the geometric similarity ratio α 1 =100, the time similarity ratio The excavation speed of the model is calculated to be 0.25mm/min. Due to the different sizes of the oil pockets, the pumping speed range is: 0.01L/min-0.5L/min. The pumping speed is generally 0.025L/min-0.03L/min.

本发明的有益效果是: The beneficial effects of the present invention are:

(1)本发明可真实模拟地应力三向应力状态,当采用模型尺寸3000mm×3000mm×3000mm时,垂直方向布置9个千斤顶(每个千斤顶加载面积1000mm×1000mm),两个水平方向均布置18个千斤顶的成本(每个千斤顶加载面积1000mm×500mm),这样可以通过多组液压千斤顶实现了对垂直应力和两个水平方向上应力的非均布加载,可模拟井下采掘过程中不同顶板活动阶段时的煤层应力的复杂分布现象。 (1) The present invention can truly simulate the three-dimensional stress state of the ground stress. When the model size is 3000mm×3000mm×3000mm, 9 jacks are arranged in the vertical direction (the loading area of each jack is 1000mm×1000mm), and 18 jacks are arranged in both horizontal directions. The cost of one jack (the loading area of each jack is 1000mm×500mm), so that the non-uniform loading of vertical stress and stress in two horizontal directions can be realized through multiple groups of hydraulic jacks, which can simulate different roof activity stages in the underground mining process. The complex distribution phenomenon of coal seam stress at that time.

(2)本发明试件尺寸可变,可采用一套硬件系统而模拟不同的煤层情况,如1000mm×1000mm×1000mm试件可模拟巷道开挖情况;2000mm×2000mm×2000mm试件可模拟西南地区薄煤层情况;3000mm×3000mm×3000mm试件可模拟北方厚煤层情况。 (2) The size of the test piece of the present invention is variable, and a set of hardware systems can be used to simulate different coal seam conditions. For example, a 1000mm×1000mm×1000mm test piece can simulate roadway excavation; a 2000mm×2000mm×2000mm test piece can simulate the southwest region Thin coal seam situation; 3000mm×3000mm×3000mm test piece can simulate the thick coal seam situation in the north.

(3)本发明可调整试件箱的角度,因此在制作试件时,可使试件箱调整到矿层的倾角水平堆料,材料晾干后再将试验台放回水平状态,较以往相似模拟试验台在水平条件下堆大倾角矿层更方便、效果更好。 (3) The invention can adjust the angle of the test piece box, so when making the test pieces, the test piece box can be adjusted to the inclination angle of the ore seam to stack materials horizontally, and after the materials are dried, the test bench can be put back to the horizontal state, which is similar to the past It is more convenient and effective for the simulated test bench to pile up the ore seam with a large dip angle under horizontal conditions.

(4)本发明可采用油囊模拟开采层,抽出油囊中空气模拟开采矿层开采。 这样可以保证在整个开采过程中,岩体都存于三向应力条件下。 (4) The present invention can use the oil bag to simulate the mining layer, and extract the air in the oil bag to simulate the mining of the mining layer. This can ensure that the rock mass exists under the three-dimensional stress condition during the entire mining process.

(5)本发明载荷控制方式为力、位移全闭环控制,力、位移自编程控制模式,这相较以往的相似模拟试验装置加载方式更灵活,更智能,更多样,可以研究更多工况下的地下空间开挖。 (5) The load control method of the present invention is full closed-loop control of force and displacement, and the self-programming control mode of force and displacement, which is more flexible, smarter and more diverse than the loading method of similar simulation test devices in the past, and can study more processes Excavation of underground space under circumstances.

(6)本试验系统有一半是在地下,从而降低了整个系统地表上的高度,并利用地下的反力墙,降低造价,也使系统更加稳定。 (6) Half of the test system is underground, which reduces the height of the entire system above the surface, and uses the underground reaction wall to reduce the cost and make the system more stable.

(7)本发明试件输送采用皮带送料机传动,省时省力。 (7) The test piece transportation of the present invention is driven by a belt feeder, which saves time and effort.

附图说明 Description of drawings

图1是本发明一具体实施方式的结构示意图。 Fig. 1 is a schematic structural view of a specific embodiment of the present invention.

图2是图1中IV处的局部放大图。 Fig. 2 is a partially enlarged view of IV in Fig. 1 .

图3是图1的俯视结构示意图。 FIG. 3 is a schematic top view of the structure in FIG. 1 .

图4是图3的E-E剖视放大图。 FIG. 4 is an enlarged cross-sectional view along line E-E of FIG. 3 .

图5是图4的左视结构示意图。 Fig. 5 is a left view structural diagram of Fig. 4 .

图6是图1的左视结构示意图。 Fig. 6 is a left view structural diagram of Fig. 1 .

图7是图6中III处的局部放大图。 Fig. 7 is a partial enlarged view of III in Fig. 6 .

图8是本发明一具体实施方式中试件箱的结构示意图。 Fig. 8 is a schematic structural view of a test piece box in a specific embodiment of the present invention.

图9是图8的左视结构示意图。 FIG. 9 is a left view structural diagram of FIG. 8 .

图10是图8的俯视结构示意图。 FIG. 10 is a schematic top view of the structure of FIG. 8 .

图11是图10中I处的局部放大图。 Fig. 11 is a partial enlarged view of position I in Fig. 10 .

图12是图10中II处的局部放大图。 Fig. 12 is a partially enlarged view of II in Fig. 10 .

图13是本发明一具体实施方式中压座的结构示意图。 Fig. 13 is a schematic structural view of a pressure seat in a specific embodiment of the present invention.

图14是图13的俯视结构示意图。 FIG. 14 is a schematic top view of the structure of FIG. 13 .

图15是图13的左视结构示意图。 Fig. 15 is a left view structural diagram of Fig. 13 .

图16是本发明一具体实施方式中牵引机构的结构示意图。 Fig. 16 is a schematic structural view of the traction mechanism in a specific embodiment of the present invention.

具体实施方式 Detailed ways

下面结合附图和实施例对本发明作进一步说明: Below in conjunction with accompanying drawing and embodiment the present invention will be further described:

如图1至图16所示,一种三向加载大型三维相似模拟试验系统,包括试件箱和反力系统。试件箱包括底座1,底座1的边缘设置有构成正方形的左螺孔带13、右螺孔带14、前螺孔带15和后螺孔带16。底座1在左螺孔带13处通过螺栓固定连接有左侧板3,在前螺孔带15处通过螺栓固定连接有前侧板5。 As shown in Figures 1 to 16, a three-dimensional loading large-scale three-dimensional similar simulation test system includes a specimen box and a reaction system. The test piece box includes a base 1, and the edge of the base 1 is provided with a left screw hole band 13, a right screw hole band 14, a front screw hole band 15 and a rear screw hole band 16 forming a square. The base 1 is fixedly connected with the left side plate 3 at the left screw hole band 13 by bolts, and is fixedly connected with the front side plate 5 at the front screw hole band 15 by bolts.

右螺孔带14与左螺孔带13之间设置有两个第一中间螺孔带17,后螺孔带16与前螺孔带15之间设置有两个分别与第一中间螺孔带17垂直相接的第二中间螺孔带18,相接的第一中间螺孔带17和第二中间螺孔带18与左螺孔带13和右螺孔带14构成正方形。 Between the right screw hole band 14 and the left screw hole band 13, two first middle screw hole bands 17 are arranged, and two screw hole bands respectively connected with the first middle screw hole bands are arranged between the rear screw hole band 16 and the front screw hole band 15. 17 vertically connected second middle screw hole bands 18, the first middle screw hole bands 17 and the second middle screw hole bands 18 and the left screw hole band 13 and the right screw hole band 14 form a square.

右螺孔带14和两个第一中间螺孔带17上均可通过螺栓固定连接右侧板4,与右侧板14相接的后螺孔带16和两个第二中间螺孔带18上均可通过螺栓固定连接后侧板6。 The right screw hole band 14 and the two first middle screw hole bands 17 can be fixedly connected to the right side plate 4 by bolts, and the rear screw hole band 16 connected with the right side plate 14 and the two second middle screw hole bands 18 Both can be fixedly connected to the rear side plate 6 by bolts.

本实施例中,当右侧板4设置于右螺孔带14、后侧板6设置于后螺孔带16,则各侧板与底座1可合围成一3000mm×3000mm×3000mm的立体空间;当右侧板4设置于靠右的第一中间螺孔带17、后侧板6设置于靠后的第二中间螺孔带18,则各侧板与底座1可合围成一2000mm×2000mm×2000mm的立体空间;当右侧板4设置于靠左的第一中间螺孔带17、后侧板6设置于靠前的第二中间螺孔带18, 则各侧板与底座1可合围成一1000mm×1000mm×1000mm的立体空间。 In this embodiment, when the right side plate 4 is set on the right screw hole belt 14, and the rear side plate 6 is set on the rear screw hole belt 16, then each side plate and the base 1 can enclose a three-dimensional space of 3000mm×3000mm×3000mm; The right side plate 4 is set on the right first middle screw hole belt 17, and the rear side plate 6 is set on the rear second middle screw hole belt 18, then each side plate and the base 1 can be enclosed into a 2000mm×2000mm×2000mm Three-dimensional space; when the right side plate 4 is set on the left first middle screw hole belt 17, and the rear side plate 6 is set on the front second middle screw hole belt 18, then each side plate and the base 1 can be surrounded by a 1000mm× 1000mm×1000mm three-dimensional space.

本实施例中,各侧板为可通过螺栓连接的分体式结构,以便于试件箱拼接成不同的尺寸。 In this embodiment, each side plate is a split structure that can be connected by bolts, so that the specimen boxes can be spliced into different sizes.

在其他具体实施方式中,可根据需要灵活设置第一中间螺孔带17和第二中间螺孔带18的位置,以使试件箱拼接为其他尺寸或其他形状。 In other specific embodiments, the positions of the first middle screw hole band 17 and the second middle screw hole band 18 can be flexibly set according to needs, so that the specimen boxes can be spliced into other sizes or shapes.

后侧板6上设置有传感器接线孔19,后侧板6的外侧间隔固定有第一垫板31。 The rear side plate 6 is provided with a sensor wiring hole 19 , and the outer side of the rear side plate 6 is fixed with a first backing plate 31 at intervals.

左侧板3的内侧通过螺栓固定连接有左压座7,左侧板3上按均分区域设置有左压套9,左压座7上固定有数量和位置与左压套9相对应的左压杆8,左压杆8穿出左压套9。如图9所示,左侧板3为3000mm×3000mm,其可均分为9个1000mm×1000mm的区域,每个区域设置有两个左压套9。 The inner side of the left side plate 3 is fixedly connected with a left pressure seat 7 by bolts, and the left side plate 3 is provided with a left pressure sleeve 9 according to an evenly divided area. Left pressure rod 8, left pressure rod 8 passes left pressure sleeve 9. As shown in FIG. 9 , the left side panel 3 is 3000mm×3000mm, which can be equally divided into nine areas of 1000mm×1000mm, each area is provided with two left pressure sleeves 9 .

前侧板5的内侧通过螺栓固定连接有前压座10,前侧板5上按均分区域设置有前压套11;前压座10上固定有数量和位置与前压套11相对应的前压杆12;前压杆12穿出前压套11。如图8所示,前侧板5为3000mm×3000mm,其可均分为9个1000mm×1000mm的区域,每个区域设置有两个前压套11。 The inner side of the front side plate 5 is fixedly connected with a front pressure seat 10 by bolts, and the front side plate 5 is provided with a front pressure sleeve 11 according to an evenly divided area; The front pressing rod 12; the front pressing rod 12 passes through the front pressing sleeve 11. As shown in FIG. 8 , the front side plate 5 is 3000mm×3000mm, which can be equally divided into nine areas of 1000mm×1000mm, each area is provided with two front pressure sleeves 11 .

左压座7与前压座10间隔设置。 The left press seat 7 is spaced apart from the front press seat 10.

反力系统包括位于地面下的混凝土反力池23,反力池23的底部设置有与反力池23固定连接的第一反力座24a,第一反力座24a的右侧设置有第二反力座24b,第二反力座24b与反力池23的池底固定,并同时与第一反力座24a通过螺栓固定连接。反力池23的两侧设置有与地面相连的楼梯56,可通过楼梯56安装维修反力池23内的各部件。  The reaction force system comprises the concrete reaction force pool 23 under the ground, the bottom of the reaction force pool 23 is provided with the first reaction force seat 24a fixedly connected with the reaction force pool 23, and the right side of the first reaction force seat 24a is provided with a second The reaction force seat 24b and the second reaction force seat 24b are fixed to the bottom of the reaction force pool 23, and at the same time are fixedly connected to the first reaction force seat 24a by bolts. Stairs 56 connected to the ground are provided on both sides of the reaction force pool 23 , and various components in the reaction force pool 23 can be installed and maintained through the stairs 56 . the

反力池23在试件箱的左侧设置有与第一反力座24a固定连接,并且紧靠混凝土墙面的侧承力架26,侧承力架26上固定有数量和位置与左压杆8相对应的左液压缸27。反力池23在试件箱的右侧设置有与第二反力座24b螺栓连接的反力架28,反力架28可与试件箱通过螺栓固定连接。 The reaction force pool 23 is provided with a side bearing frame 26 fixedly connected with the first reaction force seat 24a on the left side of the test piece box, and close to the concrete wall. Rod 8 corresponds to the left hydraulic cylinder 27. The reaction force pool 23 is provided with a reaction force frame 28 bolted to the second reaction force seat 24b on the right side of the test piece box, and the reaction force frame 28 can be fixedly connected with the test piece box by bolts.

第一反力座24a的前部固定有前立柱29,前立柱29的一端面紧靠反力池23的混凝土墙面,另一端面固定有数量和位置与前压杆12相对应的前液压缸30。 The front portion of the first reaction force seat 24a is fixed with a front column 29, and one end surface of the front column 29 is close to the concrete wall surface of the reaction force pool 23, and the other end surface is fixed with a number and a position corresponding to the front pressure rod 12. Cylinder 30.

第一反力座24a的后部固定有后立柱33,后立柱33的一端面紧靠反力池23的混凝土墙面,另一端面固定有数量和位置与第一垫板31相对应、并可紧贴第一垫板31的第二垫板32。 The rear portion of the first reaction force seat 24a is fixed with a rear column 33, and one end surface of the rear column 33 is close to the concrete wall surface of the reaction force pool 23, and the other end surface is fixed with a number and a position corresponding to the first backing plate 31, and The second backing plate 32 can be in close contact with the first backing plate 31 .

前立柱29和后立柱33通过上方固定的横梁55连接为一体结构,横梁55上均布设置有与试件箱相对的上液压缸34。 The front column 29 and the rear column 33 are connected as an integral structure through the fixed beam 55 above, and the upper hydraulic cylinder 34 opposite to the specimen box is uniformly arranged on the beam 55 .

模拟试验系统还包括压座35,进行相似模拟试验时,压座35将上液压缸34的加载力传递至试件箱内的相似材料上。压座35包括上板35a和底板35b,上板35a和底板35b通过立板35c连接为一体结构,立板35c上设置有筋板35d。 The simulation test system also includes a pressure seat 35, which transmits the loading force of the upper hydraulic cylinder 34 to similar materials in the test piece box when similar simulation tests are performed. The pressure seat 35 includes an upper plate 35a and a bottom plate 35b, the upper plate 35a and the bottom plate 35b are connected into one structure through a vertical plate 35c, and a rib plate 35d is arranged on the vertical plate 35c.

在高度方向上,前压座10与左压座7的转角处放置有与前压座10和左压座7接触的第一防干涉座20,左压座7的内侧放置有第二防干涉座21,第一防干涉座20和第二防干涉座21间隔设置。 In the height direction, a first anti-interference seat 20 in contact with the front press seat 10 and the left press seat 7 is placed at the corner of the front press seat 10 and the left press seat 7, and a second anti-interference seat 20 is placed inside the left press seat 7. The seat 21, the first anti-interference seat 20 and the second anti-interference seat 21 are arranged at intervals.

第一防干涉座20远离左压座7一端为楔形结构;第一防干涉座20的顶端为楔形结构;第二防干涉板21靠近前压座10一端为楔形结构。 The end of the first anti-interference seat 20 away from the left pressure seat 7 has a wedge-shaped structure; the top end of the first anti-interference seat 20 has a wedge-shaped structure;

第一反力座24a上设置有滚动导轨25,试件箱可放置在滚动导轨25上。 A rolling guide rail 25 is arranged on the first reaction force seat 24a, and the test piece box can be placed on the rolling guide rail 25 .

底座1的左右两侧均间隔设置有两个拉座22;在试件箱的左右两侧设置有与拉座22相对应的牵引机构。牵引机构包括减速机36,减速机36通过第一联轴器37与第一卷筒38的第一端连接,第一卷筒38的第二端通过第二联轴器39、传动轴40和第三联轴器41与第二卷筒42联接。第一卷筒38和第二卷筒42上缠绕有可与拉座22连接的钢丝绳43。 Two pull seats 22 are arranged at intervals on the left and right sides of the base 1; traction mechanisms corresponding to the pull seats 22 are arranged on the left and right sides of the test piece box. The traction mechanism includes a speed reducer 36, the speed reducer 36 is connected with the first end of the first reel 38 through the first shaft coupling 37, and the second end of the first reel 38 passes through the second coupling 39, the transmission shaft 40 and the first end of the first reel 38. The third coupling 41 is coupled with the second drum 42 . The first reel 38 and the second reel 42 are wound with a wire rope 43 that can be connected with the pull seat 22 .

第二反力座24b的前侧设置有可固定第一卷筒38的钢丝绳的第一钢丝绳固定座44;第二反力座24b的后侧设置有可固定第二卷筒42的钢丝绳的第二钢丝绳固定座45。 The front side of the second reaction force seat 24b is provided with the first steel wire rope fixing seat 44 that can fix the steel wire rope of the first reel 38; Two wire rope holders 45.

第二反力座24b的右侧设置有第三反力座24c,第三反力座24c与反力池23的池底固定,并同时与第二反力座24b通过螺栓固定连接。 The right side of the second reaction force seat 24b is provided with a third reaction force seat 24c, and the third reaction force seat 24c is fixed to the bottom of the reaction force pool 23, and is fixedly connected with the second reaction force seat 24b by bolts simultaneously.

第三反力座24c的右端间隔设置有第一铰接座46和第二铰接座47,底座1的右端设置可分别与第一铰接座46和第二铰接座47铰接的第三铰接座48和第四铰接座49。 The right end of the third reaction force seat 24c is provided with a first hinged seat 46 and a second hinged seat 47 at intervals, and the right end of the base 1 is provided with a third hinged seat 48 and a third hinged seat 48 which can be hinged with the first hinged seat 46 and the second hinged seat 47 respectively. The fourth hinge seat 49.

反力池23在第三反力座24c靠近第二反力座24b一侧的前后两端分别设置有油缸支座51,油缸支座51上铰接有油缸52。油缸52的活塞杆53端部铰接有推力支座54,推力支座54可与试件箱的底座1连接。 The reaction force pool 23 is respectively provided with oil cylinder supports 51 at the front and rear ends of the third reaction force seat 24c near the second reaction force seat 24b, and an oil cylinder 52 is hinged on the oil cylinder support 51. The end of the piston rod 53 of the oil cylinder 52 is hinged with a thrust support 54, and the thrust support 54 can be connected with the base 1 of the test piece box.

前侧板5和后侧板6上对应设置有一列油囊安装孔50。 A row of oil bag mounting holes 50 are correspondingly provided on the front side plate 5 and the rear side plate 6 .

本试验系统按照以下步骤进行模拟试验: The test system carries out the simulation test according to the following steps:

(1)试件箱准备:在右螺孔带14上安装右侧板4,在后螺孔带16上安装后侧板6,从而获得3000mm×3000mm×3000mm尺寸的试件箱;将试件箱的底座1与推力支座54连接,同时使第一铰接座46与第三铰接座48铰接,第二铰接 座47与第四铰接座49铰接;将试件箱通过油缸52的活塞杆53顶升到试验所需的矿层倾角θ,如图1所示。试件箱具体的尺寸大小根据需要进行试验的试件的尺寸而定。 (1) Test piece box preparation: install the right side plate 4 on the right screw hole belt 14, and install the rear side plate 6 on the rear screw hole belt 16 to obtain a test piece box with a size of 3000mm×3000mm×3000mm; place the test piece The base 1 of the box is connected with the thrust support 54, and at the same time the first hinged seat 46 is hinged with the third hinged seat 48, the second hinged seat 47 is hinged with the fourth hinged seat 49; the test piece box is passed through the piston rod 53 of the oil cylinder 52 Jack up to the inclination angle θ of the ore seam required for the test, as shown in Figure 1. The specific size of the test piece box depends on the size of the test piece to be tested.

(2)试件制备:comsol是以有限元法为基础,通过求解偏微分方程(单场)或偏微分方程组(多场)来实现真实物理现象的仿真,目前已经在流体动力学、地球科学、多孔介质、结构力学、传动现象、波的传播等领域得到了广泛的应用,因此对岩层压力场分布规律进行comsol模拟是可行的。利用comsol数值模拟软件对岩层压力分布规律进行数值模拟,以便于各压力传感器能更准确的测量到岩层的应力分布,根据comsol数值模拟软件的模拟结果,得出试件应力测点布置压力传感器的具体位置;按照几何相似比、容重相似比、应力相似比以及强度相似比计算出模型岩石的容重、抗压强度、开挖速度等力学性质参数,通过河砂、石膏、碳酸钙以不同的比例与适量的水搅拌均匀,制作成多个标准试件并在自然状态下风干,对标准试件的单轴抗压强度进行测定,根据强度相似比计算出的抗压强度与不同配比的一系列单轴抗压强度对比,得出各层相似材料的最佳配比,根据各分层的最佳配比和容重,计算出各分层材料所需质量,称出相应配料的质量,将各种配料搅拌均匀,再加入适量水,立即进行搅拌,防止凝结;搅拌均匀后,将配料送入试件箱内,并夯实;在模拟矿层分层之间的表面上均匀地铺一层云母粉作为分层弱面,用壁刀将表面抹平,同时在各分层的指定位置插上测标;依照次序将各分层按以上步骤装好,直到所有岩层都装到试件箱内;同时,根据comsol数值模拟软件的模拟结果布置传感器,并根据各油囊安装孔50的位置在试件内设置油囊模拟煤层,通过充油量控制模拟煤 层的厚度,通过泄油模拟煤层开挖;待相似材料干燥后回复油缸52的活塞杆53,使试件箱回复到水平位置。 (2) Specimen preparation: comsol is based on the finite element method, and realizes the simulation of real physical phenomena by solving partial differential equations (single field) or partial differential equations (multiple fields). Science, porous media, structural mechanics, transmission phenomena, wave propagation and other fields have been widely used, so it is feasible to perform comsol simulation on the distribution of rock formation pressure field. Use the comsol numerical simulation software to numerically simulate the distribution of rock formation pressure, so that each pressure sensor can measure the stress distribution of the rock formation more accurately. Specific location; according to the geometric similarity ratio, bulk density similarity ratio, stress similarity ratio and strength similarity ratio, the mechanical property parameters such as bulk density, compressive strength, and excavation speed of the model rock are calculated, and the river sand, gypsum, and calcium carbonate are used in different proportions. Stir evenly with an appropriate amount of water, make a number of standard specimens and air-dry them in a natural state, measure the uniaxial compressive strength of the standard specimens, and compare the compressive strength calculated according to the strength similarity ratio with a different ratio By comparing the series of uniaxial compressive strengths, the best proportion of similar materials in each layer is obtained. According to the best proportion and bulk density of each layer, the required mass of each layered material is calculated, and the mass of the corresponding ingredients is weighed. Stir all the ingredients evenly, then add appropriate amount of water, and stir immediately to prevent condensation; after stirring evenly, put the ingredients into the test piece box and compact them; spread a layer of mica powder evenly on the surface between the layers of the simulated mine layer As the layered weak surface, smooth the surface with a wall knife, and at the same time insert a measuring mark at the designated position of each layer; install each layer according to the above steps in order, until all rock layers are installed in the test piece box; At the same time, the sensors are arranged according to the simulation results of the comsol numerical simulation software, and the oil pockets are set in the test piece to simulate the coal seam according to the positions of the installation holes 50 of each oil pocket, the thickness of the simulated coal seam is controlled by the amount of oil filling, and the opening of the coal seam is simulated by the oil drainage. Digging; after the similar material is dried, return the piston rod 53 of the oil cylinder 52, so that the test piece box is returned to the horizontal position.

另一方面,udec是一款利用显式解题方案为岩土工程提供精确有效分析的工具,显式解题方案为不稳定物理过程提供稳定解,并可以模拟对象的破坏过程,该软件特别适合于模拟节理岩石系统或者不连续块体集合体系在静力或动力荷载条件下的响应。利用udec数值模拟软件对岩层的岩层变形规律进行数值模拟,对udec数值模拟软件形成的裂隙场进行裂隙提取,得到裂隙分布,并根据提取的裂隙场在试件上布置钻孔位置进行钻孔。 On the other hand, udec is a tool that provides accurate and effective analysis for geotechnical engineering by using explicit problem-solving schemes. Explicit problem-solving schemes provide stable solutions for unstable physical processes and can simulate the failure process of objects. The software is especially It is suitable for simulating the response of jointed rock system or discontinuous block aggregate system under static or dynamic loading conditions. Using udec numerical simulation software to carry out numerical simulation of the deformation law of the rock formation, extract the cracks from the crack field formed by the udec numerical simulation software, obtain the distribution of cracks, and arrange the drilling positions on the test piece according to the extracted crack field for drilling.

(3)加载:在钻孔内放置电视成像仪;拆开试件箱的底座1与推力支座54,同时拆开第一铰接座46与第三铰接座48,第二铰接座47与第四铰接座49;将试件箱通过牵引机构送入第一反力座24a上,并固定试件箱;安装反力架28;以上下方向为Z向,左右方向为X向,前后方向为Y向,采用力控制方式对X向水平加载压力、Y向水平加载压力、Z向垂直加载压力进行加载,加载顺序为: (3) Loading: place a TV imager in the borehole; disassemble the base 1 and the thrust support 54 of the specimen box, and simultaneously disassemble the first hinged seat 46 and the third hinged seat 48, the second hinged seat 47 and the second hinged seat Four articulated seats 49; the test piece box is sent into the first reaction force seat 24a by the traction mechanism, and the test piece box is fixed; the reaction force frame 28 is installed; the up and down direction is the Z direction, the left and right direction is the X direction, and the front and rear direction is In the Y direction, the force control method is used to load the horizontal loading pressure in the X direction, the horizontal loading pressure in the Y direction, and the vertical loading pressure in the Z direction. The loading sequence is:

a)同时加载X向和Y向10秒,然后加载Z向10秒;加载速率恒定为0.05kN/s; a) Simultaneously load the X and Y directions for 10 seconds, then load the Z direction for 10 seconds; the loading rate is constant at 0.05kN/s;

b)重复步骤a); b) repeat step a);

c)同时加载X向和Y向20秒,然后加载Z向20秒;加载速率恒定为0.05kN/s; c) Simultaneously load the X and Y directions for 20 seconds, then load the Z direction for 20 seconds; the loading rate is constant at 0.05kN/s;

d)重复步骤c)至三向加载压力达到预定值,该预定值为工况现场实测的地应力,本实施例中为20KN; d) Repeat step c) until the three-way loading pressure reaches a predetermined value, and the predetermined value is the ground stress measured on site under working conditions, which is 20KN in this embodiment;

e)保持载荷; e) holding load;

f)当Z向垂直加载压力≥5kN,Z向垂直加载压力瞬时下降力≥0.3kN时,三向加载切换为位移控制方式,加载速度为0.1mm/min。 f) When the vertical loading pressure in the Z direction is ≥5kN, and the instantaneous drop force of the vertical loading pressure in the Z direction is ≥0.3kN, the three-way loading is switched to the displacement control mode, and the loading speed is 0.1mm/min.

(4)开挖并观测:煤层的开挖通过微型真空泵抽取油囊中的油。由于开采形成采空区,岩层在地应力的作用下会发生变形,甚至破坏。通过数据采集系统采集岩层在开采过程中由于地应力(外力和自身重力)作用下岩层不同层面的岩层应力、各测点的下沉量、覆岩的垮落高度、破断及离层;通过钻孔电视成像仪观测裂隙的分布范围、单位厚度岩层内离层裂隙的高度、单位厚度的裂隙条数等。 (4) Excavation and observation: The excavation of the coal seam extracts the oil in the oil bag through the micro vacuum pump. Due to the formation of gobs during mining, the rock strata will be deformed or even destroyed under the action of in-situ stress. Through the data acquisition system, the stratum stress at different layers of the strata, the subsidence of each measuring point, the collapse height, fracture and separation of the overlying rock due to the in-situ stress (external force and self-gravity) during the mining process are collected; through drilling The hole TV imager observes the distribution range of cracks, the height of the cracks in the strata per unit thickness, the number of cracks per unit thickness, etc.

通过微型真空泵抽取油囊中的油,从而形成开采层。油的抽取速度根据前述开挖速度确定。开采层的开挖通过抽取油囊中的油来实现,开挖速度通过油囊抽油速度来模拟。如某矿一煤层实际开挖速度为3.6m/d,根据几何相似比α 1=100、时间相似比 计算出模型开挖速度为0.25mm/min,由于油囊大小不一样,抽油速度范围为:0.01L/min-0.5L/min,通常优选为0.025L/min-0.03L/min。本实施例中,抽烟速度为0.028L/min。 The oil in the oil bag is pumped out by a micro-vacuum pump to form a production layer. The oil extraction rate is determined according to the aforementioned excavation rate. The excavation of the production layer is realized by pumping the oil in the oil bag, and the excavation speed is simulated by the oil pumping speed of the oil bag. For example, the actual excavation speed of a coal seam in a certain mine is 3.6m/d, according to the geometric similarity ratio α 1 =100, the time similarity ratio The model excavation speed is calculated to be 0.25mm/min. Due to the different sizes of the oil pockets, the oil pumping speed range is: 0.01L/min-0.5L/min, usually preferably 0.025L/min-0.03L/min. In this embodiment, the smoking speed is 0.028L/min.

步骤(3)中,根据研究需要,可对不同加载方式和保载时间进行设置,若是研究岩体的松弛,一开始就用位移控制加载,将位移达到预定值。 In step (3), different loading methods and holding time can be set according to the needs of the research. If the relaxation of the rock mass is studied, the displacement control loading is used at the beginning to bring the displacement to a predetermined value.

步骤(3)中,待开挖矿层引起岩体在预定荷载下破坏失稳的时间根据预定荷载值达到岩体开挖后所能承受的应力峰值的百分比不同而不同,在此期间载荷保持稳定,直至岩体失稳。 In step (3), the time for the rock mass to fail and become unstable under the predetermined load due to the mine layer to be excavated varies according to the percentage of the predetermined load value reaching the peak stress that the rock mass can withstand after excavation, and the load remains stable during this period , until the rock mass loses stability.

步骤(3)中,因为岩体失稳后无法承受之前预定的载荷,但岩体依然还有一定的承载能力,切换成位置加载后,可以研究岩体失稳的应力—应变特征,这对指导工程实践有一定的指导意义。 In step (3), because the rock mass cannot bear the pre-determined load after the instability, the rock mass still has a certain bearing capacity. After switching to position loading, the stress-strain characteristics of the rock mass instability can be studied. It has certain guiding significance to guide engineering practice.

本实施例中,根据右侧板4和后侧板6安装的其他两个具体位置,可获得 1000mm×1000mm×1000mm或2000mm×2000mm×2000mm尺寸的试件箱,但这不影响后续的试验操作。但由于试件箱尺寸较小,可能会影响尺寸变小方向上液压缸的加载,因此可在相应方向上设置垫板传力,以达到基本相同的技术效果。 In this embodiment, according to the other two specific positions where the right side plate 4 and the rear side plate 6 are installed, a test piece box with a size of 1000mm×1000mm×1000mm or 2000mm×2000mm×2000mm can be obtained, but this does not affect the subsequent test operation . However, due to the smaller size of the test piece box, it may affect the loading of the hydraulic cylinder in the direction of smaller size, so the force transmission of the backing plate can be set in the corresponding direction to achieve basically the same technical effect.

以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。 The preferred specific embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make many modifications and changes according to the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning or limited experiments on the basis of the prior art shall be within the scope of protection defined by the claims.

Claims (9)

1. three-dimensional loads a large-scale three dimensional resemble simulation test system, comprises test piece box and counter force system, it is characterized in that:
Described test piece box comprises base (1); The edge of described base (1) is provided with and forms foursquare left screw band (13), right screw band (14), front screw band (15) and rear bolt hole band (16); Described base (1) has been bolted to connection left plate (3) at described left screw band (13) place, has been bolted to connection front side board (5) at described front screw band (15) place;
At least one first middle screw pore area (17) is provided with between described right screw band (14) and described left screw band (13); The second middle screw pore area (18) that is corresponding with described first middle screw pore area (17) quantity, vertical connection is provided with between described rear bolt hole band (16) with described front screw band (15); The the first middle screw pore area (17) connected and the second middle screw pore area (18) form square with described left screw band (13) and right screw band (14); Described right screw band (14) or arbitrary described first middle screw pore area (17) have been bolted to connection right plate (4); The described rear bolt hole band (16) connected with described right plate (14) or arbitrary described second middle screw pore area (18) have been bolted to connection back side panel (6); Described back side panel (6) is provided with sensor wiring hole (19); The outside spacers of described back side panel (6) is fixed with the first backing plate (31);
The inner side of described left plate (3) has been bolted to connection left wedge (7); Described left plate (3) is provided with left gland (9) by equal subregion; Described left wedge (7) is fixed with quantity and the position left depression bar (8) corresponding with described left gland (9); Described left depression bar (8) passes described left gland (9);
The inner side of described front side board (5) has been bolted to connection front wedge (10); Described front side board (5) is provided with front gland (11) by equal subregion; Described front wedge (10) is fixed with quantity and the position forward press (12) corresponding with described front gland (11); Described forward press (12) passes described front gland (11);
Described left wedge (7) and described front wedge (10) interval are arranged;
Described counter force system comprises and is positioned at underground concrete counter-force pond (23); The bottom of described counter-force pond (23) is provided with the first counter-force seat (24a) be fixedly connected with described counter-force pond (23); The right side of described first counter-force seat (24a) is provided with the second counter-force seat (24b); Fix at the bottom of described second counter-force seat (24b) and the pond of described counter-force pond (23), and be bolted to connection with described first counter-force seat (24a) simultaneously;
Described counter-force pond (23) is provided with in the left side of described test piece box and is fixedly connected with described first counter-force seat (24a), and near the side heavy frame (26) of concrete wall surface; Described side heavy frame (26) is fixed with quantity and the position left hydraulic cylinder (27) corresponding with described left depression bar (8); Described counter-force pond (23) is provided with on the right side of described test piece box and described second counter-force seat (24b) bolted reaction frame (28); Described reaction frame (28) can be bolted to connection with described test piece box;
The front portion of described first counter-force seat (24a) is fixed with front column (29); One end face of described front column (29) is near the concrete wall surface of described counter-force pond (23), and other end is fixed with quantity and the position front hydraulic cylinder (30) corresponding with described forward press (12);
The rear portion of described first counter-force seat (24a) is fixed with rear column (33); One end face of described rear column (33) near the concrete wall surface of described counter-force pond (23), other end be fixed with quantity and position corresponding with described first backing plate (31) and second backing plate (32) of described first backing plate (31) can be close to;
Described front column (29) and rear column (33) connect as one structure by the crossbeam (55) that top is fixing; Described crossbeam (55) is above uniform is provided with the upper hydraulic cylinder (34) relative with described test piece box;
Described three-dimensional loads large-scale three dimensional resemble simulation test system and also comprises the first wedge (35); When carrying out resemble simulation test, the loading force of described upper hydraulic cylinder (34) is passed on the analog material in described test piece box by described first wedge (35).
2. three-dimensional as claimed in claim 1 loads large-scale three dimensional resemble simulation test system, it is characterized in that: in the height direction, described front wedge (10) and the corner of described left wedge (7) are placed with the first anti-interference seat (20) contacted with left wedge (7) with described front wedge (10); The inner side of described left wedge (7) is placed with the second anti-interference seat (21); Described first anti-interference seat (20) and the second anti-interference seat (21) interval are arranged.
3. three-dimensional as claimed in claim 2 loads large-scale three dimensional resemble simulation test system, it is characterized in that: described first anti-interference seat (20) is wedge structure away from described left wedge (7) one end; The top of described first anti-interference seat (20) is wedge structure; Described second anti-interference plate (21) is wedge structure near described front wedge (10) one end.
4. three-dimensional as claimed in claim 1 loads large-scale three dimensional resemble simulation test system, it is characterized in that: described first counter-force seat (24a) is provided with rolling guide (25); Described test piece box can be placed on described rolling guide (25);
The left and right sides of described base (1) is provided with pulling seat (22); The left and right sides of described test piece box is provided with the haulage gear corresponding with described pulling seat (22).
5. three-dimensional as claimed in claim 4 loads large-scale three dimensional resemble simulation test system, it is characterized in that: the left and right sides of described base (1) is all arranged at intervals with two pulling seats (22); Described haulage gear comprises reductor (36); Described reductor (36) is connected by the first end of the first shaft coupling (37) with the first reel (38); Second end of described first reel (38) is connected with the second reel (42) by the second shaft coupling (39), transmission shaft (40) and the 3rd shaft coupling (41); Described first reel (38) with the second reel (42) is wound with the wire rope (43) that can be connected with described pulling seat (22).
6. three-dimensional as claimed in claim 5 loads large-scale three dimensional resemble simulation test system, it is characterized in that: the front side of described second counter-force seat (24b) is provided with the first wire rope holder (44) of the wire rope can fixing described first reel (38); The rear side of described second counter-force seat (24b) is provided with the second wire rope holder (45) of the wire rope can fixing described second reel (42).
7. three-dimensional as claimed in claim 1 loads large-scale three dimensional resemble simulation test system, it is characterized in that: described first wedge (35) comprises upper plate (35a) and base plate (35b), described upper plate (35a) and base plate (35b) connect as one structure by riser (35c); Described riser (35c) is provided with gusset (35d).
8. the three-dimensional as described in as arbitrary in claim 1 to 7 loads large-scale three dimensional resemble simulation test system, it is characterized in that:
The right side of described second counter-force seat (24b) is provided with the 3rd counter-force seat (24c); Fix at the bottom of described 3rd counter-force seat (24c) and the pond of described counter-force pond (23), and be bolted to connection with described second counter-force seat (24b) simultaneously;
The right-hand member of described 3rd counter-force seat (24c) is arranged at intervals with the first hinged seat (46) and the second hinged seat (47); The right-hand member of described base (1) arrange can respectively with described first hinged seat (46) and hinged the 3rd hinged seat (48) of the second hinged seat (47) and the 4th hinged seat (49);
Described counter-force pond (23) is respectively arranged with cylinder support (51) at described 3rd counter-force seat (24c) near the rear and front end of described second counter-force seat (24b) side; Described cylinder support (51) is hinged with oil cylinder (52); Piston rod (53) end of described oil cylinder (52) is hinged with thrust bearing (54); Described thrust bearing (54) can be connected with the base of described test piece box (1).
9. the three-dimensional as described in as arbitrary in claim 1 to 7 loads large-scale three dimensional resemble simulation test system, it is characterized in that: described front side board (5) and back side panel (6) are gone up correspondence and be provided with at least one row oil sac mounting hole (50).
CN201210376520.3A 2012-09-29 2012-09-29 Three-way load large-scale three-dimensional analog simulation test system Expired - Fee Related CN102879549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210376520.3A CN102879549B (en) 2012-09-29 2012-09-29 Three-way load large-scale three-dimensional analog simulation test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210376520.3A CN102879549B (en) 2012-09-29 2012-09-29 Three-way load large-scale three-dimensional analog simulation test system

Publications (2)

Publication Number Publication Date
CN102879549A CN102879549A (en) 2013-01-16
CN102879549B true CN102879549B (en) 2015-07-08

Family

ID=47480950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210376520.3A Expired - Fee Related CN102879549B (en) 2012-09-29 2012-09-29 Three-way load large-scale three-dimensional analog simulation test system

Country Status (1)

Country Link
CN (1) CN102879549B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114827B (en) * 2013-01-23 2016-09-28 重庆大学 Multi-scenarios method coal bed gas extraction simulation experiment method
CN103335829B (en) * 2013-06-21 2016-02-10 上海航天精密机械研究所 A kind of general three-dimensional switching charger and three-dimensional charger thereof
CN103454103B (en) * 2013-07-11 2015-07-15 北京工业大学 Loading device for geotechnical engineering large-sized three-dimensional comprehensive simulation test bed
CN103452144B (en) * 2013-07-11 2015-07-15 北京工业大学 Large-scale three-dimensional comprehensive simulation test bench for geotechnical engineering
CN103675235B (en) * 2013-12-13 2015-11-11 北京工业大学 Variable displacement heavy machine tool foundation model case
CN103760096B (en) * 2014-01-16 2016-06-01 中国矿业大学 A kind of side direction pressurization analog simulation experimental device and experimental technique
CN103901167B (en) * 2014-03-29 2015-07-22 北京工业大学 High-pressure inflatable raft mat testing device and method for simulating coal seam mining
CN104297067B (en) * 2014-09-22 2016-09-07 山东科技大学 A kind of equivalent material simulating semi-flexible loading experimental apparatus and experimental technique thereof
CN104502565B (en) * 2014-12-31 2016-04-06 马新足 Two-dimensional solid hot gas THM coupling physical simulation experiment table
CN104677581B (en) * 2015-02-10 2017-03-15 西安建筑科技大学 Charger and the bean column node shock test system based on the charger
CN106290783B (en) * 2016-07-29 2018-11-23 湖南科技大学 Horizontal multi-angle mining plane analog simulation experimental device and experimental method
CN106759534B (en) * 2016-11-09 2019-05-17 北京工业大学 A kind of three direction type variable heavy machine tool foundation model case of controllable boundary condition
CN106769127B (en) * 2016-11-15 2019-03-19 重庆大学 Three-dimensional loads three-dimensional analog simulation test and excavates system and method
CN107192602A (en) * 2017-07-11 2017-09-22 兰州交通大学 A kind of high ground stress soft rock stress tunnel indoor model test equipment and system
CN108131542B (en) * 2017-11-29 2020-01-17 中国神华能源股份有限公司 Platform support, experiment platform and construction method thereof
CN109708972A (en) * 2019-02-27 2019-05-03 重庆大学 A large-scale three-dimensional similarity simulation test system combining three-dimensional loading and fixed-point dynamic loading
CN110274928A (en) * 2019-07-03 2019-09-24 重庆大学 The simulation experiment method of coal and rock HEAT TRANSFER LAW under deep mining Geothermal Conditions
CN110455635B (en) * 2019-08-27 2024-07-02 武汉科技大学 Model size adjustable analogue simulation test loading device
CN117554144B (en) * 2024-01-11 2024-03-22 中国矿业大学(北京) Tunnel physical model test device

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3728895A (en) * 1970-12-18 1973-04-24 Trw Inc Triaxial compression test apparatus
SU1345095A1 (en) * 1986-04-03 1987-10-15 Производственный И Научно-Исследовательский Институт По Инженерным Изысканиям В Строительстве Госстроя Ссср Arrangement for loading ground-testing device
SU1352315A1 (en) * 1986-04-24 1987-11-15 Московский Инженерно-Строительный Институт Им.В.В.Куйбышева Device for investigating dynamic properties of grounds
CN101285808A (en) * 2008-05-29 2008-10-15 山东大学 High ground stress true three-dimensional loading model test system
CN101344444A (en) * 2008-08-18 2009-01-14 山东大学 High ground stress quasi-3D visualization model test bench device
CN101377479A (en) * 2008-09-25 2009-03-04 山东科技大学 Stope mine pressing three-dimensional physical simulation test stand
CN101514977A (en) * 2009-03-03 2009-08-26 山东大学 Three-dimensionally loaded guide frame device for underground project model test
CN101539491A (en) * 2009-04-17 2009-09-23 山东大学 Device for testing model with three-dimensional gradient nonuniform loading structure
CN102175517A (en) * 2011-02-16 2011-09-07 山东大学 Large-size freely combined model test device for high ground stress underground engineering
CN102446447A (en) * 2011-08-30 2012-05-09 中国矿业大学(北京) Three-dimensional model testing system of deep mine construction engineering
CN202351236U (en) * 2011-11-18 2012-07-25 中国矿业大学(北京) Optical measurement mechanics experimental apparatus for simulating deep rock blast cracking

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3728895A (en) * 1970-12-18 1973-04-24 Trw Inc Triaxial compression test apparatus
SU1345095A1 (en) * 1986-04-03 1987-10-15 Производственный И Научно-Исследовательский Институт По Инженерным Изысканиям В Строительстве Госстроя Ссср Arrangement for loading ground-testing device
SU1352315A1 (en) * 1986-04-24 1987-11-15 Московский Инженерно-Строительный Институт Им.В.В.Куйбышева Device for investigating dynamic properties of grounds
CN101285808A (en) * 2008-05-29 2008-10-15 山东大学 High ground stress true three-dimensional loading model test system
CN101344444A (en) * 2008-08-18 2009-01-14 山东大学 High ground stress quasi-3D visualization model test bench device
CN101377479A (en) * 2008-09-25 2009-03-04 山东科技大学 Stope mine pressing three-dimensional physical simulation test stand
CN101514977A (en) * 2009-03-03 2009-08-26 山东大学 Three-dimensionally loaded guide frame device for underground project model test
CN101539491A (en) * 2009-04-17 2009-09-23 山东大学 Device for testing model with three-dimensional gradient nonuniform loading structure
CN102175517A (en) * 2011-02-16 2011-09-07 山东大学 Large-size freely combined model test device for high ground stress underground engineering
CN102446447A (en) * 2011-08-30 2012-05-09 中国矿业大学(北京) Three-dimensional model testing system of deep mine construction engineering
CN202351236U (en) * 2011-11-18 2012-07-25 中国矿业大学(北京) Optical measurement mechanics experimental apparatus for simulating deep rock blast cracking

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
土与结构接触面三维静动力变形规律与本构模型研究;侯文峻;《中国博士学位论文数据库》;20091231;全文 *
大型地下工程三维可加载物理模拟实验方法研究;张艳丽;《中国优秀硕士学位论文数据库》;20101231;全文 *
煤与瓦斯突出模拟试验台的研制与应用;许江;《岩石力学与工程学报》;20081130;第 27 卷(第 11 期);2354-2362 *

Also Published As

Publication number Publication date
CN102879549A (en) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102879549B (en) Three-way load large-scale three-dimensional analog simulation test system
CN102866241B (en) Three-directionally-loaded large-scale three-dimensional similarity simulation test method
CN102879547B (en) Three-direction loading large-scale three-dimensional analog simulation test counterforce system
CN102879284B (en) Triaxial-loading large three-dimensional similar simulation test sample box
CN102879548B (en) Three-direction loading large-scale three-dimensional analog simulation test sampling method
Zheng et al. Stability analysis of the middle soil pillar for asymmetric parallel tunnels by using model testing and numerical simulations
Li et al. Model test study on surrounding rock deformation and failure mechanisms of deep roadways with thick top coal
Yang et al. Large-scale model experiment and numerical simulation on convergence deformation of tunnel excavating in composite strata
CN102879550B (en) Three-dimensional loads the load simulated method of large-scale three dimensional resemble simulation test
Zhang et al. Large-scale geo-mechanical model tests for the stability assessment of deep underground complex under true-triaxial stress
Liu et al. Stability analyses of vertically exposed cemented backfill: A revisit to Mitchell’s physical model tests
CN104833537B (en) A similar model test device for simulating tunnel construction
Zhu et al. Failure and stability analysis of deep soft rock roadways based on true triaxial geomechanical model tests
Cengiz et al. Shaking table tests on geosynthetic encased columns in soft clay
CN104266913B (en) Mining failure simulation test device for mine working face floor
El Sawwaf et al. The effect of deep excavation-induced lateral soil movements on the behavior of strip footing supported on reinforced sand
CN108868770A (en) A kind of filling mining rock stratum position state is precisely controlled design method
Zhou et al. Deformation characteristics and failure evolution process of the existing metro station under unilateral deep excavation
CN211602719U (en) Stope mine pressure three-dimensional physical simulation test platform of multi-functional top bottom plate gushing water
Zhao et al. Distribution characteristics of floor pore water pressure based on similarity simulation experiments
Li et al. Bidirectional construction process mechanics for tunnels in dipping layered formation
CN104237025A (en) Mining fracturing simulating test method for sealing drilling
Le et al. Experimental study on the effect of granular backfill with various gradations on the mechanical behavior of rock
Dang et al. Complex analysis of shear box tests with explicit consideration of interaction between test device and sample
Zhuo et al. Analysis of cracking development and mechanical characteristics of high-filled cut-and-cover tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20210929

CF01 Termination of patent right due to non-payment of annual fee