CN102849092B - 隧道台车可视化定位监测系统 - Google Patents
隧道台车可视化定位监测系统 Download PDFInfo
- Publication number
- CN102849092B CN102849092B CN201210314643.4A CN201210314643A CN102849092B CN 102849092 B CN102849092 B CN 102849092B CN 201210314643 A CN201210314643 A CN 201210314643A CN 102849092 B CN102849092 B CN 102849092B
- Authority
- CN
- China
- Prior art keywords
- laser
- chassis
- tunnel
- trolley
- monitoring system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 16
- 230000007246 mechanism Effects 0.000 claims description 12
- 230000000007 visual effect Effects 0.000 claims description 11
- 238000005286 illumination Methods 0.000 claims description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 239000000428 dust Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000010009 beating Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000005465 channeling Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Landscapes
- Length Measuring Devices By Optical Means (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210314643.4A CN102849092B (zh) | 2012-08-30 | 2012-08-30 | 隧道台车可视化定位监测系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210314643.4A CN102849092B (zh) | 2012-08-30 | 2012-08-30 | 隧道台车可视化定位监测系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102849092A CN102849092A (zh) | 2013-01-02 |
CN102849092B true CN102849092B (zh) | 2015-06-03 |
Family
ID=47396183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210314643.4A Active CN102849092B (zh) | 2012-08-30 | 2012-08-30 | 隧道台车可视化定位监测系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102849092B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888706B (zh) * | 2016-06-13 | 2019-01-15 | 中国葛洲坝集团基础工程有限公司 | 一种可移动升降的多功能钢台车及顶拱弧板钢罩安装方法 |
DE102017124303A1 (de) * | 2017-10-18 | 2019-04-18 | Grob-Werke Gmbh & Co. Kg | Verfahren und Vorrichtung zur Montage einer Drahtführung an einem Brennerkopf für eine Beschichtungsanlage |
CN108316949B (zh) * | 2018-02-08 | 2023-05-26 | 中铁五局集团有限公司 | 隧道顶拱无空洞衬砌方法 |
CN109057825B (zh) * | 2018-08-06 | 2020-05-29 | 长沙泽和智能科技有限公司 | 一种衬砌台车模板自动调节对中的装置及应用于所述装置的控制方法 |
CN110470149A (zh) * | 2019-07-18 | 2019-11-19 | 首钢京唐钢铁联合有限责任公司 | 一种台车动态跟踪方法和装置 |
CN111538353B (zh) * | 2020-05-12 | 2021-10-19 | 南京航空航天大学 | 一种隧道检测车稳定装置 |
CN111911211B (zh) * | 2020-07-06 | 2022-06-28 | 中铁十六局集团北京轨道交通工程建设有限公司 | 一种用于盾构重叠隧道施工中的可视化自动支撑行走台车及施工方法 |
CN113215991B (zh) * | 2021-04-25 | 2022-11-04 | 邵阳公路桥梁建设有限责任公司 | 钢箱梁快速架设装置及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2741149A1 (fr) * | 1995-11-09 | 1997-05-16 | Sol Comp Du | Cible de visee, notamment pour le guidage d'un appareil de forage tel qu'un tunnelier |
DE10352719A1 (de) * | 2003-11-12 | 2005-06-23 | Wente, Holger, Dr.-Ing. | Verfahren zur Ausrichtung von zwei Objekten und Laser-Zielplatteneinheit sowie Punktstrahlereinheit hierzu |
CN2744727Y (zh) * | 2004-12-03 | 2005-12-07 | 张新如 | 多功能轨道尺 |
CN201535666U (zh) * | 2009-12-11 | 2010-07-28 | 北京市市政工程研究院 | 顶管机的机头姿态自动测量装置 |
CN102650211A (zh) * | 2012-05-22 | 2012-08-29 | 湖南五新重型装备有限公司 | 直线及曲线段隧洞通用式钢模衬砌台车 |
CN202765036U (zh) * | 2012-08-30 | 2013-03-06 | 中国葛洲坝集团股份有限公司 | 隧道台车可视化定位监测系统 |
-
2012
- 2012-08-30 CN CN201210314643.4A patent/CN102849092B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2741149A1 (fr) * | 1995-11-09 | 1997-05-16 | Sol Comp Du | Cible de visee, notamment pour le guidage d'un appareil de forage tel qu'un tunnelier |
DE10352719A1 (de) * | 2003-11-12 | 2005-06-23 | Wente, Holger, Dr.-Ing. | Verfahren zur Ausrichtung von zwei Objekten und Laser-Zielplatteneinheit sowie Punktstrahlereinheit hierzu |
CN2744727Y (zh) * | 2004-12-03 | 2005-12-07 | 张新如 | 多功能轨道尺 |
CN201535666U (zh) * | 2009-12-11 | 2010-07-28 | 北京市市政工程研究院 | 顶管机的机头姿态自动测量装置 |
CN102650211A (zh) * | 2012-05-22 | 2012-08-29 | 湖南五新重型装备有限公司 | 直线及曲线段隧洞通用式钢模衬砌台车 |
CN202765036U (zh) * | 2012-08-30 | 2013-03-06 | 中国葛洲坝集团股份有限公司 | 隧道台车可视化定位监测系统 |
Also Published As
Publication number | Publication date |
---|---|
CN102849092A (zh) | 2013-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102849092B (zh) | 隧道台车可视化定位监测系统 | |
CN106382121B (zh) | 一种地铁隧道盾构掘进的测量方法 | |
JP4559346B2 (ja) | 支保工建て込み方法及び支保工建て込みシステム | |
JP6188061B2 (ja) | トンネル計測システム | |
CN108398955B (zh) | 一种掘进机姿态控制系统及方法 | |
CN109974715B (zh) | 捷联惯导和光斑识别组合的掘进机自主导航系统及方法 | |
CN103201590A (zh) | 测量和标记沿水平延伸的轮廓线的空间点的装置 | |
CN108195364B (zh) | 用于锚杆钻机的作业定位系统 | |
RU2436043C1 (ru) | Способ согласования осей инерциальной навигационной системы с осью наземного транспортного средства и измерительный комплекс для его осуществления | |
CN105021140A (zh) | 基于激光准直技术的靶板调校装置 | |
CN102778222B (zh) | 一种隧道衬砌台车定位系统 | |
CN202765036U (zh) | 隧道台车可视化定位监测系统 | |
JP2000275044A (ja) | 柱の建込み計測方法及びその装置 | |
JP2023050332A (ja) | 測量システム | |
KR101208591B1 (ko) | 야간 시준을 위한 시설물측량용 반사체 | |
CN211783473U (zh) | 一种用于盾构机姿态检测的电子激光靶装置 | |
JP3323779B2 (ja) | 反射プリズム付き測量器械 | |
JP3429046B2 (ja) | 位置計測投光装置および投光装置取り付け構造 | |
CN106482703A (zh) | 一种具有测距功能的经纬仪及其工作方法 | |
CN207335711U (zh) | 一种全站仪坐标放样测量的棱镜装置 | |
RU2657334C1 (ru) | Способ согласования линии визирования оптического прибора с продольной осью наземного транспортного средства | |
CN105592294A (zh) | 一种vsp激发炮群的监控系统 | |
CN206300636U (zh) | 一种具有测距功能的经纬仪 | |
JP7364185B2 (ja) | 支保工建込方法および支保工建込システム | |
CN102979530A (zh) | 煤矿巷道挖掘防偏移系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENG Free format text: FORMER OWNER: CHINA GEZHOUBA GROUP CO., LTD.;SANXIA UNIVERSITY Effective date: 20140623 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 443002 YICHANG, HUBEI PROVINCE TO: 443000 YICHANG, HUBEI PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140623 Address after: 443000 Dongshan Avenue, Hubei, Yichang, No. 11 Applicant after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. Applicant after: Hunan Wuxin Heavy Equipment Co., Ltd. Address before: 443002 Hubei province Yichang City Road No. 1 Applicant before: China Gezhouba Group Co., Ltd. Applicant before: Hunan Wuxin Heavy Equipment Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 443000 Dongshan Avenue, Hubei, Yichang, No. 11 Patentee after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. Patentee after: HUNAN WUXIN TUNNEL INTELLIGENT EQUIPMENT CO., LTD. Address before: 443000 Dongshan Avenue, Hubei, Yichang, No. 11 Patentee before: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. Patentee before: Hunan Wuxin Heavy Equipment Co., Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210708 Address after: 443000 No.11 Dongshan Avenue, Yichang City, Hubei Province Patentee after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING Co.,Ltd. Patentee after: HUNAN WUXIN TUNNEL INTELLIGENT EQUIPMENT Co.,Ltd. Patentee after: CHINA GEZHOUBA GROUP FIRST ENGINEERING Co.,Ltd. Address before: 443000 No.11 Dongshan Avenue, Yichang City, Hubei Province Patentee before: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING Co.,Ltd. Patentee before: HUNAN WUXIN TUNNEL INTELLIGENT EQUIPMENT Co.,Ltd. |